Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

Similar documents
STANDARD 3-PIECE CULTURED MARBLE PANEL INSTALLATION GUIDE

Wall Panel Installation

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL

Product number: TS-CS/6 x 24 - TB - S

Installation Instructions for Mincey Marble Manufacturing s. Windowsill Line and Edge Options

Installation Instructions for Mincey Marble Manufacturing s 30 Wall Mount Accessories Ledge. Product number: SS-03-30

Product number: FR-03

BARRIER FREE SHOWER PAN INSTALLATION INSTRUCTIONS

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Ideal supports for dry vertical adhesion are: Ideal supports for wet applications are:

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Comfort Designs with Swan Solid Surface

Before You Begin... TOOLS & PRODUCT INVENTORY

Installation Instructions for Mincey Marble Manufacturing s Napoli Straight Barn Door Shower Enclosures

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Titan Installation Instructions

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

Frameless Bypass Slider

Tape Measure Metal Clippers Screw Bit Set With Extensions

INSTALLATION INSTRUCTIONS

Installation Instructions

Frameless Bypass Slider

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

FITS MUSTEE 32 X 32 SHOWER RECEPTOR

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Installation Instructions for easy to install Texture Plus faux wall panels

Frameless Inline Door QCI5248

Pocket Door Installation Instructions

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

60 DIRECT-TO-STUD SHOWER WALL SET

Frameless Fixed Panel Slider

VANITY INSTALLATION INSTRUCTIONS

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

SHELTON THERMOSTATIC SHOWER PANEL

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Frameless Inline Door With Return QCI5263

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

A-935 RODA WALL MOUNT HINGES

Frameless Inline Door QCI5254

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Installation Instructions

UNIT No FRAMELESS PIVOT SHOWER DOOR

INSTALLATION INSTRUCTIONS

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

Frameless Fixed Panel Slider QCI5279

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Frameless Inline Door QCI5250

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

FIXED PANEL SLIDER QCI5241

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

TUB SHOWER Framed Sliding Enclosure

CAELI THERMOSTATIC SHOWER PANEL

Installation Instructions

Two Panel Frameless Bypass Door

MUSTEE FIBERGLASS SHOWERWALL

Frameless Heavy Glass Door with Wall Mount Hinges

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

Install Instructions for Corvallis #4008GRC Mantel

Low Base 3, 4 and 5-Piece Showers with SnapJoint 3/4/5 LBS SJ

Vanity Installation Instructions

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

890 SERIES PIVOT STEAM DOOR

Frameless Door QCI5284

Model 5400H / 7000H Illustrated Installation Instructions

Super 2.5-EZ. Sheetrock Wall. Sheetrock Wall 10'-10" 2.5V-EZ 2.5V-EZ 2.5A-EZ

UNIT No. 8150/9150 SHOWER ENCLOSURE

Curium 19.4H Installation Instructions & Parts List

CALLAS THERMOSTATIC SHOWER SET

Unit No. 6150, 7150 Deluxe Framed Sliding Tub/Shower Enclosure

Double Frameless Swing Door QCI5247

Swanstone Wall Kits and Panels

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Chapter 14. Wall Sheetrock

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

How to Install Elite Bayside Beadboard

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

Radon 07 Installation Instructions & Parts List

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Balustrade Systems / Installation Instructions

RECOMMENED TOOLS FOR MACHINING COUNTERTOPS

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Frameless Inline Door QCI5288

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support.

Transcription:

, inc. Mincey Marble Mfg., Inc. 4321 Browns Bridge Road Gainesville, GA 30504 Ph: 800.533.1806 Fx: 770.531.0935 www.minceymarble.com Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling] PRE-INSTALLATION CHECKLIST AND NOTES MATERIALS / TOOLS NEEDED CHECKLIST STANDARD PANEL INSTALLATION ATTENTION: Prior to starting the installation, please read through these instructions. This will help avoid any unneccesary breakage. Any breakage due to handling or installing the panels are the responsibility of the installer and is not covered under the Mincey Warranty. These installation instructions apply to all standard Mincey 3-piece panel systems where the panels do not extend to the ceiling and each wall is manufactured in one piece. If your project is using panels that extend to the ceiling, please refer to the instructions labeled: Installation Instructions for panels that extend to the ceiling. Drawings Are Not To Scale. If your project requires the back or sidewalls to be manufactured in more than one piece per wall, please use the instructions labeled Installation Instructions for large 2 piece back panels. These instances will occur only when your back wall is larger then 62 wide, or when any of the walls are more than 96 tall. PRE-INSTALLATION CHECKLIST AND NOTES Our Cast Marble panels are more fragile in extremely cold temperatures, and should be handled with care in these conditions. When possible, store all material in a heated area at least 24 hours prior to installation. If you are installing grab bars, blocking should always be placed in the proper location prior to the wall substrate being installed. We recommend using a 2 x 6 on end. Our panels are not designed to support the tension placed on the bar. Once the Mincey panels are installed, all screw holes must be pre-drilled through the panels large enough so that no screw threading comes in contact with the panel. This will prevent damage to the panel. Tighten all screws carefully, the panels can be cracked or broken if over-tightened. SUBSTRATE (Sheetrock, etc.) CAST MARBLE PANEL 2 x 6 BLOCKING 2 x 4 STUD CAST MARBLE PANEL SCREW GRAB BAR HOLE IN PANEL

PRE-INSTALLATION CHECKLIST AND NOTES (cont.) 2 When installing a Mincey Panel System over existing tile, make sure the tile is well adhered to the substrate and is clean of mold and mildew. Then, follow all standard instructions for cutting and installing the panels - EXCEPT - use only 100% Silicone for the adhesive. The silicone will provide better adhesion to the tile than the construction or cast marble adhesive. EXISTING TILE CAST MARBLE PANEL SUBSTRATE (Sheetrock, etc.) 2 TRIM STRIP (continues to top of panel) The Tub or Shower Pan must be set in place before the Substrate can be installed. (Please see Shower Pan Installation Instructions for installing the Pan.) The Shower Pans and Tubs have a Leak-proof Flange attached to them. The Wall Substrate must be thick enough so that when the Panels are installed, they are ush with the wall while covering the Flange without bowing out at the bottom. (See diagram below.) SUBSTRATE CAST MARBLE PANEL FRAMING FLANGE SHOWER PAN INTEGRAL CURB SUB-FLOOR Standard Substrate Installation Fire-rated Substrate installation will require two layers of Substrate be installed. The rst layer should be installed before the pan and all the way to the Sub- oor. The second layer should be installed stopping just above the Fiberglass Flange. The second layer of Substrate will allow the Shower Panels to be installed from the surface of the Pan or Tub upward without the Shower Panels bowing out. (See diagram below.) SUBSTRATE CAST MARBLE PANEL FRAMING FLANGE SHOWER PAN INTEGRAL CURB SUB-FLOOR Fire-Rated Substrate Installation

PRE-INSTALLATION CHECKLIST AND NOTES (cont.) 3 When following Fire-rated requirements, the Substrate must be installed all the way to the Sub- oor. When the Shower Panels are installed, they must extend over the Attached Flange all the way to the Shower Pan oor. If only one piece of Substrate is used, the Shower Panel will bow out at the bottom to cover the Flange. (See diagrams below) SUBSTRATE CAST MARBLE PANEL FLANGE PAN SUB-FLOOR ATTENTION: Please follow these Mincey Panel Installation Instructions carefully. If you are installing a panel that has a tile pattern for instance, the process is explained in detail in these instructions. If these instructions are not followed exactly, the grout joints will not align from panel to panel. Misalignment is the number one factor creating customer dissatisfaction and requiring the purchase of additional material. As a general rule, in order to install the panels correctly, you will need to trim the panels on all sides following these instructions very closely. MATERIALS / TOOLS NEEDED CHECKLIST Circular Saw with a Masonry Blade Drill / Various Drill Bits Mask - for when cutting panels Measuring Tape Pencil - for marking measurements on front of panels for cutting and installing, the pencil marks can be removed by Acetone once installed Hole Saw - for drilling plumbing xtures (Diamond Hole Saw is recommended, 1 1 4 and 4 are the most common, however, sizes will vary according to the speci c job requirements Saw Horses 2 x 4 s to place over saw horses to support panels when cutting 4 Level 80 Grit Sandpaper - for sanding a light bevel edge on cut edges to eliminate chipping the nish upon install Acetone for cleanup of markings and general panel cleanup Dry, Clean Rags Commercial Quality Hot Glue Gun Commercial Quality 15 Glue Sticks Construction Adhesive or Cast Marble Adhesive for applying panels to the Substrate (Sheetrock, etc.) 100% Silicone - for all panel to panel, panel to tub and panel to pan seams, also applying panel to existing tile Latex Caulking - for all ends where the panel is caulking to the sheetrock or the ceiling

HOW TO INSTALL STANDARD 3-PIECE PANELS - NOT EXTENDING TO THE CEILING 4 First, make sure the Shower Pan or Tub is level from front to back, side to side and diagonally. The maximum tolerance is +/- 1 4. If the Pan or Tub is over 1 4 out or level in any direction, you should notify the customer before moving forward with the installation. To begin with, you will need to determine what the FINAL HEIGHT the panels will be. As an example in these instructions, we are going to say the FINAL HEIGHT will be 82. In these instructions we will be using a Tile Pattern Panel System (Product # TS-CS/12x24) as an example panel system. 82 82 FIND THE LOWEST POINT ON THE PAN OR TUB AND MEASURE UP FROM THERE MARKING 82 ON THE WALL 82 OVERALL DO THE SAME FOR A TUB, DEDUCTING THE HEIGHT OF THE TUB TS-CS/12x24 Tile Pattern Panel Panel Installation with Shower Pan Panel Installation with Tub Find the lowest point or corner on the Pan or Tub and measure up the wall to the determined FINAL HEIGHT of the panel. In this example, 82. This will now become your HORIZONTAL CONTROL LINE. Pencil a mark at that measurement and draw a line across the back wall using a 4 LEVEL. Repeat the same process to pencil the line on both of the side walls. Now that you have your HORIZONTAL CONTROL LINE established, you will be taking measurements to determine the dimensions in which to cut the BACK PANEL. Start by measuring from the Pan/Tub to the in Left, Center and Right locations. MEASURE FROM PAN TO ALL 3 LOCATIONS MEASURE SAME LOCATIONS FROM TUB Back Panel with Shower Pan Back Panel with Tub

INSTALLING STANDARD 3-PIECE PANELS - NOT EXTENDING TO THE CEILING (cont.) 5 Normally, there would be two sets of vertical measurements taken to insure that the grout lines will line up on the back panel and the side panels. With the overall panel height being determined and the panel only needing to be trimmed on the bottom and the sides, only the vertical measurements from the Pan or Tub up to the will be necessary. The rst three vertical measurements from the Pan up to the /Grout Line will be recorded here The second set of measurements will be unnecessary Follow the same instructions for a Tub installation, using the Panel Trimming Guide Panel Trimming Guide Located on the last page of these instructions As you take your measurements, use the Panel Trimming Guide located on the last page of these instructions. This will help you transfer your measurements to the panels when you trim them. Simply, follow the instructions and ll out the elds in the guide for accurate and proper order for trimming and installation. Next, measure and record the Back Panel Location Width at the Top, Center and Bottom. You are now ready to transfer these measurements to the Back Panel for trimming. MEASURE ALL 3 TOP, CENTER AND BOTTOM LOCATIONS RECORD MEASUREMENTS HERE Back Panel with Shower Pan To trim the Back Panel, measure from the top of the Panel downward. The top of the Panel has a Factory Finished Edge and will remain untouched. Mark the panel in the Left, Center and Right vertical positions and connect with a pencil line. Then, measure from the center of the Back Panel to establish the Top, Center and Bottom horizontal measurements, connecting them with a pencil line. You want to trim equal amounts o of both sides to center the panel. Allow 1 8 tolerance on the sides of the Back Panel for installation (once installed the side panels will cover the two side gaps). (See diagram on following page.)

INSTALLING STANDARD 3-PIECE PANELS - NOT EXTENDING TO THE CEILING (cont.) 6 RECORDED MEASUREMENTS You are now ready to trim the Back Panel. Place the Panel on top of the 2 x 4 s on the Saw Horses. Trim with the Circular Saw using the Masonry Blade. If you are trimming more than 1 2 of material, make sure to support the material being trimmed o to avoid the material breaking o before completing the cut. If the piece being trimmed breaks o, it could damage the panel and render the panel useless. After you have trimmed the panel, thoroughly sand all cut edges with 80 grit sandpaper, especially the bottom. Whenever possible, dry t the panel to make sure it is a proper t before applying adhesive to the wall. Once the t is con rmed, wipe down the wall with Acetone to clean and prepare the wall. Then, wipe o the pencil marks on the front of the Panel with Acetone. Next, wipe o the back, un nished side of the Panel with Acetone to clean it of dust and debris. There are two basic methods of applying adhesive and adhering the Panels to the Wall. METHOD 1: The rst one includes using Construction Adhesive and 100% Silicone combined or Cast Marble Adhesive alone requiring substantial bracing and drying time. CONSTRUCTION ADHESIVE - OR - CAST MARBLE ADHESIVE - THEN - CONSTRUCT PROPER BRACING - AND - 100% SILICONE Apply generous amounts of adhesive. An entire large tube of adhesive should be used for the back panel alone, and 1 2 tube for the side panels.

INSTALLING STANDARD 3-PIECE PANELS - NOT EXTENDING TO THE CEILING (cont.) 7 METHOD 2: The second one includes Construction Adhesive and 100% Silicone combined or Cast Marble Adhesive alone coupled with Commercial Grade Hot Glue for quicker set-up time and possibly less bracing. CONSTRUCTION ADHESIVE - AND - - OR - CAST MARBLE ADHESIVE - AND - COMMERCIAL GRADE HOT GLUE 100% SILICONE - THEN - CONSTRUCT PROPER BRACING The Hot Glue will set up immediately, allowing you to hold the Panel in place for a couple of minutes and the Panel will stay put. You can then construct the proper bracing to allow the adhesive to set up, usually 24 hours. Again, apply generous amounts of adhesive. An entire large tube of adhesive should be used for the back panel alone, and 1 2 tube for the side panels. Also keep in mind, more bracing may be necessary depending on the walls and site conditions. * If you are installing Trim at the front edge of the Shower Pan or Tub, please refer to the footnote instructions at the end of this document for details on how to properly install. We recommend you install the Trim before the Side Panels. * You are now ready to trim and install the Side Panels. Using the same Panel Trimming Guide, you will take measurements from the HORIZONTAL CONTROL LINE to the Pan or Tub like the Back Panel. First, you will need to establish a PLUMB LINE at the front edge of the Pan or Tub. USE LEVEL TO DRAW LINE FROM FRONT EDGE OF PAN OR TUB TO MEASURE FROM TO PAN OR TUB Take all of the same measurements like before and record them on the Panel Trimming Guide. Make note that you are recording the LEFT side panel and place an X on the Outside edge. The OUTSIDE edge will be the FINISHED EDGE from the factory. You will trim the INSIDE edge that butts up to the Back Panel. FACTORY FINISHED EDGE INSIDE EDGE TO TRIM

INSTALLING STANDARD 3-PIECE PANELS - NOT EXTENDING TO THE CEILING (cont.) 8 To determine what WIDTH to trim the Side Panel, measure from the PLUMB LINE that was established from the edge of the Pan or Tub back to the wall corner in all three Top, Center and Bottom locations. The OUTSIDE EDGE will be the FINISHED EDGE from the factory. The INSIDE EDGE will be the one to be trimmed, and will butt up to the Installed Back Panel. MEASURE FROM PLUMB LINE TO BACK WALL - (FROM WHAT WILL BE THE FINISHED EDGE) FACTORY FINISHED EDGE INSIDE EDGE TO TRIM Shower Pan or Tub Front Edge Recorded Measurements Trim the Side Panel by transferring the measurements from the Panel Trimming Guide to the Panel like before, using the Circular Saw with the Masonry Blade. After you have trimmed the panel, thoroughly sand all cut edges with 80 grit sandpaper, especially the bottom. Install the Side Panel using the same Adhesive Technique as the Back Panel. You will need to locate and cut the holes for the SHOWER PLUMBING FIXTURES on the appropriate Side Panel. Measure from the downward to the locations of the Control Valve and the Shower Head Pipe. Measure over from the PLUMB LINE / FINISHED EDGE to the locations. These will determine where to drill your holes in the Panel. Normally, there will be two holes to be located and drilled for a Shower and three for a Tub. MEASURE FROM PLUMB LINE TO FIXTURE LOCATIONS MEASURE FROM DOWN TO FIXTURE LOCATIONS Plumbing Fixture s Locations Carefully drill out the holes for the plumbing xtures in the panel. Be aware that if you use too much pressure when drilling, you can damage the panel, especially as the drill completes the hole.

INSTALLING STANDARD 3-PIECE PANELS - NOT EXTENDING TO THE CEILING (cont.) 9 Properly bracing the panels is important for allowing the adhesive to set up. Be sure to use caution when constructing the bracing. Below is a general graphic illustrating how bracing can be constructed, but there are other variables that may come into play depending upon the conditions at the site. You may need to build more braces, but you want to make sure that the panels are held rmly but without enough pressure to crack or damage the panels. CONSTRUCT PROPER BRACING MORE BRACING MAY BE REQUIRED THAN SHOWN HERE After the adhesive has had time to dry, usually 24 hours, carefully remove the bracing. You are now ready to caulk all of the joints. Use 100% Silicone where Marble meets Marble. Where Marble meets Substrate (Sheetrock, etc.) use Paintable Latex Caulk. 100% SILICONE WHERE MARBLE TO MARBLE PAINTABLE LATEX CAULK WHERE MARBLE TO SUBSTRATE You are now ready to install any Accessories. To install Soap Dishes, Shampoo Shelves and Foot Rests, whether Cast Marble, Ceramic or Chrome Plated Metal, please refer to the appropriate Accessory Installation Instructions for that product. * When you are installing Trim pieces for the sides of the Shower or Tub, it is recommended that you measure and cut them at the same time you are measuring and trimming the Back Panel. After cutting the trim, test t them to make sure they t. Install the trim right up against the Pan or Tub following the Vertical Plumb line. Use 100% Silicone or Cast Marble Adhesive combined with Commercial Grade Hot Glue and press and hold into place. After a couple of minutes, the Hot Glue will set up and hold the Trim in place. Then, you can proceed with installing the Side Panels as per these instructions. INSTALL TRIM FLUSH TO PAN OR TUB INSTALL TRIM LEVEL WITH PLUMB LINE THANK YOU FOR PURCHASING AND USING OUR MINCEY MARBLE PRODUCTS! WE VALUE YOUR BUSINESS!