MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 14 May Braddock Dam

Similar documents
Lakes and Rivers Division, Mr. David Dale

Lakes and Rivers Division, David Dale

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC

Public Safety Radio System Update September 9, 2013

Louisville-Southern Indiana Ohio River Bridges Project

PNWA 2013 SUMMER CONFERENCE: USACE PORTLAND DISTRICT UPDATE

Active Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT

Implementation Status & Results Congo, Democratic Republic of DRC-Growth with Governance in the Mineral Sector (P106982)

Economic & Real Estate Outlook. Tax Reform. Michigan 4/26/18

FY2005 Results Briefing Session. May 24, 2006

August 7, 2014 Heiwa Corporation

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space

Space and Missile Systems Center

Results for the Three-Month Period Ended June 30, 2013

Goldman Sachs Global Energy Conference. January 2014

DRAFT. SPECIAL SELECTBOARD Meeting Minutes Tuesday, January 24, 2017

EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS 1580 PAOLI PIKE SEPTEMBER 20, :00 pm FINAL MINUTES

The Washington Perspective

Massport Capital Programs Enterprise Schedule Management. Primavera Schedule Toolkit Design. January 2018 Version 1.0

Housing Market Outlook

U.S. Infrastructure Report Card in 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Sanford Bernstein Strategic Decisions Conference. May 2014

Inland Waterways Users Board #60. Inland Navigation R&D

The work underway across the business is beginning to take effect

DRAFT For Discussion Purposes. Las Vegas Stadium Alternative Funding Concept

THE PORT OF VIRGINIA:

Implementation Status & Results China Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

GRUAN Site Report for Cabauw/De Bilt

Pareto Securities 20 th Annual Oil & Offshore Conference. Dan Rabun, Chairman & CEO. 4 September 2013

Recreation Facility Hours

You may review a blank copy of the application form by clicking on this pdf link. *Last Name *First Name Middle *Position Title.

Announcement of Korea Research Fellowship (KRF) for Postdoctoral Researchers (1st round in 2018)

Overview of INAZUMA Certified Systems for our Business Partners

Staff: Interim Executive Director. Business Development Director Environmental Programs Director. Planning and Development Director

I-5 Bridge Replacement Project

SWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1

The minutes from the February 24, 2014 Contracts and Purchasing Board meeting were unanimously approved, as written.

Results Briefing Session

FINANCE REPORT. April 2014 to December 2014

Capital One Securities, Inc.

Review of the UK oilfield services industry. January 2016

Phase 2 Silver Line Update

TO: FROM SUBJECT: SRBA Jon Albright Technical Memorandum on Hydrologic Yields PROJECT: Sulphur River Basin Feasibility Study DATE: 08/26/2014 CC:

Shell s Journey to Mobility

ECSEL JU Update. Andreas Wild Executive Director

MONTHLY OPERATING REPORT

Economic & Housing Outlook

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space. FY 2011 Total Estimate. FY 2011 OCO Estimate

Minute /18. Exemptions. FOI Exemptions: Section Page 4, FOI Exemption Section 43. Section Page 4-5, FOI Exemption Section 22

Rule 21 Working Group 3.

COOK INLET NAVIGATION CHANNEL

Assessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus

AGENDA Board Meeting NEW JERSEY TURNPIKE AUTHORITY December 19, 2017

Infrastructure Funding Panel

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

The partner of choice for self-care products

Economic and Housing Market Outlook

ACEC OC February 22, 2017

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1%

ENSCO 8500 Series. 11 April Mark Burns Senior Vice President Western Hemisphere. David Hensel Vice President North and South America

Textron Reports First Quarter 2016 Income from Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook

BRC Financial Summary BRC Application and Program Summary

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Winning at New Products

Metrological Telecommunication System Development Project

Evolution or Revolution? Recent Changes in Government Contracts Labor Requirements

PROGRAM UPDATEPDATE. Has anyone heard any good rumors lately? Steve Guilfoos AF SBIR/STTR Program Manager Spring 2007

Financial Results Briefing Session

FY rd Quarter Financial Results

Considerations in FERC Licensing of New Projects

Bridge Condition Assessment Using Remote Sensors

ANASAC, September 20, 2012

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

For information, no action is recommended.

BusinessHaldimand.ca. Haldimand County 2018 Community Profile

FY nd Quarter Financial Results

Toolbox for Renewable Energy Tariff Design in West African Countries

CORPORATE COUNSEL SYMPOSIUM XXIV OCTOBER 22, 2013

Fourth Quarter 2013 Results. February 6, 2014

FY2013 Indicative Work Programme and Budget Co-regulatory Forum. 18 November 2011

Textron Reports Third Quarter 2018 Results; Narrows Full-Year EPS and Cash Guidance

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES August 8, 2011

First Quarter 2014 Results

THE BOARD OF DIRECTORS OF THE NORTH KINGS GROUNDWATER SUSTAINABILITY AGENCY JOINT POWERS AUTHORITY MINUTES FOR THE FEBRUARY 23, 2017, at 6:00 P.M.

Acquisition of HR Textron

September 2017 PGM:TSX-V

Complete Streets & PPM to FDM Update

I Need Your Cost Estimate for a 10 Year Project by Next Week

Parish Records of Tadcaster. Finding Aid

FY2007 First-Half Period Results Briefing Session. November 19, 2007

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5%

Financial Results Six-Month Period Ended September 30, 2013

First Quarter 2013 Results May 8, 2013

Environment and Natural Resources Trust Fund (ENRTF) M.L ENRTF Work Plan (Main Document)

Seale & Associates Creative Solutions. Trusted Advice. MERGERS & ACQUISITIONS MEXICO JUNE 2018 MONTHLY ISSUE

REPORT DOCUMENTATION PAGE

Transcription:

Locks and Dams 2, 3, and 4 Monongahela River, PA (Lower Mon Project) Inland Waterways Users Board MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division Braddock Dam 14 May 2015 US Army Corps of Engineers Charleroi Locks

Agenda Financials Project Overview Schedule Ongoing Construction at Charleroi Images of Charleroi Construction Scorecard S Curve Challenges Discussion 2

Locks and Dams 2, 3, and 4, Monongahela River, PA Total Project Cost: $2,733M* ARRA CG IWTF Total FY13 Allocation: $1,510, 007 $11,093,652 $11,093,652 $23,697,311 FY14 Allocation: $0 $36,336,500 $36,336,500 $72,673,000 FY15 Allocation: $(50,711) $28,016,000 $28,016,000 $55,981,289 FY16 Budget: $0 $26,000,000 $26,000,000 $52,000,000 Remaining Balance: $997,149,337 $997,149,337 $1,994,298,674 Remaining Balance Change From Last Meeting NA Notes: None No changes since last update Changes Funding Overview Original Authorized Cost: $556M 902 Limit: $1.76B ARRA Funding (FY09-FY14): $68.4M Engineering & Design Cost: $603M * Supervision & Admin Cost: $207M Mitigation: $12M Next Steps Award Charleroi River Chamber Completion (Base plus Options) Contract in FY2015 On Schedule Current Status of the Project Charleroi Emptying Basin Construction On Schedule Charleroi M22-M27 Construction On Schedule * $603M includes all Engineering & Engineering During Construction

Lower Mon - Project Costs ($million) Total Project As Authorized Without Land Chamber Without Port Perry Bridge Without Either Authorized Cost (1992) $556 $531 $531 $506 Authorized Cost Inflated (Oct 2014) $1,018 $997 $1,012 $940 Certified Cost Estimate (Oct 2014)*1 $1,661 $1,203 $1,584 $1,126 Fully Funded Cost Estimate (Oct 2014) $2,773 $1,395 $2,625 $1,287 Project 902 Limit: $1,761,250,000 Certified cost estimate ($2,773 M Fully Funded) Certified March 2014 @ the Oct 2014 Price Level Certification predated Olmsted cost share and IWTF revenue structure changes Includes IWTF revenue & Olmsted schedule restrictions which adds $185 million in escalation Includes Charleroi Land Chamber deferment which adds $797 million in escalation Estimated allocations thru FY 2015 - $687 million Estimated sunk costs (investments) thru FY 2015 - $579 million *1-This new slide reflects estimated project costs if the Port Perry Rail Road Bridge and the Charleroi Land Chamber were not constructed. These reduced costs were not certified, but rather, the costs of these features were deducted from the from the total certified cost. 4

Pre-Project Condition Lower Mon - Project Overview Post-Project Condition L/D 2 Braddock L/D Major Project Features New Dam at Braddock New Locks at Charleroi Dredging Removal of Locks and Dam 3 Relocations L/D 3 L/D 3 L/D 4 Charleroi L/D DONE 5

Lower Mon - Project Schedule Major Feature Construction Last Reported Completion (Feb 2015) Charleroi River Wall FY 2016 Charleroi Dam Emptying Basin FY 2016 Charleroi M22-M27 FY 2018 Charleroi Dam Stilling Basin FY 2021 Charleroi River Chamber Completion FY 2022 Dredging Pool 3 FY 2022 Relocations Variable Lock and Dam 3 Removal FY 2023 Revised Revised schedule based on WRRDA 2014 implementation of Olmsted cost share and Lowermon Project as next priority and the expectation of efficient funding Specific relocations are associated with pool changes so their timing is variable Charleroi Land Chamber has been removed from this slide. 6

Locks and Dams 2, 3, and 4, Monongahela River, PA Schedule of Remaining Work Design Initiated Contract Award Construction Complete *3 Project Benefits*4 Capitalized Cost Closeout*4 Charleroi River Wall 1-Oct-95 27-Sep-04 14-Dec-15 S 2028 2030 Charleroi Emptying Basin 1-Oct-95 30-Sep-13 26-Dec-15 S 2028 2030 Charleroi River Chamber (M22-M27) 1-Oct-95 15-Aug-14 December 2018 2028 2030 Charleroi Dam Stilling Basin 1-Oct-95 FY 2018 S FY 2022 S 2028 2030 Charleroi River Chamber Completion 1-Oct-95 FY2015 S FY 2022 S 2028 2030 L/D 3 Removal 2020 2021 S FY 2023 S 2028 2030 Dredging 1-Oct-95 2017 S FY 2022 S 2028 2030 Municipal Relocations *1 1-Oct-95 Multiple Multiple NA 2030 Port Perry Bridge Relocation 1-Oct-95 Deferring NA NA Charleroi Land Chamber *2 TBD Deferring NA NA *1: To complete all municipal relocations, multiple relocation agreements are required. *2: Over 90 % of project benefits can be achieved without constructing the Charleroi Land Chamber. *3 Dates are achievable based on an efficient funding profile. *4: Project benefit and close out dates are based on the certified cost and schedule with the assumption that the Port Perry Bridge and the Charleroi Land Chamber will not be constructed. These dates can be approximately 5 years earlier (2023 and 2025, respectively) if an efficient funding profile is maintained. 7

Lower Mon Charleroi Ongoing / Pending Construction (Plan - Visual) Emptying Basin Planned Complete FY 2016 M22-M27 Planned Complete FY 2018 RCC Base Contract (M1-M7) Planned Complete FY 2022 RCC Option 1 (M11-M16) Planned Complete FY 2022 RCC Option 2 (M8-M10) Planned Complete FY 2022 RCC Option 3 (M17-M21) Planned Complete FY 2022 RCC Option 4 (In-Chamber) Planned Complete FY 2022 RCC Option 5 (Chamber-Operational) Planned Complete FY 2022 Stilling Basin Planned Completion FY 2021 Completion date of the Charleroi River Chamber could be as late as 2039 if not awarded efficiently 8

Lower Mon Charleroi Middle Wall (Isometric) M22-M27 Planned to Complete in FY 2018 (Under Contract) RCC Base Contract (M1-M7) Planned to Complete in FY 2022 RCC Option 1 (M11-M16) Planned to Complete in FY 2022 RCC Option 2 (M8-M10) Planned to Complete in FY 2022 RCC Option 3 (M17-M21) Planned to Complete in FY 2022 Option 4 and Option 5 not shown in isometric view. Completion date of the Charleroi River Chamber could be as late as 2039 if not awarded efficiently 9

Charleroi Construction Images 1 2 3 4 Emptying Basin Contract: 1 - Pre-Cast Basin Units; 2 - Foundation Drilled Shafts. M22-M27 Contract: 3 - Emergency Generator Pad Reinforcement; 4 - Emergency Generator Platform 10

Locks and Dams 2, 3, and 4 Monongahela River Project Time and Cost Scorecard Thru Jan 2015 Expenditures Planned (BCWS) Earned (BCWP) Actual (ACWP) $554.3 M $ 565.5 M $ 563.1 M Target: Actual as compared to Planned: (<5% = Green); (>5% and <10% = Yellow); and (>10% = Red) Values shown reflect project sunk cost of $550.6M thru FY 2014 and Current data thru March 2015 Schedule (Baseline)/(Current Early) Overall Project Completion 2071 / 2061 Realize over 90% of project Benefits 2039 / 2023 Reserve Balances (estimated): -Contingency to >90% of benefits: 95 Months -Management Reserve not yet determined Opportunity to move project benefits to the left due to Olmsted cost share revision and an increase in the fuel tax Estimated Cost at Completion >90% benefits Total project BAC(FF) $1.40 B $ 2.73 B EAC(FF) $1.40 B $ 2.73 B Based on CSRA and Cost to Date Reserve Balances (FF): Estimated Cost $ 2.73 B Project Contingency $ 0.464 Billion Sunk Cost (thru FY14) $ 0.55 Billion Milestones Status for the Next 6 Months J&A for concrete production DOC Approval: Approved Acquisition Plan PARC Approval: Approved Real Estate Risk Memos: Approved Charleroi River Chamber Completion RTA: 23 Apr 2015 Actual completion 23 April 2015 Advertise River Chamber Completion: June 2015 11

Lower Mon S Curve or the Port Perry Bridge ASSUMPTIONS 1) 2073 project completion is based on the project schedule included in the 2014 certified cost and schedule. 2) $2.7 Billion is the fully funded Total Project Cost (TPC) certified in 2014. 3) Contingencies includes future risks from the CSRA associated with EDC, S&A, Land, and construction. 4) The schedule and estimate assume capability level funding will be provided after Olmsted is completed. 5) THIS IS A DRAFT BASELINE. Basis = March 2014 Certified Total Project Cost Estimate Originator = Steve Fritz, Project Manager and Sean Weston, Cost Engineer Approved By = NOT READY FOR APPROVAL April 2015 Current Estimated Completion Date Including Contingency For Official Use Only - Not for Release 12

Future Challenges Most Efficient Schedule & Funding Continue to move project schedule left at every opportunity Funding available when needed Site constraints at Charleroi and Victory Hollow 13

Lower Mon - Discussion 14