ATLANTIS RAIL Contact Information

Similar documents
ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

Template. Blue 242. May 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

Chalk Line. #4 Phillips Driver Bit. Cable Cutters

Safety Glasses Work Gloves Chop Saw with Cutting Disk. Half Round File Pencil Marker

Installation Instructions for. Before You Begin TOOLS REQUIRED

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Horizontal Cable Systems

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

Horizontal Cable Systems

BioPrism Solid Surface

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Hammer. Loctite 242 Blue. April 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Straight Stringer Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing stair kit.

TREX TRANSCEND RAILING

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

1. TOOLS + MATERIALS REQUIRED

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

SINGLE TRACK BYPASS (patent pending) barn door hardware

Instruction Manual. The Clear Choice! Aluminum Railing. Stainless Railing. Cable Railing. Trellis Systems. Maintenance Free. 316 Stainless Steel

Page 1 of 18. SunRail System Installation Instructions

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

The following instructions will guide you through the installation of your new vinyl railing.

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Create cable assemblies to fit your style

Installing AZEK Evolutions Rail

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Installation Instruction

RAILING R A IL ING 51

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Continuous Handrail Kit Installation Instructions

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

TREX SELECT RAILING. Installation Instructions PARTS

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

TREX SELECT RAILING Installation Instructions

Installation Instructions for. Handrail Component System

Installation Instructions - Model V4JSD 1

I N S T A L L A T I O N I N S T R U C T I O N S. RailEasy MARINER

Shetland Stalls Installation Instructions

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

Assembly and installation help

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Stair Parts Installation. Tricks

A Step-by-Step How To Guide

MobileTrak5 Installation Instructions

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

RadianceRail Installation Guide

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

Vinyl Gazebo Instructions

Tools & Materials Needed

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Cabinet Storage Products

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

Mount to the Wall INSTALLATION MANUAL

Tools & Materials Needed

Double Beam Freestanding Pergola Installation Guide

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

Open Up Your View With CABLE SYSTEMS

Clearview Railing System Installation Instructions

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

RLP Flat Track Hardware sliding door hardware/ barn door track

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

GATE INSTALLATION. Tools & Materials Needed. peakproducts.com. Self-drilling screw. Lag bolt

POST INSTALL INSTRUCTIONS

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

Assembly Instructions for model: VMPR1

Installation Manual For ToddPod Outdoor Shower Enclosures

Assembly Instructions

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Handrail Installation. Paramount Cable Railing Systems 49 Stokes Drive Carson City, NV

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

Tools & Materials Needed

Kai Installation Instructions

Frameless Inline Door With Return QCI5263

Installation Guidelines

PRODUCT: BALDUR + ODEN

INSTRUCTION BOOKLET #C20

TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions

MODULAR BUMPER INSTALLATION MANUAL

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

Dura-Lock Roof System

FIXED PANEL SLIDER QCI5241

PVC Composite Railing & Stair Kit

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Face Mount to Through-the-Post Mount

Pickup Box Utility Rack Package Installation (Instruction ID: )

Transcription:

ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing product. It utilizes surface or fascia mounted square posts and a horizontal cable infill choice between HandiSwage studs with 5/32 or 1/8 cable. The Spectrum System is offered in a standard black or metallic silver color option. Other colors are available. Ask your Sales Representative for details. Customers must source their own flat hardwood top rail (minimum of 2 x 4 ). Tools Required Recommended Power Drill Level #2 Phillips Driver Bit Tape Measure 7/32 Drill Bit Carpenter s Square 1/8 Drill Bit Chalk Line 1/2 Socket & Ratchet Rubber Mallet Pencil Coping Saw Safety Glasses Silicone Caulk Work Gloves 1/4 Wood Dowel Mounting Options Facsimile (508) 732-9798 Web Address www.atlantisrail.com www.handiswage.com Mailing Address Atlantis Rail Systems 70 Armstrong Rd. Plymouth, MA 02360 Table of Contents Tools 1 Mounting Options 1 Infill Options 1 Post Kit Components 2 Installing the Surface Mount Stair Posts 2 Surface Mount Posts Preparation 3 Installing the Surface Mount Posts 3 Installing the Fascia Mount Stair Posts 4 Fascia Mount Post Preparation 4 Installing the Fascia Mount Posts 5 Installing the Top Rail 5 Installing the Infill 6 Spectrum System Accessories 6 Spectrum System Specifications 8 Post Kits Cable Spacing & Heights 8 Spectrum System Product Specifications 8 Spectrum System Part Numbers & Descriptions 9 Infill Options The HandiSwage cable infill option features hand swage studs and 5/32 or 1/8 cable. Fascia Mount Post Kits Surface Mount Post Kits Helpful Hint: Start by marking post locations using removable tape on the deck surface. Install stairs first, followed by corner and end posts. NOTE: ALWAYS REFER TO YOUR LOCAL BUILDING CODE OFFICIALS PRIOR TO INSTALLING ANY ATLANTIS RAIL SYSTEM TO ENSURE ALL CODE AND SAFETY REQUIREMENTS ARE MET. ATLANTIS RAIL SYSTEMS IS NOT RESPONSIBLE FOR IMPROPER OR NON-RECOMMENDED INSTALLATIONS. 1 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Spectrum Surface Mount Post Kit Components A Spectrum Square Post B Top Mounting Plate Assembly C Lag Screws (quantity: 4) D Lag Screw Caps (quantity: 4) E Base Cover Spectrum Fascia Mount Post Kit Components A Spectrum Square Post B Top Mounting Plate Assembly C Plastic Bottom Cap D Lag Screws (quantity: 3) E Lag Screw Caps (quantity: 3) Installing the Surface Mount Stair Posts NOTE: IF INSTALLING THE FASCIA MOUNT POSTS, PLEASE SKIP AHEAD TO THE INSTALLING THE FASCIA MOUNT STAIR POSTS SECTION (PAGE 4). Find the Location of the Top Stair Post Begin at the top of the stairs. Mark the location of the straight post adjacent to the top stair post (post A). Place your top stair post (post B) and position it so the space between the stair and deck posts is less than 4 (Figure A). At the same time, make sure the deck post is aligned with the stair post. Find the Location of the Lower Stair Posts Place the lower stair post (post C) and insert a 1/4 wooden dowel through the bottom cable holes of the top and lower stair posts to visualize the alignment. Code requires that a 6 sphere cannot fit through the triangle created by the stair rise, stair tread and the bottom row of cable (Figure A). Repeat this process and mark the position of all lower stair posts. Install the Posts Once the stair posts are marked for location, begin installing using the instruction below. The first installed post should be the straight post adjacent to the top stair post. Figure A. Place your top stair post and position it so the space between the stair and deck posts is less than 4. Code requires that a 6 sphere cannot fit through the triangle created by the stair rise, stair tread and the bottom row of cable. 2 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Surface Mount Posts Preparation NOTE: PREPARE PROPER BLOCKING PER LOCAL BUILDING CODE TO ENSURE SAFE AND CODE COMPLIANT INSTALLATION. Measure & Mark the Centerlines Use a tape measure to find the centerline of your railing system. Measure from the edge of the deck to the center of the structure or blocking below (Figure B). This is typically 3-1/2. It is important that all the fasteners are secured to the structure or appropriate blocking. With the centerline measured, carefully snap a chalk line around the perimeter of the deck. This will be your centerline throughout the project. Make sure that the center of all of your bases fall along this line. Assemble the Corner Brackets Assemble the top mounting plates in the necessary corner configuration. Use the corner mending plate and four (4) 1/4 screws to rigidly hold the assembly (Figure C). The top mounting plates assemble into 90 or 135 corner brackets by using different edges of the corner bracket and a different hole pattern on the mending plate (Figure D). Assemble the Corner Posts With the corner brackets assembled, attach a post to each mounting plate, using the center hole pattern, with two (2) 1/4 screws. Corners require two (2) posts. Make sure that the post holes for the cable are running parallel with the long side of the plate on both sides. Installing the Surface Mount Posts Figure B. Measure to the center of your structure or blocking and snap a chalk line to mark the centers. Do this around the perimeter of the deck. Figure C. Use the Corner Mending Plate Set to hold the top mounting plates together. Figure D. The top mounting plates can be assembled into 90 and 135 corner brackets. Install the Corner & End Posts Beginning with corner posts, place the bases along the centerline being careful to make sure the bases are properly oriented. Using the base as a template, mark the four (4) holes for the screws (Figure E). Use a 7/32 drill bit to drill a pilot hole for the lag bolts. Take extra care to be sure the holes are drilled into joists or blocking. With the holes predrilled, install the corner posts with the lag bolts using a 1/2 socket and ratchet set. When installing the posts, constantly check for level. Once the posts are installed, apply silicone to the lag bolts and secure the supplied lag bolt caps to prevent moisture from getting to the lag bolts (Figure F). Slide the base cover onto the base BEFORE installing the cable (Figure G). Figure E. Use the base as a template and mark the four (4) holes for the screws. Repeat the steps above to install the end posts. Install the Mid Posts When you have the end and corner posts installed, measure the distance between the end and corner. Divide this measurement evenly to get the required number of sections. Mark the center locations for the mid post bases once again taking care that the base is located on the centerline and oriented properly. Follow the steps above to install the mid posts. Figure F. (Left) Apply silicone to the lag bolts once installed and secure the lag bolt caps. Figure G. (Right) Slide the base cover onto the base BEFORE installing the cable. 3 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

NOTE: TO ENSURE CODE COMPLIANCE, ATLANTIS RAIL DOES NOT RECOMMEND EXCEEDING 4 (48 ) ON-CENTER BETWEEN CABLE SUPPORT POSTS. DO NOT EXCEED 48 BETWEEN TERMINATION HARDWARE. Installing the Fascia Mount Stair Posts Find the Location of the Top Stair Post Begin at the top of the stairs. Mark the location of the straight post adjacent to the top stair post (post A). Place your top stair post (post B) and position it so the space between the stair and deck posts is less than 4 (Figure H). At the same time, make sure the deck post is aligned with the stair post. Find the Location of the Lower Stair Posts Place the lower stair post (post C) and insert a 1/4 wooden dowel through the bottom cable holes of the top and lower stair posts to visualize the alignment. Code requires that a 6 sphere cannot fit through the triangle created by the stair rise, stair tread and the bottom row of cable (Figure H). Repeat this process and mark the position of all lower stair posts. Install the Posts Once the stair posts are marked for location, begin installing using the instruction below. The first installed post should be the straight post adjacent to the top stair post. Figure H. Place your top stair post and position it so the space between the stair and deck posts is less than 4. Code requires that a 6 sphere cannot fit through the triangle created by the stair rise, stair tread and the bottom row of cable. Please note that stair railings that take a corner to a level surface, the straight post adjacent to the top stair post will be closer together. Fascia Mount Posts Preparation Assemble the Corner Brackets Start by assembling the top mounting plates in the necessary corner configuration. Use the corner mending plate and four (4) 1/4 screws to rigidly hold the assembly (Figure I). The top mounting plates assemble into 90 or 135 corner brackets by using different edges of the corner bracket and a different hole pattern on the mending plate (Figure J). Assemble the Corner Posts With the corner brackets assembled, attach a post to each mounting plate, using the center hole pattern, with two (2) 1/4 screws. Corners require two (2) posts. Make sure that the post holes for the cable are running parallel with the long side of the plate on both sides (Figure K). Figure I. Use the Corner Mending Plate Set to hold the top mounting plates together. Figure J. The top mounting plates can be assembled into 90 and 135 corner brackets. Measure the Height To begin, measure the thickness of your top rail and add 6-1/8. This is the distance below the deck surface where the bottom of the post will sit. As an example, a 1-1/2 thick top rail will require the post to sit 7-5/8 (1-1/2 + 6-1/8) below the deck surface (Figure L). Block Out or Notch the Deck You ll need to account for any overhang of trim your deck may have. This can be accomplished one of two ways, by either notching out the trim piece with a coping saw or similar, or by blocking out underneath the overhang. Use the completed corner assembly and mark on either side of each post and cut or block accordingly. Figure K. (Left) Attach a post to each plate using the center hole pattern. Figure L. (Right) Determine the length below the surface of the deck by adding 6-1/8 to the thickness of the top rail. 4 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Mark the Centers Using the completed corner assembly as a guide, mark the centers of the corner posts on either side of the fascia. Use a carpenter s square to draw a vertical line on the fascia board at the center mark (Figure M). Measure down to the height as determined in the previous step, in our example, 7-5/8 and draw a mark. With the centerline drawn, hold the post on the center line at the height mark you just made, and carefully mark the centers of the three (3) mounting holes (Figure N). Installing the Fascia Mount Posts Pre-Drill the Fascia Using a 7/32 drill bit, pre-drill the fascia at the marks made in the previous step to a depth as needed, once again, beginning with the corner posts. Take extra care to be sure the holes are drilled straight into the fascia. Figure M. (Left) Use a carpenters square to draw a vertical line at the center mark of the post. Figure N. (Right) With the post held in place, carefully mark the centers of the mounting holes. Install the Lag Bolts With the holes drilled for the fascia, install the post with the lag bolts using a 1/2 socket and ratchet set. When installing the post, constantly check for level, both side to side and front to back. Over tightening the lag bolts may cause the post to pitch forward (Figure O). If this happens and the post is pulled out of level, simply loosen the offending bolt slightly until the post comes back to square and shim as required to keep the post plumb. Once the post is installed, press on the supplied lag screw caps for a finished look (Figure P). Repeat When you have the end and corner posts installed, measure the distance between the end and corner. Divide this measurement evenly to get the required number of sections. Repeat the above steps to install the mid posts. Figure O. (Left) Check the post for level as you tighten the lag bolts. Adjust the tightness of the bolts as necessary and shim as required to ensure that the post is level front to back and side to side. Figure P. (Right) Attach the supplied lag screw caps for a finished look. NOTE: TO ENSURE CODE COMPLIANCE, ATLANTIS RAIL DOES NOT RECOMMEND EXCEEDING 4 (48 ) ON-CENTER BETWEEN CABLE SUPPORT POSTS. DO NOT EXCEED 48 BETWEEN TERMINATION HARDWARE. Installing the Top Rail Install the Top Plates Secure the top plates to each of the posts using two (2) 1/4-20 RH screws. For mid posts, use the hole pattern in the center of the plate (Figure Q). For end posts use the side hole patterns. Be sure to have the corner plates pre-assembled for ease of installation. Install the Top Rail Carefully measure and cut your top rail taking into account any mitering of joints you may need to do. Piece by piece; lay your top rail on the center of the mounting plate being sure that the top rail covers the top plate in its entirety. With the top rail in place, using a 7/32 drill bit, pre-drill for the wood screws that attach the top rail to the mounting plate. Use up to six (6) #10 pan head screws to fasten the wooden top rail (not supplied) to the Spectrum posts (Figure R). Figure Q. For mid posts, use the hole pattern in the center of the plate and secure using two (2) 1/4-20 RH screws. Figure R. Secure wooden top rail using up to six (6) #10 pan head screws. 5 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Installing the Infill With the frame securely built according to these installation instructions, it s time to install the cable infill. The Spectrum System is designed to utilize two (2) cable diameter options, 5/32 or 1/8 with HandiSwage Studs (Figure S). Please consult the appropriate cable installation instructions. MAKE SURE THE POSTS AND TOP RAILS ARE INSTALLED IN THEIR ENTIRETY PRIOR TO TENSIONING CABLES! The posts of the Spectrum System will deflect under load if the guard frame isn t fully assembled. Spectrum System Accessories Cable Grommets C0916-0003 Cable Grommets (part number C0916-0003) are available at an additional cost and recommended to help prevent movement and deflection of the cable, as well as, reducing dirt and moisture from getting inside the posts. They are available for straight post sections with 1/8 cable. Once the cable infill is installed, place the slotted side on the cable and push down until it snaps onto the cable (Figure T). Push the tapered end into the mid post hole until only the flange is showing (Figure U). 30 Degree Stair Spacer C0841-0030-2 When installing cable infill on stair posts, a 30 Degree Stair Spacer (part number C0841-0030-2) is used to achieve the angled cable run. Place the stair space on the threaded end before attaching the desired cover nut set (Figure V). Figure S. HandiSwage Standard Stud Figure T. (Left) Place the slotted side on the cable and push down. Figure U. (Right) Push the tapered end into the mid post hole. Figure V. Place the 30 Degree Stair Spacer on the threaded end before attaching the cover nut set to achieve the angled cable run. Wide Mounting Plate S0904-XX53 The Wide Mounting Plate (part number S0904-XX53) is twice the width of the standard mounting plate and is used in applications where a wider top rail is desired. Secure the plate to the post using two (2) 1/4-20 RH screws. For mid posts, use the hole pattern in the center of the plate (Figure W). For end posts use the side hole patterns. ADA Mounting Clamp S0904-XX60 The ADA Mounting Clamp (part number S0904-XX60) fits snugly on the Spectrum post. To attach, insert the U-shape piece of the clamp onto the post making sure the pads stay intact (Figure X). Figure W. Use when a wider top rail is desired. For mid posts, use the hole pattern in the center of the plate and secure using two (2) 1/4-20 RH screws. Helpful Hint: Before inserting the U-shape piece onto the post, moisten the pads. This will enable it to glide easier over the post while keeping the pads in place. Attach the back piece and insert the screws. Using a 5/32 (or 4mm) Allen wrench, tighten the screws alternately a half turn at a time until the screws are fully tightened. Figure X. Insert the u-shape piece onto the post making sure the pads stay intact. Attach the back piece and tighten screws alternately until fully tightened. 6 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Reinforcing Channel S0904-XX54 This channel (part number S0904-XX54) is used in applications where the handrail needs additional reinforcement. The 36 surface mount Spectrum post requires a spacing block (part number S0904-XX58) for installation. If a spacing block is required, attach it to the post before attaching the top mounting plate (Figure Y). The reinforcing channel is 48 in length and is ideal for 4 post spacing. It can be cut to size if shorter spans are needed. Place the channel in the center of the post on top of the top mounting plate (Figure Z). Place the customer supplied top rail on top of the reinforcing channel. Use the supplied #10 wood screws to attach the channel and top mounting plate to the top rail (Figure AA). Using two (2) screws at either end of all exposed slots, fasten the channel to the top rail. Also, be sure to fasten through the top mounting plate where slots offer exposed top rail access. Figure Y. Attach the spacing block to the post before attaching the top mounting plate. Figure Z. Place the reinforcing channel in the center of the post on atop the top mounting plate. Figure AA. Use the supplied fasteners to attach the channel and top mounting plate to the top rail. 7 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Spectrum System Specifications The Spectrum System uses stainless steel square posts and fittings with horizontal cable infill. Customers must provide their own hard wood top rail. It is advised to observe that tension must be applied to fittings and cable. Posts should be fascia or surface mounted securely enough to resist detachment and hold under tension. Straight Sections The Spectrum System is offered in two (2) standard post heights of 36 or 42 for straight sections. Stair Sections Railing heights are offered in these dimensions due to nationwide building codes requiring 34 to 38 stair rail heights. 42 railings do not require 42 stair railings unless special circumstances exist. Between Post Lengths Atlantis Rail requires staying at or below 4 section lengths (post to post) to maintain structural integrity and comply with current building codes. Railing Finish The Spectrum System is offered in a powder coated black or metallic silver finish. Special colors are available. Cable Spacing The cable is spaced on the posts at less than 3 on-center to comply with nationwide building codes. See Post Kit Cable Spacing & Height chart below for more details. Post Kits Cable Spacing & Heights Part Number Post Description Cable Spacing Actual Post Rendered Height From Height Rail Height Surface S0905-XX36* 36 Surface Mount Post Kit 2.625 34.5 36 34.5 S0905-XX38-ST* Surface Mount Universal Stair Post Kit **2.629 2.756 39.625 34 36 39.625 S0905-XX42* 42 Surface Mount Post Kit 2.688 40.5 42 40.5 S0904-XX36* 36 Fascia Mount Post Kit 2.625 42 36 34.375 +/- S0904-XX38-ST* 38 Fascia Mount Stair Post Kit **2.629 2.756 47.25 34 36 39.625 +/- S0904-XX42* 42 Fascia Mount Post Kit 2.688 48 42 40.375 +/- * XX in the part number is the color designation. Replace with BK for black, MT for metallic silver or SP for one of the special colors. **Cable spacing on stair post kits vary due to the angle of the stairs. These variations are based on stair angles between 32 and 36 (aligned dimensions). Spectrum System Product Specifications Material Finish Dimensions Notes Post Powder Available in standard colors or special 316L s/s 1-1/2 square Coated colors Top Rail -- -- Minimum 2 x 4 hardwood Customer supplied Cable 316L s/s n/a 5/32, 1 x 19 strand, left hand lay or 580 lb. or 420 lb. working load limit 1/8, 1 x 19 strand, left hand lay respectively HandiSwage See catalog or website for more 316L s/s n/a Studs information 5/32 or 1/8 studs Fittings 316L s/s Powder Coated 6 x 1-1/2 x 1/8 -- Fasteners 316L s/s Powder Coated Fasteners vary -- 8 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017

Spectrum System Part Numbers & Descriptions Part Number Description Use Fascia Mount Post Kits S0904-XX36* Spectrum 36" Universal Fascia Post Kit 36" fascia mount straight post S0904-XX38-ST* Spectrum 38" Stair Fascia Post Kit 42" fascia mount stair post S0904-XX42* Spectrum 42" Universal Fascia Post Kit 42" fascia mount straight post Surface Mount Post Kits S0905-XX36* Spectrum 36" Universal Surface Post Kit 36" surface mount straight post S0905-XX38-ST* Spectrum Stair Surface Post Kit (36"& 42") 36" or 42" surface mount stair post S0905-XX42* Spectrum 42" Universal Surface Post Kit 42" surface mount straight post Accessories S0904-XX51* Spectrum Corner Mending Plate Set Use on surface or fascia mount post corners S0904-XX53* Spectrum Wide Mounting Plate 3.5" Use when wider top rail is desired S0904-XX54* Spectrum Reinforcing Channel Used when non-structural top rail is desired S0904-XX58* Spectrum Spacing Block for Reinforcing Channel Required on 36" surface mount straight post when using Reinforcing Channel S0904-XX60* Spectrum Post Clamp Used to make ADA handrail mounting bracket C0841-0030-2 30 Degree Stair Spacer (2 pack) Use at cable termination points on stairs C0916-0003 Cable Grommet (25 pack) Use in mid post holes * XX in the part number is the color designation. Replace with BK for black, MT for metallic silver or SP for one of the special colors. 9 ATLANTIS RAIL SYSTEMS Spectrum System Installation Instructions www.atlantisrail.com March, 2017