Installation Instructions

Similar documents
Installation Instructions

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

14000 Series. Fabrication and Installation Instructions

4500 Series. Fabrication and Installation Instructions

14000 Series. Fabrication and Installation Instructions

Table of Contents. Typical elevation & cut lengths. General construction notes. General installation notes. Typical jamb assembly

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

Storefront Installation Guide

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

YES 600 Thermal Clip Storefront System Installation Manual

YWE 40 T Window Wall System Installation Manual

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

YCW 752 Outside Glazed Curtain Wall System Installation Manual

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

YES 45 TU Thermal Storefront System Installation Manual

YSG 40/50/50T Window Wall System Installation Manual

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

YES 40 FS/FI Storefront System Installation Manual

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

Series Sloped glazed Curtain wall. Installation Instructions

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

SERIES BW3250 BLAST WALL TABLE OF CONTENTS INSTALLATION INSTRUCTIONS GENERAL NOTES

Illustration Part Description Base List Weight/ Ft./ Box Number Price/S.L. S.L. S.L. Qty.

ELEPHANT DOOR SYSTEMS SERIES E1200

Series Advanced and alternate. Installation Instructions

Sun Control-Solar Eclipse-Solar Shelf

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

YHC 300 SSG Structural Silicone Glazed Curtain Wall System Installation Manual

YES 45 XT High Performance Thermal Storefront System

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! May 2015

Series Exterior glazed curtain wall. Installation Instructions

INSTALLATION INSTRUCTIONS 2 1/2 x 7 for 1 Glass

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

INSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T

YES 45 FS/FI Storefront System Installation Manual

BuildingEnvelope Oldcastle ( ) -

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS TRIFAB 451UT SCREW SPLINE ASSEMBLY TRIFAB 451UT. AUGUST, 2010 (Part No. 452T-CG-970) EC

Installation Instructions

YHC 300 IG Inside Glazed Curtain Wall System Installation Manual

INSTALLATION INSTRUCTIONS SERIES 3600 SUNSHADE SYSTEM

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE

Storefront Installation Guide INSTALLATION INSTRUCTIONS

RELIANCE -LT INSTALLATION AND GLAZING MANUAL

YHS 50 FS Storefront System & Model 35H/50H Door Installation Manual

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

SERIES CF450 INSTALLATION INSTRUCTIONS. SERIES CF450 1¾ x 4½ - B1. Fabrication for Panel Assembly. High Performance Non-Thermal Storefront System

TCR 250 THERMAL COMPOSITE RIBBON WINDOW

SERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES

YHS 50 TU Storefront System & Model 35H Door Installation Manual

SERIES CF451T INSTALLATION INSTRUCTIONS. SERIES CF451T 2 x 4½ - B2. Fabrication for Panel Assembly. High Performance Thermal Storefront System

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

SECTION C1 INSTALLATION INSTRUCTIONS

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Architectural Testing AAMA 501 TEST REPORT. Report Number: C Rendered to: Tubelite, Inc. Walker, Michigan

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

SERIES 406X. Installation Instructions. Place photography here. Don t go over grey area. (size w x h )

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

RELIANCE CURTAIN WALL INSTALLATION AND GLAZING MANUAL

IF THE END REACTION IS 350# TO 750# THE FOLLOWING PERIMETER ANCHORING CAN BE USED. HEAD AND SILL CONDITIONS WITH EXPOSED INTERIORS SHIMS

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! FEBRUARY 2012

INSTALLATION INSTRUCTIONS. EnCORE CAPTURED & SSG SCREW SPLINE SHEAR BLOCK TYPE B LITHO IN U.S.A. JANUARY KAWNEER COMPANY, INC

YSD 400 Sliding Door System Installation Manual

Swing Door Installation Manual

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

YOW 225 TU Window System

INSTALLATION INSTRUCTIONS. EnCORE CAPTURED & SSG SCREW SPLINE SHEAR BLOCK TYPE B. EnCORE FEBRUARY, 2012 EC PART NO.

Assembly and Installation Instructions Section 1

SERIES 2100/2200 CURTAIN WALL

SERIES 2100/2200 CURTAIN WALL

Installation Instructions for Vista Air Vertically Folding Walls

Installation Manual. YSD 600 T/TH Sliding Door. YSD 600 T/TH Sliding Door System

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

YSD 600 T/TH Sliding Door System Installation Manual

INOVO 2-LITE SLIDING PATIO DOOR

e-lite fabrication/assembly and Installation instructions

CURTAIN WALL INSTALLATION AND GLAZING MANUAL

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! OCTOBER Phone: OLDCASTLE ( ) Web Address:

SECTION HOLLOW METAL DOORS AND FRAMES

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS SERIES 8000 SINGLE HUNG WINDOW BLOCK OR FIN FRAME

Series 525 impact storefront. Installation Instructions

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Heavy Wall Applied Stop Tube Frame and Door Installation

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

INSTALLATION INSTRUCTIONS

4-lite Patio Door. Installation Instructions

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

Transcription:

Installation Instructions 200 Series Curtainwall 3056 WALKER RIDGE DR. NW, SUITE G WALKER, MI 49544 800-866-2227 dependable@tubeliteinc.com Revised April 2014 dependable@tubeliteinc.com Page 1

TABLE OF CONTENTS GENERAL CONSTRUCTION NOTES PARTS LIST ELEVATION DETAILS FRAME FABRICATION Step 1: Determine Frame Size Determine Frame Width Determine Frame Height Step 2: Cut Mullions to Size Step 3: Cut Pressure Plates, Snap-on Face Covers and Fillers to Length Step 4: Drill Weep Holes in Horizontal Pressure Plate Step 5: Mill Weep Slot in Horizontal Snap-on Cover Step 6: Drill Slots in Horizontal Step 7: Notch Sills and Heads Step 8: Notch Horizontal in Final Bay (if necessary) Step 9: Fasten Splice Sleeves in Lower Segments of Verticals (if necessary) Step 10: Add Steel Reinforcing (if necessary) CURTAINWALL INSTALLATION Step 11: Attach Shear Block Step 12: Butt Sill Anchor to Side of Mullion Step 13: Fasten Sill Anchor to Masonry Step 14: Slide Horizontal Onto Shear Block Step 15: Slide Horizontal Onto Sill Anchor Clip Step 16: Seal Joints Between Verticals and Horizontals Step 17: Install Water Dams Step 17: Install Water Dam (SSG) Step 18: Apply Sealant Around Water Dam Step 19: Press Vertical Gaskets Into Vertical Members Step 20: Press Horizontal Gaskets Into Horizontal Members Step 21: Place Setting Blocks Step 22: Install Glass Step 23: Press Glazing Gaskets Into Vertical Pressure Plates Step 24: Fasten Vertical Pressure Plate and Snap-on Cover Step 25: Press Glazing Gaskets Into Horizontal Pressure Plates Step 26: Screw Horizontal Pressure Plate Into Place Step 27: Seal Horizontal Pressure Plate Screw Step 28: Install Horizontal Snap-on Cover Step 29: Insert Backing Rod CONNECTION AT PERIMETER Return Leg Pressure Plate F Perimeter Runner CORNER CONDITION Outside 90 Degree Corner SUNSHADE ATTACHMENT 3 4 8 10 10 10 11 11 12 13 13 14 14 15 16 17 18 18 19 19 20 20 21 21 22 23 23 24 25 26 26 27 27 28 29 29 30 31 31 32 33 33 34 Revised April 2014 dependable@tubeliteinc.com Page 2

GENERAL CONSTRUCTION NOTES 1. These instructions cover typical product application, fabrication, installation and standard conditions and are general in nature. They provide useful guidelines, but the final drawings may include additional details specific to this project. Any conflict or discrepancies must be clarified prior to execution. 2. Materials stored at the job site must be kept in a safe place protected from possible damage by other trades. Stack with adequate separation so materials will not rub together, and store off the ground. Cardboard or paper wrapped materials must be kept dry. Check arriving materials for quantity and keep record of where various materials are stored. 3. All field welding must be done in accordance with AISC guidelines. All aluminum and glass should be shielded from field welding to avoid damage from weld splatter. Results will be unsightly and may be structurally unsound. Advise general contractor and other trades accordingly. 4. Coordinate protection of installed work with general contractor and/or other trades. 5. Coordinate sequence of other trades which affect framing installation with the general contractor (e.g. fire proofing, back up walls, partitions, ceilings, mechanical ducts, HVAC, etc.). 6. General contractor should furnish and guarantee bench marks, offset lines and opening dimensions. These items should be checked for accuracy before proceeding with erection. Make certain that all adjacent substrate construction is in accordance with the contract documents and/or approved shop drawings. If not, notify the general contractor in writing before proceeding with installation because this could constitute acceptance of adjacent substrate construction by others. 7. Isolate all aluminum to be placed directly in contact with masonry or other incompatible materials with a heavy coat of zinc chromate or bituminous paint. 8. Sealant selection is the responsibility of the erector, installer and/or glazing contractor and must be approved by the sealant manufacturer with regard to application and compatibility for its intended use. All sealants must be used in strict accordance with the manufacturer s instructions and applied only by trained personnel to surfaces that have been properly prepared. 9. Sealant must be compatible with all materials with which they have contact, including other sealant surfaces. Consult sealant manufacturer for recommendations relative to shelf life, compatibility, cleaning of substrate, priming, tooling adhesion, etc. 10. Drainage gutters and weep holes must be kept clean at all times. Tubelite will not accept responsibility for improper drainage as a result of clogged gutters and weep holes. 11. This product requires clearances at head, sill and jambs to allow for thermal expansion and contraction. Refer to final distribution drawings for joint sizes. Joints smaller than ¼ may be subject to failure. Consult your sealant supplier. 12. All materials are to be installed plumb, level and true with regard to established bench marks and column center lines established by the general contractor and checked by the erector, installer and/or glazing contractor. 13. Cleaning of exposed aluminum surfaces should be done per AAMA recommendations. 14. Due to varying perimeter conditions and job performance requirements, anchor fasteners are not specified in these instructions. For anchor fastening, refer to the shop drawings or consult the fastener supplier. 15. Check tubeliteinc.com for any updates on installation instructions. Revised April 2014 dependable@tubeliteinc.com Page 3

EXTRUSIONS Shape Description Back member for captured 1" glass Back member for captured 1/4" glass Part No. E1180: 2" x 2 1/2" E2053: 2" x 3 5/8" E1199: 2" x 4" E1025: 2" x 4 1/2" E2297: 2" x 6" E1046: 2" x 2 1/2" E1495: 2" x 4" E0977: 2" x 4 1/2" E1584: 2" x 6" Open-back perimeter E3284: 2" x 4" E3285: 2" x 6" Back member for silicone glazed 1" glass E3127: 2" x 4" E3126: 2" x 4 1/2" E3125: 2" x 6" 2" screw applied horn E3270: 1" glass E2012: 1/4" glass 2" x 4 1/2" tube E1451 1 3/4" x 4 1/2" slick tube E0041 4" x 1" F anchor perimeter runner E3162 2 1/2" x 1" F anchor perimeter runner E1094 Revised April 2014 dependable@tubeliteinc.com Page 4

Shape EXTRUSIONS Description Snap cover Part No. E0968: 2" x 1/2" E0992: 2 x 3/4" E2606: 2" x 1" E1214: 2" x 1 1/2" E0978: 2" x 2" E3642: 2" x 3" E1587: 4" x 3/4" O.S. corner adapter E2101 I.S. corner adapter E2100 Pocket reducer for 1/4" glazing E4TB69 Pocket reducer for 3/8" - 1/2" glazing E4TB80 Glass pocket - closure plate for 1" glass E3192 Return leg pressure plate E1062 Revised April 2014 dependable@tubeliteinc.com Page 5

Shape ACCESSORIES Description Insulated pressure plate Temporary glazing clip Part No. M1061 P1193 Return leg pressure plate M1202 Back member splice Insulator for M1061 P1625A: For E1180 P1625B: For E1199, E1495 P1625C: For E0977, E1025 P1625D: For E1584, E2297 P1625E: For E2053 P1625F: For E3125 P1625G: For E3126 P1625H: For E3127 P914 Temporary glazing clip (use with E3125/3126/3127) Setting block for 1" glass Snap cover splice Fixed glazing gasket Silicone glazing spacer Water dam for 1" glazed system P1108 P946: EPDM P947: Silicone P1626A: 1/2" P1626B: 3/4" PTB28: 1/8" PTB31: 3/16" P1690 P945 Water dam for silicone glazed verticals P1629 Locking lug Shear block P1265:.3125" hole diameter P1266:.375" P1267:.4375" P1320A: 4" back member P1320B: 6" P1320C: 4 1/2" P1320D: 2 1/2" P1320F: 3 5/8" P1320K: 4" open back member P1320L: 6" open back member Revised April 2014 dependable@tubeliteinc.com Page 6

Shape ACCESSORIES Description Part No. Sill anchor Head anchor F anchor T anchor Pipe sleeve spacer for 3/8" diameter bolt #10 UNC x 5/8" type B hex washer head #14-14 x 1/2" type B hex head #10 x 1/2" type B Phillips truss head #14-14 x 1/2" type B hex head P1318A: 4" back member P1318B: 6" P1318C: 4 1/2" P1318D: 2 1/2" P1318F: 3 5/8" P1318K: 4" open back member P1318L: 6" open back member P1543: 4" back member P1543A: 6" P1543B: 4 1/2" P1543C: 2 1/2" P1543E: 3 5/8" P1543J: 4" open back member P1543K: 6" open back member P2078A: For E1215 P2078B: E1180 P2078C: E2053 P2078D: E1199 P2078E: E1025 P2078F: E2297 P2078G: E3127 P2078H: E3126 P2078J: E3125 P2079A: For E1215 P2079B: E1180 P2079C: E2053 P2079D: E1199 P2079E: E1025 P2079F: E2297 P2079G: E3127 P2079H: E3126 P2079J: E3125 P2028 S357 S139 S191 S270 Revised April 2014 dependable@tubeliteinc.com Page 7

ELEVATION DETAILS Revised April 2014 dependable@tubeliteinc.com Page 8

ELEVATION DETAILS Revised April 2014 dependable@tubeliteinc.com Page 9

FRAME FABRICATION Step 1: Determine Frame Size Determine Width Check that the opening is square and plumb at both ends. Units must be installed in a true rectangle. Measure the width of the opening at the top, middle and bottom. Select the smallest dimension measured. To determine the frame width to be used, subtract a minimum of 1 from the smallest measured width, to allow a minimum of 1/2 at each jamb for shimming and caulking. Allow a larger clearance if necessary to accommodate building tolerances, an out-of-square opening, anticipated thermal expansion within the unit and/or according to project needs. 1/2" min. 1/2" min. Revised April 2014 dependable@tubeliteinc.com Page 10

Determine Height Measure the height of the opening in several places along the entire length of the opening. To determine the frame height to be used, select the smallest dimension measured and subtract 1 to allow a minimum of 1/2" at sill and head for shimming and caulking. Allow a larger clearance if necessary to accommodate building tolerances, an out-of-square opening, anticipated thermal expansion within the unit and/or according to project needs. 1/2" min. 1/2" min. Step 2: Cut Mullions to Size Verticals should be frame height found in Step #1 (rough opening height minus clearances). Vertical framing members run through as shown in the elevation overview. Cut horizontal framing members to the daylight opening (the distance between verticals) minus 1/16" total. Revised April 2014 dependable@tubeliteinc.com Page 11

Step 3: Cut Pressure Plates, Snap-on Face Covers and Snap-in Fillers to Length Cut vertical pressure plates and face covers to the same length as the corresponding vertical. Cut horizontal pressure plates to a minimum of daylight opening minus 3/8" (3/16" off each side) and a maximum of DLO minus 1/8" (1/16" off each side). Cut horizontal face covers and snap-in fillers for roll-over horizontals to the same length as the corresponding horizontals (daylight opening). To splice vertical pressure plates and face covers, allow a 3/8" gap for the splice joints. The splice in a vertical pressure plate should be 2" below the splice in the mullion, and the splice in a vertical snap-on cover should be 2" below the splice in the pressure plate as shown in Figure 1. Splice sleeve Back member Face cover splice (2" lower than pressure plate splice) Pressure plate splice (2" lower than splice of back member) Figure 1: Splice face covers and pressure plates as necessary. Revised April 2014 dependable@tubeliteinc.com Page 12

Step 4: Drill Weep Holes in Horizontal Pressure Plate Drill three weep holes in the horizontal pressure plate: two halfway between the center and the end of the pressure plate and one at the center of the pressure plate, as shown in Figure 2. Drill all weep holes 5/16" above the groove which marks the center line of the pressure plate. Pressure plate is pre-punched with holes for fasteners. Drill additional holes as required to ensure end holes are a minimum of 2 and maximum of 4 from the vertical and then assume a 10 center to center spacing for the remainder. 2" min. - 4" max. Center line Weep holes Figure 2: Install three weep holes in the horizontal pressure plate. Step 5: Mill Weep Slot in Horizontal Snap-on Cover Mill a weep slot a maximum of 1" from the end of the cover. The weep slots are to be 1/4" wide x 1/2" long as shown in Figure 3. 3/16" 1/2" x 1/4" weep slot 1" max. Figure 3: Mill a weep slot in the horizontal snap-on cover. Revised April 2014 dependable@tubeliteinc.com Page 13

Step 6: Drill Slots in Horizontal Drill two slots in the front of the horizontal back member between the reglet and the glass support tongue. The slots are.281" x.201" in diameter and centered 3/8" from the end of the horizontal member, on the V-shaped groove in the extrusion, as shown in Figure 4..281" x.201" slots 3/8" Figure 4: Drill slots in the horizontal member. Step 7: Mill Sills and Heads Mill sills and heads to clear anchor clips. This step is only necessary for installations that use tubular back members for heads and sills, not for open-back perimeter members. The notch must not damage the vertical walls of the tube, but should remove the top or bottom of the tube from wall to wall, to a depth of 3 1/16" from the end of the sill or head as shown in Figure 3 1/16" Width as required by head/sill anchor, leaving 1/8" on each side 5. Figure 5: Notch the sills, shown, and heads, similar, to fit in the anchor clips. Revised April 2014 dependable@tubeliteinc.com Page 14

Step 8: Mill Horizontal in Final Bay (if necessary) The tubular horizontals for the last bay to be installed may need to be milled on both ends, as the masonry may prevent movement of the jamb to get the frame clips into the horizontals. Mill the sill, head and intermediate horizontals in the final bay as shown in Figure 6, or attempt to spread the vertical mullions apart. 9/16" 3/4" 1/8" 1 3/4" 1/8" 1/4" Figure 6: Notch the horizontals in the last bay so they can slide over the frame clips. Revised April 2014 dependable@tubeliteinc.com Page 15

Step 9: Fasten Splice Sleeves in Lower Segments of Verticals (if necessary) Consult the approved shop drawings to see what size of 1/4-20 flat-head fasteners (minimum 3/4") to use when fastening the splice sleeves to the lower segments of the verticals. Drill and countersink four holes on both sides of the verticals (eight holes per vertical), in the locations shown on the approved shop drawings. The diameter of the holes should be appropriate for the fasteners. Slide a splice sleeve into the end of the vertical mullion where holes were just drilled as shown below. The splice sleeve is 10" long. Half its length should be inside the mullion, and half should project out the end of the mullion. 1/4" steel angle dead load clip (not by Tubelite) Splice sleeve 1" insulated glass Outline of pressure plate Sealant.040 aluminum splice Splice Hard splice Revised April 2014 dependable@tubeliteinc.com Page 16

Step 10: Add Steel Reinforcement (if necessary) Refer to approved shop drawings to determine whether the application requires steel reinforcement. If reinforcement is required, cut steel to 6 less than the frame height. Slide the steel into the vertical mullion from one end, recessing it 3 in from the end of the vertical. Drill pilot holes through the steel and the vertical mullion at the center of each horizontal, and anchor the steel to the vertical using fasteners of an appropriate size (not by Tubelite) as shown at right. Steel Fastener Revised April 2014 dependable@tubeliteinc.com Page 17

CURTAINWALL INSTALLATION Step 11: Attach Shear Block Drill.201" diameter holes into the side of the vertical back member as shown in Figure 7. Attach an intermediate shear block for the corresponding vertical back member using S139 fasteners. For dimensions, examine the table below. Dimensions also apply to where the head and sill anchors meet the vertical. However, the drilled holes must be 1" from the top and bottom of the mullion. Dim. A Dim. B S139 Figure 7: Attach shear block to the vertical back member. Clip Dim. A Dim. B Use With Extrusion Glass Tube depth P1320A 2.250" 0.886" E1199, E1495, E3283 1", 1/4" 4" P1320B 4.218" 0.897" E1584, E2297 1", 1/4" 6" P1320C 2.250" 1.136" E0977, E1025 1", 1/4" 4 1/2" P1320D 0.750" 0.886" E1046, E1180 1" 2 1/2" P1320F 1.875" 0.886" E2053 1" 3 5/8" P1320K 1.750" 1.136" E3284 1" 4" P1320L 3.750" 1.136" E3285 1" 6" Revised April 2014 dependable@tubeliteinc.com Page 18

Step 12: Butt Sill Anchor to Side of Mullion Position an end vertical back member in an opening in the masonry. Leave a gap for sealant between the masonry and the vertical. Fasten sill anchor to vertical using S139 fasteners. Head anchor is similar. Place a shim (not by Tubelite) under the sill anchor, and butt the sill anchor against the side of the mullion, as shown in Figure 8. S139 Figure 8: Butt the sill anchor against the side of the mullion. Step 13: Fasten Sill Anchor to Masonry Using the hole in the sill anchor clip as a guide, drill a hole into the masonry for the anchor bolt. Place a locking lug on the anchor clip and a washer over the locking lug as shown in Figure 9. Then fasten the anchor clip to the masonry with the anchor bolt (not by Tubelite) shown in the shop drawings. Head anchor is similar. Anchor bolt (not by Tubelite) Locking lug Figure 9: Place a locking lug on the anchor clip and a washer over the locking lug, then fasten an anchor bolt (not by Tubelite) to the masonry. Revised April 2014 dependable@tubeliteinc.com Page 19

Step 14: Slide Horizontal Onto Shear Block Seal the perimeter of the shear block to the mullion. Seal the ends of the horizontal that will attach to the vertical. Slide the end of the horizontal onto the frame clip, and fasten the horizontal to the frame clip using two S270 fasteners, as shown in Figure 10. Seal fastener heads. S270 Cap seal Seal perimeter of shear block Seal ends of horizontal Figure 10: Slide the end of the horizontal onto the shear block and fasten using two S270 fasteners. Step 15: Slide Horizontal Onto Sill Anchor Clip Seal the perimeter of the sill anchor to the mullion. Seal the ends of the horizontal that will attach to the vertical. Slide the end of the sill onto the sill anchor clip, and place shims under the sill as necessary to make it level, and to create a sealant gap. Slide the end of the horizontal onto the frame clip, and fasten the horizontal to the frame clip using two S270 fasteners, as shown in Figure 11. Seal fastener heads. For perimeter anchoring and connection details, go to page 30. S270 Seal perimeter of sill anchor Cap seal Seal ends of horizontal Figure 11: Slide the end of the horizontal onto the sill anchor and fasten using two S270 fasteners. Revised April 2014 dependable@tubeliteinc.com Page 20

Step 16: Seal Joints Between Verticals and Horizontals Seal the joints between verticals and horizontals, as shown in Figure 12. Tool the sealant into the voids, and clean off excess sealant. Sealant Figure 12: Seal the joints between verticals and horizontals. Step 17: Install Water Dams Wherever a horizontal meets a vertical, apply a bead of butyl sealant across the vertical member, as shown in Figure 13. Insert a water dam into the gap between the horizontal and vertical members where the sealant was just applied. PTI 707 butyl sealant or equivalent Water dam Figure 13: After sealing the gap between the horizontal and vertical, insert a water dam into the gap. PTI 707 butyl sealant or equivalent Revised April 2014 dependable@tubeliteinc.com Page 21

Step 17: Install Water Dam (SSG) Wherever a horizontal meets an SSG vertical, apply a bead of butyl sealant across the vertical member, as shown in Figure 14. Insert a water dam into the gap between the horizontal and vertical members where the sealant was just applied. PTI 707 butyl sealant or equivalent PTI 707 butyl sealant or equivalent Water dam (P1629) Figure 14: After applying sealant to the gap between the horizontal and vertical, insert a water dam into the gap. Revised April 2014 dependable@tubeliteinc.com Page 22

Step 18: Apply Sealant Around Water Dam Apply a bead of butyl sealant around the perimeter of each water dam. Also apply sealant across the front of the water dam stretching across the tongue of the vertical member, as shown in Figure 15. Tool the sealant into all voids and tool to ensure the sealant will not contact the edge of the glass. Infiltrated water must also be able to pass freely around the glass and out the weep hole. PTI 707 butyl sealant or equivalent Water flow Figure 15: Apply a bead of sealant around the perimeter of each water dam. Step 19: Press Vertical Gaskets Into Vertical Members Seal the heads of the S270 fasteners on the horizontal member. Press the vertical gaskets into their reglets on the vertical member, as shown in Figure 16. Press the ends of the gaskets into the sealant around the water dams. Gasket Gasket Figure 16: Press the vertical gaskets into their reglets on the vertical member. Revised April 2014 dependable@tubeliteinc.com Page 23

Step 20: Press Horizontal Gaskets Into Horizontal Members Apply butyl sealant where the vertical gaskets will meet the horizontal gaskets as shown in Figure 17. Press horizontal gaskets into their reglets on the horizontal back members as shown in Figure 18. Press the ends into the sealant. PTI 707 butyl sealant or equivalent Figure 17: Apply butyl sealant where the vertical gaskets will meet the horizontal gaskets. Gasket Gasket Figure 18: Press the horizontal gaskets into their reglets on the horizontal member. Revised April 2014 dependable@tubeliteinc.com Page 24

Step 21: Place Setting Blocks Place setting blocks at the quarter points of each light (two setting blocks per light) or as required by shop drawings, as shown in Figure 19. Use P946 for 1" glass and P948 for 1/4" glass. Setting block Figure 19: Place setting blocks at the quarter point of the light or as required by shop drawings. Revised April 2014 dependable@tubeliteinc.com Page 25

Step 22: Install Glass Glass size is calculated as daylight opening + 1" horizontally and vertically. Place glass on setting blocks, as shown in Figure 20. Glass Glass Figure 20: Place glass on setting blocks. Step 23: Press Glazing Gaskets Into Vertical Pressure Plate Press glazing gaskets (PTB28) into the reglets of the vertical pressure plate, as shown in Figure 21. Figure 21: Press glazing gaskets into the reglets of the vertical pressure plate. Revised April 2014 dependable@tubeliteinc.com Page 26

Step 24: Fasten Vertical Pressure Plate and Snap-on Cover Fasten the vertical pressure plate to the mullion as shown in Figure 22 with an S357 fastener and glazing gaskets (PTB28). Torque of 30-40 in.-lbs. should be used to fasten the pressure plate. Install the vertical snap-on cover as shown in Figure 22. Snap-on cover S357 Pressure plate Figure 22: Place the vertical pressure plate and snap-on cover. Step 25: Press Glazing Gaskets Into Horizontal Pressure Plate Gasket (PTB28) Press glazing gaskets (PTB28) into the reglets of the horizontal pressure plate. Butter the ends of the gaskets in the horizontal pressure plate with butyl sealant as shown in Figure PTI 707 butyl sealant or equivalent 23. Figure 23: Butter the ends of the gaskets in the horizontal pressure plate with butyl sealant. Revised April 2014 dependable@tubeliteinc.com Page 27

Step 26: Fasten Horizontal Pressure Plate Into Place Fasten the horizontal pressure plate in place with an S357 fastener as shown in Figure 24. Torque of 30-40 in.-lbs. should be used to fasten on the pressure plate. Seal the joint between the horizontal pressure plate and the vertical snap-on cover, and tool the sealant into the void, as shown in Figure 25. S357 Figure 24: Fasten the horizontal pressure plate into place. Sealant Figure 25: Seal the joint between the horizontal pressure plate and vertical snap-on cover. Revised April 2014 dependable@tubeliteinc.com Page 28

Step 27: Seal Horizontal Pressure Plate Fastener Seal the head of the fastener holding the horizontal pressure plate, as shown in Figure 26. Sealant Figure 26: Seal the head of the fastener holding the horizontal pressure plate. Step 28: Install Horizontal Snap-on Cover Install the horizontal snap-on cover as shown in Figure 27. Figure 27: Install the horizontal snap-on cover. Revised April 2014 dependable@tubeliteinc.com Page 29

Step 29: Seal the Perimeter Sealant Insert a backer rod into the gap between the frame and the building substrate on the top, sides and bottom of the installation as shown in Figure 28. Apply sealant to fill the void. Tool the sealant smooth. Backer rod Sealant Building substrate Figure 28: Insert a backer rod into the gap between the frame and the building substrate. Revised April 2014 dependable@tubeliteinc.com Page 30

CONNECTION AT PERIMETER Return Leg Pressure Plate Option Back member Glazing gasket (PTB28) Glass Return leg pressure plate S357 Snap cover Assembly Install glazing gaskets (PTB28) in the reglets of the vertical mullion. Install the glass. Attach glazing gasket to pressure plate. Install the return leg pressure plate to the vertical mullion using S357 fasteners. Install the snap cover to the pressure plate. Revised April 2014 dependable@tubeliteinc.com Page 31

F Perimeter Runner Option Dow Corning 995 sealant or equivalent Back member Glass F perimeter runner Dow Corning 995 sealant or equivalent Glazing gasket (PTB28) Pressure plate S357 Snap cover Assembly Install an F perimeter runner in the frame opening. Install glazing gaskets (PTB28) in the reglets of the vertical mullion. Apply structural sealant in corner between F perimeter runner, vertical mullion and glazing gasket, as well as where the F perimeter runner will meet the pressure plate. Install the vertical mullion next to the F perimeter runner. Install the glass. Attach glazing gaskets to pressure plate. Install the pressure plate to the vertical mullion using S357 fasteners. Install the snap cover to the pressure plate. Revised April 2014 dependable@tubeliteinc.com Page 32

CORNER CONDITIONS Outside 90 Degree Corner Glass Dow Corning 995 sealant or equivalent Back member Spacer Corning 9 #10 x 1 1/8" Type B (not by Tubelite) OS adapter Dow Corning 995 sealant or equivalent Glass Dow Corning 995 sealant or equivalent Assembly Attach an OS adapter (E2101) to the back member. Attach a pair of modified spacers (PTB75) to the OS adapter. Apply structural sealant beside the spacers. Set the glass. Apply structural sealant between glass. Revised April 2014 dependable@tubeliteinc.com Page 33

SUNSHADE ATTACHMENT Back member S424 Sunshade attachment bracket (P3908) Assembly Pre-drill holes at least 3/4" deep into the tongue of the back member where the S424 fasteners will go. Attach sunshade attachment brackets (P3908) to vertical mullion using eight S424 fasteners. Revised April 2014 dependable@tubeliteinc.com Page 34

SUNSHADE ATTACHMENT Sunshade attachment bracket (P3908) Back member Notched face cover (E0992) S365 Sunshade outrigger Sealant Assembly Notch a face cover (E0992) to fit around the sunshade attachment brackets, then install the face cover to the vertical. Seal perimeter of notch when face cover is installed. Using eight S365 fasteners, attach the sunshade outrigger to the sunshade attachment brackets. Revised April 2014 dependable@tubeliteinc.com Page 35