SECTION 09902 PAINT, PUTTY, AND CAULKING MATERIALS FORM Date General Contractor Painting Sub-Contractor Project Number Project Name Project Address Paint, putty, and caulking materials as specified are accepted for use on only the school project designated above. 2. Materials used shall be identical in formula to the materials designated in Miami-Dade County Public School System and Florida Department of Education Paint and Related Materials (M-DCPS/DOE Paints), latest edition. 3. Use paints, stucco and masonry paints, enamels, and metal finish coats with the specific base coats as tested and as grouped in M-DCPS/DOE Paints. 4. Submit 5 completed typewritten or legible hand printed forms for each project for A/E's acceptance. Complete forms by providing all information required. Provide additional copies of the following forms as needed to include all paint groups. 5. After acceptance is given and the forms signed by the Board, 1 copy will be returned to the Contractor and 4 copies retained by the A/E for further distribution. 6. Only materials accepted in writing shall be allowed on the job site. 7. Deviation from the above will be sufficient grounds for condemning not only such materials, but all work completed, in which case the Contractor shall properly prepare and repaint surfaces previously painted, to the satisfaction of the Board, at no additional cost to the Board. 8. Exceptions to the above are not allowed. Project No. SPECIFICATION GUIDELINES 09902-1
I. EXTERIOR STUCCO LATEX PAINT: A. Prime Coat: B. First Coat: C. Second Coat: II. METAL COATINGS: A. Prime Coat: B. First Coat: Project No. SPECIFICATION GUIDELINES 09902-2
C. Second Coat: III. INTERIOR AND/OR EXTERIOR SEMI-GLOSS A. Prime Coat: B. First Coat: C. Second Coat: IV. INTERIOR AND/OR EXTERIOR HIGH GLOSS ENAMEL A. First Coat: Project No. SPECIFICATION GUIDELINES 09902-3
A. Second Coat: C. Third Coat: V. INTERIOR PAINT A. First Coat: B. Second Coat: C. Third Coat: Project No. SPECIFICATION GUIDELINES 09902-4
VI. ALCOHOL (denatured): VII. CAULKING COMPOUND (gun grade): VIII. CAULKING COMPOUND (knife grade): IX. GALVANIZED METAL WASH: C. Other X. PUTTY GLAZING FOR METAL AND WOOD SASH, ALUMINUM GRAY: XI. SPACKLING COMPOUND: XII. HARDWOOD FLOOR FINISH: A. GYMNASIUM 1. Primer Coats Project No. SPECIFICATION GUIDELINES 09902-5
a. Trade name b. Manufacturer 2. Finish Coats a. Trade name b. Manufacturer B. STAGES, GYMNASTICS/DANCE, AND LITTLE THEATERS 1. Primer Coats a. Trade name b. Manufacturer 2. Finish Coats a. Trade name b. Manufacturer XIII. REDUCERS: Paint Materials shall be reduced with a reducer recommended by the manufacturer and accepted in writing by M- DCPS Authorized Representative. IX. PASTE FILLER FOR WOOD FLOORS: MATERIALS ACCORDING TO M-DCPS SPECIFICATIONS: Label materials with the required Federal specification numbers, when applicable. Contractor shall be responsible for making necessary investigations in the selection of manufacturers with materials meeting the specific DOE/M-DCPS Paints lists. Full monetary restitution of labor and materials shall be made for any damage suffered by the Board due to the use of any material not according to these Specifications, or which fails to meet the specified tests. 1. FLUID OIL COLORS: Project No. SPECIFICATION GUIDELINES 09902-6
2. FLOOR PAINT (Floor and Deck Enamel): 3. INTERIOR CONVENTIONAL FLAT WALL PAINT: 4. INTERIOR WALL PRIMER SEALER: 5. LINSEED OIL - RAW: 6. LINSEED OIL - BOILED: 7. LACQUER - FINISH COAT: 8. LACQUER - SAND SEALER: 9. MINERAL SPIRITS: 10. PAINT AND VARNISH REMOVER: 11. TURPENTINE (Gum): 12. TURPENTINE (Steam): 13. VARNISH (Exterior and/or Interior High Gloss): Project No. SPECIFICATION GUIDELINES 09902-7
14. VARNISH (Interior Semi-Gloss): 15. ALUMINUM PAINT: A. Trade Name C. Identification Number This is to certify the previously listed paint materials have been accepted by the A/E and the Board for use on the specified project as designated. SIGNED: Painting Contractor DATE: SIGNED: Board's Representative DATE: Five signed copies are required. All five copies shall be returned to the A/E's office for acceptance and distribution. END OF SECTION Project No. SPECIFICATION GUIDELINES 09902-8