Thurston County Permitting System Policies &Procedures Page: 1 of 3

Similar documents
On-Site Sewage Disposal Application Packet

PLANNING AND DEVELOPMENT

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

Product Dimensions (Width x Length x Height) (inches)

Oil-Water Separator Design Checklist

Grease Interceptor Design Checklist

Yavapai County Development Services

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

B17. Sewer Site Plans BULLETIN

Application for Site Plan Review

DESIGN REVIEW PROCESS AND APPLICATION

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Single-Family Dwelling Submittal Requirements

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Town of Skowhegan Application For Development Review

Residential Room Addition / Remodel Submittal Requirement Checklist

DECK PERMIT APPLICATION PACKET

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Plan Submittal and Review Checklist

Crow Wing County Mound Design

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Residential Construction Checklist Single and Two Family Construction

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Skamania County Community Development Department

Sewer Line Extension Permit Design Checklist

Clear Creek County Site Development

Fee: Received By: Date: Application #:

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

Residential Plot Plans

Skamania County Community Development Department

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

SIGN PERMIT APPLICATION

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

Conceptual, Preliminary and Final Site Plan Review in Holladay City

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Site Plan/Building Permit Review

NEW SINGLE FAMILY HOMES

PROJECT ADDRESS: PERMIT #

Minor Site Plan Review Process

PROJECT ENTITLEMENT APPLICATION

List of Figures. List of Forms

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

PRELIMINARY PLAT CHECK LIST

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Town of Rotterdam Office of the Planning Commission

Checklist for Tentative Subdivision Map

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

GENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Applying for a Site Development Review (Sign CVCBD only)

Permit Application. General Information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

1.1 GENERAL RECORD DRAWING REQUIREMENTS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

SECTION III SUBMITTALS AND APPROVALS

SECTION SUBMITTAL PROCEDURES

BERKELEY COUNTY ENGINEERING AND

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Promontory Architectural Review Committee

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

City of Keizer Floodplain/Greenway Development Application

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Applying for a Site Development Review

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

PLAN SUBMITTAL REQUIREMENTS

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Procedure to Petition for Plat Review and Site Plan Review

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NON-RESIDENTIAL DEVELOPMENT

Transcription:

Thurston County Permitting System Policies &Procedures Page: 1 of 3 Number: Title: ONST.11.POL.802 APPLICATION OF RECOMMENDED STANDARDS AND GUIDANCE FOR PRESSURE DISTRIBUTION SEWAGE SYSTEMS July 2009 VERSION Related: None Approved: Environmental Health Director Date: 7/5/11 Cancels: ONST.02.POL.802 (9/1/02) RCW/Code: WAC 246-272A, Article IV This policy clarifies how Thurston County Environmental Health applies the Washington State Department of Health Recommended Standards and Guidance (RS&G) for Pressure Distribution Sewage Systems (July 2009). 1. Shall and must items in the RS&G must be followed. Must and shall items are required for all pressure distribution systems except as noted in this policy. 2. Guidance portions of the RS&G can be used at the discretion of the designer except as specified in this policy. 3. Pump Chamber: RS&G Section 2.4.1.4 Basket-style pump chamber screens are NOT allowed for new construction. Basket-type screens are allowed only in repair situations where effluent filters CANNOT be installed in the septic tank outlet. 4. Pump Controls: RS&G Section 2.5.1.2.1 Timer controlled dosing is required for: All sites where technologies meeting Treatment Levels A or B are mandated under WAC 246-272A-0230 or Article IV, All sand-based systems, Sewage systems designed for 1000 gallons or more per day, Reduced-sized gravelless drainfields, systems installed in Soil Types 2 and 3, and The dispersal component in all repairs using the allowances of Table VI of Article IV. 5. Orifice spacing: RS&G Section 2.8.3.1 All trench systems located in a Category I, Aquifer Recharge Area will require a minimum of one orifice per 6 sq. ft of infiltrative surface area, evenly distributed. Orifice spacing of 30 inches will be allowed for beds.

Thurston County Permitting System Policies &Procedure ONST.11.POL.802 Page 2 of 3 6. Minimum Design Submittal: RS&G Section 2.9 Designs must address all the requirements of Article IV, Section 8.1. Certain sewage system types require submittal of a service contract with Certified Monitoring Specialists prior to permit issuance, see (policy) ONST.08.POL.605. Highest transport line elevation: required only for sites where it will be higher than the highest lateral invert. (i.e., pumping over a hill.) Electrical wiring diagram: NOT required with any design. User's manual: NOT required with the design for a sewage system using pressure distribution. (See section on User's Manual) 7. Record Drawing Information: RS&G Section 2.10 A complete Record Drawing submission must contain, at a minimum, the following: All items noted in Section 15 of Article IV, WAC 246-272A-265 All items listed in the attached Record Drawing Submittal Requirements dated October 13, 2010 Any provisions made to facilitate the location of lateral cleanouts (if applicable). Certification of a satisfactory pressure test: o REQUIRED: the recorded squirt height for the system overall o Not Required: squirt height for each lateral end When timers are used and after installation: o Measured drawdown in the pump chamber per dose cycle; and, o Timer settings for pump run time and pump time off. 8. User s Manual: RS&G Section 2.11 The sewage system designer must provide the homeowner a user s manual for the following types of OSS s: Proprietary treatment devices, Reduced sized drainfields, Systems designed to meet treatment level A that utilize pressure distribution as the final means of effluent treatment and dispersal. Unless specified by the health officer, user s manuals do not need to be submitted to the department.

Thurston County Permitting System Policies &Procedure ONST.11.POL.802 Page 2 of 3 9. Operation and Maintenance: RS&G Section 3.0 Operation and maintenance requirements will be included in the Operational Certificate, User s Manual, or the Recommended Maintenance information provided by the Department. 10. Compliance of pumps, controls, and associated electrical components with applicable NEC and local electrical codes is the responsibility of the manufacturer for those parts and the electrician installing them.

RECORD DRAWING SUBMITTAL REQUIREMENTS Updated 10/13/10 This document identifies Thurston County requirements for Record Drawings (formerly As-builts ) and cancels all other documents pertaining to this matter. A Record Drawing shall be submitted to the health officer upon completion of new construction, modification, or repair of an On-Site Sewage System (OSS). WAC 246-272A-0625) requires the drawing to be labeled Record Drawing. The main purpose of a Record Drawing is to provide accurate and detailed information to the homeowner who may have little or no knowledge of OSS components. The elements identified in this document are important and should assist the homeowner in locating the OSS components, as well as conducting ongoing operation and maintenance of the OSS. The drawing is a stand-alone document submitted after the installation is completed. The drawing must contain sufficient information to adequately identify the site. A re-creation of the entire lot dimensions is not necessarily needed. What is needed is a representation, to scale of the items identified in this document. A. Responsibilities (Section 14.4.2 of Article IV) 1. Installers: a. Install all portions of the OSS in accordance with the approved design or approved modification. b. Responsible for pressure testing after installation (Section 1.2 of the Recommended Standards and Guidance for Pressure Distribution). c. Inform the Licensed Designer or Professional Engineer of the results. d. Note the correction of deficiency items identified on a final inspection and inform the Licensed Designer or Professional Engineer when no re-inspection is required. e. The applicable information required shall be provided to the designer/engineer on the document supplied by Thurston County Environmental Health (INSTALLER CONSTRUCTION COMPLETION FORM). 2. Licensed Designer / Professional Engineer: a. Certify to the health officer that the on-site sewage system (OSS) installation is per the approved design or approved modifications b. Submit 3 Record Drawings for new construction prior to final occupancy for building projects located in Thurston County. c. Submit 3 Record Drawings within 30 calendar days of final inspection notification for projects other than new construction. Examples: Sewage system repairs, modifications, and city building projects, etc. 3. Thurston County a. EH: will review, request changes, and accept drawings. Thurston County Public Health and Social Services, Environmental Health Division 2000 Lakeridge Drive SW, Olympia WA 98502

Final occupancy approval will be withheld for new construction until the drawing is submitted, reviewed, and accepted by Environmental Health. The Permit Assistance Center does not schedule final occupancy inspections for Thurston County building projects until the Record Drawing is accepted. B. Requirements: 1. Dimensions (Section 15.1 of Article IV) a. The maximum size is 11 x 17 inches. b. The scale shall not be greater than one inch equals 30 feet unless otherwise authorized. It may be beneficial to include a scale bar showing 1-inch equals 30 feet or authorized scale. Final records are imaged electronically. Imaged documents when printed out may not characterize the original scale. The addition of a scale bar showing the scale will address this issue on imaged printouts. 2. Be drawn and submitted after the installation is completed. a. Drawing must be in ink b. A Red Lined copy of the approved design will not be accepted c. All information and language relating to design specifications shall be removed from the document, i.e., preconstruction notes, specific installation requirements, the use of terms to be or must be, etc. 3. Show the following: a. Licensed Designer/Licensed Professional Engineer stamp, signature and date b. Installation firm name and installation date c. Owner/applicant name d. Property tax parcel number e. Folder sequence number f. Site address g. North arrow 4. Three copies shall be submitted and distributed by the county to: a. Thurston County Public Health & Social Services, Environmental Health Division b. Property owner c. Licensed Designer / Licensed Professional Engineer by SWDOL. When a Thurston County Certified Installer submits a Record Drawing when a designer or engineer is not involved, the third copy shall be for the installer. Example: For tank placements only, a design is not required, but a site plan from a Thurston County Certified Installer is required. C. Drawing Elements: The drawing must contain and label information to adequately identify the site and locate the system components. 2

1. Structures show outline or footprint. (Building envelope is not acceptable.) a. Residence and/or sewage generating structure. b. Other structures in the vicinity of the sewage system and on the lot. c. For residential show total number of bedrooms using the OSS (primary residence plus other uses such as a Family Member Unit, Accessory Dwelling unit, Guest House, etc). 2. Components of wastewater system a. Plumbing - stub out, cleanouts. b. Tanks - septic tank, pump/siphon chamber and their size (s) c. Pumps - make and model. Document applicable pressure test results Actual run time on and off settings. (Timer only) Pump chamber draw down in inches per minute. (Timers only) All squirt test results. d. Disposal Component Trench cross-section and construction details must be included if the installation varied from the original design approval. e. Treatment devices such as an intermittent sand filter, aerobic treatment unit, or disinfection component. f. Ports inspection ports/monitoring ports (deep and shallow) / sampling ports g. Misc Anti-siphon devices, valves, valve boxes and other components such as spring check valves, dose counters, couplings, unions, etc. 3. Water Source a. Confirm the water source, i.e. single family well or connection to a public water supply b. Show the well location on the lot. Single family well or any well on the lot. c. Show well locations 100 feet or less from the OSS. d. Water lines as installed to residence and/or other structures on the property. Note: When the designer/engineer and installer are not directly involved with the installation/inspection of the water line, it is acceptable to place a disclaimer on the Record Drawing that the location is per. The statement shall include who installed the line, i.e. owner, builder, etc. 4. Reserve Area a. Location and dimension. b. Show the make-up area for systems installed with approved reductions. 3

5. Site Features a. Driveways or other existing roads. b. Setbacks to surface water, drainage ditches, footing drains, property lines, etc. 6. Other a. Note the correction of deficiency items identified on a final inspection notice. b. Information pertaining to any changes to the approved design. Any changes must be technically justified. c. Note the completion of all construction details to satisfy the requirements of a waiver. d. Septic tank or pump chamber evaluation/abandonment information. e. Note the completion of all construction details for water and sewer line crossings when not part of the approved design. f. Any information that the Licensed Designer/Professional Engineer deems pertinent to certification of the system and would help locate system components. All information must reflect what is installed. If any of the above items are not present at the time of an initial drawing, a partial drawing can be submitted. The drawing will be placed with the records until the final and finished record drawing is submitted. 4