INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Similar documents
A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

East Central College

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTAL PROCEDURES

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Answer: Qualification statement should be provided with the bid.

Section Meetings Section Material and Equipment. None Required

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

TABLE OF CONTENTS ALL OTHER SPECIFICATION SECTIONS ARE ON THE CONSTRUCTION DRAWINGS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Section Project Closeout

SECTION SUBMITTAL PROCEDURES

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SUBMITTAL PROCEDURES

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Facility Services Subgroup Preface for Divisions 21` through 28

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

SECTION BULLET- RESISTANT DOORS

SECTION WOOD DOORS

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

Working Drawing Manual

EXTERIOR PAINTING

B. Samples: For each exposed product and for each color and texture specified.

What Are Submittals?

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

A. Section includes surface preparation and the application of paint systems on the following exterior substrates: 1. Steel and iron.

1. Land survey Work. 2. Civil and Structural engineering services.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

A. Section includes surface preparation and the application of paint systems on exterior substrates.

CHAPTER 5 ARCHITECTURE

SECTION 2 GENERAL REQUIREMENTS

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Addendum #1 - Bid Package #

SECTION SIGNAGE

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles.

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

submittals 1s e c t i o n

SECTION PRE-MANUFACTURED CABINETS

SEI Certification Program Manual

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

Single-Family Dwelling Submittal Requirements

01100 SUMMARY OF WORK

State College Area School District

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

Product Guide Specification

Merrick Pet Care New Distribution Center Hereford, Texas

Solid Surface Countertops

PLAN SUBMITTAL REQUIREMENTS

*********************************************************************************************************

Ash Brook Golf Course Scotch Plains, New Jersey

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

B. Related Sections: The following Sections contain requirements that relate to this Section:

AMBICO Limited Section and WOOD BULLET RESISTANT DOORS AND FRAMES Page 1

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Jacksonville District Master

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

ADDENDUM #2 September 12, 2018

SECTION COUNTERTOPS ecox PART 1 GENERAL

DESIGN REVIEW PROCESS AND APPLICATION

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SECTION IDENTIFYING DEVICES

ADDENDUM #1. April 29, 2009

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

SECTION WOOD AND PLASTIC DOORS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Bidders for the Oak Brook Park District Family Locker Room Renovation

Transcription:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK 024119 SELECTIVE STRUCTURE DEMOLITION DIVISION 3 CONCRETE: 033000 CAST IN PLACE CONCRETE DIVISION 5 METALS: FOR STRUCTURAL STEEL SEE SPECIFICATIONS ON DRAWINGS STAMPED DIVISION 6 WOOD, PLASTICS AND COMPOSITES: 064023 INTERIOR ARCHITECTURAL WOODWORK DIVISION 7 THERMAL AND MOISTURE PROTECTION: 072100 BUILDING INSULATION 072119 FOAMED-IN-PLACE INSULATION 079200 JOINT SEALANTS DIVISION 8 OPENINGS: 081119 STEEL DOORS & FRAMES 081416 FLUSH WOOD DOORS 084110 ALUMINUM ENTRANCES AND STOREFRONTS 087110 FINISH HARDWARE 088000 GLAZING DIVISION 9 FINISHES: 092216 GYPSUM BOARD ASSEMBLIES 093100 CERAMIC TILE 095100 ACOUSTICAL PANEL CEILINGS 096510 RESILIENT FLOOR TILE 096813 CARPET TILE 099120 PAINTING (PROFESSIONAL LINE PRODUCTS) DIVISION 10 SPECIALTIES: 105200 FIRE PROTECTION SPECIALITES 108010 TOILET AND BATH ACCESSORIES 108200 LOUVERED SCREENS

DIVISION 11 EQUIPMENT NONE DIVISION 12 FURNISHINGS: 122113 HORIZONTAL LOUVER BLINDS DIVISION 21 FIRE PROTECTION: SEE SPECIFICATIONS ON DRAWINGS STAMPED DIVISION 22 PLUMBING: SEE SPECIFICATIONS ON DRAWINGS STAMPED DIVISION 23 MECHANICAL: SEE SPECIFICATIONS ON DRAWINGS STAMPED DIVISION 26 ELECTRICAL: SEE SPECIFICATIONS ON DRAWINGS STAMPED DIVISION 27 COMMUNICATIONS 270100 COMMUNICATIONS SYSTEMS

SECTION F - SPECIAL CONDITIONS BUILDING USE AND OCCUPANCY The existing building west of the project site will remain occupied. The east end exterior door, exiting from the existing building must remain functional as a means of emergency egress. The Construction Manager shall provide occupant separation from the work and shall maintain egress. Separation shall be accomplished with temporary railings or partitions along with signage. If any work on the project site affects the Life Safety Systems or utilities in the west-end building, the Construction Manager shall provide a 7 day notice to the GSU Project Manager and the Architect. The Construction Manager shall provide temporary provisions to compensate for Life Safety systems as directed by the GSU Fire Official. END OF SPECIAL CONDITIONS 1F

SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. 1.2 DEFINITIONS A. Action Submittals: Written and graphic information that requires Architect's review or other action prior to the Contractor s proceeding. B. Informational Submittals: Written information that does not require approval. Submittals may be rejected for not complying with requirements. 1.3 SUBMITTAL PROCEDURES A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on architect's receipt of submittal. 1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Architect will advise Contractor when a submittal being processed must be delayed for coordination. C. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 4 by 5 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect. 3. Include the following information on label for processing and recording action taken: a. Project name. b. Date. c. Name and address of Architect. d. Name and address of Contractor. SUBMITTAL PROCEDURES 013300-1

e. Name and address of subcontractor. f. Name and address of supplier. g. Name of manufacturer. h. Unique identifier, including revision number. i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Other necessary identification. D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals. E. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. 1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Architect. 2. Additional copies submitted for maintenance manuals will be marked with action taken and will be returned. F. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will return submittals, without review received from sources other than Contractor. 1. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect [on previous submittals, and deviations from requirements of the Contract Documents, including minor variations and limitations. Include the same label information as the related submittal. 2. Include Contractor's certification stating that information submitted complies with requirements of the Contract Documents. 3. Transmittal Form: Provide locations on form for the following information: a. Project name. b. Date. c. Destination (To:). d. Source (From:). e. Names of subcontractor, manufacturer, and supplier. f. Category and type of submittal. g. Submittal purpose and description. h. Submittal and transmittal distribution record. i. Remarks. j. Signature of transmitter. G. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. H. Use for Construction: Use only final submittals with mark indicating action taken by Architect in connection with construction. PART 2 - PRODUCTS SUBMITTAL PROCEDURES 013300-2

2.1 ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification Sections. 1. Number of Copies: Submit five copies of each submittal, unless otherwise indicated. Architect will return four copies. Mark up and retain one returned copy as a Project Record Document. 2. Number of Copies: Submit copies of each submittal, as follows, unless otherwise indicated: B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable: a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Standard color charts. e. Manufacturer's catalog cuts. f. Wiring diagrams showing factory-installed wiring. g. Printed performance curves. h. Operational range diagrams. i. Mill reports. j. Standard product operating and maintenance manuals. k. Compliance with recognized trade association standards. l. Compliance with recognized testing agency standards. m. Application of testing agency labels and seals. n. Notation of coordination requirements. C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. 1. Preparation: Include the following information, as applicable: a. Dimensions. b. Identification of products. c. Fabrication and installation drawings. d. Roughing-in and setting diagrams. e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring. f. Shopwork manufacturing instructions. g. Templates and patterns. h. Schedules. i. Design calculations. j. Compliance with specified standards. k. Notation of coordination requirements. l. Notation of dimensions established by field measurement. 2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring. 3. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 40 inches. SUBMITTAL PROCEDURES 013300-3

a. Initial Submittal: Submit one correctable, translucent, reproducible print and one blue- or black-line print. Architect will return the reproducible print. D. Coordination Drawings: Comply with requirements in Division 1 Section "Project Management and Coordination." E. Samples: Prepare physical units of materials or products, including the following: 1. Comply with requirements in Division 1 Section "Quality Requirements" for mockups. 2. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. 3. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from the same material to be used for the Work, cured and finished in manner specified, and physically identical with the product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection. 4. Preparation: Mount, display, or package Samples in manner specified to facilitate review of qualities indicated. Prepare Samples to match Architect's sample where so indicated. Attach label on unexposed side that includes the following: a. Generic description of Sample. b. Product name or name of manufacturer. c. Sample source. 5. Submit Samples for review of kind, color, pattern, and texture for a final check of these characteristics with other elements and for a comparison of these characteristics between final submittal and actual component as delivered and installed. a. If variation in color, pattern, texture, or other characteristic is inherent in the product represented by a Sample, submit at least three sets of paired units that show approximate limits of the variations. b. Refer to individual Specification Sections for requirements for Samples that illustrate workmanship, fabrication techniques, details of assembly, connections, operation, and similar construction characteristics. 6. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use. b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor. F. Product Schedule or List: Prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: 1. Type of product. Include unique identifier for each product. 2. Number and name of room or space. 3. Location within room or space. G. Submittals Schedule: Comply with General or Supplementary Conditions. SUBMITTAL PROCEDURES 013300-4

H. Application for Payment and Schedule of Values: Comply with General or Supplementary Conditions. 2.2 INFORMATIONAL SUBMITTALS A. General: Prepare and submit Informational Submittals required by other Specification Sections. B. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with General or Supplementary Conditions. C. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. D. Subcontract List: Comply with General or Supplementary Conditions. PART 3 - EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect. B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3.2 ARCHITECT'S ACTION A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action. B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken. C. Submittals not required by the Contract Documents will not be reviewed and may be discarded. END OF SECTION 013300 SUBMITTAL PROCEDURES 013300-5

SECTION 018116 - CONSTRUCTION WASTE MANAGEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous demolition and construction waste. 2. Recycling nonhazardous demolition and construction waste. 3. Disposing of nonhazardous demolition and construction waste. B. Related Sections: 1.3 DEFINITIONS A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging. B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations. C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction. D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse. E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility. F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work. 1.4 PERFORMANCE REQUIREMENTS A. General: Achieve end-of-project rates for salvage/recycling of 75 percent by weight of total nonhazardous solid waste generated by the Work. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. 1. The following items must be recycled or salvaged (80 percent by weight for each item): a. Asphaltic Concrete paving b. Concrete CONSTRUCTION WASTE MANAGEMENT 018116-1

2. The contractor shall recycle at least 50 percent by weight of all new waste generated by new construction. 1.5 ACTION SUBMITTALS A. Waste Management Plan: Submit the Waste Management Plan to the owner s representative when the project schedule is submitted. 1.6 INFORMATIONAL SUBMITTALS A. Waste Reduction Progress Reports: Submit the Waste Progress Report with payment invoices. Use Form CWM-2 for demolition waste. Include the following information: 1. Material category. 2. Generation point of waste. 3. Total quantity of waste in tons. 4. Quantity of waste salvaged, both estimated and actual in tons. 5. Quantity of waste recycled, both estimated and actual in tons. 6. Total quantity of waste recovered (salvaged plus recycled) in tons. 7. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste. B. Waste Reduction Calculations: Submit the Waste Reduction Calculation with final payment; submit calculated end-of-project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work. C. Records of Donations: Indicate receipt and acceptance of all salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt. D. Records of Sales: Indicate receipt and acceptance of all salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt. E. Recycling and Processing Facility Records: Indicate receipt and acceptance of all recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices. F. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of all waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices. 1.7 QUALITY ASSURANCE A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction. B. Waste Management Conference: This conference shall be combined with the pre-construction conference. Review methods and procedures related to waste management including, but not limited to, the following: 1. Review and discuss waste management plan including responsibilities of waste management coordinator. CONSTRUCTION WASTE MANAGEMENT 018116-2

2. Review requirements for documenting quantities of each type of waste and its disposition. 3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays. 4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities. 5. Review waste management requirements for each trade. 1.8 WASTE MANAGEMENT PLAN A. General: Develop a waste management plan according to ASTM E 1609 and requirements of this Section. Plan shall consist of waste identification, waste reduction work plan, and cost/revenue analysis. Distinguish between demolition and construction waste. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan. B. Waste Identification: Indicate anticipated types and quantities of demolition, site-clearing and construction waste generated by the Work. Use Form CWM-1 for demolition waste. Include estimated quantities and assumptions for estimates. Shall be submitted for approval, within 14 days of notice to proceed. C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Use Form CWM-1 for demolition waste. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures. 1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work. 2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers. 3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers. 4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers. 5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility. 6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located. D. Cost/Revenue Analysis: The Cost/Revenue Analysis shall be completed at the end of the project and submitted prior to final material completion payment request. Indicate total cost of waste disposal as if there was no waste management plan and net additional cost or net savings resulting from implementing waste management plan. Use Form CWM-3 for demolition waste. Include the following: 1. Total quantity of waste. 2. Estimated cost of disposal (cost per unit). Include hauling and tipping fees and cost of collection containers for each type of waste. 3. Total cost of disposal (with no waste management). 4. Revenue from salvaged materials. 5. Revenue from recycled materials. 6. Savings in hauling and tipping fees by donating materials. 7. Savings in hauling and tipping fees that are avoided. 8. Handling and transportation costs. Include cost of collection containers for each type of waste. 9. Net additional cost or net savings from waste management plan. CONSTRUCTION WASTE MANAGEMENT 018116-3

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 PLAN IMPLEMENTATION A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract. B. Waste Management Coordinator: Engage or assign a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan. Coordinator shall be present at Project site full time for duration of Project. 1. The Waste Management Coordinator shall actively monitor and sort all wastes in dumpsters. Additional sorting by hand will be necessary during the course of demolition. The Coordinator shall also work closely with all trades to make sure that recycling dumpsters are conveniently located to serve on-going demolition activities. C. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site. 1. Distribute waste management plan to everyone concerned within three days of submittal return. 2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal. D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. 1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold. 3.2 SALVAGING DEMOLITION WASTE A. Salvaged Items for Sale and Donation: Not permitted on Project site. 3.3 RECYCLING DEMOLITION WASTE A. Asphaltic Concrete Paving: 1. Break up and transport paving to asphalt-recycling facility. B. Concrete: Remove reinforcement and other metals from concrete and sort with other metals. CONSTRUCTION WASTE MANAGEMENT 018116-4

3.4 DISPOSAL OF WASTE A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction. 1. Do not allow waste materials that are to be disposed of accumulate on-site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. 3. Provide weight tickets to GSU Project Manager. B. Burning: Do not burn waste materials. C. Disposal: Transport waste materials off Owner's property and legally dispose of them. 3.5 ATTACHMENTS A. Form CWM-1 for demolition waste reduction work plan. B. Form CWM-2 for demolition waste identification. C. Form CWM-3 Waste Management Cost/Revenue Analysis END OF SECTION CONSTRUCTION WASTE MANAGEMENT 018116-5