Satellite trends. Technical and business technology. and regulatory challenges

Similar documents
SMALL SATELLITE REGULATION WRC-15 OUTCOME AND RESULTS OF THE ITU-R WP7B STUDIES

ITU Symposium and Workshop on small satellite regulation and communication systems Prague, Czech Republic, 2-4 March 2015

ITU RADIO REGULATIONS and SMALL SATELLITES

Most important aerospace outcomes of the WRC-15

ISIS Innovative Solutions In Space B.V.

Frequency Registration for Small Satellite Missions

Innovation, Science and Economic Development Canada Spectrum Licensing

RESOLUTION 155 (WRC-15)

Characteristics, definitions and spectrum requirements of nanosatellites and picosatellites, as well as systems composed of such satellites

Current practice and procedures for notifying space networks currently applicable to nanosatellites and picosatellites

ITU RADIO REGULATIONS. SMALL SATELLITE Earth Stations (TA)

Satellite Regulation: An introduction for new entrants

Regulations, WRC 2015/2019:

Nano and Picosatellites

Satellite Regulatory Framework in Japan

Results and implications of World Radiocommunication Conference, Omar KA BR/SSD/SSC

Satellite Orbit & Spectrum Resources for Future Innovation WRC-15 OUTCOME

WRC-15: Key Issues. Joaquin RESTREPO Head, OPS Division ITU, Radiocommunication Bureau

INNOVATIVE SOLUTIONS IN SPACE Small satellites: today's emerging applications, tomorrow's spectrum management challenges

APT Preliminary Views on WRC-19 agenda iitems 1.4, 1.5, 1.6, 7 and 9.1 (Issues 9.1.2, and 9.1.9)

Update on legal and policy aspects of small satellites: sustainability, frequency (interference), registration and ownership

Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8)

ITU-APT Foundation of India NATIONAL WORKSHOP ON WRC-19 PREPARATION 22 nd February 2018, New Delhi

ACHIEVING SPECTRUM HARMONISATION TO DELIVER CONNECTIVITY TO NEXT 1 BILLION Joaquin Restrepo, Chief of Outreach and Publication Services Division, BR/

BR DIRECTOR'S REPORT TO WRC-15 NGSO Issues

Agenda Items for WRC-19. Inter-American Telecommunication Commission (CITEL) Permanent Consultative Committee II

ESIMS - Mobile broadband provision on a global scale: an harmonised regulatory approach

Small satellite developments in ESA satellite telecommunications group

Outcome of World Radiocommunication Conference, 2015

Spectrum management for radio astronomy in Europe and beyond

Implementation of. on Satellite Services. Yvon Henri

Satellite Regulation to Foster Broadband Access

Consultation on the Use of the Band GHz

World Radio Conferences, WRC

Dear Sir, Regards. Dr Mike Willis. Head of Spectrum Policy, UK Space Agency

CRAF REPORT TO CORF TALAYEH HEZAREH, CRAF FREQUENCY MANAGER WIM VAN DRIEL, CRAF CHAIR

Satellite Issues. WRC-19 agenda items 1.5, 1.6, 7. Jack Wengryniuk Chairman, WP 4A

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016

CubeSat Issues: Where Are We?

Evolving International Regulation on Satellite Services

Technical and Regulatory Studies on HAPS

A Technical Comparison of Three Low Earth Orbit Satellite Constellation Systems to Provide Global Broadband

Receivability. Request for Coordination

Satellite Services Regulatory Issues and Broadband Internet

O3b A different approach to Ka-band satellite system design and spectrum sharing

WRC-19 Conference Proposals Interface (CPI) User Guide

CONSIDERATION OF THE OUTCOME OF WRC-12 AND PREPARATION OF INITIAL ADVICE ON A DRAFT IMO POSITION ON WRC-2015 AGENDA ITEMS

EXPERIMENTAL STATION FREQUENCY COORDINATION REQUEST 1 USING FREQUENCIES ALLOCATED TO THE AMATEUR AND AMATEUR-SATELLITE SERVICES

PRESENTATION ON WRC-15 ISSUES

5 National Footnotes to the Table of Frequency Allocations. NF0 ( KHz)

Science Outcomes of WRC-12 Presentation to the CORF May 17, Tomas E. Gergely

World Radiocommunication Conference 2019 and 2023 issues. Eric ALLAIX METEO-FRANCE WMO SG-RFC CHAIRMAN

AGENDA ITU Regional Workshop Current Trends and Best Practices of Satellite Communications Minsk, May ATDI Experience

Implementation of WRC-15. for Space Services. Hon Fai Ng. Space Services Department

PART 1 : From WRC-15 to WRC-19 Setting the basis

ECC Decision (05)11. Approved 24 June 2005

Earth Stations in Motion (ESIM) Studies in the Ka-Band (WRC-19 A.I. 1.5) and other ITU-R relevant issues

WRC-07 Radio Astronomy Preparations CORF Meeting October 15, 2006

RRS-17 Africa Forum Emerging Innovative Technologies

Orbit/Spectrum Allocation Procedures

AGENDA ITEMS UNDER PREPARATION BY SOUTH AFRICA FOR THE WORLD RADIOCOMMUNICATION CONFERENCE 2012 June 2009

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

World Radiocommunication Conference 2019 (WRC-19)

Question 1: Do you have any comments on our approach to this review?:

IARU Positions on WRC-15 Agenda Items

COMMENTS OF TELESAT CANADA

Xihua University; Chengdu, Sichuan, China: 11 Jan. 2016

ARTES 1 ROLLING WORKPLAN 2010

Orbit Spectrum Allocation Procedures ITU Registration Mechanism

Opportunities For New Entrants

ATTACHMENT A to FCC Public Notice DA

UN/NEPAL WORKSHOP on GNSS APPLICATIONS December 2016, Kathmandu, Nepal. Presented by Dominic Hayes. Harmful Interference (HI) related to

Efficient use of Satellite Resources through the use of Technical Developments and Regulations

FCC FACT SHEET* Streamlining Licensing Procedures for Small Satellites Notice of Proposed Rulemaking, IB Docket No

Science Outcomes of WRC-12 Presentation to the BPA April 27, 2012

International Maritime Organization

GUIDELINES FOR THE PREPARATION OF PROPOSALS FOR WRC-19

SPACE FREQUENCY COORDINATION GROUP (S F C G)

Future IMT Bands: WRC-15 & C-band Satellite Solutions for the Caribbean. David Hartshorn Secretary General GVF

5G NETWORKS DEVELOPMENT IN THE RUSSIA: EXPERIENCE AND PLANS

9/22/08. Satellite Systems. History of satellite communication. Applications. History Basics Localization Handover Routing Systems

NASA Spectrum Management Update: WRC-11 Issues and Objectives and Domestic Concerns

UNMANNED AIRCRAFT SYSTEMS STUDY GROUP (UASSG)

Frequency sharing between SRS and FSS (space-to-earth) systems in the GHz band

Radiocommunication Bureau (BR)

Recommendation ITU-R M (09/2015)

STATUS OF ATU PREPARATIONS FOR WRC-19

K/Ka Band for Space Operation Services, Pros and Cons. ITU International Satellite Symposium 2017 Ing. Hernan Sineiro

ITU and ITU-R Vadim Nozdrin Study Group Department Radiocommunication Bureau

UPDATES to the. Rules of Procedure. (Edition of 1998) approved by the Radio Regulations Board. Contents

ARTICLE 22. Space services 1

5G and IMT Identification - Views from CEPT- Alexander Kühn (CPG-19 Chairman) March 2017

Footnotes to National Frequency Allocation of Japan (Column 4)

The Network Effect, 5G and Satellite Communications

Future use of the band MHz

Decisions on the Frequency Bands GHz, GHz and GHz

Consultation on the Technical and Policy Framework for Radio Local Area Network Devices Operating in the MHz Frequency Band

RECOMMENDATION ITU-R BO.1834*

ITU Radio Regulations. ITU Radiocommunication Bureau

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Transcription:

Satellite trends Technical and business technology and regulatory challenges Attila MATAS am@orbitspectrum.ch

WRC-15 GFT Decision Seamless satellite based ADS-B GFT - world wide coverage 2 ITU

WRC-15 UAS Decision Unmanned Aircraft Systems (UAS) Use of FSS bands for control and nonpayload communications (CNPC) of UAS in non-segregated airspaces Out-LOS LOS 3

Non-GSO satellites Advantages Less booster power required Less delay in transmission path Suitability for providing service at higher latitude Lower cost per satellite to build and launch satellites Disadvantages Satellite system and ground segment are expensive Less expected life of satellites due to ionizing radiation effects, requires frequent replacement Requirements for deorbiting

Non-GSO satellite projects Nowadays Space science missions, navigation (GPS, Galileo, Glonass, Compas) and mobile-satellite systems (Iridium, Globalstar) First non-gso broadband from O3B

Satellite technology Era of microsats, nanosats Mass production brings down the cost Technological advancements Satellites terminals are smaller and cheaper Ka-band applications New technologies optical links, electronic propulsion

How it is non-gso different? Cost per kg to LEO (USD) 1990s 2016 >10 000 [1 600] 4 000 (Dnepr-1) (FH projected) Teledesic OneWeb Cost per sat. (USD) 20mil/35mil [0.5mil] Project cost (USD) 9bn 1.5-2bn

How is the satellite communication different? Investments More IT/TECH - companies ready to invest (Google, Facebook) Launch Costs Launch costs are down, new entrants in the market SpaceX, Virgin Galactic, Orbital ATK etc Market Internet is very different There are millions without access Big Data requires more users to mine data Mobile is the next market to win New applications ADS-B, UAS, IoT, ESiM Competition More players Support from satellite operators

High Throughput Satellite (HTS) Improved capacity, higher throughput rates, lower space segment cost per MB through frequency reuse and multiple spot beams 1. Is the future towards a fully HTS? 2. Will traditional FSS satellites cease to exist? 3. Does the current Radio Regulations fit to the concept of HTS with its operational flexibility? 9 ITU

Electrically powered propulsion are more fuel efficient than chemical ones, so an enormous amount of mass can be saved through the need for less fuel on board the satellite. However, orbit raising takes several months to reach GSO. 1. What is the regulatory impact? 2. If regulatory deadline is missed should this be dealt with case by case? 3. Should bringing into use be modified to take electric propulsion into account? 10 ITU

On Orbit Servicing Providing satellite operators with lifeextension (beyond-end-of-fuel continuous service) and other in-orbit services (relocation, orbit correction, inclination correction, bring-into-use (BIU) and deorbiting) using small satellites. 1. What could be the frequency / service used by small satellites for inorbit service and TT&C? 2. Can the current Radio Regulations procedures API / Coordination / Notification support such services? 3. Is there a demand for such services in view of 15-20 years lifetime of a satellite? 11 ITU

Small satellites A standard 1U" CubeSat has a volume of one liter - 10 cm cube and a mass of 1 kg, orbiting at 300-600 km circular orbit, 1W transmitter on 145 or 435 MHz amateursatellite service band. Source: Rasmus G. Sæderup/AAU Student Space (University of Aalborg, Denmark) ITU 2016

Why Small Satellites? Faster, Cheaper, Better, Smaller Faster Cheaper Easy Smaller to build/launch (<1 year) to build/launch (10 s of k$) modular & standardised (CubeSats) latest technology (lighter and efficient) Also promotes: Technology transfer, Collaboration, Education, Earth Science, Testing innovative technologies,... But this comes with drawbacks 13 ITU 2016

Drawbacks! no regulatory definition for small satellites in the ITU RR (only geostationary (GSO) and non-gso satellites) Limited Launching opportunities > mission delays No/Little Orbit Control > higher collision risks Small/Unreliable Power Source > large & costly ground stations Limited Lifetime > low reliability of electronics Limited Mission Types > commercially unsustainable Limited Regulatory Certainty > Lengthy time for Space Activity License > Lengthy ITU frequency/coordination 14 ITU 2016

Small satellite characteristics? ITU-R Question 254/7 Characteristics and spectrum requirements of satellite systems using nano and pico satellites The ITU-R WP7B finished study Question 254/7 Report ITU-R SA.2312 Characteristics, definitions and spectrum requirements of nanosatellites and picosatellites, as well as systems composed of such satellites Report ITU-R SA.2348 Current practice and procedures for notifying space networks currently applicable to nanosatellites and picosatellites For more info see ITU-R WP7B studies: http://www.itu.int/en/itu-r/study-groups/ 15

Small satellite Launches Committed to Connecting the World Depending on specific mission objectives, small satellite missions May or may not have particular orbital requirements May have a number of potential launch opportunities available, and may thus not have knowledge of specific orbital characteristics until a launch vehicle is selected Have been launched mostly as secondary payloads, meaning that the primary mission for the launch vehicle involves the launch of one or more larger satellites Because of the interest in small satellites, launch/mission developers are now considering whether dedicated small satellite launches and/or launch vehicles would be useful 16

Small satellite TT&C and ground Committed to Connecting segment the World Under No. 22.1 of the RR, space stations shall be fitted with devices to ensure immediate cessation of their radio emissions by telecommand In order to comply with requirements to control and have the ability to cease transmissions, small satellites have implemented a passively-safe system - satellite is active ONLY when in view of an associated earth station Most small satellite missions are utilizing a single small earth station Recent developments in networks of cooperative earth stations have enabled to receive telemetry throughout large proportions of the orbit. In this case the satellite service area shall be declared global 17

Small satellite regulatory time limits Committed to Connecting the World IARU Coordination (if applicable) Signing of Launch Service Contract Satellite Launch bringing into use window Submit API information BR Publish API/A special section BR Publish API/B special section Submit ART 11 Notification 3 months for treatment by BR 4 months for comments from other administrations > 2 months for coordination with administrations who submitted comments MAXIMUM 7 YEARS! 18

WRC-15 Decision - 1 SUP RES-757(WRC-12) Consider whether modifications to the regulatory procedures for notifying satellite networks are needed to facilitate the deployment and operation of small (nano- and pico) satellites WRC-15 decision NO need for any special regulatory procedures to facilitate the deployment and operation of nano- and pico satellites 19

WRC-15 Decision - 2 Resolution 659 (WRC-15) Studies to accommodate requirements in the space operation service for non-geostationary satellites with short duration missions resolves to invite WRC-19 (AI 1.7) to consider the results of ITU-R studies and take necessary action, as appropriate, provided that the results of the studies referred to in invites ITU-R below are complete and agreed by ITU-R study groups, invites ITU-R 1 to study the spectrum requirements for telemetry, tracking and command in the space operation service for the growing number of non-gso satellites with short duration missions, taking into account RR No. 1.23 (space operation service); 2 to assess the suitability of existing allocations to the space operation service in the frequency range below 1 GHz, taking into account recognizing a) and current use; 3 if studies of the current allocations to the space operations service indicate that requirements cannot be met under invites ITU-R 1 and 2, to conduct sharing and compatibility studies, and study mitigation techniques to protect the incumbent services, both in-band as well as in adjacent bands, in order to consider possible new allocations or an upgrade of the existing allocations to the space operation service within the frequency ranges 150.05-174 MHz and 400.15-420 MHz 20

Committed to Connecting the World Small satellite operation Issues Operation in the free ISM bands ISM band is NOT allocated to ANY space service! ISM equipment or appliances to generate and use locally radio frequency energy for domestic or similar purposes, excluding applications in the field of telecommunications Operation without a licence in the free ham frequency band Utilisation of Globalstar or Iridium earth terminal on board of small satellite for data collection Commercial use of amateur-satellite bands RR ART 25 and No. 1.56 apply (no commercial use!!) 21

Committed to Connecting the World Thank you for your attention! Questions? Attila MATAS am@orbitspectrum.ch