RECOMMENED TOOLS FOR MACHINING COUNTERTOPS

Similar documents
QUARTZ FABRICATION MANUAL

CUTTING. The direction of the slabs 01. Planning cut-outs CUTTING WITH A DISC CUTTER 02. Making cut-outs with a disc cutter 04

BASIC RECOMMENDATIONS FOR FABRICATING WALKER ZANGER S SECOLO PORCELAIN SLABS

SILESTONE TRAINING MANUAL

EZYSTONE WORKSURFACES

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

WOOD COUNTERTOP INSTALLATION INSTRUCTIONS

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Seamed Undermount Bowls

GlassTech Contact: Penny Cho Phone:

TECNICAL MANUAL COUNTERTOP APPLICATION

Tape Measure Metal Clippers Screw Bit Set With Extensions

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

INSTALLATION GUIDE VERSION 11/14

Our existing DG diamond tools are as follow:

Before you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4

Installation Instructions

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

COFFEE TABLE WITH RECESSED TRAY

Instructables Butcher Block Top

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Grenite Installation Information.

Traditional Undermount: S Method (Undermount):

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.

Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

Robert Bosch GmbH. Lounge light fixture

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Frameless Fixed Panel Slider

MANUFACTURE GUIDELINES

Denise M. DeRose Handled Clamshell Handbag

Guidelines for working with

Coffee table with recessed tray

Installation Instructions Stainless Steel Wall Panels

BY LACKMOND TILE PRODUCTS AND SOLUTIONS EQUIPMENT ACCESSORIES DIAMOND TOOLS

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

Product number: TS-CS/6 x 24 - TB - S

BONDO PROCESS. Installation Guide.

Curium 19.4H Installation Instructions & Parts List

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

Framework joints FABRICATION - WOOD JOINTS. Corner joints. Tee joints. Worksheet 15a. Cable Educational Ltd

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

B A T H R O O M G L A S S

ZENESIS. Pattern Technology: Hybrid Layering Performance Runs Deep. What is ZENESIS Pattern Technology? FROM THE COMPANY THAT STARTED A REVOLUTION

Masterpiuma3 Glass &Tile Cutters:

Next Wave Commemorative Chess Board

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system

Frameless Inline Door With Return QCI5263

Super 2.5-EZ. Sheetrock Wall. Sheetrock Wall 10'-10" 2.5V-EZ 2.5V-EZ 2.5A-EZ

INSTALLATION INSTRUCTIONS

Installation Guide 1

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Installation Instructions for easy to install Texture Plus faux wall panels

Industrial Contractors Supplies, Inc.

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

3Insert the second rod no. 4

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

1Use the metal file to smooth

Frameless Inline Door QCI5248

MUDGUN Drywall Finishing System

Wall Panel Installation

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

Seam Locations and Cutout Positioning. Material Review. Warehousing. Inspection

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

installation manual m y w a l l a r t. c o m

Deauville Installation Guide

Wilsonart Decorative Edge Fabrication Manual

Fabrication instructions

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Hatch Installation For Pygmy Solo and Double Kayaks

How To Install Windows: Nail-Fin Application

Curium 19H Installation Instructions & Parts List

Robert Bosch GmbH. Minimalist washstand

Frameless Fixed Panel Slider QCI5279

Robert Bosch GmbH. Wall organiser

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Traditional Grinding & Polishing

Frameless Inline Door QCI5254

SlipGrip Data Sheet & Installation Guide

Unit No. 1413NP, 1713NP, 1813NP Infinity Continuous Hinge Frameless Door & Inline Panel with No Post Shower Enclosure

Radon 07 Installation Instructions & Parts List

Method of Build 1. Fire. Sound

Learn how to make decorative rivets while working with this uncommon alloy. by Addie Kidd

Jeep Cherokee Door XJ Set Part # Revision J

Portofino Installation Guide

Unit No. 6150, 7150 Deluxe Framed Sliding Tub/Shower Enclosure

Portofino Case2 Installation Guide

FILE - DIAMOND GRIND CONCRETE STEPS

Laminate Floor Installation Guide

Product Catalog. For Distribution Contact Us :

So if you re building or remodeling a kitchen or bath, Decorative Edge moldings are the affordable design option you just can t afford to overlook.

BUILDING A GOAL WALL DO IT YOURSELF! INSTRUCTIONS FOR A GOAL WALL

Transcription:

Fabrication Manual

RECOMMENED TOOLS FOR MACHINING COUNTERTOPS 1. Blades a) Segmented blade for porcelain. 4. Polishing Discs a) Silicon Carbide velcro discs for dry use. Grit 60, 120, 220, 400. 2. Grinding Discs a) Silicon Carbide velcro discs for wet use. a) Electroplated diamond grinding disc, type G30 Refining and trimming edges. b) Cup wheels, medium, grain 60. Beveling and pre-grinding edges c) Felt Pad 3. Epoxy Soldapiedra Interior applications only. Not suitable for Exterior. Must be used with Tennax hardener. Color matching pigments available 5. Core Drill 20-35 mm Electroplated diamond, cutting drill bits. 20-35mm diameter. Use water for cooling. Refer to installation recommendation manual for more info on interior and exterior adhesives and grouts.

5. Core Drill 6-12 mm Electroplated diamond, cutting drill bits. 6-12mm diameter. Use water for cooling. 2. Handling NEOLITH: NEOLITH slabs must be loaded, unloaded and transported by means of a forklift, gantry crane or other lifting device. In every case of handling and transport, the slabs should be balanced considering its center of gravity. Handling suggestions: 1) Cut a 2 cm. thick plank to roughly the following dimensions: 3 meters x 20 cms. 6. 4 Angle grinder and 7 Buffer 2) Attach two fixtures to the edge of the plank. (This will prevent the plank from falling in between the slabs.) NEOLITH 12MM COUNTER SURFACES 3) Place the plank in between the slab(s) you want to lift. Make sure the plank is placed on the backside of the slab, where the fiberglass mesh is glued. 1. NEOLITH SLAB DIMENSIONS: STANDARD SLAB DIMENSIONS The NEOLITH slab (3250 x 1560mm raw slab) is the largest available on the market. *NEOLITH can be cut down to any size or format, maintaining the same technical and aesthetic properties. NEOLITH slabs will now come without a fibre glass backing except Arctic White which will still have a fibre glass backing for reinforcement. 1. Inspecting NEOLITH: Before commencing fabrication perform a visual control of the slab for: Pigment contamination. Blisters, cracks & fissures. Warping.

Handling suggestions: 4) Place the clamp over the slab(s) and the plank. Manual Handling suggestions: Moving a NEOLITH slab: THE RIGHT WAY! Carried vertically at all times 2. Handling NEOLITH: 5) Fix the clamp and lift the slab(s) with caution. Try to avoid sudden changes of direction. AVOID! Carrying horizontally

Manual Handling suggestions: Placing a Neolith Slab on a bench: THE RIGHT WAY! Supported and tilted Transporting NEOLITH: NEOLITH must always be in a vertical position when handling manually. CUTTING NEOLITH: Segmented blade for porcelain. WET cutting TABLE cutting Regular bridge saws or cutting tables. Disc Diameter (mm) RPM 300 mm 2500 1,0 350 mm 2200 1,0 400 mm 1900 1,0 WATERJET cutting (m/min) To ensure a good finish it is recommended to start and finish the cut with a slower speed of 0,3 m/min. Recommended cutting speed: AVOID! Having unsupported panels Pressure (Bars) 3900 0,7 CNC Machines (m/min) Core bit for drilling holes - Recommended downwards speed: RPM (mm/min) 4500 20 Finger bit - Recommended cutting speed: RPM (mm/min) 4600 120 DRY cutting Hand Tools Using regular granite & marble hand tools, make use of safety systems, such as dust collectors. RPM (m/min) 11 000 0,7

NEOLITH-drilling holes: Electroplated Diamond, Cutting Drill Bits. NOTE: use the drill without the hammer action. Recommendations for L cuts: Drill prep holes in every inside corner before cutting L-shaped counter tops. This will relieve pressure and eliminate weak points. Installing and fixing sinks Undermount Sink When installing an under-mount sink, the cut out should be a little bit smaller than the sink. Bevel and polish the internal edges. Cut-outs Requires a perfectly flat and straight working bench surface, as it can flex under surface unevenness. NOTE: Cut-outs are made by first drilling out the corners. The minimum radius of the corner should be 6 mm. Over-mount installation. Flatten the edges of the cut-out and leave a space between the fixture and the edge of the cut-out. When fabricating a cut out please bear the following in mind: The minimum distance between a cut-out and the edge of the slab should be at least 8 cm. The distance between a hole for a tap and the cut-out should be at least 5cm. Cut-outs not supported by a solid sub-surface should be reinforced with a suitable material such as granite strips, aluminium bars or high density polyurethane foam strips. Flush installation. Fabricate a cut-out to fit the perimeter of the fixture. Afterwards mark the perimeter of the overlapping part of the fixture. Grind down carefully the thickness of the overlap to make sure the exterior of the overlap coincides with the surface of the countertop. 8 cm 5 cm NEOLITH 45 mitre 8 cm Recommendations for cutting 12mm slabs: removing 2-3 cm of the perimeter of the slab, the first and last 15 cm of a straight cut should be at 0,5 m/min, while using our new segmented blade allows a smooth & clean cut. Machined Edges can be performed by any type of machine, with water. Cut the slab directly at a 45 degrees angle. Reduce the 45 degree angle a bit on the back part of the mitred cut, to leave room for the adhesive. Recommended speed: Depends on the diameter of the disc, as stated in the section on Table cutting

NEOLITH 45 mitre - continued Manual Cutting can be done without water: First you make a straight cut with a 4 Diamond blade, afterwards you grind down the edge with a electroplated diamond grinding disc, later on you finish and smoothen the 45º edge with a cup wheel. Recommended speed: 1M/minute Dry Polishing NEOLITH: Dry polishing: up until grit 400. Silicon Carbide velcro discs for dry use. Grit 60, 120, 220, 400. Recommended speed 2.000 RPM Start off with the lowest grit and finish with the highest grit, if required the edge can be buffed using polishing wax. Machined Edges Manual Fabrication 1. 2. 3. 4. 5. Grind down the edges with a electroplated diamond grinding disc leaving a few millimeters from the edge. Grind down the remaining millimeters with a grit 60 cup wheel and smoothen the edges. Fixing brackets must be used. Make sure to distribute the adhesive evenly to ensure a strong joint. To guarantee optimal strength, the mitred edge is reinforced using any suitable material (e.g. granite strips, aluminium bar or high density polyurethane bars). After hardening bevel and polish the joint to the desired size. Wet Polishing NEOLITH: Polished edges are fabricated by traditional polishing discs for granite of different grain sizes. Wet polishing: up until grit 1500. Silicon Carbide velcro discs for wet use. Joining NEOLITH: Ensure that all the edges are smooth and straight and line up properly before you joint Neolith. Attach one or two soft rubber suction cups on either side of the joint you are joining and attach turnbuckles between the suction cups. You will use this to pull the two pieces together as the seam dries. Leave room so you can work underneath the turnbuckle attachments. Apply adhesive and tighten the turnbuckles to squeeze the two pieces together. Don t over tighten or you ll pull the suction cups off the countertops. Pull a wet razor blade or putty knife along the edge of the adhesive to remove excess and to create a smooth seam that s flush with the surface. Wait for the adhesive to dry, with the suction cups in place. Reinforce the seam underneath with recommended material. DO NOT POLISHING THE SEAM. NEOLITH Edges - General Note Neolith surfaces should always have a bevel or pencil edge between 3-5mm