Innova. Concealed frame doorsets. Installation instructions

Similar documents
Fire rating: NFR/FD30. Una. Riser door systems. Installation instructions

Arriva. Concealed frame doorsets. Installation instructions

Trim type: Shadow gap. Fire rating: FD30. Enigma. Pocket sliding door systems. Installation instructions FD30 S

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Instructions

CARE OF TIMBER DOORS ON SITE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

x2 1/4 (6mm) Floor Anchor

INTRODUCTION Tools Required Laminate Washroom Products... 4 DUCT PANELS Fixing the Frame: Fixing the Shadow Panels...

Installation Instructions and Ordering Information

Gyproc Proflex Access Panels - Installation Guidance Notes

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Vanity Installation Instructions

ROCKET FLUSH HINGED DOOR FRAME

Product data sheet R106FS POWERMATIC FREE SWING DOOR CLOSER

x2 1/4 (6mm) Floor Anchor

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

Tools Required. * When installing on a fire door, please see instructions below. *

Contents. Simplifying interior design and functionality. Concealed frame doorsets. Arriva introduction. Innova introduction.

Installation Instructions

Heavy Wall Applied Stop Tube Frame and Door Installation

CAUTION. Fitting and Fixing Guidelines for Rio French Doors - Outward Opening.

The perfect solution for imperfect walls

Elford - Entertainment Unit

BARN DOOR HARDWARE KIT

A F LCON PANEL PRODUCTS LTD

9.1. Door Assembly Coordination. Ÿ Architrave is not described in

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Posts INSTALLATION INSTRUCTIONS

WPS crew Doors Installation instructions

Side Light Frame Pack Assembly Instructions

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

Elford - 3 Door Display Cabinet

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

EMAC 001 ACCESS PANEL

BD101K / BD101K INSTALLATION GUIDE BARN DOOR HARDWARE TOP OF DOOR STRAP KIT

Elford - 2 Door Wardrobe

Heavy-Duty Bypass Track System

Side Light Frame Pack Assembly Instructions

Vanity Installation Instructions

INSTALLATION INSTRUCTIONS FOR A&L PRODUCTS

Installation Instructions for Bifold Doors (JII103)

INSTALLATION MANUAL STOREFRONT DOORS

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Method of Build 1. Fire. Sound

IMPORTANT NOTICE WARRANTY WILL BE HONORED ONLY IF THE JAMBS HAVE BEEN INSTALLED IN ACCORDANCE WITH THESE INSTALLATION INSTRUCTIONS

WELLINGTON FOLDING SLIDING PATIO FITTING & FIXING GUIDELINES

Installation - Sub Cills

INSTALLATION INSTRUCTIONS

Assembly Instructions

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

INSTALLATION INSTRUCTIONS

For Installer. Duration Windows. Assembly Guide Durafold 1000

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

Installing flat panels on the MPL15 wall mount

Sunhouse. Assembly Manual

Fix Out Carpentry. Carpentry - Residential Construction. Product Code: 5594

ASS 70 FD folding / sliding door. Installation Guide

Original Gallery System

Installing Your Electronic Deadbolt

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

HENDERSON. Securefold Bottom Rolling. Fitting Instructions For Bottom Rolling External Doors with Morticed hinges SYSTEM CAPACITY.

SIDE FOLDING POST ADJUSTMENTS

Acoustical Surfaces, Inc.

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

HENDERSON. Securefold R-Loc Non-Mortice 100kg. Fitting Instructions for top hung exterior folding doors with NON-MORTICE HINGES SYSTEM CAPACITY

I n s t a l l a t i o n I n s t r u c t i o n s

INSTALLATION INSTRUCTIONS

PROTECT-A-POOL INGROUND REMOVABLE SAFETY FENCE

ASS 70 FD folding/sliding door installation guide

FOLDING DOOR INSTRUCTIONS

Method of Build 1. General

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

B A T H R O O M G L A S S

CoFold Non-Mortice. Fitting Instructions for top hung exterior folding doors SYSTEM CAPACITY. Diagram 1. Diagram 2. Diagram 3.

How To Install Windows: Nail-Fin Application

Installation Instructions. Oakmont Folding Doors

Portofino Installation Guide

General guidance. L20Doors/ Shutters/ Hatches. 1 Fire doors

Before fitting door, check opening size and squareness of timber frame. The door is made smaller to give correct clearance within the frame.

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

INSTALLATION MANUAL FORTRESS SERIES

Deauville Installation Guide

Elford - 3 Door Centre Mirror Wardrobe

Curium 19H Installation Instructions & Parts List

C-Series & S-Series Classic Frame with Transom (Single or Pair)

wellington french patio doorset fitting & fixing guidelines

Parveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes

INSTALLATION INSTRUCTIONS

Garage. Door. Unframed Tracked Fitting Instructions V2.2. fitting instructions. Warning!

Transcription:

Innova Concealed frame doorsets 1 2 Installation instructions

3 Thank you for choosing Innova To ensure the installation process is simple and efficient we recommended you read this guide in full before you begin. Getting started Before installation, please ensure the system specifications correspond with your project schedule. Tools required Preparing for installation Your delivery will include one or both of the boxes shown depending on your order. Ensure you have everything you need prior to installation. Sizes should be checked on the frame box. Pencil Spirit level Cordless screwdriver Tape measure Frame box Set square Knife Allen keys (metric) Multitool Door leaf - Fire rating notice The fi re rating of any doorset is subject to a number of factors, including: 1. The design/workmanship of other work, in particular the partitions into which the doorset is fi xed.) 2. The doorset being installed in accordance with the installation instructions. The Innova system can be fi tted to either studwork or masonry walls, you will need to ensure the wall itself meets the correct fi re performance. Please consult Selo for advice and guidance to ensure the fi re performance is met. tel 020 3880 0339 email sales@selo-uk.com Scan to watch the installation video. /video

Innova Installation instructions 5 What s included Identify the components below and ensure you have everything prior to installation. A) Step-by-step installation Before installation please ensure you have carried out the recommendations in the Wall Construction Preparation booklet. 1 Check opening Frame Kit Ensure that the opening is square and level and the opening dimensions are correct. Opening dimensions are obtained from the Selo door schedule provided for your project and also listed as standard opening width and height on the individual frame boxes. 1 Hinge jamb 2 Strike jamb 3 Head jamb with pivot fitted 2 Notch Notch head stud to accommodate pivot hinge Notch the head stud to the dimensions shown to accommodate the top pivot. A notch template is provided with the frame. 4 Strike plate and fixing 5 Pivot fittings 6 Door

Innova Installation instructions 7 3 Hinge jamb 6 Preparing the pivot The frame is inserted over the wall as shown. Make sure it is hard up against the timber stud and, when plumb and straight, fix through both Once all the jambs are fitted, double check that it is square level and plumb. perforated side flanges with x4 drywall screws (at least 50mm long) evenly spaced along the length of the jamb through the perforated flange. Before installation is complete, further screws will be required. This is covered in Step 13. Do not completely secure frame yet. 4 Head jamb installation 7 Retract the hex screw Install the head jamb. Locate the end of the head into the rebate on the frame and fix through the perforated side flanges as before. Unwind the hex head screw as far as it will go (anticlockwise) to allow the top pivot to retract flush into the head. The corner junction should look as shown. 5 Strike jamb installation 8 Fit pivot base plate Install the strike jamb by locating it into the head and fixing into place. Place a straight edge against the face of the frame as shown. Use the provided pivot template to position the pivot base plate as shown. Fix into Ensure that the spacing between the two vertical place using the screws provided. frame sides is equal and the jambs are square. You will need to notch the stud to allow for the strike plate insert. The door leaf provided will be made to give you a 5mm undercut. You will need to let the pivot base plate into the floor by 5mm to achieve this. Straight Edge

Innova Installation instructions 9 9 Fit pivot sockets 12 Check fitment Calculate the pivot socket centres by measuring the distance from the pivot centres to the edge of the frame, minus 3mm for the door gap. Swing the door, open and closed to ensure it is working correctly. Check that the gaps around the sides are 2.5-3mm, make adjustments to the frame if required. If doors have not been provided Fit the pivot sockets to the door. with the frames, a dummy door can be provided. If the gap at the head of the door is too large, a 1mm and 2mm packer are provided in the pivot set. The packer can be placed over the pivot pin to lift the door to it s correct position. Ensure the frame is level, plumb and square. 10 Hang door 13 Fix every 200mm With assistance lift the door up on its end and locate the bottom socket over the floor pivot pin as shown. Install the door to ensure it swings correctly and smoothly. Check that all the perforated side flanges sit flat against the plasterboard and screw at 200mm centres all around the frame through the perforated holes into the studwork. Double screw all ends and corners as shown. If the doors have not been supplied with the frames then a ensure the frame is level, plumb and square and go to step 13. Now that the swing and the frame alignment are correct, the door can be removed and put aside until the plastering and decorating are complete. See page 16 for correct storage of doors. 11 Fix into place 14 Plaster tape Swing the top of the door into an upright position to locate the top pivot into the pivot socket in the top of the door. Standing on a Apply plaster fibre tape to the top corners at 45 and across the head over the pivot cut out. hop-up or steps will make it easier to sight the pivot in. Once located, tighten the hex bolt with the Allen key provided to lock the pivot securely into position.

Innova Installation instructions 11 15 Plastering / Decoration Finish up to the stop bead with multi-finish plaster skim or tape and jointing compound. This conceals the frame and all fixings. Once the plaster/jointing compound has dried, the wall and frame can be painted. The frame will need a metal primer applied (if supplied unfinished) and can then be painted as required. Congratulations You have now completed installation of your Innova concealed frame doorset. Please refer to the following pages for additional nstructions. 16 Hang door The door can then be re-hung. If the door is fire rated then the intumescent strip will need to be fitted to the grooves in the door edges. If the doorset is acoustic rated then the acoustic seals will need to be fitted. Innova options Self closer If minor height adjustments are needed see page 13. Door height adjustment Fire rating 17 Fitting the latch Fit the latch or lock to the door. Fitting of the latch plate is straight forward as it is surface mounted over the frame via 2 PH2 self-drilling screws. Use a low drill torque to avoid turning the screws from the frame. FIRE CERTIFICATION NOTE If the doorset is fire rated then the lock or latch used will need to be lined with a 1mm intumescent pad. Innova Concealed frame doorsets

Innova Options Innova options Important Correct storage of timber doors Self closer If the doorset is required to be self closing then a floor spring pivot set is used. The bottom pin and socket are replaced with the floor spring box and bottom strap, which are installed in the usual sequence. The floor Standard cover plate spring is covered by the cover plate shown or a floor spring cover tray which the flooring can be fitted into. Floor spring cover tray Floor spring Door height adjustment Laid flat with load spread evenly Avoid excessive temperatures Do not leave leant against wall Avoid excessive moisture and damp environments If the door sits too low when position it on the base pin 2 stainless steel height adjustment washers can be used with the pivot set. There is a 1mm and a 2mm washer that can be placed over the top of the pin and then the door re-hung. Fire rating The Innova system is available with an FD30 or FD60 certification when installed using intumescent seals. To achieve the relevant specified fire rating intumescent seals will be provided. Doors will come with the appropriate pre-cut grooves ready for installation. It is important that timber doors are stored in the correct manner prior to installation. Let solid wood doors acclimatise at normal room temperature for several days prior to installation. They must be protected from exposure to excessive moisture and stored horizontally on a level surface on 3 or more equally spaced bearers, away from ground floor level. It is also recommended that any wrappings be left in place for as long as possible. Do not lean doors on their edge up against a wall. This will almost certainly cause them to warp and distort. Fire door leafs and doorsets are internal joinery components. As such, their handling and storage prior to installation should ensure that they are protected from rain, sun, and splashing by corrosive or staining materials - preferably in a ventilated building. Door leafs and doorsets that are clear lacquered or varnished should be subject to storage that protects them from being unevenly exposed to sunlight. For more information speak to one of our advisors today: tel 020 3880 0339 / email sales@selo-uk.com

Innova Contact Find out more For help and advice with your installation contact our experienced team. call 020 3880 0339 / email sales@selo-uk.com Visit our website, loaded with the content and features you want to see. 2015 by Selo. All rights reserved. No part of this publication may be reproduced in any material form (including photocopying or storing it in any medium by electronic means and whether or not transiently, or incidentally to some other use of this publication) without the written permission of the copyright owner. Application for the copyright owner s permission to reproduce any part of this publication should be addressed to Selo. Where colour and finish samples are shown within this document limitations in the reprographics process mean absolute colour accuracy cannot be guaranteed. Where colour matching is critical, a sample of the material can be provided on request. Selo reserves the right to alter specification and designs without prior notice. Revised - June 2018