X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

Similar documents
State Road A1A North Bridge over ICWW Bridge

Appendix G. Visual Simulations and Illustrations

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017

Moorhead / Dilworth Fixed Route Expansion Study

Public Works Procedures & Checklist

BAY MEADOWS SPECIFIC PLAN

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations

STATION AREA CONDITIONS ANALYSIS APPENDIX A1

This page is intentionally left blank

Updated: April 7, 2016

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

Exit 61 I-90 Interchange Modification Justification Study

Charlton/Oxford Route 20 Reconstruction Project

City of St. Petersburg Planning & Visioning Commission October 11, 2011

BOTTINEAU TRANSITWAY STATION AREA PRE-PLANNING STUDY PREPARED FOR HENNEPIN COUNTY

Attachment #2 PPW133-07

Start Time: End Time: Total Time: Distance: 07:07 am 07:45 am 37: mi.

Newtown SGA Master Plan

%&g( %&g( ) Bridge Projects DRAFT

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND

Maitland & Winter Park, FL

CAPITOL GATEWAY MARKETPLACE. East Capitol Street & Southern Avenue NE, Washington, DC

King Mill Lambert DRI# 2035 Henry County, Georgia

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

1111 N 13th St Omaha, Nebraska 68102

Summary of Subarea Workshop Feedback Related to the BART/MTC/Madison Square Blocks

Public School Facilities Element

The Edward V. Lofstrom Collection M/A

Operating Standards Attachment to Development Application

CTA Blue Line Forest Park Branch Feasibility/Vision Study

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Plan Preparation Checklist

Diversion Analysis. Appendix K

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Planarization & Routing Guide

$1,200,000 RETAIL BUILDING 8890 ABERCORN RETAIL/OFFICE BUILDING. Chuck Mitchell (912)

Article 4.0 Measurements and Exceptions

USING BLUETOOTH TM TO MEASURE TRAVEL TIME ALONG ARTERIAL CORRIDORS

Single Point Urban Interchange (SPUI) with Signals

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE

Complete Streets & PPM to FDM Update

Memorandum 1.0 Highway Traffic Noise

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

TUSCAN VILLAGE - MASTERPLAN

1050 Page Mill Road Office Development

NW SF Office For Sale

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute

UPT COLLEGE AREA INFILL DEVELOPMENT 30 UNITS STREET 55TH STREET. JOE BRADY

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

The Shoppes at Forney Crossings

FORMER COMMUNITY BETHESDA SPACE

YORBA LINDA BLVD & IMPERIAL HWY PACKING HOUSE SQUARE YORBA LINDA YORBA LINDA BLVD

GCEA rd Qtr Report

Applying for a Site Development Review

LOCATION: DODGE AVENUE FROM WASHINGTON STREET TO SEWARD STREET LENGTH: APPROXIMATELY 1350'

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

PINELLAS COUNTY MPO FY 2013/ /18 TRANSPORTATION ALTERNATIVES (TA) PROGRAM PRIORITY LIST STATUS REPORT

Maps for People Who Walk and Bike

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

LEXINGTON PRESERVE BUSINESS PARK

Appendix F: Archaeology VEIRS MILL CORRIDOR MASTER PLAN PUBLIC HEARING DRAFT

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Appendix B: Noise Study

RETAIL SHOPPING STRIP WITH APARTMENTS AND OFFICES OFFERED AT $6,750,000- MAKE OFFERS CAMPBELL AVENUE & 270 CENTER STREET WEST HAVEN, CT 06516

OVERVIEW WATERMARK. "Prestigious Scottsdale Road Business Address in the Valley's Most Vibrant City of Tempe."

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

Abilene District Traffic Signal Timing and Capacity Analysis

RESHAPING METRO WASHINGTON

Town of Burlington Small Wireless Facility. and similar structures. Design Rules and Regulations

Mixed Use Case Studies: The Price of Success

FOR LEASE THE PLAZA AT THE BORDER. Tijuana Population: ±1.78 million. Mexico. New Border Crossing & Transit Station

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

23.6 ACRES FOR SALE TBD Highway 16 & Promise Rd, Rapid City, SD 57701

FOR SALE 8.24 ACRES. Development Site with Exceptional Freeway Visibility HADEN ONGARO RON REINKING COMMERCE BOULEVARD ROHNERT PARK // CA

Context Aware Dynamic Traffic Signal Optimization

Site Plan/Building Permit Review

2015 HDR, Inc., all rights reserved.

LOCATION: RIDGE AVENUE FROM LAKE STREET TO DEMPSTER STREET LENGTH: APPROXIMATELY 1075' 2-WAY STOP AT RIDGE AVENUE AND GREENWOOD STREET

Bluerock Center LONE TREE WAY > ANTIOCH, CA > OFFICE > RETAIL

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Locate Request Information

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED

1543 Delplaza Drive. Office 515-1,545 SF. For more information: Evan Scroggs Property Features.

A. INTRODUCTION PRINCIPAL CONCLUSIONS

OVERVIEW SITE/PROJECT DESCRIPTION

AMES INDUSTRIAL PARK AND OFFICE PLAZA

CHAPTER 3. Public Schools Facility Element

DESIGN PUBLIC HEARING

April 7, Notice of Project Change Hyde Park Avenue, Jamaica Plain Phase C Rental Portion of Parcel U. Dear Director Golden:

San Antonio Wrong Way Driver Initiative

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

VALUE-ADD RETAIL & REDEVELOPMENT

Transcription:

HIGHWY 55 PEDESTRIN CROSSINGS» This graphic depicts walking distances to proposed signalized intersections along Olson Highway if existing unsignalized crossings are closed. Farwell Mpls College Prep Charter Lovell Square FT. X Distance to Intersection Loss of Pedestrian 1450!! Existing Proposed! Wirth ike/ped and Vehicle Regional k Crash Incident (2009-2013) Planned LRT Station ottineau LRT lignment Existing On-Street ike Proposed On-Street ike 700 400 600 X X X X X X 600 600 Riverbend assett Creek 600 Existing Paved Trail Proposed Paved Trail LRT Station Half Mile uffer 40 0 feet et OPEN HOUSE- November 12, 2014 PENN VENUE METRO lue Line extension (ottineau LRT) Phase: 1 Station rea Planning

PEDESTRIN ND ICYCLE ENHNCEMENTS C» This graphic depicts proposed pedestrian and bicycle facilities that will enhance connectivity to planned LRT stations. Proposed C Line rterial us Rapid Transit Station Penn venue Community Works ike Facility lternatives North Minneapolis Greenway lternatives ½ ½ Potential Location Enhanced Proposed Nice Ride Station Existing Nice Ride Station Proposed Sidewalks ½ C Existing Sidewalks Existing Paved Trail Proposed Paved Trail Existing On-Street ike Proposed On-Street ike Planned LRT Station ottineau LRT lignment LRT Station Half Mile uffer OPEN HOUSE- November 12, 2014 PENN VENUE METRO lue Line extension (ottineau LRT) Phase: 1 Station rea Planning

We have heard that pedestrian safety and high traffic speeds along Olson Highway are major concerns for the community. elow is a list of suggested potential safety improvements along Olson Highway. Please place a sticker next the three highway corridor modifications that you feel will best improve the safety, character and livability of Olson Highway. (Note: Future study may determine some of these modifications are ultimately not feasible, but we want to understand the importance of these items to determine whether they should be investigated further) 1 6 Sidewalks and/or trails should be buffered from Olson Highway by boulevards planted with street trees ll traffic signals should include countdown timers to let people know how much time they have left to safely cross the highway 2 7 Sidewalks and/or trails along Olson Highway should be lighted during evening hours 3 8 Pedestrians and bicyclist crossings of Olson Highway should only be located at signalized intersections 4 9 More pedestrian and bicycle crossings of Olson Highway are needed in addition to the signalized intersections 5 10 There should be a comfortable space on the highway median islands for pedestrians and bicycles as they wait to cross the roadway Multi-family Housing Multi-family Housing New multi-family housing should be located close to Olson Highway to visually narrow the width of the highway corridor (which would change the character of the roadway and encourage lower vehicle speeds) ing llow on-street parking on the outside lane of Olson Highway during non-rush hour periods X Remove Remove one vehicle travel lane in each direction along Olson Highway (which would reduce the crossing distance for pedestrians) us or ike Use ing Remove us or ike Use In the long term, transition the outer travel lane to a dedicated lane exclusively for bus and/or bicycle use X OPEN HOUSE- November 12, 2014 OLSON HIGHWY POTENTIL SFETY IMPROVEMENTS METRO lue Line extension (ottineau LRT) Phase: 1 Station rea Planning

PENN VENUE: Station Typology Place Type: Urban Neighborhood Desired Land Uses: Medium to high density residential, institutional, and some commercial Potential for Change: Moderate (primary drivers: LRT/RT, excess right-of-way) Scale of Transformation: Moderate Housing Types: Multi-family at station, townhomes, and small lot single family Commercial and Employment Types: Limited locally-serving retail, small commercial, and institutional Primary ccess Mode to Station: Walk, bike, bus Role in Transit System: Origin Open House Draft - Nov. 12, 2014 METRO lue Line extension (ottineau LRT) Phase 1: Station rea Planning

Washburn ve Vincent ve Oliver ve N Knox ve N James ve N Irvin g ve Irving ve N Humboldt ve N e Xerxes ve N Xerxes ve N Washburn ve N State Hwy 55 State Hwy 55 Wirth Regional 2nd ve N Vincent ve N 0 600 Farwell ve Upton ve N Thomas Thomas ve N ve N Heaner Ter N Chestnut ve W Farwell Pl Farwell Olson Highway Service Rd Sheridan ve N Sheridan ve N Sheridan ve N Russell ve N Russell ve N Russell ve N Olson Highway Service Rd Inglewood St assett s Creek assett s Creek NorthPoint Health & Wellness Oak ve Queen ve N Queen ve N Queen ve N N Frontage Rd Penn ve N 12th ve N Lincoln School 8th ve N Plymouth ve N Oliver ve N Oliver Urban League ven 5th ve N 12 1/2 ve N 4th ve N Glenwood ve N UROC Newton ve N 1 1/2 ve N Newton ve N N Frontage Rd Newton ve N 2nd ve N 3rd ve N Morgan ve N N Morgan ve Olson Memorial Hwy Olson Memorial Hwy Chestnut ve Logan ve N Logan ve N Thomas Pl Oak ve N ve N Knox Oak Olson Highway Service Rd Gramercy ve James ve N ve Irving ve N 11th ve N N arnes Pl 5th ve N Riverbend Currie ve N Humboldt ve N Humboldt ve N ann 2nd ve N Ojib Elmwo 4 PENN VENUE: Development Opportunities What is a development opportunity?» Sites that may attract developer interest» Does not necessarily mean development is or will be supported by:» The community» Government leaders» Property owners» Does mean it is worthy of an open discussion. Development Opportunities Publicly Owned Privately Owned Transit TOD Corridor Oriented Development (TOD) Corridor Transit Oriented Development (TOD) Nieghborhood TOD Neighborhood Zone Zone Vacant Properties NorthPoint Health & Wellness Urban League UROC PENN VENUE: What types of development do you want to see here? Farwell Lincoln School INSTRUCTIONS:» Use the stickers provided to show where in the station area you would like to see different types of development» Other ideas? Write your comments or ideas on a post-it note and place it on the map What would you like to see here? PRTMENTS TOWNHOME Stick it on the map! RETIL RESTURNT Wirth Regional OFFICE EPRKS ND PLZ SPC Riverbend COMMUNITY GRDEN assett s Creek assett s Creek 0 600 Open House Draft - Nov. 12, 2014 LRT lignment Proposed Station METRO lue Line extension (ottineau LRT) Phase 1: Station rea Planning

PENN VENUE: What Could it Look Like? Townhomes / Rowhomes (attached or stacked) Plaza with public art partments partments with ground floor retail Open House Draft - Nov. 12, 2014 METRO lue Line extension (ottineau LRT) Phase 1: Station rea Planning

Penn avenue: Concept a roadway:» Maintain DEIS alignment» Hwy 55 is 3-lane roadway (east and westbound)» Trail on north side of Hwy 55» Maintain most of existing street network on north side of Hwy 55» New street behind apartments on south side of Hwy 55» Narrow the visual field (compression of Hwy 55 where possible)» cquire 3 lot-depth on north side to allow for more intense development» Townhomes possible within existing MnDOT right-of-way Proposed RT Station Public rt Opportunity dditional development proposed around Penn / Plymouth ve intersection See supporting Penn ve boards for detail av e 8t h thomas ave upton ave vincent ave LRT lignment development:» Develop MnDOT-owned land on the south side of Hwy 55 LND USe Digrm NOTE: Concepts illustrate sites that might attract developer interest. Concepts do not represent actual development proposals and are for discussion purposes only. They do not imply that development is or will be supported by property owners, the community, or government leaders. New trail hwy 55 Floyd. Olson Memorial New street sheridan ave Penn avenue: Concept roadway:» Shift Hwy 55 north (provides 12-14 feet of additional development depth on south side); 3-lane roadway (traffic analysis required to verify feasibility)» New frontage road on north side of Hwy 55 (shift north closer to existing properties)» Trail on south side of Hwy 55» New pedestrian bridge over fright rail or crossing at Thomas (signal as indicated in the DEIS) of Hwy 55 for townhomes» cquisition of 3 lot-depth on north side of Hwy 55 for apartments» Mixed use near station (SE and SW quadrant) development:» No acquisition on south side of Hwy 55» cquisition of 2 lot-depth on north side knox ave LRT lignment Public rt Opportunity dditional development proposed around Penn / Plymouth ve intersection See supporting Penn ve boards for details upton ave 8t h thomas ave vincent ave NOTE: Concepts illustrate sites that might attract developer interest. Concepts do not represent actual development proposals and are for discussion purposes only. They do not imply that development is or will be supported by property owners, the community, or government leaders. Proposed RT Station LND USe Digrm logan ave MORGan ave 5th ave newton ave OliveR ave Penn ave dditional development proposed around Penn / Glenwood ve intersection See supporting Penn ve boards for detail Queen ave Russell ave Wirth 200 feet av e 3 lot depth, full block width for for apartment development 2 lot depth, 1/2 block width for for townhome development hwy 55 Floyd. Olson Memorial 5th ave Penn avenue: Concept C roadway:» Maintain DEIS alignment» Extend streets to Hwy 55 on south side Mostly right-in/right-out access Full intersection at Thomas (signal as indicated in DEIS)» Trail on north side of Hwy 55» Hwy 55 is 2-lane roadway (east and westbound) (traffic analysis required to verify feasibility)» Extension of redevelopment along Penn ve. (north to 8th ve; south to 5th ve)» Extension of redevelopment east-west along Hwy 55 development:» Minimal site acquisition (SW quadrant)» Mixed use near station (SE and SW quadrant) knox ave Proposed RT Station Public rt Opportunity 8t h New trail hwy 55 Site 8 Site 9 sheridan ave Site 7 New street 5th ave knox ave Penn ave dditional development proposed around Penn / Glenwood ve intersection See supporting Penn ve boards for details Queen ave Russell ave Wirth Floyd. Olson Memorial Extend streets to Hwy 55 cquisition needed for development and new roadway av e logan ave Site 9 MORGan ave Site 8 newton ave Site 7 dditional development proposed around Penn / Plymouth ve intersection See supporting Penn ve boards for details OliveR ave thomas ave upton ave vincent ave 200 feet LRT lignment NOTE: Concepts illustrate sites that might attract developer interest. Concepts do not represent actual development proposals and are for discussion purposes only. They do not imply that development is or will be supported by property owners, the community, or government leaders. LND USe Digrm logan ave 200 feet dditional development proposed around Penn / Glenwood ve intersection See supporting Penn ve boards for details MORGan ave Russell ave Wirth newton ave Trail along westbound Hwy 55 bridge with crossing at Thomas New ped/bike bridge south of Hwy 55 OliveR ave New street Penn ave New trail Queen ave sheridan ave METRO lue Line extension (ottineau LRT) Phase: 1 Station area Planning