TEXAS SENATE MILES DESCRIPTION: WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION TO: 0.25 MILES N. OF LOOP 20/FM 3464 IN

Similar documents
I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

San Antonio Wrong Way Driver Initiative

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

FM 691 CORRIDOR STUDY

%&g( %&g( ) Bridge Projects DRAFT

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

The Shoppes at Forney Crossings

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Single Point Urban Interchange (SPUI) with Signals

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

Attachment #2 PPW133-07

Appendix G. Visual Simulations and Illustrations

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Exit 61 I-90 Interchange Modification Justification Study

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

2017 San Juan College Luminarias 6:00pm - 11:30pm

MAINTENANCE OF TRAFFIC &

Updated: April 7, 2016

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM

State Road A1A North Bridge over ICWW Bridge

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

PROGRAM SITES Current as of 1/1/2017

ACEC OC February 22, 2017

TRAFFIC ENGINEERING SAB3843. CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN

DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/10/19 to 03/16/19 Contact: Rick Estrada (209)

1050 Page Mill Road Office Development

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

King Mill Lambert DRI# 2035 Henry County, Georgia

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

INTELLIGENT COMPACTION

PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS

CAPITOL GATEWAY MARKETPLACE. East Capitol Street & Southern Avenue NE, Washington, DC

SECTION EDITION - REVISION 2. Large Guide

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

Update on Traffic Results and Findings

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

2015 GDOT PowerPoint. Title Page

BAY MEADOWS SPECIFIC PLAN

Stimulus April Letting

LOCATION: RIDGE AVENUE FROM LAKE STREET TO DEMPSTER STREET LENGTH: APPROXIMATELY 1075' 2-WAY STOP AT RIDGE AVENUE AND GREENWOOD STREET

SALE/ LEASE 4760 PORTLAND RD NE. SALEM OR. Offered at $3,800,000 $.90/ SF NNN. Ian Levin, Realtor main:

Maintenance of Traffic sequence of operations including any phasing and detour maps;

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

Increasing Pace of Utility Accommodations

APPENDIX M NOISE ANALYSIS

Managing traffic through Signal Performance Measures in Pima County

DEVELOPMENT PLAN CHECKLIST

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Pacificans for Highway 1 Alternatives c/o Hal Bohner

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010

PHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground

Texas Transportation Institute The Texas A&M University System College Station, Texas

Welcome Public Open House

2018 District 1 Highway Construction Program

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

SCOPE OF WORK AND DELIVERABLES T.H.

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

LCRA TRANSMISSION SERVICES CORPORATION

COUNTY OF SANTA CRUZ DEPARTMENT OF PUBLIC WORKS. 701 Ocean Street 4 th Floor, Santa Cruz, CA Phone: (831) Fax: (831)

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

BOARD OF DIRECTORS MEETING MINUTES

This page is intentionally left blank

Jointing Rural Intersections

CITY OF VISTA STANDARD DRAWINGS

Noise Study Report. Addendum. Interstate 10 Corridor Project. In the Counties of San Bernardino and Los Angeles

APPENDIX IV-C. Glades County Critical Facilities Vulnerability Analysis

Texas Water Safari Driving Directions

CITY OF VISTA STANDARD DRAWINGS

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

6. Use the left lane to take exit 5B to merge onto OK-51 W/US-412 W/US-64 W toward Sand Springs

Locate Request Information

2016 CMP MONITORING AND CONFORMANCE REPORT

RETAIL PADS AT THE PLANNED HIGHWAY 65 INTERCHANGE. SWC Whitney Ranch Parkway and Wildcat Boulevard, Rocklin California

Interchange Feasibility Study

CONCEPT REVIEW GUIDELINES

TCAG Annual Intersection Monitoring Program

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Study Description. November 29, Overpass Road Alternatives Public Workshop

Complete Streets & PPM to FDM Update

PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO

Directions to Away Schools

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

Transcription:

Page 1 IH 35 0018-06-136 1.4 WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION SHILOH ROAD TO: 0.25 N. OF LOOP 20/FM 3464 IN URBAN FREEWAY $6,000,000 $23,000,000 IH 35 0018-06-138 0.9 FOR THE CONST OF DIR CNNECT CONSIST OF PAVMT, GRDG, DRG, SIGNIN 0.5 MI S OF LOOP 20 TO: LOOP 20 URBAN FREEWAY $13,284,409 $13,374,831 US 83 0038-02-027 9.9 WIDEN FROM 2 LANE UNDIVIDED TO 4 LANE DIVIDED COUNTY LINE TO: SOUTH 9.90 MI $11,500,000 $11,500,000 US 83 0038-03-023 6.3 WIDEN FROM 2 LANE UNDIVIDED TO 4 LANE DIVIDED 9.90 MI S. OF / COUNTY LI TO: 0.09 MI N. OF BUS 83-N $7,500,000 $7,500,000 US 83 0038-03-024 0.8 WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN DIVIDED-FLUSH MEDIAN 0.09 MI N OF BUS 83-N TO: 0.24 MI S. OF FM 3169 IN SAN YGNACI $1,500,000 $1,500,000 US 83 0038-03-025 3.7 WIDEN FROM 2 LANE RURAL TO 4 LANE UNDIVIDED 0.24 MI S. OF FM 3169 IN SAN YGNACI TO: 3.75 MI S. OF FM 3169 IN SAN YGNACI US 83 0038-04-046 8.5 WIDEN FROM 2 LANE UNDIVIDED TO 4 LANE DIVIDED 3.75 MI SOUTH OF FM 3169 TO: 3.3 MI NORTH OF SH16 $6,300,000 $6,300,000 US 83 0038-04-047 1 WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED WITH CONTINUOUS TURNI 3.3 MI NORTH OF SH 16 TO: 7.78 MI NORTH OF SH 16 $2,750,000 $2,750,000 US 83 0038-04-048 2.8 WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED 4 MI SOUTH OF SH 16 TO: SOUTH 2.76 MI $2,000,000 $2,000,000 US 83 0038-05-028 6.6 WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED 6.76 MI SOUTH OF SH 16, SOUTH TO: FM 2687 $4,125,000 $4,125,000 US 83 0038-05-029 11.1 WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED FM 2687 TO: / COUNTY LINE $7,750,000 $7,750,000 US 83 0038-06-029 2.1 CONSTRUCT 44' (ONE WAY) AND 84' (TWO WAY) CURB AND GUTTER (REAL ON GARCIA IN ROMA, FR US 83 TO: GONZALES AVENUE URBAN UNDIVIDED $986,109 $986,109

Page 2 US 83 0038-06-033 12.7 WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED / COUNTY LINE, SOUTH TO: LOMA BLANCA ROAD $19,000,000 $19,000,000 US 83 0038-07-032 0.8 CONSTRUCT 44' CURB AND GUTTER (ONE WAY) (REALIGNMENT OF US 83) ON GARCIA IN ROMA, FR GONZALES TO: US 83 URBAN UNDIVIDED $4,365,897 $4,365,897 US 83 0086-01-052 0.5 CONSTRUCT RAILROAD GRADE SEPARATION STR AND APPROACHES SAN EDUARDO STREET TO: MCPHERSON ROAD URBAN DIVIDED $9,360,000 $10,763,134 SH 44 0086-10-032 0.3 CONSTRUCT FACILITY TO 4 LANE DIVIDED 2.4 MI W OF /JIM WELLS C/L TO: 1.8 MI E OF /JIM WELLS C/L $22,000,000 $22,000,000 LP 20 0086-14-025 1.6 FOR THE CONSTRUCTION OF AN INTERCHANGE FACILITY AT THE SH 359 INTERSECTION TO: IN URBAN UNDIVIDED PROP. FACILITY: URBAN UNDIVIDED $21,000,000 $15,653,405 US 59 0088-01-047 8.9 2.3 MI NE OF US 181 TO: GOLIAD COUNTY LINE $16,200,000 $16,200,000 US 59 0088-01-054 2.3 UPGRADE TO 5 LANE CURB AND GUTTER SECTION 0.16 MI. NE OF DICKERSON RD. TO: US 181 $8,400,000 $8,669,822 US 181 0101-01-057 0.6 SULLIVAN STREET IN SKIDMORE TO: SOUTH.621 MI $1,200,000 $1,200,000 US 181 0101-02-030 6.2 6.245 MI N OF SAN PATRICIO C/L TO: SAN PATRICIO COUNTY LINE $9,000,000 $9,000,000 US 181 0101-02-031 4.1 0.621 MI S OF SULLIVAN ST IN SKIDMO TO: SOUTH 4.125 MI $65,000,000 $6,500,000 SH 44 0237-05-023 11.6 0.5 MI E OF SH 16 TO: 1.0 MI W OF FM 3196 $14,600,000 $14,600,000 SH 44 0237-06-024 12 1.0 MI W OF FM 3196 TO: 2.4 MI W OF CO./JIM WELLS CO. $13,500,000 $36,621,443

Page 3 US 59 0447-01-046 7.4 COUNTY LINE TO: IH 37 $12,600,000 $12,600,000 US 59 0447-01-050 5.5 CONSTRUCT ADDITIONL TWO LANES IH 37 TO: PROP. FACILITY: BU 59 INTERSECTION RURAL DIVIDED $18,000,000 $18,000,000 US 59 0447-02-038 9.2 COUNTY LINE TO: 0.3 EAST OF FM 351 $15,800,000 $15,800,000 US 59 0542-01-053 9.4 CONSTRUCT 4 LANE DIVIDED FACILITY 12.65 MI E OF ARKANSAS STREET TO: 7.59 MI W OF FM 2895 $10,123,776 $10,123,776 US 59 0542-01-054 9.4 CONSTRUCT 4 LANE DIVIDED FACILITY 3.3 MI E OF ARKANSAS STREET TO: 12.64 MI E OF ARKANSAS $14,934,400 $14,934,400 US 59 0542-02-024 11.6 WELHOUSEN ROAD TO: COUNTY LINE $14,599,835 $14,599,835 US 59 0542-02-025 11.7 CONSTRUCT 4 LANE DIVIDED FACILITY (RURAL) 7.59 MI OF FM 2895 TO: WELHOUSEN ROAD $12,480,000 $12,480,000 US 59 0542-03- 11.1 COUNTY LINE, EAST TO: 2.19 MI W OF SH 16 $18,249,794 $18,249,794 US 59 0542-03-022 4.5 CONSTRUCTION OF A NEW LOCATION ROADWAY - CONSTRUCT FACILITY TO 2.2 WEST OF SH 16 TO: EAST INTERSECTION OF SH 44/US 59 $14,551,169 $14,551,169 US 59 0542-04-018 9.1 WIDEN TO A FOUR LANE RURAL DIVIDED HIGHWAY THE INTERSECTION OF US 59/ E SH 44 TO: 1.0 MI SW OF FM 2359 $18,906,786 $18,906,786 US 59 0542-04-019 9.1 WIDEN TO A FOUR LANE RURAL DIVIDED HIGHWAY 1.0 MI SW OF FM 2359 TO: MCMULLEN COUNTY LINE $11,514,403 $11,514,403 SAN ANTONIO MC MULLEN US 59 0542-05-013 3.5 CONSTRUCT ADDITIONAL TWO LANES COUNTY LINE TO: MCMULLEN/ COUNTY LINE $7,000,000 $7,000,000

Page 4 US 59 0542-06-031 21.3 CONSTRUCT ADDITIONAL TWO LANES.25 MI SW OF LAGARTO RD. TO: MCMULLEN COUNTY LINE $45,436,492 $45,436,492 US 59 0542-06-041 0.9 CONSTRUCT FOUR LANE BOULEVARD US 281 TO:.25 MI SW OF LAGARTO RD. US 59 0542-07-008 1.1 CONSTRUCT 4 LANE BOULEVARD BU 59 INTERSECTION TO: US 281 $2,500,000 $2,500,000 VA 0921-26-004 5.7 FM 755 ON NEW LOCATION TO: EAST OF RGC @ US 83 $5,200,000 $5,200,000 VA 0921-26-013 7.8 @ INT'SEC OF US 83 & LOMA BLANCA TO: ON NEW LOCATION TO FM 649 $8,250,000 $8,250,000 VA 0921-26-014 10.5 FM 649 ON NEW LOCATION TO: FM 755 $60,000,000 $6,000,000 VA 0922-33-022 6.8 OUTER LOOP,CONSTRUCT 2-LANE SECTION WITH SHOULDER (PHASE I) CUATRO VIENTOS INTERSECTION TO: SH 359 $6,120,000 $12,088,337 VA 0922-33-024 5.6 OUTER LOOP, CONSTRUCT 2 LANE SECTION W/SHOULDER,AND RR GRADE SE SH 359 TO: US 59 $8,400,000 $13,863,601 VA 0922-33-039 2.3 OUTER LOOP, CONSTRUCT 4 LANE DIVIDED FACILITY WITH AN INTERCHAN US 83 TO: PROPOSED CUATRO VIENTOS STREET $6,070,000 $6,936,740 VA 0922-33-040 6.8 OUTER LOOP UPGRADE TO A 4-LANE DIVIDED FACILITY (PHASE II) CUATRO VIENTOS TO: SH 359 $8,773,939 $8,773,939 VA 0922-33-043 7.2 LOOP 20, EXTENSION OF LOOP 20 - CONSTRUCT 5 LANE URBAN SECTION THE INTERSECTION OF SH 359 & LP 20 TO: PROPOSED OUTER LOOP $45,000,000 $52,551,709 VA 0922-33-066 2.5 LOOP 20,EXTENSION OF CUATRO VIENTOS - CONSTRUCT 2 LANE RURAL SE INTERSECTION OF CUATRO VIENTOS/OUTE TO: US 83 MAIN ENTRANCE TO RIO BRAVO $4,000,000 $5,301,517

Page 5 VA 0922-33-919 0.6 OUTER LOOP, FOR CONSTRUCTION OF AN INTERCHANGE AT SH 359 TO:. $1,959,489 HIDALGO FM 2061 1939-02-019 2.3 IMPROVE TRAFFIC SIGNAL & ADD THROUGH LANES AND INSTALL CLTL 1.5 SOUTH OF RIDGE ROAD TO: FM 3072 $3,750,000 $3,750,000 SAN ANTONIO BEXAR LP 1604 2452-03-097 0, 025 EXPAND FROM 4 TO 8 LANE EXPY (TOLL 4 ML'S) REDLAND ROAD TO: GREEN MOUNTAIN ROAD URBAN FREEWAY $46,000,000 $46,000,000 SH 255 3586-02-001 0 PURCHASE OF CAMINO COLOMBIA TOLL RD INTERSECTION OF FM 1472 AND FM 255 TO: IH 35 PROP. FACILITY: CONGRESSIONAL DISTRICT '' TOTAL 52 PROJECTS $20,000,000 $20,000,000 $714,582,009 $658,731,628