FIB-R-MAX STANDARD SINGLE DOOR

Similar documents
EXTRUTECH PLASTICS, INC. Custom Extruder of Close Tolerance Profiles

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

Parveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes

C-Series & S-Series Classic Frame with Transom (Single or Pair)

Installation Instructions. 45 and 60-Minute Fire-Rated Neutral Pressure Veneered Door Frame UBC & UL-10C

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Installation Instructions. 45 and 60-Minute Positive Pressure Fire-Rated Veneered Door Frame UBC & UL-10C

Ballistic Fiberglass Doors & Frames

Heavy Wall Applied Stop Tube Frame and Door Installation

11 6 Round Building Assembly Instructions

DOCK WEDGE - STANDARD

Table of Contents F Series Frames

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

Shetland Stalls Installation Instructions

Double Swing Door With Header QCI5114

Installation Instructions

Windload Post 9100/9600/9900 Installation Instructions

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

Installation Manual MODEL ANE-42

Chapter 18. Interior Doors

Oxford Stalls Installation Instructions

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

Privacy Wall Glass Selections - Polished Edge Slider Door

Chapter 9. Windows and Exterior Doors

Instructions for the installation of Ellison Bronze balanced door models #137 & 138

Common Safety Concerns

Versatrim Side-Snap Frame

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular & Phillips)

Installation Instructions

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Chapter 9. Windows and Exterior Doors

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

ATTACHED SINGLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation!

Frameless Inline Door With Return QCI5263

YSG 40/50/50T Window Wall System Installation Manual

INSTALLATION INSTRUCTIONS. Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure

x2 1/4 (6mm) Floor Anchor

Installation Manual for Metal Toilet Partitions Standard Series

INFITTING & OVERLAP HINGED DOORS

SINGLE TRACK BYPASS (patent pending) barn door hardware

Steel Sound Enclosure

FIXED MOUNTING SHUTTERS INSTALLATION

BD101K / BD101K INSTALLATION GUIDE BARN DOOR HARDWARE TOP OF DOOR STRAP KIT

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

RV ENTRY DOOR REMOVAL AND SHIPPING BLOCK INSTALLATION AND ALIGNMENT

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

How To Measure Your Finished Opening

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

Dura-Lock Roof System

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

YES 600 Thermal Clip Storefront System Installation Manual

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

series 9500 top load bi4fold installation instructions

Installation Manual For ToddPod Outdoor Shower Enclosures

Chapter 20. Exterior Finish Work

Cabinetry Installation

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

UNIT 12: INTERIOR DOORS AND TRIM

FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS

ATTACHED DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS

Frameless Inline Door QCI5254

Artisan Vinyl Pergola

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Murphy Door DIY Hardware Installation Manual

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

INSTALLATION INSTRUCTIONS

Quick Fit Installation Guide Retractable Screen - Double Door

FIXED PANEL SLIDER QCI5241

x2 1/4 (6mm) Floor Anchor

3-PIECE SHOWER INSTALLATION INSTRUCTIONS

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

Assembly Instructions 10 X 10 Aluminum Frame Building

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

WPS crew Doors Installation instructions

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

4-lite Patio Door. Installation Instructions

MISCELLANEOUS CABINET REPAIRS

Tools you will need for this install

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

Plexidor Pet Door Wall Kit Instruction for All Sizes Plexidor : S, M, L, XL; BiteGuard KennelPlex TM 1113,1418, 1419 & 1825 and Plexidor Electronic LG

How To Install Windows: Nail-Fin Application

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE

A-935 RODA WALL MOUNT HINGES

INSTALLATION MANUAL STOREFRONT DOORS

OZARK DOOR CANOPY ASSEMBLY INSTRUCTIONS

Assembly Instructions

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

12. Wings, Flaps, Ailerons and Struts

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

Frameless Inline Door QCI5248

FOLDING DOOR INSTRUCTIONS

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Transcription:

FIB-R-MAX STANDARD SINGLE DOOR Style 1, 4, 4.4 and 11 Unitized Single Door Assembly By Fib-R-Max for Existing Openings 1. Set the crate, which will be marked with the specific opening location, at the opening. 2. Remove the door and frame assembly from the crate. Do not cut the band s around the door itself! Check that the door banding straps are still tight and that the plastic spacers are in place around the door. Check the back side of the door to be sure that the speraders at the strike and door bottom are in place and snug. Double check swing against plans. Notify Chase Doors if parts are missing. 3. Check plans to see where the jamb should be placed in the structure and set assembly centered in opening. Plumb and square the door frame in the opening. If necessary, shim at jamb bottom to level header. Use two or three shims at the top of the assembly to hold the door assembly, plumb and level. You should have 1/4-3/8 clearance between the door frame and the structure all around. Mask edge of door frame next to wall and wall next to frame. (See illustratiion #1.) 4. Take the bonding foam and read the directions carefully. Take injecting tube and make a mark at 3 from end of tube. 5. Insert tube between frame and wall up to the mark and inject a small amount of foam at top and bottom of jamb; each hinge and strike. One second shot will be plenty. 6. After 2-3 hours, carefully cut and remove the plastic strapping at jambs, so that it won t interfere with caulk joint. Pull the door open and discard the plastic spacers. Set frame with supplied anchors. Field drill 1/4 hole into frame and counter sink all holes 82, so anchor head will be flush with frame. Place anchors so that they penetrate solid structure. Use desired method listed below: CMU/Concrete - Recommended mehtod (1/4 Crete-Flex) Rabbet anchors - Field Drill 1/4 hold in both jamb and header rabbets. Drill 2 into solid structure with supplied 7/32 X 4 long masonry bit. Place fastener 5 or 6 from each end of jamb and header and one equal distance from both ends. CMU/Concrete - Optional method (1/4 Crete-Flex) No visible anchors - Same as above except field drill 1/4 hole underneath each jamb hinge leaf and strike. Also place one anchor at bottom of jamb on the strike side.

CMU/Concrete - Optional method (3/8 x 5 SS Sleeve Anchors) Optional Stop Anchors - Same as above except field drill 3/8 hold in jamb stop and structure. Place 3/8 anchor 5 or 6 from each end of frame to start and then 3 o.c. Specify on order. b. Metal/Wood Stud - (#14 sheet metal screws) Same as above except field drill pilot hole for supplied screws. Steel - (1/4-20 machine screws) Same as above except field drill and tap steel structure 1/4-20 to accept supplied screws. 8. Complete bonding installation again small amounts should be injected - it is not necessary to completely fill void between frame and structure. Too much foam will force jamb against door and cause binding. 9. Take a utility knife and trim foam to neat edge if required. Do not scratch or cut the frame. Remove the masking tape. 10. Rake out foam 1/8 deep around the frame if necessary and caulk. (See illustration #2.) 11. Install Accessories if required. 12. Depending on conditions it may be necessary to shim hinge leaves to maintain required door to jamb clearance. Adjust as required so door swings freely without binding.

FIB-R-MAX STANDARD DOUBLE DOOR Style 1, 2, 4, 4.4 and 11 Knock Down Double Door and Frame IMPORTANT Double door system has been pre hung and checked for correct handing and size. Maintaining 1/8 gap between door and frames and 1/4 gap between doors is very important for correct functioning of door system. Please ensure that these dimensions are kept during the installation process. Shims should be used on the back of the frame structure in order to keep gap dimensions as indicated. Installation Procedure 1. Set the crate, which will be marked with the specific opening location, at the opening. Remove parts from crates and check for damage. Notify Chase Doors if parts are missing. 2. Check plans for swing and location of jambs in structure. 3. Fasten jambs to header with 1/4 x 3 stainless steel lag bolts in pre-drilled holes in jambs and header. Check match marks on header and jambs to ensure proper orientation. This is to make sure clearances required are maintained (See Figure 1.) 4. Place spanner between jamb legs at floor. Carefully raise jamb assembly into opening. 5. Plumb jambs and level header - use shims to hold in place. Be sure jambs are parallel and header is level. 6. Set frame with supplied anchors. Drill 1/4 hole into frame and counter sink all holes 82, so anchor head will be flush with frame. Place anchors so that they penetrate solid structure. Use desired method listed below: each jamb in to start CMU/Concrete - Recommended mehtod (1/4 Crete-Flex) Rabbet Anchors - Field Drill 1/4 hold in both jamb rabbets and header. Drill 2 into solid structure with a 7/32 x 4 long masonry bit, only. Place fastener 5 to 6 from each end of jamb and header and one equal distance from both ends. CMU/Concrete - Optional method (1/4 Crete-Flex) No Visible Anchors - Same as above except field drill 1/4 hole underneath each jamb hinge leaf and strike. Also place one anchor at bottom of jamb on the strike side. CMU/Concrete - Optional Method (3/8 x 5 SS Sleeve Anchores) Optional Stop Anchors - Same as above except field drill 3/8 hole jamb stop. Place 3/8 sleeve anchor 5 to 6 from each end of frame to start and then 3 o.c. Specify in order. CMY

b. Metal/Wood Stud - (#14 sheet metal screws) Same as above except field drill pilot hole for supplied screws. c. Steel - (1/4-20 machine screws) Same as above except field drill and tap steel structure 1/4-20 to accept supplied screws. 7. Apply small amount of silicone under each countersunk anchor and snug up. Shim as necessary to hold, plumb and level. 8. Remove Spanner. 9. Hang door. Be sure match marks all agree on door. 10. Adjust shims and anchors is necessary to maintain clearances. 11. Install accessories, if required. 12. Depending on conditions it may be necessary to shim hinge leads to maintain required 1/8-3/16 door to jamb clearance, and 1/4 door to door clearance. Adjust as required so door swings freely without binding. (See Figure1.) List of Materials & Toos Required 1. Silicone 2. 7/32 x 4 long Masonry Bit (for block / concrete walls only) 3. 1/4 Drill Bit 4. Countersink Drill Bit 5. Shims for Door Frames