Downtown Memphis Review Board Application

Similar documents
Landmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

ADMINISTRATIVE DESIGN REVIEW Information

Please Print Clearly. Applicant s Signature: Date:

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

Certificate of Appropriateness (CoA) Checklist

UPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018

Major Site Plan Application

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

City of Whitefish 418 E 2 nd St PO Box 158 Whitefish, MT Phone: Fax:

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

DESIGN REVIEW PROCESS AND APPLICATION

PUBLIC ART PROGRAM Guidelines for Site Plan Projects

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

Town of Holly Springs Sign Installation Packet

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

Minor Site Plan Application

Architectural Review Board Application For Modifications & Renovations

Charlotte-Mecklenburg Planning Department Review Fees

SIGN PERMIT APPLICATION

SITE PLAN REVIEW GUIDELINES Rev. 2016

Disclaimer for Review of Plans

Procedure to Petition for Plat Review and Site Plan Review

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Winnetka Design Review Board. Regular Meeting. August 17, :00 pm

Applying for a Site Development Review (Sign CVCBD only)

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

Signs and Murals - Definitions:

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

APPLICATION DESIGN REVIEW Please Print or Type

Green Valley Pharmacy 2415 Shirlington Road

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS

Required Supporting Information and Documentation for Historic Preservation Certification Applications

Public Art Mural Packet

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

Application for Site Plan Review

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

City of Whitefish Planning & Building Department PO Box E 2 nd Street Whitefish, MT Phone: Fax:

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

PLAN SUBMITTAL REQUIREMENTS

Council Communication May 17, 2016, Business Meeting

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Planning and Zoning Application & Checklist

For Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT:

KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT CERTIFICATE OF APPROPRIATENESS APPLICATION

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

SUBMITTAL CHECKLIST ARCHITECTURAL COMMITTEE APPLICATION WOODMOOR HOMEOWNERS ASSOCIATION

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

Last Name: First Name: M.I:

Remodeling Excellence (REX) Awards Entry Packet

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Minor Site Plan Review Process

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF CAPE CANAVERAL COMMUNITY APPEARANCE BOARD APPLICATION PACKET

Architectural Review Application

EXECUTIVE SUMMARY of DESIGN REVIEW

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

January, 2014 Page 1 of 5

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project

REHABILITATING HISTORIC PROPERTIES FOR FEDERAL INVESTMENT TAX CREDITS

TOWN OF NORTH BRANFORD

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

MINUTES. Charles Farris was absent from the meeting. Also present was Rodger Lentz, Janet Holland of Development Services and two interested citizens.

Tri-County Commercial Application Checklist

SITE PLAN AMENDMENT POLICY 04/20/2016

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

To: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION

CONSTRUCTION PERMIT APPLICATION

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

CAB APPLICATION FOR MASTER SIGNAGE PLAN

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

MONTECITO BOARD OF ARCHITECTURAL REVIEW

Town of Rotterdam Office of the Planning Commission

MINUTES Board of Zoning Appeals January 9, 2017

APPLICATION FOR ZONING AND LAND DEVELOPMENT

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

SECTION PROJECT MANAGEMENT AND COORDINATION

What is the historic name of this property? What is the current name of this property?

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Request for Modification Review Information DO NOT COMMENCE ANY WORK PRIOR TO WRITTEN APPROVAL BY THE BOARD IF DIRECTORS

Infill Guide. Landmark Preservation. Community Planning & Development 3/15/16

SIGN PERMIT CHECKLIST AND APPLICATION

Architectural Review Application New Application Processing Improvements

Electronic Plans Management Training. Submitting a Revision to Approved Plans (RTAP) Application & Uploading Drawings

1 copy of all plans in pdf format and I copy of this form must be submitted, or it will be returned because it is an incomplete submittal.

Promontory Architectural Review Committee

Attachment A HERON RIDGE ESTATES RESIDENTIAL NEIGHBORHOODS PROCEDURE FOR OBTAINING DESIGN COMMITTEE APPROVAL

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

ADMINISTRATIVE REVIEW OF TELECOMMUNICATION TOWERS, ANTENNAS AND TRANSMISSION BASE SITES APPLICATION

Transcription:

Downtown Memphis Review Board Application Program 114 North Main Street Memphis, TN 38103 901.575.0540 downtownmemphis.com Packet information revised on July 26, 2011

DESIGN REVIEW PROCESS 1. Pre-Design Conference Before an application for review can be submitted to the (DRB), a pre-design conference must be scheduled with the Downtown Memphis Commission (DMC) staff. This informal review often accelerates the approval process because staff can acquaint applicants with design standards, submittal requirements, and application procedures. Some projects, by the nature of their size and scale, may require more than one review by the DRB (e.g., site plan level review, architectural review, etc.). A pre-design conference will allow staff to communicate directly with the applicant the scope of review his or her particular project warrants. It is critical that the DRB or DMC staff is involved in reviewing projects at the earliest possible time so that the project does not get delayed and so that the board has an appropriate amount of time to fulfill its responsibilities. To schedule a pre-design conference, contact our development offices at (901) 575-0540. 2. Submittal of Application After the pre-design conference with staff, an application for formal review and all information regarding the project must be submitted to the DMC Development Project Manager. A checklist of information necessary for review is included after the list of procedural steps. All applications for review and information must be received by the Development Project Manager no later than two weeks prior to the meeting of the DRB. The DRB generally meets on the first Wednesday of every month. 3. DRB Meeting At the monthly meeting of the DRB, staff will present all applications that have been received prior to the date outlined above. Applicants or their representative should attend the meeting to answer any questions the DRB may have regarding the application. After reviewing each case, the DRB will vote on the proposal. Any applicant in attendance will immediately know the results of his/her submittal. 4. Approved Applications Following approval of an application, staff will mail a letter stating the conditions of the approval to the applicant. Staff will also forward a copy of approvals to the City Construction Code Enforcement division. Administrative Approvals may take a minimum of 10 business days for approval.

Design Review Process Page 2 of 2 5. Denied Applications The DRB is under no obligation to approve every project. A decision may be postponed pending submittal of further information or may be denied. If an application is denied, the DRB will make recommendations to the applicant about changes that could be made to the proposal to warrant approval. These recommendations will be outlined in a letter to the applicant from staff. Changes to the proposal will be reviewed at a future meeting of the DRB. 6. Appealing a Denial All applicants have the right to appeal a denial of the DRB to the DMC. Such appeals must be made in writing to the Chairman of the DMC within five business days of the date of the meeting at which the application was denied. Applicants may present the appeal at the regular DMC monthly meeting. The DRB chairman and staff would also be present to outline the reasons for the denial.

DESIGN REVIEW CHECKLIST Sign Proposals If your application includes installation of a new sign or alteration to an existing sign, your submittal must include the following: photo(s) of the building(s) in question; 15 copies of drawings (not to exceed 11"x17" in size) of the proposed sign(s) with size and dimensions; drawing(s) should show the front and side views of the sign and may require additional drawings if proposal is not adequately illustrated in those drawings; description of letter style and size to be used on each sign; drawing or photo indicating where the sign(s)will be located on the building/site; and, description of the type of sign, colors, and materials of the proposed sign, including any proposed lighting. New Construction or Renovation If your application includes new construction or alteration to an existing structure, your submittal must include the following: photo(s) of the building(s) in question; site plan of proposed construction; 15 copies of architectural drawings of proposed construction at minimum 1/8" = 1'-0"; to include 1) building floor plan for each floor, 2) exterior elevations of all sides of the building, and 3) key construction details as requested by staff; if above drawings exceed 11"x17" in size, one reduced copy not to exceed 11"x17" should also be submitted; and, description of the colors and materials of the proposed work Other Exterior Alterations If your application includes exterior alterations other than those outlined above (such as installation of an awning or window/door replacement), your submittal must include the following: photo(s) of the building(s) in question; site plan of proposed alteration; 15 copies of drawings of proposed alteration at minimum 1/8" = 1'-0"; to include 1) exterior elevations of all affected sides of the building and 2) key construction details as requested by staff; if above drawings exceed 11"x17" in size, one reduced copy not to exceed 11"x17" should also be submitted; and description of the colors and materials of the proposed alterations This outline describes the typical requirements for a review by the. However, each project is unique and may require more than what is outlined above. At the pre-design conference, Downtown Memphis Commission staff will inform applicants if their particular project requires information that differs from what is described above.

DESIGN REVIEW BOARD APPLICATION Property Address*: Applicant Name & Mailing Address: Applicant Phone Number: Applicant Fax Number: Property Owner s Name & Mailing Address: Property Owner s Phone Number: The proposed work consists of the following (check all that apply): Sign Renovation New Building Other Exterior Alteration Project Description: Status of Project: A complete application must be submitted to the Development Department no later than two weeks before a regularly scheduled meeting of the. Please contact Ellery Ammons at (901)575-0564 or ammons@downtownmemphis.com. Owner/Applicant Signature: Date: *Applications for properties that are located within a Landmarks Historic District may require additional approval from the Landmarks Commission. Please contact the Shelby County Division of Planning & Developement at (901) 576-6601 for more information.