Installation guide. Step-by-step instructions

Similar documents
Guardian warm roof conversion system. Installation Guide

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

Synseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide

NEW equinox INSTALLATION GUIDE Issue

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Installation guide for 20/20

CONSERVATORY ROOF INSTALLATION GUIDE Issue

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Eurocell conservatory roof system. Installation manual Issue 3

NEW equinox INSTALLATION GUIDE Issue

CLEARSPAN GABLE STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. WITH GAZEBO END ATTACHED PATIO

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

MULTISPAN GABLE WITH HIP END ATTACHED PATIO

The Leka System Installation Guide

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

assembly guide effective from April 2005

utopia Window & Door Products Orangery Home Extension Products Conservatory Products Skylight Products

PRODUCT GUIDE K2. THE COMPLETE CONSERVATORY COMPANY

skypod INSTALLATION GUIDE CONTENTS Issue 2 If in doubt at any stage NOW INCLUDES ACUTE BE SAFE WHEN WORKING AT HEIGHT

Synseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

Recommended Slating Tools

Method of Build 1. General

DUTCH GABLE FREESTANDING CARPORT

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Configurable, Insulated Electrical Housing System for Lighting Installation Guide

Outback Gable CLEARSPAN ATTACHED

Dura-Lock Roof System

Assembly Guide. Conservatory Roof. 1. Before you start p2. 8. Sealing. 2. Box gutter. 9. Ridge top caps. 3. Eaves beam. 4. Rafters. 10.

Capella Gutter & Soffit

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

SIMPLER BETTER FASTER

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System.

Metro Series Sauna. installation instructions

Ultraroof380 Cornice Installation

Installation Guidelines

Method of Build 1. Fire. Sound

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

12x12 Pavilion. Assembly Manual

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Classicroof. Low Pitch Lean-to. Installation Guide SEPT 2015 V3

GIRTS ON BACK OF BUILDING

Skypod. Pitched PVC-U skylights. Installation guide PITCHED PVC-U SKYLIGHTS ISSUE 1

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

REGENCY TIMBER BUILDINGS

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

YWY M08 The new VELUX solution

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

skypod INSTALLATION GUIDE Issue 2 CONTENTS 1. Preparing to install 3 2. Installation 4 3. Installing jack rafters Installation examples 11

NEW skypod INSTALLATION GUIDE

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

Shingle Installation Guide

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation. ng Kitt

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Vi - BOX GUTTER COMPONENT REFERENCE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

INSTALLATION GUIDE. Outback Clearspan Gable BEFORE YOU START ADDITIONAL MATERIALS ADDITIONAL MATERIALS WITH COOLDEK ROOFING

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

10 Wide AMATEUR CEDAR GREENHOUSE

PATIO INSTALLATION MANUAL

Installation Guidelines

Roof Lantern. Installation Guide. Scan to view the installation guide on your mobile or tablet

SpeedDeck. Fixing and Handling Guide

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

SKY TUNNEL COMMERCIAL INSTALLATION GUIDE ALL WORK CARRIED OUT BY THE INSTALLER SHOULD BE IN ACCORDANCE WITH LOCAL LAWS & SAFETY REGULATIONS.

ultraframe Classic Low Pitch Lean-to Installation Guide

SmartVent Eave Edge Installation Instructions

Installation Manual. Future Roof Shingle / Slate Products

Ledger Board Lean-to Instruction Manual

10 Wide AMATEUR CEDAR GREENHOUSE

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

KIT ASSEMBLY INSTRUCTIONS

Gambrel Barn with Overhang Manual

Assembly Instructions 10 X 10 Aluminum Roof Support

10 x 10 Arch Top Pergola

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

10x10 Trellis Pergola

6 Wide AMATEUR CEDAR GREENHOUSE

Installation Guide Simplicity 16. V2.9 Lu171117

Installation Instructions

Installation Instructions

Gambrel Barn Construction Manual 8x8 through 16x24 Units

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

Assembly Instructions

Installation Guide Contemporary Alfresco V1.3 LU

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Transcription:

Installation guide Step-by-step instructions

Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam Timber to Frames p6-7 Setting Wall Starter Timber p8 Marking Panels for Fixing Locations p9 Roof Panel Fixed to Wall p10-11 Fitting Ridge p12 Assembly Sequences Georgian Style Roof p13 Victorian Style Roof p14 Lean-To Style Roof p15 Roof Panel Assembly p16-17 Hip Assembly p18-19 Fixing Roof Panel to Eaves Infill Timber p20 180mm Fixings p21 Fitting Eaves Tray p22 Fitting Breather Membrane p23-24 Fitting Starter Soaker p25 Fitting Eaves Tile Bar p26-27 Tiling p28-35 Hip Caps p36-37 Ridge Caps p38-39 Fascia Board p40-42 Tie Wires p43-46 VELUX Window p47-49 Gable End p50-59 Gutter p60 Changelog p61 Contents

Tools Required To Install IMPORTANT: It is the installer's responsibility to make sure the correct access safety equipment is used during the installation of the Celsius, such as access ladders and scaffolding. Hand Saw Cordless Drill Tape Measure Mallet (Soft Face) Spirit Level Utility Knife Staple Gun (Industrial) Pencil / Marker 6mm Drill Bit Page 1

Screws & Fixings 6mm x 180mm fixings (50's) XSR-CSS6180-50 6mm x 140mm fixings (50's) XSR-CSS6140-50 4.5mm x 40mm fixings (200's) XSR-SS440-200 40 180 140 40 40mm Polypins (250's) XSR-FBF1-250 T30 Torx Bit T20 Torx Bit Page 2

Injection Moulded Components Single Tile XSR-RTS1 Double Tile XSR-RTD1 Ridge Cap XSR-RC1 Screw Cover Cap XSR-SCC1 (x1) Hip Cap XSR-HC1 Screw Cover Cap XSR-SCC1 (x1) Ridge To Apex Cover XSR-RHA1 Screw Cap Cover XSR-SCC1 (X1) Hip End Cap XSR-HEC1 Screw Cap Cover XSR-SCC1 (X1) Gable End Cap XSR-GEC1 Screw Cover Cap XSR-SCC1 (x1) Page 3

Components Starter Soaker XSR-SS1 Eaves Tray Dry Verge XSR-DV1 Breather Membrane 150mm XSR-BM1 Expanding Foam 20mm x 25mm 5.6m Long Eaves Tile Bar (1m long, x4 Fixings per length) XSR-ETB1 Page 4

Georgian Hips Georgian hip to suit Roof Pitch Angle X 20 152 25 145 30 139 35 132 110 X 133.5 Ancillaries Wall Starter Timber Butt Joint Timber 50 100 110 110 Butt Joint Cassette 100 Eaves Beam Timber XSR-E25 61 110 See pages 6-8 for eaves beam pitch and dimensions All Dimensions In mm Page 5

Fixing Eaves Beam Timber To Frames PITCH TO SUIT ROOF 61 Max 150mm Max 150mm 90 90 Max 150m Max 150mm Secure timber eaves beam section to frames using the supplied XSR-CSS6140 6mm x 140mm screws at maximum 500 centres. Recommended fixing up through frame into timber. Screw should engage into timber by approx 45mm. Eaves Beam Timber 140 Max 150mm Max 150mm 40 Align face of timber with internal frame XSR-CSS6140-50 6mm x 140mm fixings (50's) 100mm 100mm Where timbers longer than 6m are required they must be joined at a 45 cut and fixed to the frame using fixing screws 100mm either side of the join. Page 6

Fixing Eaves Beam Timber To Frames 61 Max 150mm Max 150mm Max 150mm Max 150mm 135 135 Max 150m Max 150m 135 135 Max 150m Max 150m Max 150m Max 150mm Secure timber eaves beam section to frames using appropriate screws to suit outer frame height at maximum 500 centres. Recommended fixing up through frame into timber. Screw should engage into timber by approx 45mm. Eaves Beam Timber PITCH TO SUIT ROOF 100mm 40 Align face of timber with internal frame 100mm Where timbers longer than 6m are required they must be joined at a 45 cut and fixed to the frame using fixing screws 100mm either side of the join. Page 7

Setting Wall Starter Timber Wallplate Timber Roof Pitch 12.5 Degrees Height Dimension X 307.5mm 15 Degrees 358.5mm 61 50 Spacing Packer (not supplied) Eaves Beam Timber 16 Height Dimension Y 20 Degrees 25 Degrees 30 Degrees 35 Degrees Roof Pitch 12.5 Degrees 15 Degrees 20 Degrees 465mm 578.5mm 701.5mm 838mm Height Dimension Y 85.5mm 90.5mm 101mm 40 25 Degrees 30 Degrees 112.5mm 124.5mm 35 Degrees 138mm Set wall starter position over eaves beam timber as shown. Ensure that a 16mm gap is left between the top of the eaves beam and the underside of the timber wall starter, and the end of the timber is 50mm clear from the edge of the eaves beam as shown above. The same applies for the starter timber on the opposite side, and the two timbers should come together at the roof centreline. Use above table to check correct roof pitch. Gap Allowance to fix end panel. String line check using spirit level Page 8

Marking Panels For Fixing Locations Mark all panels 25mm from all outer edges using either a pencil or marker pen. Mark an additional line 70mm from edge at bottom of panel only. Repeat process on under side of panel. NOTE: There is no need to mark the 25mm or 70mm lines at the bottom edge on the under side of the panels (see below). IMPORTANT: It is the installer's responsibility to make sure the correct access safety equipment is used during the installation of the Celsius, such as access ladders and scaffolding. Page 9

Roof Panel Fixed To Wall Insert first roof panel over wall starter timber and resting onto eaves beam timber. Ensure that the panel is fully located and pushed up to the host wall. Secure into position using 40mm screws as shown below, making sure bottom of panel is flush with outside face of eaves beam timber. Approx 150mm Centres 50 Eaves Beam Timber 61 40 Ensure bottom edge of panel is in line with front face of eaves beam timber Approx 150mm Centres 40mm screws: Used around entire perimeter of each panel 25mm from the edge on the top & sides of the panel. Bottom fixings to be as indicated in detail. (see page 22) Page 10

Roof Panel Fixed To Wall Repeat fixing using 40mm screws on underside of panel to secure panel to wall starter timber. Repeat process for wall panel on opposite side of roof using 40mm screws as directed. Page 11

Fitting Ridge Insert ridge timber between wall panels and butt up to wall timbers. Fix using 40mm screws at approx. 150mm centres as shown below. Support ridge end as required. Page 12

Georgian Style Roof Assembly Sequence Georgian Style Roof Recommended Sequence To Assemble Panels. 1 2 3 P1 P2 P3 P4 P1 P2 P3 P4 P1 P2 P3 P4 4 5 6 P1 P2 P3 P4 P1 P2 P3 P4 P1 P2 P3 P4 7 8 9 P1 P2 P3 P4 P1 P2 P3 P4 P1 P2 P3 P4 Page 13

Victorian Style Roof Assembly Sequence Victorian Style Roof Recommended Sequence To Assemble Panels. 1 2 3 P1 P2 P3 P1 P2 P3 P1 P2 P3 P1 4 5 6 P1 P2 P3 P1 P2 P3 P1 P2 P3 7 8 9 P1 P2 P3 P1 P2 P3 P1 P2 P3 1 2 3 Page 14

Lean-To Style Roof Assembly Sequence Lean-To Style Roof Recommended Sequence To Assemble Solid Roof Panels. 1 2 P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 3 4 P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 5 6 P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 Page 15

Roof Panel Assembly Method Insert butt joint cassette into first panel and fix using 40mm screws at 300mm centres. Please note connecting timber could be either solid or connecting type - refer to supplied roof plan for connecting timber locations. Approx 300mm centres NOTE: Fixing spacings are 150mm into solid timbers and 300mm into butt joint cassettes Page 16

Roof Panel Assembly Method Approx 150mm centres NOTE If roof is to have a tie wire then the butt joint cassette is replaced by butt joint solid timber at the point where the tie wire is located. Secure end panel into position using 40mm screws as per previous instructions. Page 17

Hip Assembly Method Insert Georgian hip rafter into position and fix to panels using 40mm screws both on top and underneath the panel. Fix at approx 150mm centres. T B NOTE: Hip is marked with a 'T' and 'B' for top and bottom. T 150mm 150mm Section through Georgian hip rafter B Fix using 40mm screws at 150mm centres. Page 18

Hip Assembly Method Repeat process for opposite hip. T T B B Fit remaining front panels and joint timbers / cassettes using 40mm screws on top and underneath the panels as before. Page 19

Fixing Roof Panel To Eaves Infill Timber Insert eaves infill timber into position and ensure that timber is fully located. 150mm centres Fix using 40mm screws at approx. 150mm centres, 25mm from edge of panel. Screw through and secure into eaves beam infill section. Repeat fitting of infill timber around the entire perimeter of the roof. Ensure fillet finishes at location circled above. Page 20

180mm Fixings Fix using 180mm screws on the 25mm and 70mm lines of each panel as shown below. Use additional screws where panel width exceeds 592mm. 6mm x 180mm fixings (50's) XSR-CSS6180-50 Red dot denotes fixing locations below. Roof Panel 180 70mm 25mm >592mm <592mm Georgian Hip Rafter Georgian Hip Rafter Page 21

100mm CELSIUS Fitting Eaves Tray Fix eaves tray to panels using 40mm screws at regular intervals and 100mm from each end. Overlap eaves tray sections by 100mm. Position eaves tray to this point (membrane comes to here) Ensure eaves tray sections overlap at joins to offer protection against water ingress. Page 22

Fitting Breather Membrane Staple bottom layer of breather membrane to fully-pannelled roof, leaving an overlap of approx 150mm at wall end and over hips. Ensure membrane comes down to edge of panel Repeat around perimeter of roof to complete the bottom membrane layer. Page 23

Fitting Breather Membrane Staple top layer of breather membrane to the roof, leaving an overlap of approx 150mm at wall end, at hip, over ridge and over bottom section of membrane. Repeat around remaining sides to complete the membrane. Page 24

Fitting Starter Soaker Fix starter soaker over membrane at wall end, meeting at the centre line of the ridge. NOTE: Soaker height can be reduced to suit host wall and lead height. Reduce height as required Fix using 40mm screws at approx 500mm centres. Cut starter soaker to 70mm from upper edge of panel as shown below. Approx 500mm centres Page 25

Fitting Eaves Tile Bar Slide out upper eaves tile bar section from lower section to allow access to fixing locations on lower bar Fix lower tile bar section over membrane, locating up against edge of panel as shown below. Fix using 40mm screws at approx. 250mm centres. Fix lower tile bar section up against edge of panel, and butt up to starter soaker as shown below. Butt up to starter soaker Page 26

Fitting Eaves Tile Bar Leave a gap of 10mm between tile bar sections to allow for drainage. 10mm Fit upper tile bar section into lower section, leaving a 40mm clearance from the wall. Leave a 10mm gap between tile bar sections as before (these will be offset from the gaps on the lower section by the 40mm wall clearance). 40mm 10mm Page 27

Tiling Tabs underneath the tiles are used to locate into tile bar (shown below) and also other tiles (see next page) Tabs locate into tile bar as shown below. Page 28

Tiling When tiling the right elevation, the first full tile of each row requires the long tab along the right hand edge to be removed prior to fitting, as shown below. NOTE: Refer to supplied tile layout plan for single and double tile locations. Working in a clockwise direction around the roof, fit first tile onto tile bar and push up to wall end, leaving a gap of 40mm from wall. Page 29

Tiling Subsequent tiles locate into placed tiles via the long tab along the right hand edge. Insert tile so that the edge of the other tile comes up to the 5mm mark shown on the tab as shown below. At the end of a row trim a double tile in line with the hip, removing an additional 20mm as shown. Make sure all tiles on the row are running inline, then fix with 40mm screws via the screw ports on the tiles. Page 30

Tiling Start next row with cut down double tile, and tile along the row as before. Use tabs on underside of each tile to locate the tile into tiles on the row below, sliding to the right to lock in position. The 250mm receiving slot is used in all cases. Page 31

Tiling Complete higher rows in the same way, trimming at the hips as per previous instructions. Page 32

Tiling Tiling proceeds in a clockwise direction around the roof 1 3 2 Page 33

Tiling At the front end of the roof, begin with the first tile of the bottom row in the centre and tile outwards to the hips. Page 34

Tiling For all rows above the bottom row, tile each row from left to right as before, and build up to the apex. Tile the remaining side to complete the roof. Page 35

Hip Caps Join each hip end cap to a section of hip cap and run 20mm x 25mm expanding foam along the underside of each edge as shown below. Leave 30mm from the male end. 30mm 30mm On the other hip caps leave the same 30mm from the male end, but extend the expanding foam 30mm past the female connector end as shown below. 30mm 30mm Female connector Male connector 30mm 30mm Fit the hip end caps and first hip cap, fixing in place using 140mm fixing screws. Fit XSRCC1 screw caps over the screws. Page 36

Hip Caps Fit the next hip cap, slotting the extended 30mm of foam tape into the 30mm gap of the previous hip cap each time. Fix hip caps using 140mm screws and XSRCC1 screw caps. Trim hip caps in line with ridge centreline if necessary. Page 37

Ridge Caps Assemble ridge cap with ridge to apex cover and make a 5mm pilot hole in both sides as shown. Fix together using an XREC3 push rivet in each side. Place assembled ridge cap and ridge over hip tiles. Do not fix at this point. Page 38

Ridge Caps Dry fit other ridge caps using to complete the ridge back to the wall. If the last ridge cap requires cutting to the host wall, place the female connecting collar up to the wall and trim from the male end. Then dry fit this last ridge cap, running a pilot hole through the connection. Once all caps are placed, fix using 140mm screws and cap the screws with XSRCC1 screw caps. To complete the assembly seal the last ridge tile to the host wall. NOTE: Double-hip designs will require the middle ridge cap to have the female connector removed to allow it to connect to both neighbouring ridge caps. Trimmed edge Page 39

Fascia Board Fix fascia board J-clip to eaves beam timber using 40mm screws at approx 500mm centres. Please note that black/foiled profile will need fixing at 300mm centres. Ensure lower fascia board section is cut to soffit depth X shown below. Mitre ends to suit design. X Repeat this step on all elevations. Page 40

Fascia Board Before fitting the fascia boards it may be necessary to reduce the height measurement X shown below to ensure the fascia boards fit correctly. X X Fit upper fascia board section and fix in place using polypins at max 500mm centres. Please note that black/foiled profile will need fixing at 300mm centres. Ensure polypins locate into eaves infill timber. Repeat this step on all elevations. Page 41

Repeat process around perimeter of roof. Fascia Board Fit corner mouldings to fascia corners to finish off fascia board. Page 42

Tie Wires OPTION 1 - Adjustable Bracket (Without Pelmet) Drill pilot holes at the locations shown for the tie wire bracket. Ensure the holes fall either side of a panel joint (dotted line below). The tie wire position will be indicated on roof plan. Fix dowel screws into the pilot holes. Fit nylon sleeves over each dowel screw and fix assembled tie wire bracket onto screws using 4x washers and nuts. Please refer to the supplied fitting instructions found within the tie wire box. NOTE: Use the supplied Nylon sleeves or alternatively use a timber packer to suit required plasterboard depth. On roofs that use insulated plasterboard use a timber packer to suit plasterboard depth making sure the timber packer is securely fastened through to the solid timber connecting rafter. Page 43

Tie Wires Fit tie wire into brackets following standard procedure. Please refer to the supplied fitting instructions found within the tie wire box. 12mm plaster board and skim will leave the fixing bracket level with the plaster. Page 44

Tie Wires OPTION 2 - Fixed Bracket (With Pelmet) Drill pilot holes at the locations shown for the tie wire bracket. Ensure the holes fall either side of a panel joint (dotted line below). The tie wire position will be indicated on roof plan. Fix dowel screws into the pilot holes. Fix tie wire bracket onto screws using 4x washers and nuts. Please refer to the supplied fitting instructions found within the tie wire box. Page 45

Tie Wires Fit tie wire into brackets following standard procedure. Please refer to the supplied fitting instructions found within the tie wire box. Page 46

Fix timber into panel as shown VELUX Window Fix small panels to ridge and eaves timbers using 40mm screws at 150mm centres. Repeat on underside of panel. Page 47

Fix timber into panel as shown VELUX Window Fix small panels to ridge and eaves timbers using 40mm screws at 150mm centres. Repeat on underside of panel Page 48

Fix timber into panel as shown VELUX Window Fix small panels to ridge and eaves timbers using 40mm screws at 150mm centres. Repeat on underside of panel. Please refer to the VELUX fitting instructions found within the VELUX Flashing and Window boxes. Page 49

Gable End Where a gable end is required, the eaves beam timber will project 150mm from the front of the frames as shown and the panel will end flush with the and of the timber, secured using 40mm screws as before. Fit gable infill into end panel and fix using 40mm screws on top and bottom face as shown below. Page 50

Gable End Fit infill timber as per standard instructions (see page 20). Fix using 40mm screws at approx 150mm centres. Page 51

Gable End Fit dry verge into space between panel and roof tiles. rimming may be required at the areas shown in red below. Fix dry verge to gable end infill timber using 40mm screws at 500mm centres, and max 150mm from each end. MAX 150mm 500mm Centres Page 52

Gable End Fix fascia board J-clip to eaves beam timber using 40mm screws at approx 150mm centres. Fit lower fascia board section into fascia clip. Page 53

Gable End Fit upper fascia board section to side and front sections and fix in place using polypins as previously illustrated. Page 54

Gable End Repeat process for front of gable end, butting fascia J-clip up to front face of frames. Fit lower fascia board section into fascia clip. Page 55

Gable End Fit upper fascia board section so that it butts up to corner fascia board section and sits up to centreline of roof. Fix in place using polypins at approx 150mm centres. Page 56

Gable End Fit fascia board to inner face of gable end rebate as shown below. Corner of board must be locally removed to allow it to sit up to existing board. Fix in place using polypins. Page 57

Gable End Fix corner mouldings to cloak off corners of fascia board. Repeat process on other side of roof. Page 58

Gable End Fix gable end cap at end of ridge Page 59

Gutter Screw aluminium gutter clips to fascia using supplied 40mm screws at approx 150mm from corners and at 500mm centres in between. Locate gutter brackets into clips and lock into place as shown below. 120mm from bottom of fascia Locate front of gutter into bracket at location X shown below, then swing and clip the gutter into place, making sure it securely clips into the back of the gutter bracket. Fit remaining clips, brackets and gutter sections to suit style of roof, and fit unions and stop ends to complete gutter. X Page 60