Scratch Assay Device for Wound Healing Studies

Similar documents
Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

CHEMINSTRUMENTS LABORATORY DRAWDOWN COATER LC-100 OPERATING INSTRUCTION

AutoSeal FD 2006IL / FE 2006IL

M4 Foot Operated Underpinner Instruction Manual

Maintenance & Parts list for:

Arisaka Type 38 Rifle Disassembly and Reassembly

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

Owners Manual AGBAY Double Blade Levelers

FACTORY CAT TOMCAT CORPORATION

Hardware and Components:

FD 2002IL AutoSeal System

Sabre Series 2 Inspired Design Precision Engineering

Repairing Microsoft Wedge Touch Mouse Battery Cover Retaining Clip

Removing outter components

B9Creator Build Table Calibration Process

M*CARBO Winchester Model 70 Trigger Spring Kit Download or Print Instructions Contact: Page 1

Steele TV Stand Stock # BH

High Rise Sit-Stand Desk Converter

Vinyl Cutter Instruction Manual

HQ Hideaway. Installation and Operation Version 2.2, April 2015 Part # QT40100

AutoSeal FD 2002/FD 2032 FE 2002/FE 2032 OPERATOR MANUAL FIRST EDITION

Quill Stop V2 Installation Guide 11/16/2014

Basic steps to time the Gammill quilting machine s rotary sewing hook

High Rise Sit-Stand Desk Converter

Using Your Chip Priming Station

Mechanical Frappe Press

INVENT3D Printer Kit Disassembly Instructions

EXIT DEVICE OPERATION FIRE DOOR LABELS, STRIKES AND FRAME SCREWS FOR INFORMATION CALL OR VISIT RITEDOOR.COM

DREAMOC XXL3 - ASSEMBLY GUIDE VERSION ORIGINAL ASSEMBLY GUIDE

Hardware and Components:

ABM International, Inc.

Replacing the Reciprocator on an SWF Multi-head.

Operator s Manual. Onion King 500N 501N 502N 503N ENGLISH

Technical description

TIP FOR GETTING STARTED

AUC Cell Assembly Torque Stand. User Manual

Electron Microscopy Sciences

Installers guide Deadbolt 02.

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Fan, Eden/Northfield, GS Installation Instructions (SKU ) Packing List

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

Inde-Pendants Family. 32L Ring Plaster Trim, Grid and Drywall Ceiling Types. Document No Installation instructions for 32L-Rxx-P

AUTOMATIC ADVANCE MANUAL

Setting up and Using Digital Micrometer Controlled Lapping Fixtures

Assembly and Installation Guide

Owners Manual AGBAY Single Blade Levelers (20 Agbay & 12 Agbay Jr.)

Z-Truck Up-and-Down Motion. Y-Truck Side-to-Side Motion. Head. Squaring Plate. Sliding Plate FIGURE 1: THE CARVEWRIGHT MACHINE

Midwest RDH Handpiece Repair Procedure

Installation Manual Porter Road, Sarasota FL fax

Standard Operating Procedure

INSTALLATION MANUAL FORTRESS SERIES

Installing Brackets to Minimize Distortion in Your SMART Board 685ix Interactive Whiteboard System s Projected Image

PT50A Industrial, PT50B & PT50C Sharp

INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE:

Assembly Guide for Printrbot - Simple Maker s Edition 1405

RULTRACT RETRACTOR CABLE REPLACEMENT INSTRUCTIONS. Rultract, Inc. is the ONLY authorized service center in the U.S.A.

INSTRUCTIONS Crown Molding and Trim Protractor Used to cut trim lying flat

General Wood Shop Notes

Balishutters. INSTALLATION guide FOR L-FRAME MOUNT INSTALL OPTIONS B OR C

Step 1: The larger tower box contains the tower machine, a set of Silver 100 Lid Keys, and a set of Black 002 Coin Box Keys

Please Do Not Return Your Item to the Retailer

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004

The Useless Machine. Parts Only - Build Guide v0001

CABINETRY Assembly Instructions

Javelin Integra Inspired Design Precision Engineering

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

For additional assistance call

SCITEX Dual Roll Kit. User s guide

Vanity Installation Instructions

Studio Face Xtreme 6020 Installation Instructions (Nickel , Black )

Chapter 6 Frame And Lens Repairs

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)

SPRINT 5000 BOOKLETMAKER OPERATION MANUAL

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

Lunette Series. Home Theater Curved Fixed Frame Projection Screen. User s Guide. Important Safety and Warning Precautions

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

G. H. I. N. J. O. 22"x 28" Poster Holder. P. Q. romotional wall displ

POWER PET. Low-E Automatic Patio Pet Door Installation and Operating Instructions

Hydrajaws Safety Lifeline Tester

FBX1104P FBX1104 FBX1106P FBX1106

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

First published : May 1997 Fourth edition : January No

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Bath Accessory Installation

504P Operator s Booklet

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

A-dec 574L and 575L Dental Lights on a Cabinet or Wall INSTALLATION GUIDE

a.k.a. casegoods instructions

SAVE THESE INSTRUCTIONS

Maintenance Information

SEWING MACHINE For use with Janome HD 1000

ABSL Model Background Stand

Installation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate

MULTI-ACTIVITY PLAY TABLE

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

HP-2 / HP-4 Wall Wash Recessed Spackle & Visible Flange Installation Instructions Overview

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Mount to the Wall INSTALLATION MANUAL

WARNING: Wear safety goggles at all times when the engine is running and cooling

Transcription:

Scratch Assay Device for Wound Healing Studies By Team Cell Scratcher: Hannah Morgan, Charles Merchant, and Zachariah Cribbin 1

Quick Start Guide 2

Comments: _ Table of Contents Cover Page 1 1.0 Quick Start Guide.2 2.0 Table of Contents..3 3.0 Materials List. 4 4.0 Step-by-Step Instructions.5-13 4.1 Assembling the Device...5-12 4.2 Operating the Device 13 5.0 Maintenance/Cleaning 14-18 5.1 Needle Replacement 14 5.2 Z-axis Replacement..15 5.3 Scratcher Unit 16 5.4 Cleaning/Sanitization of the Needle.17 5.5 Cleaning/Sanitization of the Whole Device.18 6.0 Glossary of Technical Terms...19-22 6.1 General Terms 19 3

6.2 Definitions of device components 19-22 7.0 Troubleshooting..23 7.1 Z-axis piece 23 7.2 Needle 23 7.3 Scratcher unit..23 Materials List A. Top Sliding Piece (1) B. Medium rod (4) C. Top corner piece (4) D. Long rod (4) E. Steel base plate (1) F. Bottom corner piece (4) G. Short rod (4) 4

H. Z-axis holder (1) I. Reli-On tester (1) J. Needle Holder(1) K. Needle (1) Not Pictured L. Butterfly Knob (1) M. Nut (1) Comments: _ Step-by-Step Instructions Assembling the Device: Step 1: Center the top sliding piece on a flat surface in the figure shown to the right. Step 2: Insert the first of four medium-length rods into the top sliding piece. The rod is fully inserted when the score line on the rod lines up with the edge of the top sliding piece. 5

Step 3: Repeat the previous step with the three remaining medium length rods. Step 4: Insert top corner piece in the top right corner of the frame. Make sure vertical rod hole facing downward toward the floor. Step 5: Insert two of the four longest rods into the two remaining holes on the top corner piece. 6

Step 6- Insert the upper left and bottom right top corner pieces. Note: The joints may need to be loosened to insert the rods into the correct hole. Step 7: Before adding the last top corner piece, insert the two longest remaining rods into the corner piece as shown below. 7

Step 8: Insert the bottom left top corner piece into the assembly. Joints may need to be loosened first to correctly align all rods with the correct hole. The end result should look as shown below. Step 9: Set aside the top assembly and begin the bottom assembly with the steel base plate. 8

Step 10: Attach all four bottom corner pieces to each corner of the steel base plate. Step 11: Fully insert each of the four shortest rods into the bottom corner pieces on the steel base plate. 9

Step 12: Attach the top assembly onto the bottom assembly aligning the rods of the bottom assembly with the four remaining vertical holes of the top assembly. Step 13: Insert the z-axis holder into the top sliding piece and secure in place by tightening the butterfly knob on the top sliding piece. The frame of the device is now complete. Step 14: Place the Reli-On TM device in the Z-axis part as shown, with the grey button lined up with the hole in the device. 10

Step 15: Insert the needle into the needle holder as shown. 11

Step 16: Insert the needle holder into the end of the Reli-On TM device as shown. The device is now ready to be operated. 12

Comments: _ Operating the Device: Step 1: Place the well plate or Petri dish into the correct holder. Step 2: Pull back the plunger on the Reli-On TM device to load the needle. Step 3: Position the well plate holder on the magnetic platform so the needle of the scratcher is lined up with the well plate. Step 4: Loosen the butterfly knob and slide the Z-axis component down until the needle makes contact with the cells. Tighten the knob to lock the Z-axis component into place. Step 5: Press the grey button on the Reli-On TM device to propel the needle forward, creating a scratch in the cell monolayer. Step 6: Loosen the butterfly knob and move the Z-axis piece up, which will remove the needle from the well plate. Step 7: Sterilize the needle by dipping it into 70% ethanol, and allow it to evaporate. Step 8: Repeat steps 2-7 to perform another scratch. 13

Comments: _ Maintenance/Cleaning: Needle Replacement: The needle should only be used for about 50 scratches, therefore it is recommended that after 50 scratches the needle is replaced. 1. Remove needle holder from the Reli-On TM device. 2. Remove the used needle from the needle holder. 3. Place the new needle in the needle holder. 4. Reinsert the needle holder into the device. a. Remember that a calibration step must be done on the needle to ensure that accuracy of the device is maintained. 14

Z-axis Replacement: In the event that the z-axis piece is broken/ damaged it is recommended that it be replaced immediately in order to prevent skewed results. 1. Unscrew the butterfly knob to loosen the damaged z-axis piece from the top sliding piece. 2. Remove the scratcher unit from the damaged z-axis piece and then remove the z-axis piece from the top sliding piece. 3. Insert the new z-axis piece into the top sliding piece, and align the pieces, making sure that the tracks in the piece are able to easily move up and down. a. In the event that they do not allow free motion, make sure that the piece was properly installed. If it was not, remove and repeat step 3 from the beginning. 4. Screw the butterfly knob to lock the z-axis piece at the desired height. 15

Scratcher Unit Replacement: In the event that scratcher unit is damaged or no longer is generating a force to push the needle, it is recommended that the scratcher unit be replaced immediately. 1. Remove the needle holder from the scratcher unit (Reli-On TM ) device. 2. Remove the damaged scratcher unit from the z-axis movement piece. 3. Install the new scratcher unit: a. Place the new scratcher unit into the opening in the z-axis piece. b. Make sure that the push button is aligned with the opening on the z-axis piece, it should click into place. c. Make sure that the piece is secured within the z-axis piece, by gently moving it about to see if it will be easily removed 4. Reattach the needle holder to the new scratcher unit 5. Perform a scratch test without a sample to ensure that the scratcher unit is operating correctly. If device does not operate correctly redo from step 1. 16

Cleaning/Sanitization of the Needle: To sanitization the needle it is recommended that after each scratch the needle is dipped into 70% ethanol. 1. Adjust the height of the device using the z-axis piece. 2. Bring over a container of 70% ethanol and dip the visible parts of the needle into the ethanol. 3. Wait approximately 10 seconds to ensure that all the ethanol has evaporated. 4. Continue the procedure required to make a scratch in the further samples. WARNING: Do not attempt to sanitize the device using a flame technique. The 3D printed components will not withstand the heat a flame gives off, and they will melt. 17

Cleaning/Sanitization of the Whole Device: Recommended to clean the device after sample spills on the device or at least once a month to prevent contamination on the device. 1. Place the whole device in a separated area then spray down the device with a solution of 70% ethanol. 2. Do not saturate the device, just make sure that the whole device is lightly covered in the ethanol mist. 3. Wipe down the excess ethanol on the device and then allow the ethanol to evaporate from the device before the next use. WARNING: Do not put the device into an autoclave as can result in damage to device. The 3D printed components will not be able to withstand the high heat and pressure. 18

Comments: Glossary of Technical Terms: General Terms: In vitro scratch assay: An in vitro scratch assay is a method used to study cell migration patterns. The basic method is to create a wound in a cell monolayer by scratching through the cells. Upon scratching, the cells will migrate to close the gap. Definitions of Device Components: Needle: The needle is the component that makes contact with the cells and creates the scratch through the cell monolayer. Needle holder: The needle holder is the component where the needles are secured that interfaces with the spring loaded scratch mechanism. 19

Z-axis piece: Component of frame that houses the scratch mechanism and allows for height adjustment of scratcher. Scratcher Unit (Reli-On TM Device): Component that produces produces the spring force needed to move the needles. 20

Frame: The structure comprised of 3D printed parts and metal rods that provides structural stability for the scratcher. Platform: A steel base plate that doubles as structural support for the frame as well as a flat work surface to put well-plate holders on. Well Plate Holder(s): Plastic holders with magnetic bottoms prevent well-plates from moving as a scratch assay is performed. 21

Top Sliding Piece: Central component of frame where z-axis piece sits in. Comments: 22

Troubleshooting Z-axis piece: In the event that the Z-axis piece becomes damaged it is recommended that you contact a supervisor or request a new part. If current part is available see installation of Z-axis piece under maintenance/cleaning for instructions on page 15. Needle: In the event that the needle becomes damaged it is recommended that the needle be replaced immediately. Follow the procedure to replace needle, located on page 14. Scratcher unit: In the event that the scratcher unit malfunctions make sure that it is not jammed, if this does not fixed the issue it is possible that it is damaged. Therefore, go to the maintenance section and follow the procedure for scratcher unit replacement, located on page 16. Comments: _ 23