An informal discussion of drilling contractors was held prior to the Well Control Committee meeting. Key topics discussed included the following:

Similar documents
IADC Well Control Committee Meeting Minutes 7 th December 2016 IADC Crown Center Houston, TX USA

An informal discussion of drilling contractors was held prior to the Well Control Committee meeting. Key topics discussed included the following:

IADC Well Control Committee Meeting Minutes 21 st September 2016 IADC Crown Center Houston, TX USA

IADC Well Control Committee Meeting Minutes 24 August 2015 Moody Gardens Hotel & Conference Center Galveston, TX USA

IADC Well Control Committee Meeting Minutes 8 th June 2016 IADC Crown Center Houston, TX USA

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

ACCREDITATIONS AND ASSOCIATION MEMBERSHIPS

Industry Response - Post Macondo

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

4 Briefing. Responsible investor

7 Briefing. Responsible investor

Well Control Committee Meeting 20 May 2015

Well Control Considerations of MPD on Deepwater Rigs

MPD Application Process

Drilling Courses

OCS leasing program draft PEIS comments Attachment A

Marathon Drilling Indonesia

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

@balance Deepwater. MPD services

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

PressurePro CONTROL SYSTEM

EC-Drill MPD Dual Gradient Drilling

Macondo Blowout Lessons Learned for Prevention and Mitigation

Wells Expert Committee Bulletin

IADC NEW INITIATIVES

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

GTSC Rig for Hands-on Training

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Sinking of the Deepwater Horizon. 11 perish and 115 survive

EXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT. Stavanger, October 20 th 2011

Oil and Gas UK Well Integrity Guidelines

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

IWCF Well Control Level 5. Celle Drilling Conference 2017

On the Development of the Blowout Preventer PRA Model

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

DRILLING 101 COURSE. March 11, 2019 Hyatt Regency Houston Houston, TX. FUNDAMENTALS OF WELL COMPLETIONS MARCH 12, 2019 Houston, TX RELATED EVENT:

June 16, Via Electronic Transmission. Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

Drilling Courses Overview Pressure control and drilling equipment course offering

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999.

SubSea MudLift Drilling: from JIP to the Classroom

Advancing Global Deepwater Capabilities

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

IADC Well Control Committee Meeting Minutes Thursday 10 February 2011 Chevron, Houston TX. Welcome and Facility Orientation/Safety

Overview and Update of API Standards

API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

Syllabus CH EN 6181 Drilling and Completions Fall 2015

ECDM System. November, Security Classification: Restricted - Status: Draft

2 nd Annual Offshore Well Control Conference Provisional Agenda

Deepwater well design, construction & drilling operations

John Bednar, Chairman

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

Click to edit Master title style

2016 Employee Product Education Courses

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

Advancing Global Deepwater Capabilities

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

TOP HOLE DRILLING WITH DUAL GRADIENT TECHNOLOGY TO CONTROL SHALLOW HAZARDS

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

Marine Well Containment Company Outer Continental Shelf Summer Seminar

An Introduction to Oil & Gas Drilling and Well Operations

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

IADC UBO & MPD Committee Meeting

" The Future of Drilling R&D"

SAVE WEEKS DRILLING AND COMPLETING

AADE Houston Chapter. Group. 26 January 2011

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

GAO OIL AND GAS. Interior Has Strengthened Its Oversight of Subsea Well Containment, but Should Improve Its Documentation

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions

for High School Students Presented in collaboration by:

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

Company Overview DEDICATED TO SAFETY, QUALITY, VALUE, AND PROJECT EXECUTION EXCELLENCE!

Well Control Events. Well Flow Modeling. hydraulics and

Single / Dual Barrier HP Drilling Risers

4/28/2006. ModuSpec Engineering

Application of Remote Real-Time Monitoring to Offshore Oil and Gas Operations. Dissemination Workshop. September 22, 2016

Oil&Gas Subsea Production

Mid-Atlantic Investor Meetings. February 2013

july aug HPHT operations pose escalating challenges for operators, suppliers all drilling, all completions, all the time

UNDERBALANCED DRILLING (UBD) - A CASE STUDY IN INDIAN OFFSHORE

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

Investor Relations Presentation April 30, 2013

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

February 23, Re: EO & Well Control and Blowout Preventer Rule. Via Electronic Transmittal. Dear Mr. Whiteman:

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000]

New Orleans Driller. FEBRUARY, 2011 Volume 24, Number 2. March Monthly Meeting. Thursday, March 3, :30 am 1:00 pm (Doors open at 11:15)

Ocean Energy Safety Institute The First Year

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Offshore Drilling Rigs

To attract people and capital, industry must educate the public

Mark McAllister welcomed the group and chaired the meeting.

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Transcription:

IADC Well Control Committee Meeting Minutes 22 nd June 2017 IADC Crown Center Houston, TX USA Contractor roundtable An informal discussion of drilling contractors was held prior to the Well Control Committee meeting. Key topics discussed included the following: Onshore utilization remains high despite low oil prices As activity picks up, former drillers are returning to that position, creating a shortage of floorhands Advantages of automated BOP handling systems Importance of communication to avoid shallow gas kicks UH Capstone petroleum engineering program projects Operator requests for customized rig configurations, such as third mud pumps Well Control Committee Meeting Welcome & Introductions Chairman Aaron Mueller of Independence Contract Drilling opened the meeting and welcomed the attendees. Steve Kropla of IADC provided a building safety briefing and reminded everyone the meeting was subject to the IADC Antitrust Policy and Guidelines. Mr. Mueller asked those present to introduce themselves and their companies. WellSharp Update Gerardo Barrera provided an update on the status of WellSharp. There was some discussion of the low passing rate for the instructor exam for surface drilling. Effective Monday, 26 th June, the length of the time permitted for the test will be increased by 30 minutes. This change is due to a request from international training providers. The Arabic translation of the WellSharp examination was launched in early May, with the Chinese language version launched in mid-june. Brooke Polk gave an update on the process of converting to the WellSharp well servicing curriculum. She noted that the conversion would be complete at end of February 2018, except for the introductory level. Instructor requirements will be increased for well servicing instructors. IADC will send out an information sheet outlining the changes required to convert from WellCAP to WellSharp.

The well servicing curriculum will not require a formal simulator assessment as with drilling, but must be taught with some form of simulation. This will be checked in program audits. Ms. Polk stated that development was underway for an enhanced well control course, using the scenario-based training principles of WellCAP Plus and adding high-fidelity simulation and human factors. This is expected to be rolled out about January 2018. WellSharp audit activity will be ramping up to the end of the year, and providers should expect to be contacted about arranging an audit. Audits will always be performed to the highest level of course taught. Ms. Polk noted it is also important to be able to audit an actual course in progress. Audits consist of at least two days. They will take place both in the US and international locations, though recently most audits have been outside the US. Items that may trigger an audit include the amount of time since the last audit, whether it is a new program, and other factors. IADC s goal is to perform 60 WellSharp audits by end of year. Post-audit actions depend on the specific findings of the audit. Corrective actions can vary from requiring an action plan for improvement a to having program suspended. Suspended providers are removed from the website and have no access to the WellSharp system to upload records. IADC is also looking at updating sample exams, since the older samples have confusing questions that have since been clarified in the WellSharp testing system. There was a question from the group on what steps are being taken to add additional questions to the testing database, since students may become familiar with questions given in a small question pool. Ms. Polk stated IADC has been trying to finish the database language translations before adding questions. Now that the bulk of the translations are complete, IADC will ramp up that process. 20K BOP on Solaris Project Fred Milne of Helix Oilfield Systems gave a presentation on its Hydril 11 20K PSI HP/HT BOP system. The BOP had been selected as part of the complex hybrid stack used on the Solaris project operated by Total E&P Norge AS in Norway. It was the first time a stack of its kind had been used on the Norwegian Continental Shelf. Mr. Milne said the BOP is unique in that it is the only 11-inch 20K BOP with a 15K annular. The BOP stack, built in 1992, had only been used on three projects, and had never been operated in response to a well control event. Its last previous deployment was in1998, though it had been subject to regular maintenance with the OEM to stay in a ready state. Nevertheless, due to the long period of time since the stack was last utilized, the Norwegian PSA required additional testing prior to giving approval for use on the project. Preparation prior to drilling to meet regulatory compliance included providing support of PSA and company audits combined with BOP recertification, shear test program, rig upgrades, stack integration, and commissioning and testing. In addition, extensive HPHT/MPD and BOP controls training was performed with project personnel. Total spudded the Solaris gas exploration well in February 2016 using the Maersk Gallant jackup rig. Drilling operations faced a number challenges, including being the deepest well and the heaviest vertical casing string on the NCS, along with formation pressure of more than 18K PSI and a formation temperature of 198ºC. Mr. Milne stated that with the Helix BOP System, Total was able to meet its drilling program in spite of the challenging well parameters. Drilling activity was successfully completed after 202 days of operations in September 2016.

Formation temperature was not as high as had been expected, but Mr. Milne said mud cooling was still a consideration. No damage discovered on demobilization, only signs of normal mud circulation. Mr. Milne stated that Helix s primary market for the BOP stack is for use as a contingency for operators on HPHT wells. He said that an advantage of the 11-inch annular is that smaller is better in a high pressure environment. In addition, Helix has proposed the stack to BSEE as a well control contingency to use the system as a 20K deepwater capping system. Following Mr. Milne s presentation, the group took a break MPD/UBO Committee Presentation Christopher Scarborough of BP provided a presentation on behalf of the IADC Underbalanced Operations/Managed Pressure Drilling (UBO/MPD) Committee in response to a request for an update on the group s activities. He began by reviewing the IADC definition of MPD: Managed Pressure Drilling (MPD): an adaptive drilling process used to precisely control the annular pressure profile throughout the wellbore. The objectives are to ascertain the downhole pressure environment limits and to manage the annular hydraulic pressure profile accordingly. It is the intention of MPD to avoid continuous influx of formation fluids to the surface. Any influx incidental to the operation will be safely contained using an appropriate process. Mr. Scarborough stated that the benefits from MPD on influx control are significant, but perhaps not fully understood by operators and drilling companies as to how it can open new possibilities on influx control. He said that MPD can provide increased safety for drilling operations by providing early kick detection capability and dynamic influx control which provides the ability to manipulate pressures instantaneously with a higher circulation rate. In addition, MPD provides the ability to keep pipe moving throughout the kill operations, and eliminates ballooning and formation cycling through constant pressure on open hole formations. One of biggest benefits of MPD is increased granularity in monitoring, especially when using Coriolis meters and other monitors. It makes it easy to monitor flow in/flow out in gallons on both sides and the friction pressure. Kicks can be noticed within a half-barrel and the well can be shut in within 1 or 1.5 barrels. On large floating rigs, MPD is less likely to set off alarms since it eliminates the impact of rig movement due to the fixed volume container. This saves significant time in both cost and NPT since it eliminates the need to shut in and shut down. Mr. Scarborough stated that when the time a well takes is increased by NPT, personnel HSE risk is increased as well. He said just the use of a rotating head can dramatically reduce incidents of loss of well control. Despite its recognized benefits, Mr. Scarborough said, MPD still faces a number of challenges with industry acceptance and acceptance by regulatory bodies. These are frequently due to concerns over conflicting company policies, liability/accountability issues, and confidence and competency levels. He noted that it is current practice that when an influx is detected, even when using MPD, to revert to conventional well control. To provide a better understanding of MPD capabilities and a framework for MPD operations, the IADC UBO/MPD Committee is currently working on an MPD Influx Control Supplement to the API 92 series. This is intended to provide guidance on aspects to verify for operations being designed to actively manage influxes with the MPD system. The objective is to ensure that

equipment setup, engineering and safety processes will provide a safe envelope to manage influxes within the primary barrier. Designed to supplement API 92M and API 92S, the Committee document will define additional recommendations for operations planning to use MPD for influx removal. These will include detailed guidelines for engineering, equipment selection and assurance, testing, process safety practices, and crew training and competency development. In conclusion, Mr. Scarborough said that dynamic influx control mitigates many of the current challenges faced during conventional Well Control, since it utilizes an adjustable primary barrier, improves HSE and operational safety, reduces secondary challenges, and increases operational efficiency. When completed, the MPD influx control supplement to API 92S will provide guidance to the industry to properly make use of this technology. Subcommittee reports Well Control Practices Subcommittee: Paul Sonnemann, SafeKick Since very few people attended the last meeting, there was no further development on the scope of Subcommittee. Mr. Sonnemann urged more people to be involved on the Subcommittee. Intent is not to write document. SC has list of conventional practices they are interested in. Curriculum Subcommittee: Matt Parizi, Chevron There was no report from this group. Simulator Subcommittee Michael Arnold, Intertek There was no report from this group. A subcommittee meeting planned to follow the meeting was cancelled and will be rescheduled. Barriers Subcommittee Scott Randall, PlusAlpha Risk There was no report from this group. General Discussion Paul Sonnemann discussed the gas in riser work being done by the MPD/UBO Committee. He noted that the Committee had developed a set of draft recommendations relating to riser gas management for deep water operations. These are still under development. Mr. Mueller discussed interest in being involved with either high schools or colleges with activities focusing on the petroleum industry. He asked if anyone knows of someone who might help pursue presentations from these groups to refer them to him. The following were suggested as possible topics for future meetings: MPD components Mud/Gas Separators Decommissioning of platforms Rental vs. purchase of equipment Automated well control Petroleum engineering professors retiring, only schools that focus on well control is LSU and A&M -- Jerome Schubert Discussion & Next Meeting The next Well Control Committee meeting will be at 1 p.m. on Monday, 28 th August at Moody Gardens Hotel & Conference Center in Galveston. This will be the day prior to the next IADC Well Control Conference of the Americas, which will take place at the hotel on 29-30 August.

The meeting was adjourned, with a meeting of the Well Control Practices Subcommittee scheduled to follow afterwards. Attendance: Name Company Name Brian Piccolo AFGLOBAL CORP Austin Johnson AFGLOBAL CORPORATION Charlie Holt BP Chuck Boyd CS INC Michael Williams DIAMOND OFFSHORE DRILLING INC. Robert Kemper EXXONMOBIL Trevor Bishop EXXONMOBIL Fred Milne HELIX OILFIELD SERVICES Bill Burch HELIX OILFIELD SERVICES Phillip Harris HTK INTERNATIONAL Mike Harris HTK INTERNATIONAL Steve Kropla IADC Mark Denkowski IADC Aaron Mueller INDEPENDENCE CONTRACT DRILLING Jane Murphy INTERTEK Laura Murchison MURCHISON DRILLING SCHOOLS John Bottrell NOMAC DRILLING CORPORATION Steven Ronan OTC SOLUTIONS Antonio Lage PETROBRAS Paul Sonnemann SAFKICK Harshad Patil WEATHERFORD Robert Ziegler WEATHERFORD TECHNOLOGY & TRAINING CENTER Barry Cooper WELL CONTROL SCHOOL