Assessment of the orbital-frequency resource used by a geostationary satellite communication network

Similar documents
Frequency sharing between SRS and FSS (space-to-earth) systems in the GHz band

Radio-frequency channel arrangements for fixed wireless systems operating in the band GHz

Alternative BSS earth station antenna radiation pattern for 12 GHz BSS bands with effective apertures in the range cm

Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band

Recommendation ITU-R SF.1843 (10/2007)

Radio-frequency channel arrangements for fixed wireless systems operating in the GHz band

Recommendation ITU-R M (06/2005)

Radio-frequency channel arrangements for fixed wireless systems operating in the band GHz

Protection criteria related to the operation of data relay satellite systems

Protection criteria for non-gso data collection platforms in the band MHz

Radio-frequency arrangements for systems of the fixed service operating in sub-bands in the GHz band

Frequency block arrangements for fixed wireless access systems in the range MHz

Protection criteria for arrival time difference receivers operating in the meteorological aids service in the frequency band 9-11.

Recommendation ITU-R M (12/2013)

Radio-frequency arrangements for systems of the fixed service operating in the 25, 26 and 28 GHz bands. Recommendation ITU-R F.

Recommendation ITU-R M (09/2015)

Test procedure for measuring the scanning speed of radio monitoring receivers

Characteristics of data relay satellite systems

Protection criteria for Cospas-Sarsat local user terminals in the band MHz

Recommendation ITU-R F (05/2011)

Report ITU-R SM.2181 (09/2010)

Spectrum limit masks for digital terrestrial television broadcasting

Measurement uncertainty as it applies to test limits for the terrestrial component of International Mobile Telecommunications-2000

Radio-frequency channel and block arrangements for fixed wireless systems operating in the 42 GHz (40.5 to 43.5 GHz) band. Recommendation ITU-R F.

Frequency bands and transmission directions for data relay satellite networks/systems

Recommendation ITU-R F (03/2012)

Recommendation ITU-R SA (07/2017)

Recommendation ITU-R SA (07/2017)

Electronic data file format for earth station antenna patterns

Common formats for the exchange of information between monitoring stations

Radio-frequency channel arrangements based on a homogeneous pattern for fixed wireless systems operating in the 4 GHz band

Use of International Radio for Disaster Relief (IRDR) frequencies for emergency broadcasts in the High Frequency (HF) bands

Calculation of the maximum power density (averaged over 4 khz or 1 MHz) of angle-modulated and digital carriers

Performance and interference criteria for satellite passive remote sensing

Radio-frequency channel arrangements for medium- and high-capacity digital fixed wireless systems operating in the MHz band

Use of the frequency bands between MHz by the aeronautical mobile (R) service for data transmission using class of emission J2D

Radio-frequency channel arrangements for fixed wireless systems operating in the 8 GHz (7 725 to MHz) band

Interference criteria for meteorological aids operated in the MHz and MHz bands

Guidelines for efficient use of the band GHz by the Earth explorationsatellite service (space-to-earth)

Channel access requirements for HF adaptive systems in the fixed and land mobile services

Test procedure for measuring the sensitivity of radio monitoring receivers using analogue-modulated signals. Recommendation ITU-R SM.

The concept of transmission loss for radio links

Test procedure for measuring direction finder sensitivity in the VHF/UHF frequency range

Methods for measurements on digital broadcasting signals

Systems characteristics of automotive radars operating in the frequency band GHz for intelligent transport systems applications

Antenna rotation variability and effects on antenna coupling for radar interference analysis

Allowable short-term error performance for a satellite hypothetical reference digital path

Technical and operational characteristics of land mobile MF/HF systems

SINPO and SINPFEMO codes

Prediction of building entry loss

Minimum requirements related to technical performance for IMT-2020 radio interface(s)

The prediction of the time and the spatial profile for broadband land mobile services using UHF and SHF bands

Characteristics of and protection criteria for systems operating in the mobile service in the frequency range GHz

Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers

Impact of audio signal processing and compression techniques on terrestrial FM sound broadcasting emissions at VHF

The use of diversity for voice-frequency telegraphy on HF radio circuits

Recommendation ITU-R BT (03/2010)

General requirements for broadcastoriented applications of integrated

Technical characteristics and protection criteria for aeronautical mobile service systems in the frequency range GHz

Report ITU-R S (06/2015)

Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations

Availability objective for radio-relay systems over a hypothetical reference digital path

Frequency ranges for operation of non-beam wireless power transmission systems

Interference mitigation techniques for use by high altitude platform stations in the GHz and GHz bands

Protection of fixed monitoring stations against interference from nearby or strong transmitters

Water vapour: surface density and total columnar content

Role of the amateur and amateur-satellite services in support of disaster mitigation and relief

Characteristics of precipitation for propagation modelling

Sharing between the Earth explorationsatellite service (Earth-to-space) and

Recommendation ITU-R S (09/2015)

Attenuation due to clouds and fog

Essential requirements for a spectrum monitoring system for developing countries

Service requirements for digital sound broadcasting to vehicular, portable and fixed receivers using terrestrial transmitters in the VHF/UHF bands

Error performance and availability objectives and requirements for real point-to-point packet-based radio links

Objectives, characteristics and functional requirements of wide-area sensor and/or actuator network (WASN) systems

Radio-frequency arrangements for fixed service systems

Assessment of impairment caused to digital television reception by a wind turbine

Acquisition, presentation and analysis of data in studies of radiowave propagation

Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations. Recommendation ITU-R SM.

Preferred frequency bands for radio astronomical measurements

RECOMMENDATION ITU-R S.1063 * Criteria for sharing between BSS feeder links and other Earth-to-space or space-to-earth links of the FSS

Prediction of clutter loss

BSS system parameters between 17.3 GHz and 42.5 GHz and associated feeder links

Recommendation ITU-R M (10/2015)

Characteristics of systems operating in the amateur and amateur-satellite services for use in sharing studies

Field-strength measurements along a route with geographical coordinate registrations

Recommendation ITU-R SF.1486 (05/2000)

RECOMMENDATION ITU-R BO.1834*

International maritime VHF radiotelephone system with automatic facilities based on DSC signalling format

Conversion of annual statistics to worst-month statistics

Recommendation ITU-R M.1905 (01/2012)

Multi-dimensional signal mapping technique for satellite communications

Report ITU-R M.2198 (11/2010)

Propagation curves for aeronautical mobile and radionavigation services using the VHF, UHF and SHF bands

Morse telegraphy procedures in the maritime mobile service

Reliability calculations for adaptive HF fixed service networks

RECOMMENDATION ITU-R BO.1658

Broadcasting of multimedia and data applications for mobile reception by handheld receivers

Serial digital interface for production and international exchange of HDTV 3DTV programmes

Bandwidths, signal-to-noise ratios and fading allowances in complete systems

Transcription:

Report ITU-R S.2280 (10/2013) Assessment of the orbital-frequency resource used by a geostationary satellite communication network S Series Fixed satellite service

ii Rep. ITU-R S.2280 Foreword The role of the Radiocommunication Sector is to ensure the rational, equitable, efficient and economical use of the radio-frequency spectrum by all radiocommunication services, including satellite services, and carry out studies without limit of frequency range on the basis of which Recommendations are adopted. The regulatory and policy functions of the Radiocommunication Sector are performed by World and Regional Radiocommunication Conferences and Radiocommunication Assemblies supported by Study Groups. Policy on Intellectual Property Right (IPR) ITU-R policy on IPR is described in the Common Patent Policy for ITU-T/ITU-R/ISO/IEC referenced in Annex 1 of Resolution ITU-R 1. Forms to be used for the submission of patent statements and licensing declarations by patent holders are available from http://www.itu.int/itu-r/go/patents/en where the Guidelines for Implementation of the Common Patent Policy for ITU-T/ITU-R/ISO/IEC and the ITU-R patent information database can also be found. Series of ITU-R Reports (Also available online at http://www.itu.int/publ/r-rep/en) Series BO BR BS BT F M P RA RS S SA SF SM Title Satellite delivery Recording for production, archival and play-out; film for television Broadcasting service (sound) Broadcasting service (television) Fixed service Mobile, radiodetermination, amateur and related satellite services Radiowave propagation Radio astronomy Remote sensing systems Fixed-satellite service Space applications and meteorology Frequency sharing and coordination between fixed-satellite and fixed service systems Spectrum management Note: This ITU-R Report was approved in English by the Study Group under the procedure detailed in Resolution ITU-R 1. ITU 2013 Electronic Publication Geneva, 2013 All rights reserved. No part of this publication may be reproduced, by any means whatsoever, without written permission of ITU.

Rep. ITU-R S.2280 1 REPORT ITU-R S.2280 Assessment of the orbital-frequency resource used by a geostationary satellite communication network (2013) TABLE OF CONTENTS Page 1 Introduction... 2 2 Measurement unit... 2 3 Assessment of the occupied orbital arc... 2 4 Generalized parameters of the reference system... 4 5 Interference sensitivity of the assessed network... 4 6 Final evaluation of the occupied orbital arc and of the occupied orbital-frequency resource... 5 7 Conclusion... 5 Annex 1 List of abbreviations and notations, and main relationships between used values 7 Annex 2 Example of reference network parameters... 8 Annex 3 The effect of network parameters on the occupied orbital-frequency resource... 9

2 Rep. ITU-R S.2280 1 Introduction The congestion in the geostationary-satellite orbit (GSO) experienced by FSS and BSS networks is well-known and results from natural constraints of the angular dimension of the unique GSO (360 degrees) and limited frequency bands allocated to satellite communications. Numerous studies, including those carried out in the framework of ITU-R Study Group 4, have been aimed at increasing the total GSO resource and its efficient use. However, no methodology for evaluation of the resource occupied by a given geostationary satellite network, which could make it possible to compare networks of the same service using a common metric, has been discussed or approved in the framework of the ITU. This Report provides a methodology that could be used to arrive at a metric that would represent the amount of orbital-frequency resource (OFR) occupied by a given GSO satellite network. The intent of this methodology is to make the assessment of the occupied resource as simple and practicable as possible, in order to allow for comparative evaluation of different GSO networks. 2 Measurement unit The GSO OFR, occupied by a given FSS or BSS network (OOFR), is considered to be the part of the overall OFR of the GSO which cannot be used by other FSS or BSS networks. The OOFR of a satellite communication or broadcasting network is directly proportional to two components the occupied bandwidth, ΔF (Hz), and the occupied GSO arc, Δφ (degrees), of the network under consideration. For example, the number of similar networks which can be located within the whole GSO equals (360/Δφ) (Δf/ΔF), where Δf is the bandwidth allocated to the service. The size of the OOFR is defined as: where: k = 1 k = 0.5 R = ΔF Δφ k, (Hz degr.) (1) if the assessed system uses polarization division and both polarizations (or no polarization division); and if only one polarization is used, but polarization division is foreseen and allowed. Given this definition of OOFR, the measuring unit is hertz degree (Hz degr.). The occupied bandwidth as defined by the Radio Regulations is the width of a frequency band where the major part of the total mean power of a given emission is located (RR No. 1.153). The methodology contained in this Report does not consider the case of several co-located/co-frequency/co-coverage FSS or BSS networks (e.g. wave-form division or CDMA is not considered), so it is supposed that any network at a given notified orbital position occupies the whole notified frequency band irrespective of the pfd level and signal-to-noise ratio. The term occupied orbital arc is considered as the part of the GSO on both sides of the satellite position of the assessed network, which cannot be used for deployment of satellites of other networks because of harmful interference between networks. 3 Assessment of the occupied orbital arc For already operating networks, the minimum angular separation, Δφ, Δφ +, between the assessed network and the nearest adjacent GSO networks operating in the same frequency band can be determined using the current criteria, and it is possible to assume that the assessed network occupies the arc Δφ = [(Δφ )+(Δφ + )]/2.

Rep. ITU-R S.2280 3 For networks which requested coordination at a given orbital position, the necessary angular separation from submitted or notified adjacent networks, for which the interference level does not exceed permissible limits, could be also defined. However, it is evident that such assessment is not appropriate for the comparison of the networks because the result will be random, depending on adjacent network parameters such as emitted power, sensitivity to interference, size and location of coverage areas, ES antenna size and so on and, finally, on the number of networks on the given GSO arc. It is also evident that such evaluation is not applicable to assess networks which are prepared for application if their orbital positions have not been determined yet. An approach [1], [2] provides the description of a method for evaluation of the occupied orbital arc by the necessary angular separation from an adjacent network having exactly the same parameters as the assessed network. The non-applicability of this approach is evident; if, for example, the network under assessment has high emitted power, it will consequently cause high interference to less powerful networks, but this approach will show their compatibility in relation to similar networks at a small angular separation. Relying on these considerations, it is proposed to accept a method for determining the occupied orbital arc by the value of the necessary angular separation with regard to a reference network, applied to assess the occupied orbital arc for all networks in the framework of a certain service and frequency band (see Fig. 1). Parameters of the reference network should be chosen on the basis of operating systems, i.e. they should be typical and representative for networks in a certain radio service and a certain frequency band. This approach will put all assessed networks into equal conditions, and in addition this will facilitate the homogeneity of the networks, which will benefit to increased capacity of the GSO. In equation (1) above, it is assumed that the service areas of the assessed and reference networks overlap, and earth stations are located within the overlapped part of these service areas. These assumptions significantly simplify calculations and correspond to the most difficult and practically the most frequent case. In this case, the coverage area of the assessed system is not taken into consideration. However, if an ideal radiation pattern (i.e. zero gain of the satellite antenna outside the coverage area) is assumed for both the assessed and reference systems, then the assessed system coverage area may be taken into consideration while assessing the occupied resource by introducing a simple coefficient s = S c /S s, which represents the ratio of the covered territory S c to the whole visible Earth s surface S s, because, evidently, the part of the Earth s surface not being a part of the coverage area of the assessed network is free from interference in this ideal case and the necessary angular separation between satellites equals zero when an earth station of the reference system is located outside the coverage area of the assessed system. In order to account for this geographic coverage aspect of the assessed system, the factor shown in (2) below is added to (1): s = S c /S s (2) In other words, the surface area (S s S c ) can be used by other networks without any angular separation between satellites. Assessment of an interference-free area can be obtained without the presumption of an ideal radiation pattern of the assessed satellite network while determining the value of S c and (S s S c ) using pfd ed, pfd eup, pfd rid and pfd riup, pfd rd, pfd rup, pfd eid, pfd eiup values and active compatibility criteria (see their definitions and relationships in Annex 1). On this basis, the following equation is used for the calculation of the occupied resource rather than (1): R = ΔF Δφ k s, (Hz degr.) (3)

4 Rep. ITU-R S.2280 where Δφ is the required angular separation of the assessed network relative to the reference network; other values being as defined above. 4 Generalized parameters of the reference system Parameters of an FSS network in the 6/4 GHz and 14/11 GHz bands were proposed to specify pfd coordination levels on the Earth s surface and at the GSO in order to fully protect satellite networks outside the coordination arc earlier in ITU-R in preparations for previous WRC, and appear to be appropriate for a reference FSS network for interference assessment towards the reference network (RN) as it was stated in the specified documents (see Annex 2). Parameters of a typical BSS network in the 21.4-22.0 GHz band are specified in Annex 1 to Resolution 553 (WRC-12). Based on the technical parameters of the reference network specified in Annex 2, one can determine generalized parameters of the reference network sufficient to analyse interference caused to the reference network by the network under assessment: interference power-flux density, pfd riup, acceptable for a reference network in the uplink (at the GSO); interference power-flux density, pfd rid, acceptable for a reference network in the downlink (at the Earth s surface), which depends on the diameter of the earth station antenna and angular separation between satellites of the assessed and reference networks. The necessary angular separation in the downlink, Δϕ rd, is derived directly from Fig. 2 (FSS network in the Ku-band or similar in other cases), by finding a point on the envelope corresponding to a maximum permissible pfd created by the satellite of the assessed network at the Earth s surface. The necessary angular separation in the uplink, Δϕ rup, is determined by the value of angular separation under which the pfd at the GSO from all types of ESs in the network under assessment, taking into account their e.i.r.p. and selectivity of the antenna, does not exceed the value of pfd riup given above. To describe the effect of interference to the network under assessment (specifically for the calculation of the occupied orbital arc using the acceptable level of interference to the network under assessment) it is necessary to complement the above parameters of the reference network with values defining pfd of the wanted signal of the reference network in the uplink and downlink, pfd rd and pfd rup. For that, it is sufficient to choose a typical signal-to-noise ratio in the uplink and downlink, C/N, for the reference network. 5 Interference sensitivity of the assessed network To define interference sensitivity of the assessed network, it is necessary to have the network parameters similar to those shown above for the calculation of interference to the reference network. In the generalized form, it is the permissible interference in the uplink, pfd eiup, for the assessed network (minimum value for the whole set of signal types transmitted in this network) and the permissible interference in the downlink, pfd eid, with the value of the latter depending on the size and radiation pattern of ES antennas of the assessed network, as well as on angular separation. The value of the necessary angular separation in the downlink is determined by the value of Δϕ ed at which the pfd produced by the reference network equals the permissible pfd eid value for the assessed network (minimum value for all notified antenna types), and the necessary angular separation in the uplink is determined by the value of Δϕ eup at which the pfd produced by the reference network equals pfd eiup (also minimum value). The value of Δϕ eup is determined by the necessary selectivity

Rep. ITU-R S.2280 5 of the reference network ES antenna. If the reference network allows different sizes of ES antennas, it may be convenient for assessment to plot curves similar to Fig. 2. 6 Final evaluation of the occupied orbital arc and of the occupied orbital-frequency resource The final evaluation of the occupied orbital arc shall use the maximum value of four derived values: Δφ= max[δφ rup, Δφ eup, Δφ rd, Δφ ed ] (4) Then, taking all the above into account and the number of satellites in the network, N, the final evaluation of the orbital-frequency resource occupied by the network is: R = N n= 1 ( ΔF Δϕ k s) (5) n 7 Conclusion The assessment of the orbital-frequency resource used by the network deems necessary to compare systems with regard to their use of the outer space resource. It can also be used to assess the resource necessary for administrations to meet national or regional needs. In the latter case, the number N of GSO positions is determined by the minimum angle of arrival necessary to cover the territory of a country/group of countries. When assessing the required national/regional resource, other factors could also be taken into account determining the necessary use of satellite communication systems [4]. The condition of using the proposed method for assessment of the occupied OFR is the development and approval of reference network parameters for different services and frequency bands, and for this there may be a sufficient basis taking into account previously submitted ITU-R documentation.

6 Rep. ITU-R S.2280 FIGURE 1 RSSS space station of reference system RSES earth station of reference system SS1 space station of the assessed system ES1 earth station of the assessed system FIGURE 2 Acceptable downlink pfd for the Κu-band reference system -170 downlink pfd limit to meet dt/t = 6% -180-190 pfd (db(w/(m^2 Hz))) -200-210 -220 0.45 m 0.6 m 0.9 m 1.8 m 3.5 m 11 m Method C3 prospective pfd mask Method C2 prospective pfd limit -230-240 0,01 0,1 1 10 100 Geocentric separation (degrees) NOTE Geocentric separation angle corresponding to pfd value equal to or more than 181 db(w/m 2 Hz) is defined by the brown line (i.e. curve for 11 m antenna) for the purpose of this Report.

Rep. ITU-R S.2280 7 References [1] Спутниковая связь и проблема геостационарной орбиты. Кантор Л.Я, Тимофеев В.В. Радио и связь, 1988г. (Satellite communications and the problem of the geostationary orbit. L. Kantor, V. Timofeev, Radio-i-svyaz Publishers, 1988.) [2] CC1R. XV-th Plenary Assembly. Vol. IV 1. Geneva: ITU, 1982. 501 P. [3] WRC-12 Final Acts. Resolution 756 (WRC-12). [4] G. Chouinard. Bringing broadband access to rural and remote areas. ITU News, April 2006. Annex 1 List of abbreviations and notations, and main relationships between used values pfd rd pfd of the wanted signal of reference network in the downlink pfd rup wanted signal pfd of reference network in the uplink pfd ed wanted signal pfd of assessed network in the downlink pfd eup wanted signal pfd of assessed network in the uplink pfd rid acceptable interference pfd towards reference network (min) in the downlink pfd riup acceptable interference pfd towards reference network (min) in the uplink pfd eid acceptable interference pfd towards assessed network (min) in the downlink pfd eiup acceptable interference pfd towards the assessed network (min.) in the uplink Se rd spatial selectivity of a reference network ES antenna in the downlink Se rup spatial selectivity of reference network ES antenna in the uplink Se ed spatial selectivity of assessed network ES antenna in the downlink Se eup spatial selectivity of assessed network ES antenna in the uplink ES Earth station RN Reference network EN Assessed network Δφ necessary angular separation between EN and RN Δφ rd necessary angular separation between EN and RN due to pfd rid and pfd ed Δφ rup necessary angular separation between EN and RN due to pfd riup and pfd eup Δφ ed necessary angular separation between EN and RN due to pfd eid and pfd rd Δφ eup necessary angular separation between EN and RN due to pfd eiup and pfd rup

8 Rep. ITU-R S.2280 s = S c /S s relative coverage area of the assessed network S c coverage area of the assessed network S s Earth surface area visible from the GSO position C/N, С/I, N/I required signal-to-noise ratio, signal-to-single entry interference ratio, noise-to-interference ratio in the uplink (up) and the downlink (d) for the assessed network (e) and for the reference network (r). RELATIONSHIPS BETWEEN USED VALUES pfd eid = pfd rd Se ed (Δφ ed ) = pfd ed (C/I) ed = pfd ed (C/N) ed (N/I) ed pfd eiup = pfd rup Se rup (Δφ rup ) = pfd eup (C/I) eup = pfd eup (С/N) eup (N/I) eup pfd rid = pfd ed Se rd (Δφ rd ) = pfd rd (C/I) rd = pfd rd (С/N) rd (N/I) rd pfd riup = pfd eup Se eup (Δφ eup ) = pfd rup (C/I) eup = pfd rup (С/N) rup (N/I) rup Annex 2 Example of reference network parameters The following technical parameters are proposed for FSS networks in the 14/11 GHz band for illustrative purposes: criterion for acceptable single entry interference from any other FSS network ΔТ/Т = 6% ( 12.2 db); ES noise temperature = 125 K; satellite G/T = 8 db/k; ES antenna diameter D a = 0.45 m, 0.6 m, 0.9 m, 1.8 m, 3.5 m, 11 m; downlink frequency is 11 GHz, uplink frequency is 14 GHz; ES antenna pattern complies with Recommendations ITU-R S.580-6, ITU-R S.465, and BR Antenna Pattern Library (APL); circular and linear polarization, for both uplink and downlink. On the basis of these certain technical parameters, generalized parameters can be determined which would simplify the calculations: pfd riup = 205 db (W/m 2 Hz); pfd rid shown in Fig. 2. For the assessment of interference towards the assessed network it is necessary to evaluate the pfd of the reference network signals in the uplink and downlink. Thus, assuming that under the clear weather conditions this value is the same for both uplink and downlink and equals to C/N = 14 db, then the pfd on the Earth s surface is equal to pfd rd = 184.12 db (W/m 2 Hz) for the minimum value of ES antenna diameter 0.45 m (in this case the e.i.r.p. of a reference network satellite is equal to 56 dbw in 36 MHz):

Rep. ITU-R S.2280 9 towards the GSO (to the position of the reference network satellite), pfd rup = 178.2 db (W/m 2 Hz) from any reference network ES. An example of assessment of the occupied orbital-frequency resource based on these parameters: If the assessed FSS network in the Ku-band has the same generalized parameters as the reference network, global coverage and dual polarization, then the occupied GSO arc will be 6.7 (for ES antenna diameter 45 cm); and if the occupied frequency band is 500 MHz, then R = 3 350 MHz degr. Annex 3 The effect of network parameters on the occupied orbital-frequency resource ES antenna diameter Annex 2 gives pfd rd values for the minimum ES antenna diameter 0.45 m for the reference and assessed networks: D a = 0.45 m; pfd rd = 184.12 db(w/m 2 Hz). If the minimum antenna diameter for both networks is increased, the relevant pfd will be as follows: D a = 0.6 m pfd rd = pfd ed = 186.62 db(w/m 2 Hz) D a = 0.9 m pfd rd = pfd ed = 190.12 db(w/m 2 Hz) D a =1.8 m pfd rd = pfd ed = 196.16 db(w/m 2 Hz). In accordance with these values, the orbital arc occupied in the downlink by the assessed network, having the same parameters as the reference network, can be derived from Fig. 2, and for different values of minimum ES antenna diameter is equal to: D a = 0.45 m Δφ rd = Δφ ed = 6.7 D a = 0.6 m Δφ rd = Δφ ed = 5.3 D a = 0.9 m Δφ rd = Δφ ed = 3.85 D a = 1.8 m Δφ rd = Δφ ed = 2.2. These results show quantitative assessment of the dramatic effect of small antennas on the orbital-frequency resource occupied by the network. In addition, the above data shows the importance to choose minimum ES antenna diameter for the reference network because a small size of the reference network antenna would not encourage use of greater ES antennas in the notified networks, taking into account that for large ES antenna diameter in the assessed network the necessary angular separation and occupied orbital arc would be determined by the worst case interference (see equation (4)) towards the assessed network (i.e. by Δφ ed ).

10 Rep. ITU-R S.2280 Effect of instability of ES antenna pointing Considerable ES antenna pointing errors towards the satellite of its own network may take place in certain cases. The quantitative assessment of this effect is very simple. With the possible pointing error ±0.2, the occupied orbital arc values derived above will be higher by 0.2. The instability of ES antenna pointing should have been assessed taking into account the probability of this event (see Recommendation ITU-R S.1857), however, since the acceptable interference value between GSO FSS networks is defined only for 100% of time, it is sufficient to know the maximum pointing error. Effect of adaptation of the assessed network parameters It is known that the signal in the Ku-band, and especially in the Ka-band, is subject to high attenuation in precipitation, and during these periods various adaptation methods are applied. There are three basic adaptation methods: 1) to increase the pfd of the wanted signal (without changing the data transmission rate and modulation/coding schemes); 2) to decrease the data transmission rate (without changing the pfd and modulation/coding schemes); 3) to change the modulation/coding schemes for more noise-immune options. Those methods may also be combined. In the first adaptation method, as the probability of signal attenuation is not significant (fractions of 1% of time), the probability of simultaneous high attenuation at geographically dispersed stations is rather small, i.e. at the stations of other networks (including the reference network) the signal level will not be reduced by precipitation, so the interference level towards the other network will be higher by the value of the power increase; the occupied orbital arc will correspondingly increase, because additional attenuation of interference will be required using better ES antenna selectivity to meet the permissible value of interference level. The necessary increase in angular separation can be assessed using Fig. 2 or corresponding Tables. Thus, increased power by 8 db will significantly increase required angular separation up to 14 (for 0.45 m), 11.1 (for 0.6 m), 8.15 (for 0.9 m), 4.65 (for 1.8 m). It should be noted that these considerations refer to downlink only, where stations of interacting systems may be separated, while the increased uplink pfd during attenuation usually will not cause troubles due to high correlation of signal attenuations towards neighbouring satellites. The second adaptation method decrease of the data transmission rate without changing the pfd and modulation/coding schemes will cause reduction of the signal radio frequency bandwidth and corresponding increase of spectral pfd. The effect of increased interference and occupied orbital-frequency resource will be the same as in the first adaptation method. And only the third adaptation method change of the modulation/coding schemes without change of the transmitted power and occupied signal bandwidth will not cause increase of interference and occupied orbital-frequency resource, and from this point of view it is preferable. Application of higher protection for certain systems (i.e. lower I/N ratio, for example, lower than 6%) will result in the increase in the occupied OFR similarly to the increase in the pfd of the radiated signal.