Wood Squares Installation Guide

Similar documents
Panel Grille Suspended Ceiling Installation Guide

Linear Open Style Suspended Ceiling Installation Guide

Acoustical Infill Panels

Technical Data VARIABLES

Technical Data VARIABLES

Technical Data VARIABLES

4300 Install Guide. Attention. Ceiling Accessories

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

WoodWORKS Channeled Plank

AXIOM Classic Trim. Assembly and Installation Instructions

AXIOM Classic Trim Installation Instructions

Trim (Aluminum Substrate)

METALWORKS TARTAN PANELS General Installation Instructions

metalworks Vector Assembly and Installation Instructions

WOODWORKS Access Hook-on System

WOODWORKS Walls. Installation Instructions WALL

CARE & storage 2s e c t i o n

WOODWORKS Concealed. Assembly and Installation Instructions

AXIOM Classic Trim. Assembly and Installation Instructions 1. GENERAL

METALWORKS Concealed. Installation Instructions

Safety First! Review the Safety Checklist before performing tasks in this chapter.

WOODWORKS Grille System

INSTALLATION INSTRUCTIONS

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

SECTION BULLET- RESISTANT DOORS

Installation Instructions

Vinyl Windows Manufactured by VPI Quality Windows

INSTALLATION INSTRUCTIONS

Installation Instructions and Details

Engineered Hardwood Flooring Installation Instructions

PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual

HAND CRIMP TOOL Operating Instruction and Specification Sheet Order No (CR6115B)

HAND CRIMP TOOL Operating Instruction and Specification Sheet Order No (CR60622B)

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Product Guide Specification

Installation Instructions

Vinyl Windows and Doors Manufactured by Pella Corporation

KITCHEN INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

738 SERIES PIVOT SHOWER DOOR

How to Install Drop Ceiling Tiles

APPLICATION INSTRUCTIONS FOR DINGEWOOD SIDING

KITCHEN INSTALLATION GUIDE

CARRIER OVERHANG 1'-0" MAX PANEL LENGTH 3'-0" MIN - 16'-0" MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise)

Window Frame Installation Instructions For Nail-on and Block Frames

Nanton Grain Mill Assembly

Installation Instructions and Details

INSTALLATION INSTRUCTIONS

SECTION CARPENTRY

HAND CRIMP TOOL Operating Instruction and Specification Sheet Order No

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

wellington french patio doorset fitting & fixing guidelines

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Worthington Sauna Installation & Owner s Manual

Tape Measure Metal Clippers Screw Bit Set With Extensions

PANEL INSTALLATION GUIDE

FLEX SHOWER DOOR INSTALLATION INSTRUCTIONS

Eagle clad double-hung window installation instructions

suspended ceiling tile INSTALLATION INSTRUCTIONS

Panel Installation Instructions

Installation Instructions for TruWood Reversible Trim

FLEX 28 / 32 / 42 x 72

SECTION PAINTING

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

Technical Information

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

Classic Woodworking. Installation Guide SW Jacktown Rd, Beaverton, OR Toll Free (800) Phone (503) Fax (503)

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

ARMSTRONG METALWORKS BAFFLES Installation Guide

Loose Lay Luxury Vinyl Plank

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

suspended ceiling tile INSTALLATION INSTRUCTIONS

Royal System (1948) Designed by Poul Cadovius INSTALLATION GUIDE

UNIT No. 15 & 16 SHOWER DOOR INSTALLATION INSTRUCTIONS

English Professional Installation Guidelines

Instalation rules decustik D+ acoustic panels Installation rules for walls and ceilings

Installation Instructions

INSTALLATION MANUAL STOREFRONT DOORS

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

Finishing Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing

6400, 8400 and 9400 Series Sliding Patio Door

I-VICFLEX.VS1. Victaulic VicFlex Style VS1 Dry Sprinkler WARNING WARNING TECHNICAL DATA BEND CHARACTERISTICS INSTALLATION INSTRUCTIONS SIDEWALL

Engineered Hardwood Installation

INSTALLATION INSTRUCTIONS

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

HAMPTON Crackle Wall Tile

DULUX UNIVERSAL UNDERCOAT

HAND CRIMP TOOL Operating Instruction and Specification Sheet Order No

340 & 350 SERIES DELUXE FRAMELESS BYPASS

SHOWER DOORS INSTALLATION INSTRUCTIONS SHOWER DOORS: LBSDD Version 4.0

Summit Building Products has been in business since 1999 and is a distributor of high quality import pine interior doors and a manufacturer of wood

B. Samples: For each exposed product and for each color and texture specified.

HR175 Sash Replacement Kit Installation Instructions

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Effective February, 2015

FLEXITEEK INSTALLATION INSTRUCTIONS

UNIT No. 8150/9150 SHOWER ENCLOSURE

Transcription:

Wood Squares Installation Guide World Commerce Center 2000 Ring Way Road, St. Augustine, FL 32092 Phone: 800-227-8566 or 904-584-1400 www.rulonco.com

Rulon Wood Squares Ceiling Installation Guide Receipt and Storage: a. All material shall be delivered to the project site in the original, labeled, unopened packages. Keep packages of components unopened until it is time to acclimate to the building conditions b. Material shall be stored flat and level in a fully enclosed space. DO NOT Store Rulon products in direct sunlight. Seventy-two hours before beginning ceiling installation, wood strips must be moved into the room where the HVAC system is operating and the packaging shall be opened. This is to allow the boards to adjust to the room environment. Wood panels are to be stored off the floor. c. Care in handling must be exercised to avoid damage. Before You Begin Installation: a. Ensure that all necessary tools are available (see below) b. Check Wall components to ensure all items required are at hand (see Page 2) c. Review this guide in its entirety. If you have any questions, call Rulon Company before you start the installation d. Installation shall be done only when the temperature and humidity closely approximate the interior conditions that will exist when the building is occupied. The heating and cooling systems shall be operating before, during, and after installation, with the humidity of the interior spaces maintained between 25% and 55%, temperature between 60 to 90 degrees F. e. It is important that area have proper ventilation, especially in high moisture areas. There shall be no excessive buildup of heat in the space. f. Prior to the start of installation, all exterior windows and doors are to be in place, glazed, and weather-stripped. The roof is to be watertight, and all wet trades' work is to be completed, and thoroughly dry. g. Mechanical, electrical, and other utility service installations above the ceiling plane shall have been completed. No materials should rest or wrap around, the ceiling suspension components or connecting hangers. If You Need Further Assistance: - If you have any questions, or if you encounter a situation not covered by this installation guide, contact the Rulon Technical Department. Phone: 1-800-22RULON (1-800-227-8566), 904-584-1400 Fax: 1-904-584-1499 Tools and Equipment: - Standard leveling devices - Saber saw - Miter saw - Table Saw [1] REV: July 1, 2015

- Painters tape References: Rulon Wood Squares Ceiling Installation Guide - ASTM C-635 Standard Specification for the Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Ceilings - ASTM C-636 Standard Practice for the Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Ceilings - Optional: ASTM E-1264 Standard Classification of Acoustical Ceiling Products - Optional: Seismic Considerations Refer to Local Code [2] REV: July 1, 2015

Rulon Wood Squares Ceiling Installation Guide Lay-in Square Profile Shown (See pages 4&5 for additional profiles) (Reference Shop drawings for profiles not shown in installation guide such as coffered etc.) Ceiling Components: Supplied by Rulon: - Wood Squares - Perimeter and border trim (when specified) - Touch-up finish Supplied by Others: - 9/16 [14 mm] or 15/16 [24 mm] Heavy-Duty T-Rail Grid System - Acoustical Blanket (when specified) - Perimeter angle or hardware for trim installation [3] REV: July 1, 2015

Other Profiles: Rulon Wood Squares Ceiling Installation Guide Standard Tegular Profile for 9/16 Grid Standard Tegular Profile for 15/16 Grid Edge Banded Side Slot square Profile [4] REV: July 1, 2015

Rulon Wood Squares Ceiling Installation Guide Partial Depth Edge Banded Tegular Profile for 9/16 Grid Partial Depth Edge Banded Tegular Profile for 15/16 Grid Full Depth Edge Banded Tegular Profile for 9/16 Grid Full Depth Edge Banded Tegular Profile for 15/16 Grid [5] REV: July 1, 2015

Rulon Wood Squares Ceiling Installation Guide Step 1: Ceiling Grid Preparation Level and Install heavy duty grid throughout the installation area. Heavy duty grid mains shall be supported a maximum of 4 [1219 mm] On Center with #12 Gauge Hanger wire. Hanger wire shall be hung directly from building structure, unless otherwise covered in the Rulon Shop drawings or reviewed and approved by the Rulon Engineering department. If acoustical insulation is required, install prior to laying in panels. [6] REV: July 1, 2015

Step 2: Installing Panels Rulon Wood Squares Ceiling Installation Guide Install panels as in sketch above. For side slot installation, refer to three steps below. Step 3: Perimeters and penetrations Panels are to be field-trimmed to fit site conditions. Trimming should be done with the appropriate saw, with painters tape on the veneer side to prevent splintering. Penetration cuts require a saber/jig saw, and perimeter cuts require a miter saw. Cut panels should be touched up with Rulon-supplied finish. Step 4: Cleanup. 1. Clean all wood panels and borders free of dirt, dust, grease, oils, and fingerprints. Routine cleaning is best accomplished with a soft, lint-free cloth lightly dampened with water or an inert household dust attractant. Allowing airborne dust, which is somewhat abrasive, to build up will tend to dull a finish over time. Refer to the Rulon Care and Maintenance document for further instructions. 2. Remove and replace all work that cannot be successfully cleaned or repaired [7] REV: July 1, 2015