RAVENSTHORPE NICKEL OPERATIONS

Similar documents
SEMAFO: Construction of Boungou Mine 91% Complete. Commissioning Advancing to Plan

SEMAFO: Good Reconciliation to Reserves Continues at Zone 9

September 2017 PGM:TSX-V

PRODUCING AND EXPLORING Q WEBCAST

Delivering the Turnaround. Leigh Junk - Managing Director February 2018

Prophecy Returns Silver, Zinc, Lead Assays from Latest Pulacayo Chip Sampling Programs

NEW LIBERTY GOLD MINE: GOLD RECOVERIES IMPROVING

Core Gold 2017 Gold Production

For personal use only

HIGH GRADE INTERCEPTS FROM LISEIWI PROSPECT, BLOCK 14

For personal use only

Star Orion South Diamond Project

January 11, 2012 #

For personal use only

FUGITIVE EMISSIONS AND TYPE TESTING OF VALVES

ASIAN MINERAL RESOURCES CONTINUES STRONG OPERATIONAL PERFORMANCE; STRONG EM CONDUCTORS IDENTIFIED AT KINGSNAKE EXPLORATION PROSPECT

Emerging Giant. Turnagain Project. Over 2 million tonnes of 18% Ni Concentrate 27 year mine life. Hard Creek Nickel Corporation

Drilling commences at Sertão following review of historical data

Greg Robinson Managing Director and Chief Executive Officer

For personal use only

Fura Gems Flagship Colombian Emerald Mine Begins Production

Investor Update. April 14, 2015

Operational Intelligence to Deliver Smart Solutions. Copyright 2015 OSIsoft, LLC

Copper To The World 2018

Moberly Sand Development Re-examination and Opportunity

Exploration Update Drilling Recommences in Côte d Ivoire Significant Drill Results in Ghana

Shell s Journey to Mobility

Star Orion South Diamond Project

For personal use only

2010 Reserves and Non-Reserve Mineralization

Assist & Assure. Embedding our Safety Agenda

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

PNG Mining and Petroleum Conference Sydney, December December

Kaizen Discovery prepares to commence exploration program at the Pinaya Copper-Gold Project in Peru. Update on exploration projects in BC and Nunavut

Operational Intelligence to deliver Smart Solutions

CIBC 17 th Annual Whistler Institutional Investor Conference Laurie Brlas, EVP and CFO. January 24, 2014

BISIE PROJECT UPDATE AND ALPHAMIN APPOINTS CHAIRMAN TO THE BOARD

Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013

Scoping Study Commences on Nyanzaga Gold Project in Tanzania

Carrapateena project update. Myles Johnston, General Manager Carrapateena

THE COUNTDOWN TO KARLAWINDA Building a new mid-tier gold producer

SHELL CANSOLV AT THE TCM DEMONSTRATION PLANT Delivering the CANSOLV DC-201 enhanced solvent

For personal use only. The Mining 2016 Resources Convention

Anadarko Basin Drilling Learning Curves Drivers. Pete Chacon

AMEC s major locations Mining & Metals centres of excellence

By SveMin, FinnMin and Norsk Bergindustri

Barrick and Newmont Forge Nevada Joint Venture Agreement

AMERICAS SILVER CORPORATION PROVIDES FIRST QUARTER PRODUCTION AND COST UPDATE INCLUDING RECORD LOW CASH COSTS AND ALL IN SUSTAINING COSTS

A Message from Excelsior Mining

ANNUAL & SPECIAL MEETING OF SHAREHOLDERS

There s good reason why it s called Goldstrike.

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES FOR THE MARTHA PROJECT AT WAIHI

For personal use only

Metal Bulletin 5 th International Nickel Conference

Wood Group Investor Briefing Q1 2016

Pasinex Announces Maiden High-Grade Zinc Resource in Turkey

TRANSFORMING THE WA GOLD PROJECT, GHANA

USING SKUA IN SHELL - GEOSIGNS

Deep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada

KEY MANAGEMENT APPOINTMENTS MADE AS DALGARANGA PROGRESSES TOWARDS DEVELOPMENT

Supplier Development and Keys To Supply Chain Success

Managing Well Integrity Data in a Growing Company. Rob Noble P.Eng. Drilling & Completions Laricina Energy Ltd.

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES AT WAIHI IN NEW ZEALAND

EMP Approval to Drill Next Dome Complex

Business Update Shell Trinidad and Tobago. Colette Hirstius GM Developments

Excellent Metallurgical Recovery Results & Update on Priority Drilling at Great Western Gold Project

A Seasoned Project Generator with a World Class Partner Newmont Plateau $53M Arrangement with Newmont

THE MILESTONE MINUTE IN THIS ISSUE WINTER Growing Together through the Salt of the Earth.

PyroGenesis Announces Receipt of AS9100D Certification for Aviation, Space, and Defense Industries; Provides Update on AM Business Line

LUNDIN GOLD UNDERGROUND MINE DEVELOPMENT INTO HARD ROCK AT FRUTA DEL NORTE

Exploration & Reserves. Stephen Enders, Sr. VP, Worldwide Exploration

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V

Joint Press Release Acergy and Subsea 7 Agree to Combine

Resources and Energy Group (REZ) is pleased to enclose a brief presentation on the Radio Gold Mine Project.

Seabridge Gold Inc. News Release Trading Symbols: TSX: SEA FOR IMMEDIATE RELEASE NYSE: SA November 12, 2013

Kirkland Lake Gold Announces Management Appointments

Definitions & cautionary note

TSX.V: TXR OTC: TRXXF Frankfurt: TXO. Exploring Canada s Highest Grade Gold District

NEWMONT MINING CORP /DE/

Forward-Looking Information

For personal use only

SHELL S MBM PROGRESS AND PLAN

WELLVANTAGE REMOTE OPERATIONS DEEPWATER

ADVANCED PROCESS CONTROL IN SHELL

For personal use only

CRIRSCO and evolving international accounting standards: IFRSs

T3 Mine Feasibility Study Update

Deepwater Exploration, Development and Production A Better Understanding?

For personal use only

QUARTERLY REPORT FOR THE THREE MONTHS ENDING 30 JUNE 2018 HIGHLIGHTS

FORM 8-K. MCORPCX, INC. (Exact name of registrant as specified in its charter)

UK OIL & GAS SHARE FAIR 2015

Halliburton and Baker Hughes Creating the leading oilfield services company

WORKING IN PARTNERSHIP TO IMPROVE COMMUNITY ENGAGEMENT: A CASE STUDY FROM THE PROPOSED PETERHEAD CCS PROJECT

MINING. Down to Earth. Up to the Challenge. Engineering, Geoscience and Environmental Services PAPUA NEW GUINEA

Shell Exploration and Production EP Americas. Institute of the Americas May 13, Olivier Lazare Vice President, New Business Development

Environmental Aspects of Deep Sea Mining with National Jurisdiction

Q ARAGUAIA OPERATIONAL UPDATE

Investor Presentation. Kevin Joyce Managing Director

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED)

Transcription:

RAVENSTHORPE NICKEL OPERATIONS April 2013

Disclaimer Certain statements and information contained in this presentation, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to the anticipated commencement, completion and terms of the proposed offer and the anticipated strategic and operational benefits of the offer. Often, but not always, forward-looking statements or information can be identified by the use of words such as plans, expects or does not expect, is expected, budget, scheduled, estimates, forecasts, intends, projects, anticipates or does not anticipate or believes or variations of such words and phrases or statements that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. With respect to forward-looking statements and information contained in this presentation, First Quantum has made numerous assumptions including among other things, assumptions about the price of copper, gold, cobalt, nickel, PGE, and sulphuric acid, anticipated costs and expenditures, and First Quantum's ability to achieve its goals. Although management of First Quantum believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These risks, uncertainties and other factors include, but are not limited to, uncertainties surrounding the ability to realize operational synergies following completion of the offer, reliance on Inmet s publicly available information which may not fully identify all risks related to its performance, success in integrating the retail distribution systems, and the integration of supply chain management processes, future production volumes and costs, costs for inputs such as oil, power and sulphur, political stability in Zambia, Peru, Mauritania, Finland, Turkey, Spain, Panama and Australia, adverse weather conditions in any of the foregoing countries, labor disruptions, mechanical failures, water supply, procurement and delivery of parts and supplies to the operations and the production of off-spec material. See First Quantum s annual information form for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. Although we have attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking statements or information, there may be other factors, many of which are beyond the control of First Quantum, that might cause actual results, performances, achievements or events not to be anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. While First Quantum may elect to update the forward-looking statements at any time, First Quantum does not undertake to update them at any particular time or in response to any particular event, other than as may be required by applicable securities laws. Investors and others should not assume that any forward-looking statement contained in this presentation represents management's estimate as of any date other than the date of this presentation. Neither First Quantum nor any of its directors or officers has verified the accuracy or completeness of information or statements contained herein which are made by or derived from third-party sources (including any projections or estimates made by third-party research analysts). Such third-party sources may have failed to identify events or facts which may have occurred or which may affect the significance or accuracy of any such information or statements. First Quantum has no means of verifying the accuracy or completeness of such information or statements made by or derived from third-party sources or whether there has been any failure by such sources to identify events that may have occurred or may affect the significance or accuracy of any information or statements. This presentation does not constitute an offer to buy or an invitation to sell, or the solicitation of an offer to buy or invitation to sell, any securities of First Quantum or Inmet. Such an offer may only be made pursuant to the offer and takeover bid circular First Quantum has filed with the Canadian securities regulators and pursuant to registration or qualification under the securities laws of any other such jurisdiction. In accordance with applicable Canadian securities regulatory requirements, all mineral reserve and mineral resource estimates disclosed herein have been prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), classified in accordance with Canadian Institute of Mining Metallurgy and Petroleum's "CIM Standards on Mineral Resources and Reserves Definitions and Guidelines" (the "CIM Guidelines"). The terms "mineral resources", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" are recognized by Canadian securities regulatory authorities, however, they may not be recognized by the securities regulatory authorities of other jurisdictions. Pursuant to the CIM Guidelines, mineral resources have a higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred mineral resources, when compared with measured or indicated mineral resources, have the least certainty as to their existence, and it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration. Pursuant to NI 43-101, inferred mineral resources may not form the basis of any economic analysis, including any feasibility study. Accordingly, readers are cautioned not to assume that all or any part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever be economically or legally mineable or recovered. Note: all dollar amounts in US dollars unless otherwise indicated; C$ indicates Canadian dollars 2

Itinerary Time Activity 08:10 Project History and Overview, with Assistant General Manager and Management Team. 09:30 Mine Pit Tour for visual overview of operations (with Mining Manager): Pit Lookout (site layout; geological overview; staged mining approach; grade control areas; Hale-Bopp and Shoemaker-Levy deposits) Pit tour ROM Stockpile and Crusher area (new crushers; stacker reclaimers for blending; buffer ponds; rejects handling) 10:30 Plant Overview by foot (with Plant Manager): New Crushers Beneficiation Plant Pressure Acid Leach Acid Leach and Power Plant MHP Load-out 12:00 Q&A over lunch with Management Team, in Boardroom. 13:00 Depart RNO for Hopetoun. 13:30 Visit Hopetoun and RNO residential housing. 15:50 Depart Ravensthorpe for Perth. 3

Ravensthorpe - First Quantum s Record to Date Purchased as a decommissioned operation February 2010 Design phase February June 2010 Recruitment campaign started June 2010 Modifications July 2010 September 2011 First production October 2011 First exports November 2011 Commercial production 28 December 2011 2012 Production 32,884 tonnes nickel 4

Ravensthorpe s Facts & Figures Expected mine life Three ore bodies Lease Area Corporate tax rate Mineral royalty Workforce Residential Focus >30 years Halleys Hale-Bopp Shoemaker-Levy 3,788 hectares 30% of earnings 2.5% of net sales 640 employees (incl. 200 contractors) >200 currently live in Hopetoun 5

Our Modifications to Make Ravensthorpe Work Front end materials handling Dewatering Buffer storage capacity Upgraded Tailings Storage Facility Refurbish existing plant 6

Ravensthorpe - Making it Work - Two New Crushing Plants 7

Ravensthorpe - Making it Work - Refurbish Stacker Reclaimers 8

Ravensthorpe - Making it Work - Dewatering and Rejects Management 9

Ravensthorpe - Making it Work - Upgraded Tailings Facility 10

Ravensthorpe - Making it Work Refurbished Plant The reconstructed crushing plants, beneficiation, dewatering and rejects handling circuits are performing to expectations and are consistently achieving the design throughputs. 11

Ravensthorpe Recoverable Resources Mineral Recoverable Resources have been defined as the recoverable portion of the Mineral Resource contained within the life of mine pit profiles as developed by the previous owners BHP Billiton. These estimates are considered suitable for the initial mine planning works and are currently considered as Potential Recoverable Resources by First Quantum. 12

Ravensthorpe s Laterite Profile 13

Ravensthorpe s Product - From Mine to Customer CHINA Jinchuan, Sichuan, Huaze INDIA BRAZIL MHP shipped via Esperance Port 14

Ravensthorpe s Operational Achievements to Date AREA Crushing and conveyors to reclaimer - limonite & saprolite Beneficiation Atmospheric Leach PAL Trains MHP Loadout Acid Plant ACHIEVEMENT 1400 dry tonnes vs. 1270 dry tonnes design limonite 1050 dry tonnes vs. 1142 dry tonnes design saprolite 460 dry tonnes vs. 426 dry tonnes design 200 dry tonnes vs. 135 dry tonnes design 170 dry tonnes vs. 150 dry tonnes design 140 tonnes nickel vs. 142 tonnes nickel design 4200 tonnes H2SO4 vs. 4,400 tonnes H2SO4 design 15

Ravensthorpe s Production Record to Date 16

Ravensthorpe s Safety Performance 2012 Safety Performance Change Lost Time Injury (LTI) Frequency Rate Reduced 0.70 to 0.13 LTI Severity Rate Reduced 24.39 to 0.26 Hazard reporting frequency Increased 20.89 to 96.07 17

RAVENSTHORPE NICKEL OPERATIONS April 2013