Salter Industries Spiral Stair

Similar documents
CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Stair Parts Installation. Tricks

INSTALLATION GUIDE. 5" Balustrade System

Balustrade Systems / Installation Instructions

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Dura-Lock Roof System

PAT installation of a Sun Dome over a in-ground

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

A Step-by-Step How To Guide

Assembly Instructions 10 X 10 Aluminum Frame Building

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Installation Instruction

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Balustrade System Installation - Cambridge & Huntington

Installation Instructions

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

Installation Instructions

11 6 Round Building Assembly Instructions

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

Clearview Railing System Installation Instructions

ATLANTIS RAIL Contact Information

Nanton Grain Mill Assembly

1. TOOLS + MATERIALS REQUIRED

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS GUIDE

Frameless Inline Door With Return QCI5263

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

MobileTrak5 Installation Instructions

FIXED PANEL SLIDER QCI5241

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Horizontal Cable Systems

Installation Instructions

PORCH-LOC INSTALLATION INSTRUCTIONS

Installation Instructions for. Before You Begin TOOLS REQUIRED

Bumper Sign INSTALLATION INSTRUCTIONS

Fortress Al Posts must always be secured to the deck framing. Fortress Al Posts should never be attached to only the deck boards.

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

EASY POOL STEP (NE113)

Assembly Instructions. Important!

Straight Stringer Installation Instructions

ALUMINUM PIPE GUIDERAIL 01/01/

Spiral Slide

Installation Instructions

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

10 x 10 Flat Top Two Tone Pergola

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

INSTALLATION INSTRUCTIONS

Installation Manual Flat Track Series

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

Vinyl Gazebo Instructions

Tuf-Lite and Tuf-Lite II Fans 4000 Series Hub

Install Instructions. NewAge Steel Welded Tall Locker

Horizontal Cable Systems

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Supplement. Assembly and Maintenance Guide Titan Series Commercial Step System. Manufactured in the USA

7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Tuf-Lite and Tuf-Lite II Fans 4000 Series Hub

ALUMA-CLASSIC FENCE W1716 & W1720 INSTRUCTION MANUAL

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Installation Instructions

Continuous Handrail Kit Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing.

Frameless Inline Door QCI5254

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Chapter 17 - Porch Trim

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Installation Instructions for. Handrail Component System

Frameless Inline Door QCI5248

Tuf-Lite II Fans 3000H Series Hub

Frameless Inline Door QCI5250

Installation Instructions

Tuf-Lite II Fans 3000H Series Hub

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

BARCLAY SPIRAL STAIRCASE SPECIFICATIONS

2x2 Baluster Railings FPO REDWOOD. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects

Tuf-Lite II Fans 3000HC Series Hub

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

Sawn Baluster Sizing and Installation Guide

Assembly Instructions: Bencher Skylark

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

The Festival Assembly Instructions

PREPARATION & TOOL CHECK LIST


PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

Downtown Rack. Custom logo option available

Tuf-Lite III Fans 3000K Series Hub

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Model #SH & CH SH Pine CH Naturaline

Installation Instructions

CUSTOM SHUTTERS IN-A-BOX

T A P N T W I S T INSTALLATION GUIDE

Transcription:

Salter Industries Spiral Stair The Leader in Spiral Staircases Continuous Sleeve Stair Installation Instructions TOOLS NEEDED: 1. Electric drill with hex chuck and Phillips bit 2. Drill bits 1/8", 1/4", 3/16", 3/8" 3. Socket Set 4. Tape Measure 5. Short magnetic level or 2' Level 6. Hack Saw 7. Hammer 8. Saber Saw or Reciprocating Saw with a metal cutting bl ade 9. Allen Wrenches Required minimum finished well size. See shop drawings for other specified dimensions. 3 6 4 4 6 5 5 6 6 6 6 7 44 x 44 50 x 50 56 x 56 62 x 62 68 x 68 74 x 74 80 x 80 86 x 86 Range of adjustment for stairs that have a 30 Degree Tread or the Half Turn Packages Minimum Riser Maximum Riser Required Treads Risers Degree Rotation 85 95 9 10 270 Degree 93 ½ 104 ½ 10 11 300 Degree 102 114 11 12 330 Degree 110 ½ 123 ½ 12 13 360 Degree 119 133 13 14 390 Degree Range of adjustment for stairs that have a 22 1/2 Degree Tread Minimum Riser Maximum Riser Required Treads Risers Degree Rotation 82 ½ 93 ½ 10 11 225 Degree 90 102 11 12 247 ½ Degree 97 ½ 110 ½ 12 13 270 Degree 105 119 13 14 292 ½ Degree 112 ½ 127 ½ 14 15 315 Degree WARNING: Wood handling and finishing Unfinished treads and handrails on the job site for more than one week absorb moisture from the air. They must be sealed. Plastering, tile work, cement or brickwork introduce enough water into the air for the wood to react unfavorably. If the materials need to be placed in storage, find a cool, dry and stable location. A. Sand all wood surfaces before applying any stain or polyurethane. Nearly 100% of tread and handrail finishing problems occur because little or no final sanding is done at the job site prior to application of stain or polyurethane. Treads rub together or against surfaces during handling and transportation. This creates shiny spots, which will not absorb finishing material evenly. 1

Wood can absorb moisture, raising the grain and ruining any finish applied without being sanded. B. Sand all wood surfaces with 100 to 220 grit. C. Apply a stain if you want the color of the wood other than a natural finish. D. Three coats of sealer must be applied to all surfaces of the wood. Inadequate finishing of all six sides of a tread including the bottom will permit the absorption of moisture. IMPORTANT NOTE: Check with your paint specialty dealer for complete finishing instructions. Steel stair finishing The paint applied to the steel stair is considered a primer coat. If a mark was made in the finish due to shipping and handling, sand that spot prior to finishing. We have seen very good results from both brushed and sprayed applications. We suggest that you apply a coat of paint prior to your assembly, if the timing is available. If you use spray paint, spray several thin coats. This will provide a smooth and uniform finish. Use an oil base paint such as Rust-Oleum or Krylon semi-gloss finish for best results. We have not painted the center column because the paint can be seriously scratched when the treads are slid over the center column. IMPORTANT NOTE: Paint has been changing chemically in the last few years because of the V.O.C. laws. It is impossible for Salter Industries to guarantee that all paint brands are compatible with our primer. If you are concerned with your paint being compatible with our primer, try a test spot to make certain there is no chemical reaction between the paints. Also, check that your paint will have good adhesion for chip resistance. For further information contact your local paint specialist. NOTE: Steel, Galvanized Steel, Aluminum and Forged Iron Stairs are assembled using the same procedure. The primary variation is the assembly hardware. 2

CUSTOM CONTINUOUS SLEEVES 1. While all the treads are on the ground, partially thread the setscrews into the tread and platform sleeves. 2. Attach the base plate to the center column with the setscrews supplied. 3. Stand the center column up inside the well opening. 4. Locate the tread with the short hub and slide it over the center column so it will be the bottom tread. 5. Slide the remaining treads over the center column. 6. There is a short hub, which acts as a filler. Slide the filler hub over the center column so it rests on the top tread. IMPORTANT NOTE: This is an optional step. If you need some adjustment to fine-tune the installation, do not install the short hub. When the stair is installed and painted the job will look fine. If you would prefer to have the hub, we can UPS you a replacement that has been cut in half so you may continue the installation today. 7. Slide the platform over the center column. Use the 5/16 x 2 lag screws and washers supplied and attach the platform in the desired location. IMPORTANT NOTE: If the steel platform is going to be covered with 1 1/16" oak or 3/4" flakeboard, lower the steel platform by that thickness. You want the finished platform cover to be flush with your finished floor. IMPORTANT NOTE: If you have purchased extra railings from us, the location of the platform is critical to the well enclosure railings fitting. Do a dry fit of the railings before permanently fastening the platform. IMPORTANT NOTE: You may find that your opening in the floor is not perfectly square. To center the stair and maintain the most finger and 3

knuckle room from any surrounding walls, you may shim the platform. When you are installing the stair off a balcony face, you may want to push the stair further from a lower wall. 8. Plumb the center column and attach the base plate to the floor with the 5/16 x 1 1/2 lag bolts and washers supplied. If you are installing this on concrete, you will need to purchase lead anchor shields. 9. Slide the 4 x 40 center column extension over the center column and tighten the setscrews. 10. Start the installation with the top tread. Place a baluster in the hole closest to the platform. Attach the baluster to the tread with the ¼ x 1 ½ carriage bolt, nut and lock washer supplied. IMPORTANT NOTE: Make sure that the bottom of all the balusters are at the same depth in the lower tread pocket. Use your finger to feel that it is flush with the bottom of the tread support. IMPORTANT NOTE: Be certain that you start the rotation the same way as it was ordered. Wood, aluminum and brass handrails are rolled to a specific rotation. 11. Move the top tread with the baluster attached to the proper riser height required. IMPORTANT NOTE: On the top tread only, if you are going to have a wood tread, lower the steel tread by that thickness. After this, all your steel tread to steel tread heights will be the same. 12. Plumb the baluster and attach the top baluster to the face of the platform using the top baluster bracket. 13. Check that the tread is level and that the baluster is plumb. Tighten the 5/16" set screws to lock the tread in place. IMPORTANT NOTE: Always tighten the baluster hardware first; check that the baluster is plumb and then tighten the setscrews last. 4

IMPORTANT NOTE: If you have purchased wood tread covers from us, make certain that you are able to get them on after the steel balusters have been installed. Otherwise you will need to install the steel treads and the wood treads together. 14. Spin the next treadinto position. Slide a baluster in the front hole of the upper tread and the back hole of the lower tread. IMPORTANT NOTE: Always tighten the baluster hardware first; check that the baluster is plumb and then tighten the setscrews last. 15. Continue this procedure with the remainder of the treads. 16. The bottom baluster will only have one pre-drilled hole. Attach the bottom baluster to the tread. Plumb the baluster and attach the bottom baluster bracket to the floor with the 5/16" lag bolts supplied. Once again make certain that the baluster is plumb. IMPORTANT NOTE: Measure the baluster length. The length from the top of the steel tread to the tip of the baluster should be the same as all the other balusters. 17. Attach the handrail to the balusters with the hardware supplied. 17a 17b 17c Vinyl Handrail 17 A. The vinyl handrail is shipped in a flat coil but can easily be formed to the shape of the stair. To install this handrail, use the toggle bolts supplied. Drill a 3/8" hole in the handrail to properly fasten the handrail to the baluster tip. After the handrail is fastened, cut the railing 3" above the top baluster and 3" below the bottom baluster, unless your building code calls for a longer length. Slip the vinyl railing caps over the ends to complete the installation. 5

IMPORTANT NOTE: If the baluster tips are not set at the proper angle for the handrail to lay flat, place an adjustable wrench over the tip and press up or down for the desired angle. IMPORTANT NOTE: Do not apply paint to the vinyl handrail. IMPORTANT NOTE: Check each baluster for plumb as you install the handrail. If you do not follow this step you can push them out of plumb. Brass & Aluminum Handrail 17 B. The brass or aluminum handrail has been shipped pre-formed but will need to be fine tuned during the installation. Since the material is very soft, it makes it easy to fine tune. Notice that the rail is kinked at each end. This is normal and should be cut off as excess after installation. a.) Working with two people, start at the top and fasten the handrail to the top three or four balusters with the selfpiercing screws supplied. As you work your way down, you will need to fine-tune the rail to match up to the baluster tip. To do this, you will need to push or pull the rail into place. b.) After all the balusters are attached, cut the railing 3" above the top baluster and 3" below the bottom baluster, unless your building code calls for a longer length. Cut the handrail off square. File the burrs and insert the handrail plugs to check for fit. After the fit is correct, use the two-part epoxy supplied for final connection. IMPORTANT NOTE: If the baluster tips are not set at the proper angle for the handrail to lay flat, place an adjustable wrench over the tip and press up or down for the desired angle. IMPORTANT NOTE: Check each baluster for plumb as you install the handrail. If you do not follow this step you can push them out of plumb. Wood Handrail 17 C. The wood handrail has been shipped pre-formed and is made to the shape of your stair. To fasten 6

the handrail to the baluster tips, drill a pilot hole into the handrail and make the final connection with the wood screws supplied. The railing is shipped longer than needed and we suggest that you install the rail and cut it to length before staining and finishing it. Cut the railing 3" above the top baluster and 3" below the bottom baluster, unless your building code calls for a longer length. Remove the handrail from the stair and apply the desired finish. IMPORTANT NOTE: The handrail needs to be sealed. This will prevent moisture from penetrating the wooden surface, which can cause checking (cracks in the wood). See the warning at the beginning of the instructions for further details. IMPORTANT NOTE: If the baluster tips are not set at the proper angle for the handrail to lay flat, place an adjustable wrench over the baluster tip and press up or down for the desired angle. IMPORTANT NOTE: Check each baluster again for plumb as you attach the handrail in place. If you do not follow this, step you can push them out of plumb. 18. Install your pre-finished wood tread covering. Wood tread covers are connected to the steel tread with the # 10 pan head wood screws in the pre-drilled holes provided. IMPORTANT NOTE: The wood treads need to be sealed and finished before they are connected to the steel treads. This will prevent moisture from penetrating the wood surface, which can cause checking (cracks in the wood). See the warning at the beginning of the instructions for further details. Center baluster installation 19. Center balusters are designed to close the space between the two primary balusters. Consult your local building inspector for the required maximum spacing. Most states now require a space not to exceed 4". The installation of center balusters is done after the handrail and wood treads are installed. There are several methods that are used to install center balusters depending on the type of finished tread surface. 7

Refer to the drawing that applies to your tread type to determine the proper hardware needed. In all cases the center baluster needs to be cut to length in the field by the installer. A saber saw or a reciprocating saw, with a metal cutting blade, will trim the balusters nicely. A. Wood treads and diamond patterned steel treads are pre-drilled and ready to receive the center baluster. Smooth steel tread and flakeboard treads will require the installer to locate and drill mounting holes for the center balusters. B. Place the baluster tip against the handrail as done with the primary baluster. Be certain that the baluster is plumb. Mark and cut the baluster to its proper length. Be certain that your cut is square. Connect the baluster to the tread and handrail with the appropriate hardware. IMPORTANT NOTE: Do not assume that all the center balusters will be the same length. Cut them to length as needed. IMPORTANT NOTE: If your installation uses the combination wood screw, machine screw, take note. This fastener can be inserted into the chuck of your cordless drill. Chuck the screw at the center of the fastener. Be careful not to damage the threads. Press the tube connector into the end of the center baluster after the baluster has been cut. The tube connecter will only press in one direction. Thread the center baluster over the combination screw and fasten the baluster tip to the handrail, as done on the previous primary balusters. Classic Platform Railing 20. The platform rail can be attached to any side of the platform. It is easiest to hold the rail in place with two C clamps, if available. Drill the platform with the rail clamped in place using a 5/16 bit. Fasten the rail in place with the hardware supplied. Miter Joint IMPORTANT NOTE: If the platform rail is not plumb, you may place a flat washer between the railing and the platform to act as a shim. If you have additional questions about the installation, please call 610-489-5799 8