Stainless Steel Tube and Fittings for Potable Water System Double Seals Press-Fit Type Jointing

Similar documents
DRILL GRINDER & END MILL RE-SHARPENER

Laboratory Freezer. Model : LLF-402SR / LLF-403SR / LLF-404SR LLF-403SR-H / LLF-404SR-H

HBS-AP ASSEMBLING INSTRUCTIONS

THE IMPORTANCE OF THE FITTING

WARNING: STAY CLEAR OF AREA BEHIND AND AROUND PULLING END OF OPERATION

Assembly instructions

Ziptrak. Overview. Ziptrak system considerations. Ziptrak Vertical screening ideal for outdoor restaurants, patios, verandas, corporate signage.

PIONEER TRADING CO., LTD.

MetFit MECHANICAL FITTINGS

Sprinkler wet pipe and dry pipe. For FM approval of the dry pipe model "I" shall be used. SBF 120: 7 applies to model "E".

ANNOUNCEMENT CONTINUING CONNECTED TRANSACTIONS REVISION OF EXISTING ANNUAL CAPS OF CONTINUING CONNECTED TRANSACTIONS

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

TerraBrute CR (4-12 ) Pipe Installation Guide

What is a fastener? A device to locate or hold parts

FIELD LOK 350. Gasket 4" 24" JOINT RESTRAINT NSF FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS. Certified to ANSI/NSF 61

3 Emergency Breakaway Coupling

Reed pipe tools and vises

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

Rev B C-RING TOOL VA0375 ½ in. OPERATING MANUAL

VERSAtoolTM SAE J533 & SAE J1453. Safety and Operating Manual

Ralphs-Pugh Co. I didn t know you did all that!

OPERATIONAL AND MAINTENANCE MANUAL. Drilling machine ProDrill 20 INSTRUCTION MANUAL FOR USE AND MAINTENANCE

C11.15 HANDLES AND LOCKCASES C11 SIDE HUNG WINDOWS

E11.15 HANDLES AND LOCKCASES E11 BOTTOM HUNG OPEN IN WINDOWS

Evaluation of In-Pavement Light Fixture Designs and Performance

REPORT ABOUT FINDINGS - LOOSE BRACKETS FOR TAIL WING IN JORA UA BUILD no. 008

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

Pole Conversion System For safe and efficient conversion of non-lowering light poles.

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

...thoroughly tried and tested!

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

INSTALLATION INSTRUCTIONS

海航國際投資集團有限公司 HNA INTERNATIONAL INVESTMENT HOLDINGS LIMITED. (Incorporated in Hong Kong with limited liability) (Stock Code: 521)

Fifth-wheel coupling JSK 38/50

Hong Kong Institute of Certified Public Accountants Elects New President and Council

HANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT

thoroughly tried and tested! EWE Tapping Valves A single system for all types of pipes

Casting Braided Steel

Quick-Lock LEM >700 User Manual

Repair manual. Fifth-wheel coupling JSK 38/50

General Four-Way Operation, Maintenance & Service Manual

Module-3 Lecture-7 Limit guage-2. (Refer Slide Time: 00:12)

Version Date Description Author V Creation LJM

QUADRANT SHOWER ENCLOSURE

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

SYGEF Standard SYGEF Plus PVDF Flanges

A11.15 HANDLES AND LOCKCASES A11 TURN-TILT WINDOWS

RehabPro Lat Pulls. Operating Instructions ( )

HMP-200 BENDER INSTRUCTION SET

API 8 Round Connections

AVK PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Reed pipe tools and vises

SPECIFICATION 宏致電子股份有限公司 桃園縣中壢市東園路 13 號. No.13, Dongyuan Rd., Jhongli City, Taoyuan County 320, Taiwan (R.O.C.)

OPERATION AND MAINTENANCE INSTRUCTIONS AVK UNDERGROUND FIRE HYDRANT

METRIC/IMPERIAL INSTALLATION INSTRUCTIONS

E.C. HOPKINS LTD PGO4 PEANUT GRINDER OPERATORS MANUAL AND PARTS LIST

Technical Information

Plumbing Part II - Hand Pump

Tidland Narrow Web Shaft

Thru Wall Floor Seals For New Installation

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 513. Handling Plugs TN 9906.

Care of the bar and chain

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

Frameless Fixed Panel Slider QCI5279

Installation Instructions and Details

Planning, storage, installation and maintenance instructions for rubber expansion joints

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 2: Copper Pipe Jointing Compression Fittings Phase 2

What is a fastener? A device to locate or hold parts

RPS /02 Effective for models with serial numbers beginning with "G".

Call Today Ship Today!

AFB (AIR FAN BEARING) INSTALLATION GUIDE

hargreaves cast iron installation guide

Pow-R-Feed Systems Service Manual

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

SHOWERLUX HELPLINE: TEL: SHOWERLUX (UK) Ltd.

RITE-HITE TPC. FOAM DOCK SEAL WITH HEAD CURTAIN Installation Instructions & Owner s Manual. Date of Installation:

Basket & Screen Data. Cylindrical baskets for simplex and duplex strainers up to 8" size

General Information...SA1-SA4

Complete line of Holemaking Products and Accessories

Nanton Grain Mill Assembly

Trade of Metal Fabrication. Module 1: Basic Fabrication Unit 12: Abrasive Grinding and Cutting Phase 2

The Virgo/Libra Steam Engine

Hard Drilling, Made Easier.

Panel Installation Instructions

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Chiltern Model Steam Engines

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation

Assembly instruction. for push-in joint pipe DN mm with internal restrained joint Fig. 2807A / 2807B

I-350. FIELD INSTALLATION HANDBOOK Victaulic Piping Products for CPVC/PVC Materials PRODUCT INSTALLATION INSTALLATION INSPECTION HELPFUL INFORMATION

WIND MONITOR ANEMO / WIND VANE YOUNG ALPINE

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL

SPECIFICATION 宏致電子股份有限公司. No.13, Dongyuan Rd., Jhongli City, Taoyuan County 320, Taiwan (R.O.C.) TEL: FAX:

Students will assemble and disassemble cast iron pipe and fittings according to provided specifications.

Opto Devices Product Information LED

Sight glass window Sight flow indicator

Utility cable and pipe locator

Transcription:

Stainless Steel Tube and Fittings for Potable Water System Double Seals Press-Fit Type Jointing Compatible with BSEN 10312 SERIES 1 & 2 Stainless Steel Tubing Operation and Installation Manual Tomorrow Building Innovation Certificate No.1605079 Certificate No. SPAN/PPI/1043-2015 2013MA0547

Index 1. Index...... P.1 2. Double Seals Press-fit Type Jointing Introduction and Characteristics..... P.2 3. Operation and Installation Procedure 3.1 Operation Procedure of Cutting and Grooving Machine and Tube Cutting....... P.3 & P.4 3.2 Groove Depth Inspection......... P.5 3.3 Tube End Deformation Inspection.. P.6 3.4 Installation Method.... P.7 3.5 Dismantle Method... P.8 4. Bracket Spacing Reference..... P.9 5. System Tightness Test Under Water Pressure Testing..... P.9 1

1. Introduction of TBI Double Seals Press-fit Fitting Material of TBI Double Seals Press-fit Fittings Body Investment casting in grade 1.4301 to BSEN10088 (AISI304) or 1.4401 to BSEN10088 (AISI316) O-Rings Silicon Rubber (to BS6920 for Portable Water), chloramine resistance, UV resistance C-Spring 1.4301 to BSEN10088 (AISI304) or 1.4401 to BSEN10088 (AISI316) Application Usage Plumping system, cooling system and fire system Maximum working temperature 85 Maximum working pressure 25 bar Compatible with BSEN 10312 Series 1 & 2 tube 2. Characteristics of TBI Double Seals Press-fit Fittings Every fitting including O-rings and the joint undergoes 1bar and 20bar air pressure testing before ex mill to ensure the quality is met. Easy installation, reduce the manpower, enhance the working efficiency. High impact resistance and tough. Easy disassembly, maintenance & reusable, which is an environmental friendly product. Fabricated from stainless steel which its high resistance to corrosion, economical, hygiene and no metal leaching. Insert the pipe towards the fittings and then Pull-back. The joint is completed. It is not necessary to use special tooling. TBI Double Seals Press-fit System Mechanism 2

3.Operation Procedure of Cutting and Grooving Machine Thank you for applying our TBI stainless steel system, TBI cutting and grooving machine MUST be operated with the system together. TBI cutting and grooving machine can supply in 110V and 220 V. Note a) The major cutting principle of TBI machine is a form of cold cutting which maintain the basic property of the stainless steel at the tube end. a) The plastic supporting rod must be used during the process of the cutting and grooving. b) Deformation of pipe end and pipe surface is not allowed. c) A 5mm in pipe length of each new stainless steel tube is recommend to be cut at square end and burr free to ensure to obtain the optimum result of grooving process. a) For PE coated pipe, remove 150mm PE coating before apply the cutting and grooving machine. 3.1 Tube Cutting Before operating the electrical cutting and grooving machine, Please check the following items in advance : a) Please check the emergency stop and safety circuit breaker as shown in Fig. 1 is function or not. b) Remove the cutting and grooving tool as shown in Fig 3 from the machine. Please check any tear or wear on the cutting blade and grooving blade by the No-Go gauge. If both the blades cannot go through the No-Go gauge, there is no tear and wear on the cutting blade and grooving blade, put the tool back to the machine. If both the blades can go through the No-Go gauge, replace a new set of cutting and grooving blades. Pipe stand Connect the supporting frame and pipe stand to the machine. Safety Circuit Breaker On/Off Switch Emergency stop Machine Fig. 1 3

Go No Go Gauge Fig. Fig. 2 2 Fig. Fig. 3 Tube End Deformation Check Gauge Grooving Tool Cutting Tool Grooving Tool Plastic Supporting Rod Dismantle Tool Magnet Locating Rod Fig. 5a Fig. 5b Plastic Supporting Rod Fig. 4a Plastic Supporting Rod Magnet Marked line Fig. 5c Magnet Fig. 5d Fig. 4 Fig. 5 1. Insert the locating rod into the corresponding pipe size DN hole. (Fig. 4a) 2. Then mark the pipe length first. Insert the plastic supporting rod into the pipe and stick with the magnet on the plastic supporting rod end and guide to the position of cutting and grooving tool. (Fig. 5) Hand wheel 3. Switch on the machine and turning the hand wheel down until the groove is formed and the pipe is cut. (Fig. 6) Fig. 6 On/Off Switch Please do not swith off the machine when the pipe is cut. Keep the machine running for a few seconds and then turn the hand wheel up position until the cutting and grooving tool not in contact with the pipe surface Remark 4

3.2 Groove Depth inspection Go & No-Go gauge Fig. 7 Go No-Go Fig. 8 Fig. 9 Each groove depth MUST be checked by a Go & No-Go gauge to meet the quality requirement of the system. (BOTH grooves MUST be checked) Table 3.1 Groove depth dimension DN (mm) Outside Diameter (mm) Groove Diameter (mm) 15 15.0 14.2 ± 0.2 22 22.0 21.0 ± 0.2 28 28.0 26.8 ± 0.2 35 35.0 33.6 ± 0.2 42 42.0 40.6 ± 0.2 54 54.0 52.4 ± 0.2 5

3.3Tube End Deformation Inspection Go Gauge Tube End Deformation Check Gauge Deformed Tube End Standard Tube End Deformed tube end cannot go through the check gauge Standard tube end can go through the check gauge Tube end cracking Tube end cracking Every tube end MUST be checked by tube end deformation check gauge. If the tube end can go through the check gauge, the tube end is standard. ( If the tube end CANNOT go through the check gauge Or the tube end is cracked, DO NOT install the tube ) 6

3.3 Installation of Double Seals Press-fit Fittings Fig. 10 1.Before installation, please check the pipe fitting structure as shown in above. O-Rings C-spring 1.1 The pipe fitting should be constructed with Two sealing O-Rings and One C-Spring. 1.2 The C-Spring should be freely drop on to the bottom of the pipe fitting when the fitting was hold vertically. 1.3 Do not use the pipe fitting if C- Spring does not freely drop on to the bottom of fitting. Please return to us. Installation Method Fig. 11 Fig. 12 2.Sprayed with lubricant. 3.Press the tube to the fitting end. Fig. 13 Attention: Please keep the tube surface and fitting inside surface clean before installation 4.Then Pull-back at the opposite direction. 6

5. Attention: Proper C-Spring position Tube Surface Reference Fig. 14 Fig. 15 5.1 Fig. 14a 5.2 Fig. 14b Remark Need to keep the tube surface and fitting clean and without damage. After Pull-back, the C-Spring should be hidden at the fitting end as shown above. As the C-Spring still exposes in the opening of the fitting, the jointing is improper installed. The tube end and surface should be no discolouration. 3.4 Dismantle Method Dismantle tool 1. DN15-DN28 dismantle tool (16A) 2. DN35-DN54 dismantle tool (16B) Fig. 16A Fig. 16B Fig. 17 Fig. 18 Fig. 19 1.Push the tube towards the fitting until C-Spring was pushed to the position as shown. 2.Put the dismantle tools into the square hole of the fitting. 3.Pull out the tube at opposite direction with fitting. 7

4.0 Bracket spacing reference Table 4.1 Bracket spacing reference Type OD (mm) Vertical Max Spacing(mm) Horizontal 15 1800 1200 22 / 28 2400 1800 SS 35 / 42 3000 2400 54 3000 2700 65-100 3600 3000 150 5400 4500 *Reference to copper system bracket spacing is acceptable. 5.0 System Tightness Test Under Water Pressure Testing (To prevent layman defects) Test pressure 16 bar(unacceptable for below 16 bar) Duration 1 minute Cycle 2 cycles *We are willing to provide training, assistance, guideline for operation and installation for our system. A Chinese version of Operation and Installation is also available at request. 8

10

TOPBUILD Investments Limited Stainless Steel Double Seals Press-Fit Fittings System Environmental Friendly, Fittings can be dismantled and RE-USE again Hong Kong Office : Topbuild Investments Limited 開捷企業股份 ( 香港 ) 有限公司 Address : Unit 2A, 1/F, Tower 1, Harbour Centre, 1 Hok Cheung Street, Hung Hom, Kowloon, Hong Kong 地址 : 香港九龍紅磡鶴翔街 1 號維港中心 1 期 1 樓 2A Tel 電話 : (852) 2127 4268 Fax 傳真 : (852) 2127 4267 E-mail 電郵 : sales@tbi.com.hk Website 網址 : www.tbi.com.hk Macau Office : Topbuild International Enterprise (Macau) Limited 開捷國際企業 ( 澳門 ) 有限公司 Address : Ald. Dr. Carlos d'assumpção, No. 159-207, Fl 3, Rme-1, Kuongf Aigroup Com. Center, Macau 地址 : 澳門宋玉生廣場 159 至 207 號光輝集團商業中心 3 樓 G-1 室 Tel 電話 : (853) 6860 0305 E-mail 電郵 : salesmacau@tbi.com.hk