For personal use only

Similar documents
Good Oil Conference. 7-8 September Slide 0

For personal use only

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

Buffalo field moving closer to production 3 May 2018

MARCH 2009 QUARTERLY REPORT. Herewith is Tap Oil Limited s Quarterly Report for the period ended 31 March 2009.

Attached please find Cue Energy Resources Limited s release with respect to the above mentioned.

Phoenix project drilling update 29 June 2017

Annual General Meeting 11 September 2017

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

Manager of Company Announcements ASX Limited Level 6, 20 Bridge Street SYDNEY NSW By E-Lodgement

The Directors wish to inform you about recent exploration activities:

For personal use only

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

For personal use only

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2016

FY19 production and capital expenditure guidance

For personal use only

Q2 FY18 Quarterly Report for 3 months to 31 December 2017

Q3 FY18 Quarterly Report for 3 months to 31 March 2018

Q1 FY18 Quarterly Report for 3 months to 30 September 2017

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

QUARTERLY ACTIVITY REPORT

Quarterly Report 31 December 2018

Address to the 2018 Annual General Meeting of Cooper Energy Ltd by the Managing Director, David Maxwell 8 November 2018

Matthew Allen MD & CEO Joint Venture partner Byron Energy (Operator) is a proven

Swiber Holdings Limited 1Q FY08 Results Briefing

Hydrocarb Energy 2014

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

For personal use only

For personal use only

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets

Quarterly Exploration Activities Report

For personal use only

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

DANA GAS RELEASES Q1 FINANCIAL RESULTS

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

Phoenix South-3 drilling commenced 17 April 2018

For personal use only

FAR in the MSGBC Basin

Overview of the C-NLOPB and the Can-NL Offshore Oil and Gas Industry. Sean Kelly MA, APR, FCPRS May 15, 2017

2018 Strategy Preview. February 1, 2018

For personal use only

Phoenix South-3 drilling update 29 June 2018

FOR IMMEDIATE RELEASE OGDCL UN-AUDITED FINANCIAL RESULTS FOR THE FIRST QUARTER ENDED 30 TH SEPTEMBER 2017

Dorado-1 drilling commenced 5 June 2018

For personal use only

For personal use only

A Step Change in Activity

Q4 FY18 Quarterly Report for 3 months to 30 June 2018

For personal use only

GLOBAL EXPRESSION OF INTEREST (EoI) FOR INTEGRATED DEVELOPMENT SERVICES FOR MANGALA, BHAGYAM & AISHWARIYA (MBA) FIELDS WITHIN THE RJ-ON-90/1 BLOCK

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

Bay du Nord Framework Agreement

AT A GLANCE. US$16.9 billion. US$52 billion. 41 million 5,299

For personal use only. Investor Presentation November 2016 ASX: OXX

Quarterly Activities Report 31 January 2013

Kinetiko Energy Limited ACN:

Spectrum. The Pareto Oil & Offshore Conference. Jan Schoolmeesters, COO. 4 th September 2013

Rig worker (CBC Newfoundland and Labrador) Oil and Gas

Company Presentation May.2016

Business Update. 1 st half 2017 results

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

Executive Summary and Table of Contents

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Capital One Securities, Inc.

For personal use only

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

Husky Energy East Coast Update

For personal use only

Dussafu Gabon Update January, 2018

Click to edit Master title style

BP plans for significant growth in deepwater Gulf of Mexico

Applying Earned Value to Overcome Challenges. In Oil and Gas Industry Surface Projects

TMS Initial Drilling Program Update

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

Africa s Leading Independent Oil Company

For personal use only

Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc.

Letter of Intent Signed for Philippines Drill Rig

MEO Australia Limited ABN ASX & Media Release

New Zealand Oil & Gas Activities Report

Esso offshore projects

Sanford Bernstein Strategic Decisions Conference. May 2014

Q STRIKE ENERGY LIMITED QUARTERLY ACTIVITIES REPORT For the period ending 31 March 2013

Quarterly Activities Summary for Period Ended 30 June 2018

QUARTERLY UPDATE. Summary

Persistence, partnership and the prize

Initial Drilling Program Update

Technical Challenges in Offshore Development New Technology Required for Future Offshore Development

Networking Event for the Oil and Gas Industry

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY:

Coiled-tubing operations and basic tools

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

For personal use only

For personal use only

Vancouver Small-Cap Conference Blackbird Energy Inc. BBI TSX Venture Liquid Rich Bigstone Montney

For personal use only

Transcription:

31 October 2011 The Manager, Company Announcements Australian Securities Exchange Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 REPORT ON FIRST QUARTER ACTIVITIES 30 SEPTEMBER 2011 AUSTRALIAN STOCK EXCHANGE LISTING RULE 5.1 KEY ACTIVITIES Oil sales of 127,418 barrels from Maari/Manaia fields, offshore New Zealand, generating revenue of US$15.0 million; cumulative oil production to date 16.1 million barrels generating gross revenue of US$1.4 billion. Progress on evaluating additional oil potential in and near Maari/Manaia fields. Progress on Block 22/12 field development, offshore China, with over half of US$300 million project cost contracted out at fixed price and under estimates. Front-end engineering and design (FEED) for Stanley field development in PRL 4, onshore Papua New Guinea, complete; anticipated FID presentation before year-end. Wellsite prepared for Elevala-2 appraisal well in PRL 21, Papua New Guinea and Parker Rig 226 40% rigged up; anticipated spud date second week of November. Preparation of wellsite for Ketu-2 appraisal well in PRL 21 underway. Cash balance of US$51.1 million at end of quarter, with zero bank debt.

EXPLORATION AND DEVELOPMENT ACTIVITY NEW ZEALAND PMP 38160, Offshore Taranaki Basin, Maari and Manaia Fields (Horizon Oil interest: 10%) During the quarter Horizon Oil s working interest share of production from Maari and Manaia fields was 129,151 barrels of oil. Crude oil sales were 127,418 barrels at an average realised price of US$117.71 per barrel. Cumulative oil production from the fields through 30 October 2011 was 16.1 million barrels, generating approximately US$1.4 billion in gross revenue. Production for the quarter continued to be below expectation because of unreliable performance of the downhole pumps (ESPs) and, to a lesser extent, scale build-up in some well completions. At the time of this report, the MN1 ESP was being worked over to replace the ESP and the MR9 well was shut-in awaiting an acid job to remove scale. As was reported in the last quarterly report, the field operator has engaged with the pump supplier to improve ESP design and performance and to maximise run-time. In addition, an acid treatment procedure has been instigated to remove existing scale and to prevent further scaling with a regular maintenance program that does not require workover. This involves fitting the wells with equipment to provide access for the introduction of acid and is being implemented as and when wells require workover. We expect to see gradual improvement in field performance as these measures take effect. With the field now in its third year of production, opportunities to improve production rate at relatively low cost by way of enhanced water injection efficiency are being recognized. As a result, re-perforation of the MR6 injector well in the M2A zone and the MR8 injector well in the upper Moki zone (see cross section below) are planned as part of the current workover program. Additionally the injection pump capacity will soon be increased to inject more water into the reservoir zones. The field operator is working on a comprehensive assessment of an appraisal program to delineate the considerable additional oil resource potential of the Manaia structure (Moki, Mangahewa and Page 2 of 9

deeper F Sand zones), Maari (Mangahewa and F Sand) and the Maari South prospect. As part of this effort, a new 3D seismic survey covering Maari and Manaia is being planned for acquisition in the coming summer. Two appraisal wells are being considered on the Manaia and Maari South features for drilling in 2012/2013. PEP 51313, Offshore Taranaki Basin, (Horizon Oil interest: 30%) Page 3 of 9

Processing of the newly acquired 636 km 2D seismic survey over the Te Whatu and Pukeko prospects (see map above) was completed and interpretation is underway. Interpretation of the merged 3D seismic coverage over the Maari-Pike-Matariki trend has highlighted the Pike prospect as the most likely candidate for drilling of the first well. It is likely that Pike will be drilled using the rig mobilised for drilling of two appraisal wells on Manaia and Maari South in 2012/2013. CHINA Block 22/12, Beibu Gulf (Horizon Oil interest: 55%/26.95 %) The operator of the WZ6-12 and WZ12-8W development, China National Offshore Oil Corporation (CNOOC), continues to make good progress. Basic engineering design for platform and pipeline facilities is complete and award of the detailed design contract is imminent. The overall project was approximately 8% complete at the end of the quarter. Procurement of equipment and service packages is advancing well, as is contracting for fabrication and offshore installation of the major components of the project (see schematic below). The auxiliary platform PUQB and wellhead platform construction contract was awarded to COOEC, a CNOOC subsidiary, on 15 September 2011. COOEC has also been contracted to install the facilities. Pleasingly, over half of the estimated total project cost of about US$300m is now subject to fixed price contracts and at prices lower than those estimates contained in the overall development plan (ODP). Planning for the development drilling and completion program continues. It is intended that four in- and near-field exploration/appraisal wells will be drilled in the development drilling phase in Page 4 of 9

2012. Three of the wells are planned to be drilled from the WZ6-12 platform following its scheduled installation in Q2 2012. If successful, these wells will be completed and equipped as production wells as part of the Phase I development. The fourth well will be a vertical test of the deeper zones of the WZ6-12 (north) structure. While CNOOC, as operator, continues to anticipate first oil from the project before the end of 2012, ongoing nationwide reviews by the State Oceanic Administration (SOA) into offshore operations following an incident in June at the Conoco Phillips operated Penglai oil field in the Bohai Bay could potentially delay this schedule. This is seen as essentially an administrative approval matter, rather than practical, because the Block 22/12 fields are in a different basin and not subject to the difficulties faced in the Penglai field. Contingency plans are being prepared to ensure that delays, if experienced, are minimised. Page 5 of 9

PAPUA NEW GUINEA PRL 4, Stanley Field, (Horizon Oil interest: 50%) Front-end engineering and design (FEED) work for the Stanley field development has been completed and cost estimates determined with suitable accuracy for final investment decision (FID). As part of the FEED process: - The subsurface basis of design has been modified to take into account the results of the Stanley-2 and -4 wells, which have demonstrated the need for an additional well to accommodate production for the deeper Kimu reservoir. - A solution to treat mercury in the gas and condensate stream has been engineered. - The pipeline route from the field to Kiunga base and thence to the loadout site on the Fly River has been refined and finalised. - The joint venture s shipping consultant, P&O Maritime, has qualified a number of shipyards for building of the tanker. - Vendors for the major equipment packages have been shortlisted and final clarifications sought. Equipment bids are generally within a few percent of expectations. - Discussions for marketing both condensate and gas continued throughout the quarter. Horizon Oil has engaged an independent engineering firm to audit the Stanley field condensate and gas reserves and this is essentially the only outstanding item required for the FID package. The intention is to make the FID presentation to the Horizon Oil board prior to calendar year-end. The Minister for Petroleum and Energy has approved the requested extension of PRL 4 through 31 August 2012. It is intended to submit the Petroleum Development Licence (PDL) application for Stanley field prior to that date, which will serve to maintain tenure. Preparation of the PDL submission is at an advanced stage. Page 6 of 9

PRL 21, Elevala/Ketu discoveries (Horizon Oil interest: 45%) The site for the Elevala-2 appraisal well has been built and the current operation is rigging up with Parker Rig 226 (see picture below). At the date of this report, the rig and camp is about 80% moved on location and over 40% rigged up. Estimated spud date is the second week of November. Details of the Elevala-2 drilling program and well objectives will be advised closer to the spud date. After Elevala-2, the intention is to drill the Ketu-2 appraisal well. Preparation of the surface location is progressing well and all long lead items have been purchased. A seismic program of 105km is underway to fine tune bottom hole locations for the two appraisal wells. The seismic contractor for the survey is BGP PNG Exploration Limited. Page 7 of 9

Aerial view of Elevala-2 well location Page 8 of 9

EXPENDITURE SUMMARY The following table summarises the expenditure incurred in the quarter in respect of the activities set out in this report-: Exploration and Development US$ 000 PEP 51313, offshore New Zealand 18 Block 22/12 (Beibu Gulf), offshore China 2,722 PRL 4, Papua New Guinea 2,784 PRL 21, Papua New Guinea 6,917 Producing Oil and Gas Properties PMP 38160 (Maari and Manaia), offshore New Zealand Capital expenditure 59 Production revenue 14,998 Operating expenditure 2,481 Amortisation 2,232 Production Data (barrels) Crude oil production 129,151 Crude oil sales 127,423 Cash on hand at 30 September 2011 51,062 Convertible bond 1 80,000 Net Debt 28,938 1 Represents principal amount repayable unless converted prior to 17 June 2016 Yours faithfully Michael Sheridan Chief Financial Officer & Company Secretary For further information please contact: Michael Sheridan Telephone: (+612) 9332 5000 Facsimile: (+612) 9332 5050 Email: exploration@horizonoil.com.au Or visit www.horizonoil.com.au Page 9 of 9