ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

Similar documents
7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

Roof Only Lean-to Instruction Manual

Ledger Board Lean-to Instruction Manual

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Ledger Board Lean-to Instruction Manual

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

INSTALLATION INSTRUCTIONS 10' WIDE FRAME FRAME SIZE: 10 X 18 X 7 (2 SQUARE TUBING) STORAGE SHELTER / CARPORT

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERTICALLY SHEETED GARAGE BUILDINGS BUILDING WIDTHS: 12, 20, 24, AND 30

ASSEMBLY INSTRUCTIONS FOR VERTICALLY SHEETED CARPORTS

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

Assembly Instructions

Pergola Installation Instructions

UNIVERSAL INSTALLATION

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE FRONTIER GARAGE BUILDINGS

ASSEMBLY INSTRUCTIONS FOR VERSATUBE VERTICALLY SHEETED 2 x3 & 2 x4 CARPORTS WIDTHS: 12, 16, 20, 24, 30, 36 & 40 4 & 5 ON CENTER FRAMES

ClearSpan PolyMax Windbreak Wall

flex Installation multiflex

ClearSpan End Frame Kit 26' Wide x 12' High

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

ClearSpan End Frame Kit 30' Wide x 11' High

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

The following instructions will guide you through the installation of your new vinyl railing.

CountryAccents Pergola Assembly Instructions

Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions

GrowSpan Round Cold Frames

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

10 x 10 Flat Top Two Tone Pergola

DOCK WEDGE - STANDARD

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE 2 x 3 DESIGN-YOUR-OWN FRONTIER GARAGE BUILDINGS

ClearSpan Economy Round Style High Tunnel

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

ClearSpan Majestic Greenhouse Film Roof with Roll-up Sides

ASSEMBLY INSTRUCTIONS FOR VERSATUBE VERTICALLY SHEETED 2 x3 SINGLE SLOPE LOAFING SHED 12 W X 18 2 / 30 2 / 42 2 L X 8 / 10 6 ON CENTER FRAMES

11 x11 Pergola. Assembly Instructions. Paragon Group USA cm cm cm

The following instructions will guide you through the installation of your new vinyl railing stair kit.

ClearSpan Majestic Greenhouse Film Roof with Roll-up Sides

Installation Guidelines

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

6 1/2 x 6 1/2 Flat Top Pergola

GrowSpan Round Premium High Tunnels

Double Beam Freestanding Pergola Installation Guide

Elite Home-Attached Greenhouse

ClearSpan Mini Grab Bag Shelters

INSTALLATION INSTRUCTIONS

Spring Loaded All Season Roll-Up Doors

Qwik-Fence Installation Instructions

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

50 W ide. Future Trac G able E nd. Installation Instructions AIGE

GrowSpan Estate Pro I Greenhouse

Tools Needed Hardware Provided (per shade) Hardware Needed

DUTCH GABLE FREESTANDING CARPORT

Rolling Curtain door Manual

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

Connect Transit Shelter

19 to 39 TV WALL MOUNT - FULL MOTION

ClearSpan Majestic Greenhouse Film Roof with Polycarbonate Sides

ClearSpan 38' Wide Aircraft Hangar

WeatherShield Covered Walkway and Connect-A-Building

Mount to the Wall INSTALLATION MANUAL

southpaw enterprises, inc.

6' Wide Premium Greenhouse Benches

installation guide

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.

ClearSpan Round Style Mini Garage

ALL SEASON PATIO COVER

Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions

6' Wide Premium Greenhouse Benches

ClearSpan Mini Cold Frames

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

V nyl Gazebo truct c it Assembly Instr ons

1. Layout. Step 1. Step 2. Step 3. Fig. 1

Clearview Railing System Installation Instructions

Installation Manual Porter Road, Sarasota FL fax

10 Octagon Cedar Gazebo Assembly Instructions

WeatherShield Daddy Long Legs Canopy

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

GRANDIO G R E E N H O U S E S CONCRETE ANCHORING KIT FOR GRANDIO SUMMIT FLAT MOUNT BASE KITS CONCRETE ANCHORING KIT PARTS LIST FOR ALL SIZES

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

12x24x10 Run-In Shed #51451

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Low Headroom Rear Mount TorqueMaster

HD installation guide

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

ClearSpan Super Moo-Tel Building 26' Wide

Transcription:

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER Our unique assembly process quickly transforms individual pieces into a finished structure that will give you a lifetime of service. Great care has been taken to ensure complete satisfaction with your purchase. In the unlikely event that there are any missing or damaged parts, or if you simply need technical assistance, please call our toll free number: 877-833-3237. Your questions will be addressed promptly. Thank you for choosing Absolute Steel.

SAFETY AND HAZARD INSTRUCTIONS CAUTION: Read the following safety warnings and all instructions in their entirety, prior to installation. If you have questions or are missing any parts, please contact Absolute Steel customer service at 1-877-833-3237 before proceeding. Metal parts may get hot when exposed to high heat or direct sunlight. Avoid contact with skin and wear protective gloves and clothing to prevent the possibility of burns. Do not stand or walk on the structure. It is not designed to support human weight or the storage of materials on the roof. Collapse of the structure may cause serious injury due to weight of components. Avoid installation on windy days, as wind may create hazards during the installation process. Wind may blow material or cause partially-installed components to collapse before they are secured or fully installed. The weight of the components or structure could cause serious injury if they were to collapse. Metal conducts electricity and electrical shock hazards exist since the structure is made of metal. During installation or storage, keep the structure and all components away from electrical sources. Make sure that your selected location is away from power lines, underground cables, and any other source of electrical power. Serious injury or even death may occur if contact is made with electrical current. If the structure is moved after its initial installation, be certain to inspect all components and conditions, and follow each and every step of these instructions to make certain the structure is securely anchored, properly installed, and aligned. Failure to follow these steps could lead to collapse of the structure and may result in serious risk of injury or even death. Wear protective work gloves and suitable clothing for protection, and always take care when handling metal parts. Always wear safety glasses or goggles when installing self-drilling screws. 2

ATTENTION: IT IS IMPORTANT THAT YOU READ THE FOLLOWING NOTE BEFORE STARTING THE ASSEMBLY OF YOUR SHADE COVER NOTE: If, during the installation process, you have difficulty fitting frame components together, use an adjustable wrench to open end of receiving tube as shown below. Close wrench down around bent portion of tube and bend tube wall outward. If you are still having difficulty, focus on the four inside corners; flaring both sides of each one slightly will correct the problem. WHAT YOU WILL NEED One must be able to comfortably reach the peak of the shade cover - approximately 10 high. 3

BASIC BRACKET AND COMPONENT LIST NOTE: Strong arm is color coded in green. Stiff arms are color coded in orange. #12 x 1 SELF-DRILLING FRAME / TEK SCREW 5/8 x 5 CONCRETE WEDGE ANCHOR 4

12-10 12 O/C SITE PREPARATION FOUNDATION: The Absolute Steel SofTop shade cover frame is designed to be placed on a foundation that is level side to side and front to back. The foundation should be prepared ground (leveled and re-compacted), or a concrete slab with caisson or spread footings. It is important that you create this condition prior to installing your carport. We recommend that you check with your local building official prior to starting your project, to find out what is acceptable for foundations and anchoring in your city and/or county. The outside dimension layout is 12-10 x 12-10 as shown in the site layout diagram below. Use a string line and stakes (ground mount), or a chalk line (concrete mount) as a guide for aligning the columns and squaring the structure. Make reference marks (spray paint, felt marker, or chalk) for column locations. 12-10 12 O/C 5

FOOTINGS Footings details are shown below. 6

SETTING COLUMNS Ground Mount 1. Set columns in prepared holes. 2. Use a string line at ground level and on the tops of the columns; measure in between to obtain the desired dimensions. A line level will also work well. 3. Check the diagonal measurements as well as the width and length layout measurements to ensure the structure is square. 4. Fill holes with concrete and position the columns in the holes using the string lines as a guide. Use a level on two sides of the column to plumb the column. Various methods can be used to hold the columns in position until the concrete cures. Wood 1x4 s or steel angle iron clamped or temporarily screwed to the columns in a tripod fashion (one horizontal across the hole and one diagonal) is a proven method. Concrete Mount 12 O/C 12 O/C 1. Position columns and align with chalk lines as described earlier. The layout described in the previous page is for columns with plates - adjust accordingly. 2. Use a felt marker to locate the areas that need to be drilled. 3. Drill concrete using a Rotohammer or Hilti style hammer drill. You will need a 5/8 x 8 bit if you plan to use the anchors provided. 4. Place the flat washer and nut on the anchor with a couple of threads exposed, and position it through the base plate into the drilled hole. Seat with hammer. 5. Tighten the four nuts until they are snug. If the concrete is not level, you may have to use a shim between the base plate and concrete to plumb the column. CAUTION: DO NOT LEAVE COLUMNS UNATTENDED WITHOUT PROPER BRACING. THEY COULD FALL, CAUSING INJURIES AND/OR PROPERTY DAMAGE. 7

FRAME ASSEMBLY (CROSS BRACKET AND RAFTERS) To begin assembling your structure, separate the pieces and lay them out in the center of the columns. Then refer to the diagrams in the following pages and proceed as follows: 1. Insert rafter onto cross bracket leg, and secure in place with four #12 Tek screws on each wide side of rafter. (Make certain the rafter is in line with cross bracket leg). 2. Repeat Step1 for remaining rafters. 3. Place end cap on each end of cross bracket. 4. Proceed to next step of process (next page). SAFETY NOTE: ALWAYS WEAR YOUR SAFETY GLASSES AND EAR PROTECTION. 8

FRAME ASSEMBLY - CONTINUED To continue assembling your structure, attach the strong arm eave bracket (strong arm) and three stiff arm eave brackets (stiff arms) to cross bracket and rafter assembly. Refer to the diagrams on the following pages, and proceed as follows: 1. Insert strong arm eave bracket into cross bracket / rafter assembly, and secure in place with four #12 Tek screws on each wide side of the rafter. (Make certain strong arm stays in line with rafter.) 2. Repeat Step 1 for the 3 stiff arm eave brackets. 3. Proceed to next step of process. SAFETY NOTE: ALWAYS WEAR YOUR SAFETY GLASSES AND EAR PROTECTION. CROSS BRACKET AND RAFTER ASSEMBLY STRONG ARM EAVE BRACKET (1 - green) CROSS BRACKET AND RAFTER ASSEMBLY STIFF ARM EAVE BRACKETS (3 - orange) STIFF ARM STRONG ARM STIFF ARM STIFF ARM CANOPY FRAME ASSEMBLY 9

FRAME ASSEMBLY - CONTINUED You will need two people for the next steps. The roof assembly should be placed at the base of the columns. 1. With step ladders in place, grasp two ends of the roof assembly and carry up the ladders. Position assembly at top of the column. (Carrying the assembly in the crook of your arm and using the other hand to hold on to the ladder is a proven method). 2. Insert the downward leg of one arm (strong arm or stiff arm) into top of its column. 3. Repeat Step 2 at each of the remaining corners. Roof assembly should fall into place; adjust as needed. 4. Secure assembly into place using four #12 Tek screws on front and back of each column. 10

INSTALLING SHADE CANOPY You will need two people for this final part of the installation. Follow the instructions, and use the diagrams in the following pages as a guide. Canopy Assembly SAFETY NOTE: ALWAYS WEAR YOUR SAFETY GLASSES AND EAR PROTECTION The Absolute Steel SofTop shade cover comes with a fabric canopy, and two perimeter cables for securing the canopy in place. 1. Starting at one corner of the canopy, feed one perimeter cable through one side of canopy. 2. Once cable is through the first section, pull through until cable end loop is at the starting point corner. 3. Next, feed the remaining section of cable through the adjacent side. 4. Once cable is through the second section, pull until all cable slack is through. 5. Take about 4 of the cable end and make a loop. Secure using cable end clamp - see photo below. 6. Repeat Steps 1 through 5 for second cable on opposite sides. Canopy Placement With the SofTop canopy assembled and ready, place step ladders near the center of carport and in line with rafters. 1. Position the canopy so that one of the corners with no loops will end up at rafter assembly corners with the strong arm. Carry canopy over roof rafter, and pull over until half of canopy hangs over each side. 2. Taking care not to pull canopy off, spread out over entire frame. (To keep from pulling canopy off, each person should pull along diagonal). 3. At the corner with the strong arm, insert cable through the cable hook on the top of the strong arm. (See illustration on the next page.) 4. Place cable end loops onto cable hooks on the stiff-arm corners; do the same with the cable at the remaining nonloop corner. (See illustration on the next page.) 5. Using a socket wrench and 9/16 socket, tighten adjustment nut in the end of the strong arm, taking up about 1/3 to 1/2 of the adjustment length available. 6. Adjust canopy, cables and strong-arm adjustment nut at the corners as needed to position canopy evenly and with firm tension. 7. Once canopy is secured into place, place an end cap in each arm s end. 11

CANOPY STRONG ARM (and one stiff arm) CANOPY TWO STIFF ARMS 12

ABSOLUTE STEEL SOFTOP Have a question or comment? Need technical assistance? Give us a call (toll free) at 877-833-3237. We ll be glad to help. Thank you for choosing Copyright 2011 Absolute Steel and Storage 13