NAVY SUPPLY Improved Backorder, Management Will Reduce Material Costs

Similar documents
Improved Backorder Mann oement Will Reduce Mateiial Costs

GAO. NASA PROCUREMENT Contract and Management Improvements at the Jet Propulsion Laboratory. Report to Congressional Requesters

PERFORMANCE SPECIFICATION GLASS BEADS: FOR CLEANING AND PEENING

CHAPTER 47 LOGISTICS SPECIALIST (LS) NAVPERS A CH-73

PERFORMANCE SPECIFICATION GLASS BEADS: FOR CLEANING AND PEENING

CHAPTER 51 MACHINIST'S MATE (MM) NAVPERS G CH-64

An Assessment of Acquisition Outcomes and Potential Impact of Legislative and Policy Changes

GAO PENSION BENEFIT GUARANTY CORPORATION. Appearance of Improper Influence in Certain Contract Awards. Testimony

GAO EXPORT CONTROLS. System for Controlling Exports of High Performance Computing Is Ineffective

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

CHAPTER 47 LOGISTICS SPECIALIST (LS) NAVPERS B CH-73

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

Section Meetings Section Material and Equipment. None Required

CHAPTER 20 CRYPTOLOGIC TECHNICIAN (CT) NAVPERS K CH-64

Other Transactions (OTs) for Prototypes and the Information Warfare Research Project (IWRP) Consortium OT

GAO Technology Readiness Assessment Guide: Best Practices for Evaluating and Managing Technology Risk in Capital Acquisition Programs

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Diana Gordick, Ph.D. 150 E Ponce de Leon, Suite 350 Decatur, GA Health Insurance Portability and Accountability Act (HIPAA)

Technology Needs Assessment

GENERAL DESCRIPTION OF THE CMC SERVICES

CHAPTER 20 CRYPTOLOGIC TECHNICIAN (CT) NAVPERS L CH-76

Pickens Savings and Loan Association, F.A. Online Banking Agreement

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5%

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

NOT MEASUREMENT SENSITIVE

Stakeholder and process alignment in Navy installation technology transitions

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

U.S. Department of Energy Office of Inspector General Office of Audits and Inspections

The following document was not prepared by the Office of the State Auditor, but was prepared by and submitted to the Office of the State Auditor by a

Downloaded from 1. THE FOLLOWING PAGES OF MIL-STD-462D HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED:

Keeping Your House in order?

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

1. STANDARD OPERATING PROCEDURES 1.1 MISSION STATEMENT

SECTION 2 GENERAL REQUIREMENTS

Testimony of Professor Lance J. Hoffman Computer Science Department The George Washington University Washington, D.C. Before the

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

AT&T INDIANA GUIDEBOOK. PART 2 - General Terms and Conditions 1st Revised Sheet 1 SECTION 9 - Connections

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

DEPARTMENT OF TRANSPORTATION

The Naval Undersea Warfare Center Division Newport

Internal Controls: The Basics National Grants Management Association May 17, 2017

August 25, 2017 VIA ELECTRONIC FILING

DEPARTMENT OF THE ARMY TECHNICAL BULLETIN

CHAPTER 28 ENGINEERING AIDE (EA) NAVPERS E CH-66

DMSMS Management: After Years of Evolution, There s Still Room for Improvement

Airworthiness Directive

Workshop. Debbie Lilu, CTMA Director Bill Chenevert, Senior Program Manager Marc Sharp, Project Manager

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

COMPLETE MILITARY CERTIFICATIONS OVER

FAA Research and Development Efforts in SHM

Product Guide Verizon Delaware LLC. Section 31 Delaware LLC Original Sheet 1. Connection With Certain Facilities of Others

Additive Manufacturing is making headway at NAVAIR Lakehurst

THE NATIONAL SHIPBUILDING RESEARCH PROGRAM

DATE: FY 2015 President's Budget March 2014 PRIOR YR FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TO COMP TOTAL PROG QUANTITY

National Defense Center for Environmental Excellence. Dale A. Denny, Ph.D. Executive Director

CHAPTER 11 AVIATION ELECTRONICS TECHNICIAN (AT) NAVPERS F CH-69

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Submarine Laser Communications - Archived 09/2000

The Cattle Feeder Associations Loan Guarantee Regulations, 1989

Election Notice. Notice of Election and Ballots for FINRA Small Firm NAC Member Seat. October 16, Ballots Due: November 15, 2018

Department of Defense Instruction (DoDI) requires the intelligence community. Threat Support Improvement. for DoD Acquisition Programs

SUBMITTAL PROCEDURES

Aviation Electricity and Electronics Power Generation and Distribution

CHAPTER 55 MISSILE TECHNICIAN (MT) NAVPERS E CH-58

LIFE SAFETY DIVISION GUIDELINE. Subject: BDA Radio Amplification Checklist Date initiated: Date revised:

CHAPTER ELECTRIC AND MAGNETIC FIELDS

Statement of Corporate Intent

DEPARTMENT OF THE ARMY TECHNICAL BULLETIN

GAO. NUCLEAR WEAPONS DOE Needs to Improve Oversight of the $5 Billion Strategic Computing Initiative

University of West Georgia Summary Report Investigation of Allegations Made Against the Vice President of University Advancement April 8, 2011

Textron Reports First Quarter 2016 Income from Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook

NATIONAL BANK OF THE REPUBLIC OF MACEDONIA

INVESTMENT IN COMPANIES ASSOCIATED WITH NUCLEAR WEAPONS

CHAPTER 11 AVIATION ELECTRONICS TECHNICIAN (AT)

CHAPTER 54 CULINARY SPECIALIST (CS) NAVPERS 18068D-54F CH-54

Renewal of Approved Information Collection; OMB Control No SUMMARY: The Bureau of Land Management (BLM) has submitted an information

GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

ARCHIVED REPORT. Falcon II Tactical Radio - Archived 10/07

Federal Research and Development Contract Trends and the Supporting Industrial Base,

Questioning $1 Million Fee in a Needle Deal

August 25, Please contact the undersigned if you have any questions concerning this filing.

FEDERAL SPECIFICATION WIRE, ELECTRICAL, COPPER (UNINSULATED)

Technical Standard Order

Cross-Service Collaboration Yields Management Efficiencies for Diminishing Resources

Willie D. Caraway III Randy R. McElroy

The Regents of the University of California. COMMITTEE ON AUDIT March 19, 1998

FY 2016 President's Budget Cycle February 2015

Finance Manager: Accounting

DEP 2008 ELECTRIC AND MAGNETIC FIELDS CHAPTER ELECTRIC AND MAGNETIC FIELDS

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014

GAO U.S. COINS. The Federal Reserve Banks Are Fulfilling Coin Demand, but Optimal Inventory Ranges Are Undefined

National Shipbuilding Research Program

EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

STAUNING Traditional Internet Sales Process with /Voic Templates to Non-Responsive Prospects 2018 Edition

THE NATIONAL SHIPBUILDING RESEARCH PROGRAM

VAR Generator Operation for Maintaining Network Voltage Schedules

SECTION III NM 40/17 MARINE INFORMATION

Transcription:

NAVY SUPPLY Improved Backorder, Management Will Reduce Material Costs -. 148668 (;AO/NSIAI)-!):3-1:~ 1

GAO United States General Accounting Office Washington, D.C. 20648 - National Security and International Affairs Division B-252457 March 19, 1993 Admiral Frank Kelso The Acting Secretary of the Navy Dear Mr. Secretary: When the Navy does not cancel invalid backorders, it wastes money buying, repairing, transporting, and storing parts it no longer needs. To ensure the prompt detection and cancellation of invalid backorders, the Department of Defense (DOD) has instituted a backorder validation program. We reviewed the Navy s management of the program and (1) assessed the adequacy of the validation practices for detecting invalid backorders and (2) determined if it was appropriate for the Navy to exempt certain categories of backorders from periodic validation. Background system and provides supply management policies and procedures to inventory control points and field activities. Navy retail supply activities and individual operating units requisition needed materials from wholesale stock points. The stock points maintain quantities of materials to support their customers and replenish their stock as necessary by requisitioning materials from inventory control points. The inventory control points place requisitions they cannot fill on backorder status until additional materials can be provided through purchase or repair. For decades, DOD has had a backorder validation program in which (1) retail supply activities and stock points are to confirm the need for outstanding orders for spare parts every 3 months and (2) inventory control points are to promptly cancel the invalid backorders detected by these periodic checks. The Navy reported that it canceled about $163 million in unneeded backorders in calendar year 1992. DOD Manual 4000.25-1-M, which prescribes the program s policies and procedures, requires that the inventory control points ensure, through validation by the actual user, that a continuing need exists for backordered material In the last quarter of calendar year 1992, the two Navy inventory control points-aviation Supply Office and Ships Parts Control Center-asked users to validate about 121,000 backorders valued at about $2 billion. The Navy exempted an additional 56,000 backorders valued at $443 million from the validation process. Page 1 GAO/NSIAD-98-131 Navy Material Backorders

B-262467 Results in Brief Validation Procedures Are Not Consistently Followed Visits to Field Activities Showed Diverse Results Despite Navy validation processes designed to detect and cancel unneeded requirements, invalid backorders continue to be overlooked during validation checks because some field activities do not follow required validation procedures. The Navy s practice of exempting whole categories of backorders from the validation process also prevents many invalid backorders from being identified and canceled. When invalid backorders are not identified and canceled in a timely manner, unneeded procurements and repairs and excess inventories result. DOD directives and Navy procedures for the backorder validation program require that four times each year Navy field activities conduct an item-by-item review with the user to ensure that each nonexempted item is still needed in the quantity specified. Despite these requirements, the Navy did not identify and cancel a large number of invalid backorders as part of the quarterly validation process. The invalid backorders we found were at field activities that did not follow required validation procedures. At these activities, personnel (1) were not aware of the procedures, (2) did not trace the need for the material to supporting documents, or (3) did not have the ultimate user verify the need for the material. At 6 of the 12 field activities that we visited, we found invalid backorders that should have been identified and canceled during the validation process. The invalid backorders were not identified because the field activities did not follow required validation procedures. The other six field activities followed the validation procedures, and we did not find any invalid backorders. We reviewed a sample of 273 backorders at the 12 field activities, and identified 42 invalid backorders that should have been detected by prior 6 Navy validation checks. Table 1 shows the number of backorders reviewed and those we found to be invalid at each activity we visited. Page 2 GAOINSIAD-93-131 Navy Material Backorders

B.262457 ~~ Table 1: Summary of Invalid Backorders Number of backorders Activity Reviewsd Invalid Percent Activities not followlng procedures Jacksonville Air Station 27 15 56 Value of invalid backorders $252,715 Norfolk Air Station 61 7 11 203,175 Norfolk Supply Center 23 4 17 77,112 Willow Grove Air Station 17 12 71 11,979 Norfolk Aviation Depot 49 2 4 1,944 Lakehurst Warfare Center 12 2 17 1,929 Total 199 42 22 $540,054 Actlvltles followinn procedures Oceana Air Station 29 0 0 0 Cecil Field Air Station 12 0 0 0 Mayport Air Station 5 0 0 0 Newport News Supervisor of Shipbuilding Jacksonville Aviation Depot Kings Bay Trident Facility Total 16 0 0 0 11 0 0 0 11 0 0 0 84 0 0 0 The following examples illustrate instances of inadequate internal controls and weak validation practices. At Naval Air Station Jacksonville, the Aircraft Intermediate Maintenance Department cited a continuing need for 11 spectrum analyzers (NSN 6626-01-317-4866) for the H-3 helicopter. The analyzers had been on backorder for 876 days because of procurement problems and were valued at a total of $210,100. Jacksonville supply personnel told us that they did not need the analyzers because the H-60 helicopter is replacing the H-3 helicopter. The supply technician stated that she had never received training on the quarterly validation process. Consequently, instead of ascertaining if the requirement will exceed authorized material allowances, she simply determined if the backordered equipment had been received. In response to our inquiries, Jacksonville canceled these backorders. a At Naval Air Station Norfolk, the requirements branch cited a continuing need for three backorders, ranging in age from 134 to 184 days old, for elevating fins (NSN 1075-01-275-3752) used with mine countermeasure equipment. The fins, which were valued at $46,872, were ordered to Page 3 GAOINSIAD-93-131 Navy Material Backorders

B-262457 replenish the activity s authorized stock level. We found that the backorders were invalid because they exceeded the authorized stock level. The supply technician told us that she only checks to see if the backordered material has been received and does not review backorders to determine if on-order quantities will exceed material allowances. In response to our inquiries, Norfolk canceled these backorders. At Naval Aviation Depot Norfolk, shop personnel cited a continuing need for a wiring harness (NSN 5995-01-272-7970) used on the F-14 aircraft. The harness had been on backorder for 673 days and was valued at $1,910. In April 1992, shop personnel told us that the backordered material was no longer needed. Although we informed supply personnel that the backorder was invalid, they had not canceled the backorder as of December 1992. At Naval Air Station Willow Grove, the supply department cited a continuing need for a regulator assembly (NSN 1660-01-240-2886) used on helicopter emergency exit equipment. The assembly had been on backorder for 221 days and was valued at $199. We found this backorder to be invalid because the broken equipment for which this material was ordered was no longer at the air station. Supply department officials kept this item on backorder without a valid current need, stating that the part was difficult to obtain and could be used on other equipment when needed next. The material subsequently was received and placed in storage at Willow Grove. Some Activities Use Improved Validation Procedures Some of the activities we visited had instituted controls that were independent of the quarterly validation process and went beyond the backorder validation procedures called for by DOD directives. For example, Naval Air Stations Cecil Field and Mayport and Trident Refit Facility Rings Bay perform random unannounced audits of all outstanding requisitions 1, generated by the air and submarine squadrons. The goal of the audits is to validate requirements by checking the equipment being repaired to ensure there still is a need for the parts or by verifying that a stock requisition will not exceed equipment allowances. Six of the 12 activities we visited perform these independent validations, but only for repair parts ordered by air and submarine squadrons. According to Naval Supply Systems Command,officials, the Atlantic Fleet considers these backorder validations to be a high-priority measure of the supply performance at squadrons. Page 4 GAOINSIAD-93-131 Navy Material Backorders

B-262467 Naval Air Station Oceana also has instituted additional controls. Just prior to our March 1992 visit, supply department managers directed a review of older backorders. Supply analysts first compared material on hand and on backorder with material. allowance and demand data. On the basis of knowledge of the material and the local repair capability, the analysts then determined if the air station could perform satisfactorily with the material on hand and, therefore, could cancel the backorder. As a result of this review, Oceana canceled backorders for 43 items valued at $1.4 million. Naval Aviation Depot Norfolk automatically closes out open requisitions for aircraft repair and overhaul jobs that have been completed. Under this procedure, invalid backorders are automatically identified for cancellation. Invalid Backorders Result in Unnecessary Procurements and Repairs Other Field Activities May Have Similar Problems When the validation process is followed, unneeded requirements can be canceled, thus avoiding unnecessary procurements and repairs. For example, in reporting on the April to June 1992 periodic validation results, the Ships Parts Control Center stated that it canceled 609 backorders, valued at $10.3 million. On the other hand, if invalid backorders are not identified and canceled in a timely manner, unneeded procurements and repairs and excess inventories result. In the report on the April to June 1992 validation results, the Ship Parts Control Center stated that it could not cancel 126 invalid backorders, valued at $742,000, because the material was on contract for delivery. The Center stated that it could not cancel another invalid backorder, valued at $3,500, because the material was under contract for repair. Because half of the field activities we reviewed did not properly apply backorder validation procedures, it is likely that similar problems exist at many Navy activities. Further, because activities not following the procedures had relatively high incidence of invalid backorders, the Navy needs to be more aggressive in assuring that, at a minimum, current procedures are followed. Periodic field visits by Naval Supply Systems Command and inventory control point officials is one way to see how well the backorder validation program is being implemented. However, field visits for this purpose currently are not being made. Page S GAOOJSIAD-93-131 Navy Material Backorders L

B-262467 Many Backorders Are Exempt From the Validation Process The Navy Has Exempted a Large Volume of Backorders The intent of the backorder validation program is to detect and cancel invalid backorders. However, the Navy has allowed certain categories of backorders to be exempt from the validation process. Both our tests and those of the Navy identified high percentages of invalid backorders in the exempt categories. Navy officials could not document the rationale behind the exemptions; however, by allowing them, the Navy wastes a significant amount of funds buying and repairing materials that it no longer needs. The Navy exempts backorders for materials used on Trident submarines and ballistic missile ships from the validation program, as well as materials used in new ship construction, major modernization, and overhaul projects, The Navy also exempts backorders for initial ship outfittings and certain replenishment stocks for ships and aircraft, In July 1992,55,000 backorders valued at $443 million were exempt from the validation process. The number and value of the Ships Parts Control Center s exempted backorders (41,000 valued at $258 million) are about as high as the number and value of the backorders that it asks field activities to validate each quarter. The Aviation Supply Office s exempted backorders, 14,000 valued at $185 million, are about 10 to 15 percent of the number and value of backorders that it asks field activities to validate each quarter. Many of the Exempted Backorders Are Invalid We reviewed a sample of 209 exempt stock replenishment backorders at 7 field activities and found that 60, about 29 percent, were invalid. Navy officials at the selected activities agreed with our determinations. Table 2 shows the results of our review. Page 6 GAO/NSLAD-93-131 Navy Material Backorders

B-262467..--. Table 2: Summary of lnvalld Exempt Backorders Activity Norfolk Supply Center Cecil Field Air Station Number of stock items Reviewed Invalid Percent 48 24 50 12 4 33 Value of invalid backorders $974,386 767,822 Norfolk Air Station 9 4 44 432,883 Kings Bay Trident Facility 25 3 12 35,684 Mayport Air Station 43 11 26 31,585 Jacksonville Air Station 46 14 30 20.963 Newport News Supervisor of Shipbuilding 26 0 0 0 Total 209 60 29 $2,263,323 The following are descriptions of some of the invalid exempt backorders we found. In August 1992, Naval Supply Center Norfolk had on backorder one signal data computer (NSN 6605-01-124-9243) for the F-14 aircraft. At that time, however, the supply center was authorized 13 computers and had 24 on hand. After we brought this matter to the attention of supply center officials, they canceled the $383,200 backorder for the additional computer. The backorder had been exempted from the quarterly validation process because it fit into one of the exempt stock replenishment categories. In April 1992, Trident Refit Facility Kings Bay had on backorder two ball valve parts kits (NSN 4820-01-316-2061) for Trident submarines. At that time, the facility had a requirement for only one kit. After we brought this matter to the attention of facility officials, the facility canceled the backorder for the unneeded kit, which was valued at $26,910. The Navy Also Found Invalid Exempt Backorders Because we found a high percentage of invalid exempt backorders, we asked Navy officials to validate additional exempt backorders. The Navy did three validations and also found large percentages of invalid backorders. These validations covered backorders for stock replenishment, Trident submarines, and spare parts and were made both at activities we visited and did not visit. We asked supply officials at the two inventory control points to validate the remaining universe of exempt stock replenishment backorders. The Page 7 GAO/NSIAD-93-131 Navy Material Backorders

,,,,,,,..- B-262407 Ships Parts Control Center s validation effort identified 28 percent of these backorders, 1,377 backorders valued at $8.4 million, that were for material no longer needed. The Aviation Supply Office s validation effort identified 11 percent of these backorders, 923 backorders valued at $13 million, that were for material no longer needed. A Ships Parts Control Center official told us that he believed the validation results were significant and was of the opinion that these stock replenishment backorders should be included in the periodic validation process. At our request, the Ships Parts Control Center validated exempt backorders at the two Trident submarine facilities at Kings Bay, Georgia, and Bangor, Washington. Using automated techniques, Trident program officials at the Ships Parts Control Center found that 185 of 796 backorders were potentially invalid. Supply officials at the Trident facilities conducted further validations of the 185 backorders and identified 88 invalid backorders, which represented about 11 percent of the total backorders. In view of the importance of identifying and canceling invalid backorders, Trident program officials at the Ships Parts Control Center stated they would continue performing this validation on a quarterly basis. After we told officials at Naval Air Station Norfolk that some spare parts were exempt from periodic validation, they requested the Aviation Supply Office to do a special validation of these backordered items. In response, the inventory control point validated 3,100 backorders at all field activities and canceled 240 invalid backorders. Aviation Supply Office officials stated that they were not certain if they would request this validation on a recurring basis. a Navy Officials Could Not Document the Rationale Behind the Exemptions I Naval Supply Systems Command officials could not provide documentation for the original decisions to exempt categories of backorders from periodic validation-some of which we were told go back to the mid-1970s. The officials stated that concern that valid backorders might be erroneously canceled, causing project delays or serious harm to national security, could have prompted the decisions to exempt Trident submarine and ballistic missile ship backorders from periodic validation. Again, although uncertain as to specific reasons, the officials believed that initial ship outfitting and certain stock Page 3 GAO/NSIAD-93-131 Navy Material Backorders

B-262457 replenishment backorders were exempted because funding shortfalls at the requisitioning activities would limit the generation of invalid backorders. In contrast to initial ship ouffxt,ings, the Aviation Supply Office does not exempt some initial outfitting backorders for aircraft. For example, during the January 1992 validation process, 534 invalid backorders, valued at $11.2 million, were canceled. Regardless of the original justifications for the exemptions, the significant percentage of invalid exempt backorders we and the Navy found is reason enough to rescind the exemptions. The backorder validation program has procedures to identify invalid backorders and, at the same time, has safeguards to minimize the risk of canceling valid backorders. Naval Supply Systems Command officials agreed that the continuing need for the exemptions should be reviewed. However, they have not initiated this review. Recommendations Agency Comments We recommend that the Secretary of the Navy direct the Commander, Naval Supply Systems Command, to (1) take steps to ensure that Navy field activities follow established backorder validation procedures and (2) rescind the exemptions from the backorder validation process and require that all backorders be periodically validated. Periodic visits to field activities should be one step to determine if they are following validation procedures. We requested written comments from DOD on January 26,1993, but none were provided. However, we received oral comments and these are summarized below. DOD agreed with our findings and recommendations and stated that the Naval Supply Systems Command is preparing a message to the field activities advising them of our findings and reemphasizing compliance with existing backorder validation procedures. The Command also is requesting that the validation procedures become a special interest item during command inspections at field activities. DOD also stated that the Naval Supply Systems Command is taking action to review all backorder validation exemptions with the goal of eliminating all or as many exemptions as possible. The target completion date for this action is June 30,1993. Page 9 GAO/NSIAD-93-131 Navy Material Backorders

- B-252457 Scope and Methodology 1 We performed detailed audit work at DOD and Navy headquarters, the 2 Navy inventory control points, and 12 Navy field activities. At each organization visited, we interviewed responsible agency personnel and reviewed applicable policies, procedures, and documents. The Navy organizations we visited were. Naval Supply Systems Command, Washington, D.C.; l Aviation Supply Office, Philadelphia, Pennsylvania; l Ships Parts Control Center, Mechanicsburg, Pennsylvania; l Naval Air Station, Oceana, Virginia; l Naval Air Station, Norfolk, Virginia; l Naval Air Station, Jacksonville, Florida; l Naval Air Station, Cecil Field, Florida;. Naval Air Station, Mayport, Florida;. Naval Air Station, Willow Grove, Pennsylvania; l Naval Supply Center, Norfolk, Virginia; l Naval Aviation Depot, Norfolk, Virginia; l Naval Aviation Depot, Jacksonville, Florida; l Naval Air Warfare Center, Lakehurst, New Jersey; l Trident Refit Facility, Kings Bay, Georgia; and l Supervisor of Shipbuilding, Newport News, Virginia. We identified internal controls for certifying the continuing need for backordered material at Navy field activities and evaluated the Navy s rationale for the exemptions from the validation process. We independently reviewed a sample of 273 backorders that had been subjected to the validation process at the 12 selected Navy activities and a sample of 209 backorders that had been exempted from validation. In addition to our validation of exempt backorders, Navy supply officials validated additional exempted backorders at our request and provided us with the results. Our review was made in accordance with generally I, accepted government auditing standards and was performed between January 1992 and January 1993. As you know, 31 U.S.C. 720 requires the head of a federal agency to submit a written statement on actions taken on our recommendations to the House Committee on Government Operations and the Senate Committee on Governmental Affairs no later than 60 days after the date of the report and to the House and Senate Committees on Appropriations with the agency s first request for appropriations made more that 60 days after the date of the report, Page 10 GAO/NSJAD-93-131 Navy Material Backorders

B-262457 We are sending copies of this report to the Chairmen and Ranking Minority Members, House and Senate Committees on Appropriations and on Armed Services; the Chairmen, Senate Committee on Governmental Affairs and House Committee on Government Operations; the Director, Office of Management and Budget; and the Secretary of Defense. Please contact me on (202) 512-5140 if you have any questions. The major contributors to this report are listed in appendix I. Sincerely yours, Mark E. Gebicke Director, Military Operations and Capabilities Issues Page 11 GAO/NSLAD-93-131 Navy Material Backorders

Annendix I Major Contributors to This Report National Security and International Affairs Division, Washington, D.C. Philadelphia Regional Office James Murphy, Assistant Director Edward Rotz, Regional Management Representative Joseph Margallis, Evaluator-in-Charge Audrey Petit, Evaluator Frank Foley, Computer Specialist cbwsz> Page 12 GAO/NSIAD-93-131 Navy Material Backordere,

Ordc~ring Information The first copy of each GAO report and testimony is frcae. Additional copies are $2 each. Orders should be stlllt. to the following address, accompanied by a check or mtrnc~y order made out to the Superintendent of I)ocumt9~ts, when nect~ssary. Orders for 100 or more copies to bc: mailed to a single address are discounted 25 percent. Ordc?rs by mail: IJ.S. Gc?nc?ral Accounting Office P.O. I3ox 6015 Gaithersburg, MD 20884-6015 or visit: Room 1000 700 4th St. NW (corner of 4th and G Sts. NW) 1.J.S. General Accounting Office Washington, IX Ortlt~rs may also be placed by calling (202) 512-6000 or by using fax number (301) 258-4066. PRINTED ON &;g RECYCLED PAPER