ENGINE CRATE FABRICATION

Similar documents
Desk/Wall-Mount Rack

6X3 Patio Garden Shed Assembly Manual

Vertical Offset Base and Safety Rail System Installation Instructions

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

Grand Garden Chalet 6X3 Assembly Manual - Costco

Track Rack. * Track Racks are not lockable

Chapter 23. Garage Construction

Lok Fast Column Clamp General Information

INSTRUCTION BOOKLET #C20

Sunhouse. Assembly Manual

Laney chair. assembly instructions

MM700R Recess Box Kit Addendum

Sectional armless. assembly instructions

96 (Standard Length)

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

Chapter 22. Shed Construction

Ali sectional right. assembly instructions

TRASH CAN & FIREWOOD STORAGE UNIT

BEFORE YOU BEGIN Read these instructions completely and carefully.

Over the Range Microwave Oven

Grand Garden Chalet 6X3 Assembly Manual

City of Manteca Boarding Requirements

Laney loveseat. assembly instructions

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

WOOD 4 BEAM DELUXE PERGOLA INSTRUCTIONS

Brook sectional corner. assembly instructions

Assembly Instructions

Triplex Instructions for Packing and Unpacking

INSTALLATION INSTRUCTIONS

176 S. New Holland Road Gordonville, PA Tel: Fax: Summit Tower

Best Barns USA Assembly Book

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

Assembly Instructions 10 X 10 Aluminum Roof Support

Patrol Box Plans by David J. Yarusso Troop 609

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

Renaissance Pavilion. Assembly Manual

Tux sofa. assembly instructions

Tux chair & half. assembly instructions

Best Barns USA Assembly Book

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

BIKE FILE (301)

EZ Shed. Tool eeded ST MER SER I E

Oxford Stalls Installation Instructions

Grand Garden Chalet 6X3 Assembly Manual

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

For additional assistance call

BEFORE YOU BEGIN Read these instructions completely and carefully.

The Festival Assembly Instructions

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

RLP Flat Track Hardware sliding door hardware/ barn door track

LF Series Assembly Instructions

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models.

Mount to the Wall INSTALLATION MANUAL

RLP Mini Low Profile V Track Hardware sliding door hardware/ barn door track

8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017

EZ-HAUL GARDEN CRATE WAGON

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

woodworkersjournal.com MATERIAL LIST

CleanBench Laboratory Tables

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Best Barns USA Assembly Book

10 Octagon Cedar Gazebo Assembly Instructions

Installation Instructions For Slider Casement Air Conditioners

8x8 Sunshed Garden Shed Assembly Manual Revision #9 June 11th, 2012

Wellington Wallbed 700 Series Assembly Instructions

Constable Oak Extension Dining Table

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

Direct Importers of the Finest Exotic Hardwood Decking, Lumber, & Flooring

Strata. urniture. Addison Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Germ City Storage Box Inventory

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

Ray chair & half. assembly instructions

Best Barns USA Assembly Book

6X3 Oscar Shed Assembly Manual

Best Barns USA Assembly Book

Installation Instructions for Vista Air Vertically Folding Walls

Model: SS660-PT-R Stainless Steel Poly-Top Floor Scale Series. Installation, Set-Up and Operation Manual

INSTALLATION MANUAL. All Recessed Wall-Mount Modules Front-Loading, Rear-Loading, Parcel-Only, Collection Box, Trash/Recycling Bin

Junglenastix. Instruction Manual. Technical Support: Riaan Prinsloo Do-It-Yourself Jungle Gym Kits

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Oval Vinyl Gazebo. Assembly Manual

Artisan Vinyl Pergola

Assembly Instructions Eggstreme Chicken Coops

8x12 SpaceMaker Garden Shed Assembly Manual

3/8-16 x 3/4 cap screw. 3/8-16 hex nut for above screws. 1/4-20 x 3/4 socket cap screw. 3/16 short arm hex key (not to scale)

Installation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:

Vinyl Gazebo Instructions

Klamp Trak. Instructions (39052)

Mounting Instructions Item No.: xxx

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

90 WING SPAN P-51D MUSTANG (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED

WOODEN BOOTBLACK STAND CONSTRUCTION AND ASSEMBLY INSTRUCTIONS

If you discover that material is missing or defective, contact our customer service department immediately:

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Installation Instruction

8x8 Sunshed Garden Shed Assembly Manual

Transcription:

I have been often asked about building a crate to ship an engine. Below is one crate I built and some information that should make it easier for you to build such a crate. Please be aware that the 600 engine weighs more than is allowed by most of the typical parcel carriers. Neither the USPS nor UPS will ship the 600 engine. The engine I show in this document is crated without the flat floor pans or the heat exchanger / muffler. The 600 engine with crate will weigh about 210 pounds. Most of the normal carriers cut off at 75 pounds. If you are going to ship an engine you will have to take it to a motor freight company like FedEx Freight (not to be confused with FedEx which also has a 75 pound cutoff limit). Prior to committing to a shipment, I suggest you contact your local freight company and check on rates to ship your engine. They will want to know the weight (estimate 210 pounds) and dimensions (24 x 32 x 28 ) and the class (85). With that information and the destination, they can tell you the rate. FedEx will provide a 40% discount to all customers so be sure to ask about that discount. If you go to their web page, you should be able to see what it will cost you with the above information and your destination zip code. If you plan on shipping your engine with the muffler and heat exchanger you should check and adjust the dimensions as necessary. I start out by fabricating a base. You can either use one piece of ¾ plywood or two layers of ½ plywood (which by the way is only 7/16 now remember that, it will make a difference in your measurements). I chose to use two layers of ½ plywood. Cut the two pieces 24 x 32. Align the four sides of the plywood and nail them together to hold them in place. Cut (2) 2 x 4 x 24 long to make the feet for the base. Using 3-1/2 screws, screw through the plywood into each 2 x 4 in four places. You will need about 28 of corner material. This can be any thickness that is handy. I have found that these pieces vary at different lumber yards, so I won t provide all the cut lengths since your may be different. Using 2 x 2 material cut two pieces 31 long. This will make the front and back pieces attached to the top of the crate bottom. Cut (2) more pieces to fill in the sides. You will need to leave a 7/16 gap completely around the perimeter of the base so the top can slide down and stop at the base (see next picture). Use a scrap piece of plywood to gauge spacing around 2x2 frame. After you have installed the perimeter 2 x 2 boards, cut (2) 2x4 down so they are only 2 high and 18-1/2 long. Install them in the center of the base, 3-1/4 off the centerline (6-1/2 apart). These (2) boards will be the resting pieces for the oil pan. The upright piece in the photo above is made from ¾ plywood and is used to bolt the engine to the crate. View the drawing below to fabricate this piece. Engine crate.doc Page 1 of 6

Engine crate.doc Page 2 of 6

Install (2) screws through the back of the upright engine support into the oil pan supports as indicated by the arrow. Fill the gap between the perimeter frame and the upright engine support with a piece of filler material. Screw the filler material in place. Using the guide below cut out the four sides from a sheet of 4 x 8 sheet of plywood. Engine crate.doc Page 3 of 6

Upright engine support receptacle Leave space for perimeter boards at base. Using the picture above as a guide and the 4 sides cut from the sheet of plywood fabricate a top that will slip over the base. The top piece of plywood will have to be cut from another sheet of plywood if you used double sheets of plywood for the base as shown above. The top measures 23 x 31. Be sure to leave a sufficient space at the bottom of the 2x2s corner braces for the base perimeter of 2x2(s). When building the top of the crate, I normally will assembly it onto the base. I do this by taking one short and one long side-pieces and screwing them to the perimeter 2x2s (on the base) and then cut the corner vertical brace to fit (be sure to leave a 7/16 gap between the top of the side pieces and the 2x2 corner brace this will be needed to allow the top piece to recess into the top). I continue doing this around the crate until all 4 sides and corner 2x2s braces are in place. I then will fill in the horizontal 2x2s 7/16 below the top of the sides. At this point, the top sheet of plywood can be put in place and secured with screws. I then remove the screws securing the side plywood pieces to the 2x2s around the base perimeter so I can remove the top in one piece. At this point you can add the upright engine support receptacle described in the next paragraph. The piece of filler and the 2x2 shown in the top part of the picture is used to brace the upright engine support. The filler piece (one at top) should be cut the same width as the filler piece described at the bottom end of the engine upright support. The lower piece is a 2x2 spaced ¾ below the filler piece. These two pieces make a receptacle for the engine upright support to slide into. Engine crate.doc Page 4 of 6

You are now ready to install the engine into the crate. Place the engine on the base of the crate with the oil pan spanning the two center runners. Slide the engine forward until the upper mounting studs of the engine protrude through the upright engine support. Secure the engine by installing two washers and nuts to the upper studs and installing two bolts, washers and nuts through the lower holes. Be sure all hoses, wires and other items are within the confines of the 2x2 perimeter boards. Engine crate.doc Page 5 of 6

Now take the top of the crate and lift it over the engine and install it on the base. Be sure that the receptacle is properly placed so that it will receive the upright engine support board. Install two to three screws through the top into the upright engine support to secure it tightly to the top of the crate. Install three to four screws on each side of the top near the base. These screws should secure the top to the 2x2 perimeter boards. Engine crate.doc Page 6 of 6