Angola development Daniel Elias Head of Development & Production. 1 Capital Markets Day - March 14th 2011

Similar documents
Capital Markets Day London, 15 March

Husky Energy East Coast Update

Angola. Energy, Society, Sustainability April 2016

For personal use only

Jefferies 2014 Global Energy Conference. Maryann Seaman Executive Vice President and Chief Financial Officer

Dussafu Gabon Update January, 2018

Spectrum. The Pareto Oil & Offshore Conference. Jan Schoolmeesters, COO. 4 th September 2013

For personal use only

Oil & Gas Offshore. Industry challenges in deepwater discover

CORPORATE PRESENTATION March, 2018

Technical Challenges in Offshore Development New Technology Required for Future Offshore Development

Brazil Shareholder visit 2016 Re-shaping Shell, to create a world-class investment case

Pareto s 8th annual E&P Independents Conference London, January 22, 2013 Jan Kielland (CEO)

For personal use only

Oil&Gas Subsea Production

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

Annual Statement of Reserves

Africa s Leading Independent Oil Company

Dorado-1 drilling commenced 5 June 2018

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

A Step Change in Activity

Analyst Day Real change starts here. Doug Pferdehirt, Chief Executive Officer

BC-10 PARQUE DAS CONCHAS

Details of SPE-PRMS can be found here:

Shell Exploration and Production EP Americas. Institute of the Americas May 13, Olivier Lazare Vice President, New Business Development

Business Update full year results

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

Executive Summary and Table of Contents

Rex W. Tillerson Chairman and CEO, Exxon Mobil Corporation Third OPEC International Seminar Vienna, Austria September 13, 2006

Subsea Tieback Forum

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

Value Creation through Successful Exploration and Selective Development

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

Evolution of Deepwater Subsea / Offshore Market

Annual General Meeting 11 September 2017

Upstream overview. Jay Johnson Executive Vice President Chevron Corporation

MERMAID MARINE AUSTRALIA LTD INVESTOR BRIEFING DEVELOPMENT OF DAMPIER SUPPLY BASE

27 August 2015 SUBSEA JOINT VENTURE WITH CHIYODA CORPORATION

Oil and Gas Exploration Economic Model Manual. Version Introduction

Business Update. 1 st half 2018 results

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

FAR in the MSGBC Basin

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

NCS Prospects Conference

For personal use only

Pre-Salt Reservoirs Offshore Brazil: Perspectives and Challenges. José Formigli PETROBRAS E&P Production Engineering November 2007

Overview. One of Canada s largest integrated energy companies. Headquarters in Calgary, Alberta. Permanent Employees: ~5,000

Noble Corporation. Don Jacobsen Senior Vice President Industry & Government Relations Marine/Offshore Industry Conference 29 March 2012

Husky s Focus on East Coast Exploration and Production

DEEP OFFSHORE EXPERTISE & TECHNOLOGY

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

January 11, Block BS-4 Atlanta Field Early Production System (EPS)

Delivering Value From Category Management In A VUCA World

Opportunities and Challenges in Deepwater West Africa Projects

West Africa Oil & Gas Forecast

The New Energy at Global Industries

Pareto s Annual Oil & Offshore Conference

BP plans for significant growth in deepwater Gulf of Mexico

Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc.

M. Kevin McEvoy. Oceaneering International, Inc. President & CEO. December 2, 2014 New York, NY. Safe Harbor Statement

Marvin J. Migura. Oceaneering International, Inc. Executive Vice President. September 30, 2014 New Orleans, LA. Safe Harbor Statement

NU-OIL AND GAS PLC. AGM January 2019

KONGSBERG OIL & GAS TECHNOLOGIES. Egil Haugsdal, President

Bay du Nord Framework Agreement

The State of the Offshore U.S. Oil and Gas Industry

BRAZIL ENERGY AND POWER CONFERENCE. Americo Oliveira McDermott Brazil General Manager September 20, 2015

Presenter: John T. Gremp President and Chief Operating Officer. February 2011

FY19 production and capital expenditure guidance

For personal use only

Growing Deepwater Capability Subsea UK 2009 Conference at the 2009 Oil and Gas Asia Exhibition 11 June 2009, Kuala Lumpur

Preferred partner. Aker Solutions. Nordic Energy Summit 2013, 21 March Leif Borge CFO

Persistence, partnership and the prize

For personal use only

Goldman Sachs Global Energy Conference. January 2014

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG

3D Oil Limited. Annual General Meeting 26 November Stamford Plaza Collins Street Melbourne

Morgan Stanley Houston Energy Summit

Sanford Bernstein Strategic Decisions Conference. May 2014

UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines.

MTS Outlook Conference Equipment Manufacturers and Supplies. March 26, 2015

Oil & Gas Industry Competitiveness Assessment

THE SUBSEA SECTOR IN BRAZIL BUSINESS OPPORTUNITIES IN A GLOBAL MARKET

DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7

Wood Group Investor Briefing Q1 2016

Phoenix project drilling update 29 June 2017

Tullow Oil An Irish Success Story

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

For personal use only

NATIONAL GAS DEVELOPMENT TASK FORCE ANNOUNCEMENT

Phoenix South-3 drilling commenced 17 April 2018

Deep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada

Capital One Securities, Inc.

How it works and Stakeholder Benefits

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V

Phoenix South-3 drilling update 29 June 2018

Marvin J. Migura. Oceaneering International, Inc. Executive Vice President. Safe Harbor Statement

87R14 PETROLEUMEXPLORATI

2017 Full Year Results. 8 March 2018

Transcription:

Angola development Daniel Elias Head of Development & Production 1 Capital Markets Day - March 14th 2011

Overview Exploration assets Angola development Brazil exploration assets Pre-salt Santos basin Final remarks 2 Capital Markets Day - March 14th 2011

Successful track record on Angolan projects execution Angolan blocks location Presence in Angola since 1982 12 discoveries in Block 14 and 14 discoveries in Block 32 and Block 33 Block 14 is the only producing block 255 Mbbl of total reserves 1 and contingent resources 2 at YE 2010 3 Capital Markets Day - March 14th 2011 1 Net entitlement 2P reserves 2 Working interest 3C contingent resources

Block 14 and 14K provide solid foundation for Galp Energia s presence in Angola Blocks 14 and 14K areas Almost the total area of Blocks 14 and 14K was retained following the expiry of exploration period Three fields already under production: Kuito, BBLT and Tômbua-Lândana Five areas still to be developed: Malange, Gabela, Lucapa, Negage and Lianzi Menongue is a provisional development area 4 Capital Markets Day - March 14th 2011

Kuito s FPSO was the first deepwater project in Angola Kuito s development Very successful fast track deepwater project with first discovery in 1997 and first oil in 1999 Development consists of one FPSO, three subsea centers, 22 producers, six water injection and one gas injection wells Project acceleration achieved via staged development Upgrades successfully performed with vessel on-station 5 Capital Markets Day - March 14th 2011

Excellence in execution in BBLT BBLT s Compliant Piled Tower Awarded Project of the Year by the Offshore Energy Association in 2005 Development consists of one Compliant Piled Tower (CPT), three subsea centers, 30 producers and 18 water injection wells Two stage execution: First BB (CPT, process, import and export facilities); Second LT (subsea centers and tiebacks) Hub concept, available to incorporate further tie-backs 6 Capital Markets Day - March 14th 2011

Replicating proven concept on Tômbua-Lândana Tômbua-Lândana s CPT Weight and cost optimization via Tender Assisted Drilling rig One of the tallest fixed structure executed in the world Development to date consists of one CPT, one subsea centers, 11 producers and three water injection wells Two stage execution: 1 st TL (CPT, process, import and export facilities); 2 nd TS (subsea centers and tie-back) Hub concept, available to incorporate further tie-backs 7 Capital Markets Day - March 14th 2011

Malange development leveraging on existing infrastructure Malange tie-back alternatives Malange discovery in 2007 with appraisal programme completed in 2010 Two drilled wells justified submitting conceptual development plan to concessionaire First Pinda development in Block 14 with light oil (40º API) Engineering studies underway to mature tie-back development alternative Aiming for project acceleration (contractual first oil date in 2016) 8 Capital Markets Day - March 14th 2011

Lucapa progressing towards first oil Lucapa s development area Lucapa discovery in 2007 with appraisal programme complete in 2010 with Lucapa-6 Six exploration and appraisal wells drilled justified submitting conceptual development plan to concessionaire Engineering studies ongoing to select optimal development alternative Contractual first oil expected for 2016 9 Capital Markets Day - March 14th 2011

Lianzi overcoming challenges via technology development Lianzi development First unitized development between Angola and Republic of the Congo Long tie-back to BBLT, 42 km away Technology qualification: direct electrical heating, subsea sampling and subsea multiphase metering Engineering optimization studies underway to BBLT tie-back development alternative 10 Capital Markets Day - March 14th 2011

Translating exploration success into development projects Block 32 and 33 areas 13 discoveries and 12 development areas submitted to concessionaire Total surface area of 1,113 km 2 One concept at pre-development stage: Block 32 Kaombo Block 33 proceeding with evaluation programme 11 Capital Markets Day - March 14th 2011

Kaombo with split hub concept Block 32 development hubs Kaombo Split Hub concept approved Engineering optimization studies ongoing to mature Split Hub concept Two FPSO supporting six development areas with an aggregated capacity of c.200 kbopd First oil date staged per FPSO expected by 2016 and 2017 12 Capital Markets Day - March 14th 2011

Angola WI production of c.35 kbopd in 2020 50 Angola WI production (kbopd) 0 2011 2014 2017 2020 Current projects Current projects New projects New projects Working interest production CAGR 2010-20 of 7% 13 Capital Markets Day - March 14th 2011

Acronyms # Number HR Human Resources $ United States dollar IOC International Oil Company % Percentage IPO Initial Public Offering 2D Two dimensional seismic Kboepd Thousand barrels of oil equivalent per day 3D Three dimensional seismic Kbopd Thousand barrels of oil per day ANP Brazilian agency for oil, natural gas and biofuels Km Kilometre API gravity American Petroleum Institute gravity Km 2 Square kilometre BB Benguela and Belize LLI Long Lead Item BBLT Benguela, Belize, Lobito, and Tomboco LNG Liquified Natural Gas Bcm Billion cubic metres LT Lobito Tomboco Bln Billion M 3 /d Million cubic metre per day Boe Barrel of oil equivalent Mln Million c. Circa MW MegaWatt CAGR Compound Annual Growth Rate NG Natural Gas CSEM Control Source of Electromagnetic Method NOC National Oil Company CO 2 Carbone Dioxide p.p. Percentage point CPT Compliant Piled Tower R&M Refining & Marketing E&P Exploration & Production RCA Replacement Cost adjusted EPC Engineering, Procurement and Construction TL Tômbua-Lândana EWT Extended Well Test Ton Tonne FLNG Floating Liquified Natural Gas TS Tômbua South FPSO Floating Production Storage Offloading UOTE Oil Transhipment Unit G&P Gas & Power WAG Water-alterning-gas GWh GigaWatt hour WAT Wax appearance temperature H 2 S Hydrogen sulfide WI Working interest HC Hydrocarbon YE Year End 14 Capital Markets Day - March 14th 2011

Disclaimer Financial outlook figures are RCA figures except otherwise noted. Matters discussed in this presentation may constitute forward-looking statements. Forward-looking statements are statements other than in respect of historical facts. The words believe, expect, anticipate, intends, estimate, will, may, "continue," should and similar expressions identify forward-looking statements. Forward-looking statements may include statements regarding: objectives, goals, strategies, outlook and growth prospects; future plans, events or performance and potential for future growth; liquidity, capital resources and capital expenditures; economic outlook and industry trends; developments of Galp Energia s markets; the impact of regulatory initiatives; and the strength of Galp Energia s competitors. The forward-looking statements in this presentation are based upon various assumptions, many of which are based, in turn, upon further assumptions, including without limitation, management s examination of historical operating trends, data contained in Galp Energia s records and other data available from third parties. Although Galp Energia believes that these assumptions were reasonable when made, these assumptions are inherently subject to significant known and unknown risks, uncertainties, contingencies and other important factors which are difficult or impossible to predict and are beyond its control. Such risks, uncertainties, contingencies and other important factors could cause the actual results of Galp Energia or the industry to differ materially from those results expressed or implied in this presentation by such forward-looking statements. The information, opinions and forward-looking statements contained in this presentation speak only as at the date of this presentation, and are subject to change without notice. Galp Energia does not intend to, and expressly disclaim any duty, undertaking or obligation to, make or disseminate any supplement, amendment, update or revision to any of the information, opinions or forward-looking statements contained in this presentation to reflect any change in events, conditions or circumstances. 15 Capital Markets Day - March 14th 2011