LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Similar documents
Porter County Plan Commission

City of Massillon Site Plan Checklist

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

CHAPTER 11. Plan Standards

Washington County Road Engineering Plan Submittal/Review Checklist

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

CITY OF MUSKEGO DRAFTING STANDARDS

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Subdivision Application Checklist

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

List of Figures. List of Forms

PLANNING AND DEVELOPMENT

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

Site Plan/Building Permit Review

Essential Skills: Reading and Interpreting Maps and Plans

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

Application for Site Plan Review

APPLICATION FOR SITE PREPARATION PERMIT

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

CONCEPT REVIEW GUIDELINES

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

Town of Westlake Construction Plans Review Checklist

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

MAJOR GRADING PLAN CHECKLIST

City of Starkville Development Review Committee Infrastructure Drawings Submittal Checklist for Site Plan Applications

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

PRELIMINARY PLAT CHECK LIST

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

1.1 GENERAL RECORD DRAWING REQUIREMENTS

KC Water Rules and Regulations For Water Main Extensions and Relocations

Plan Submittal and Review Checklist

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SECTION SITE SURVEYS

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

3. DESIGN SPECIFICATIONS

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

Town of Apex, North Carolina

Chapter 13 Plan Submittals

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

Grease Interceptor Design Checklist

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Project Name: County File No.: Checked by: For: Date:

B17. Sewer Site Plans BULLETIN

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

TOWN of LAKESHORE SITE PLAN CHECKLIST

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

Minor Site Plan Application and Checklist Land Disturbing Activities

SITE PLAN APPLICATION

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

Conceptual, Preliminary and Final Site Plan Review in Holladay City

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Owner Information and Authorization:

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

Sewer Line Extension Permit Design Checklist

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

10010 RECORD DRAWING INFORMATION

PRECISE GRADING PLAN CHECKLIST

Clear Creek County Site Development

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Minor Site Plan Review Process

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Lincoln County Public Works Water and Sewer Submittal Application

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

Oil-Water Separator Design Checklist

MILL HILL ARTS VILLAGE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

Transcription:

MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST Project Title: Design Firm: Design Professional: Phone: Developer: Phone: Submittal Date: Original Submission ($300.00) 2 nd Submittal (No Fee) Submittal ($350.00) This checklist is provided to assist design professionals as a guide in the preparation of improvement plans for subsequent review by the County. It is not intended to be a complete listing of all Improvement Plan requirements or criteria. The checklist may be modified from time to time as deemed necessary by the County Engineer. Place a check mark in the appropriate box as each item is achieved, sign on the line provided and include as part of the Improvement Plan submittal package. ----------------------------------------------------------------------------------------------------- ATTACH IMPROVEMENT PLAN CHECK HERE VOID IF SUBMITTED WITHOUT CHECK ----------------------------------------------------------------------------------------------------- 1

Submission Requirements A pre-application meeting has been held. (Date: ) Development has received an approved Preliminary Subdivision Plat. (Improvement Plan approval will not be obtained until the development receives an approved Preliminary Subdivision Plat). 5 Copies of Plan o Existing Conditions o Layout o Grading & Drainage o Plan & Profile o Utilities o Erosion Control o Standard Details Construction, Water & Sewer and Erosion & Sediment Control. o Cross Sections Development of New Roads or Improvement of Existing Roads. 2 Copies of Hydrology Study including detention. 1 Copy of the Engineering Plan Review Checklist. (This document) Improvement Plan Review Fee of $300.00. Cover Sheet Project Name/Title. Site Location/Vicinity Map. Drawing Index. Land District/Land Lot. Design firm name, address, email, phone & fax number. Utility and Agency Contact Information Contact name & phone number. Typical Roadway Section Based on the Lowndes County Thoroughfare Plan and the classification of the road being constructed. Legend (may be on each sheet). Existing Conditions Boundary Survey North arrow, legend, scale, certified by P.E./PLS Benchmark Total Area 2

Tax Map & Parcel Numbers Current Zoning Adjacent Land Owners Existing Easements (Utility/Drainage) Existing Roads (Public or Private) o Name o Size of right-of-way o Thoroughfare Plan Classification Railroads o Name of owner o Size of right-of-way Existing Contour Lines (2-foot intervals) Prominent Drainage Features: Lakes, Streams, Ponds, Drainage Ditches, Depressions and Wetlands (Isolated and Jurisdictional). Wetland Delineation Lines o Name and certification of individual responsible for Wetland Delineation. o 25 Undisturbed Buffer Line Indicated. Groups and locations of trees. Locations of items to be removed and/or abandoned. o Septic Tanks (Note method of abandonment) o Wells (Note method of abandonment) o Power Poles o Driveways Layout Site layout o Proposed Lot Layout Lot Numbers Size of Lot (Square Footage) Setbacks (Front, Side & Rear) Minimum of 60 of Road Frontage Finished Floor Elevations for all lots adjacent to wetlands, detention ponds and open ditch drainage easements. o Proposed Streets Size of Right-of-Way o Proposed Easements Show 10 utility easement outside of right-of-way (Both sides of Road) Label Type of Easement (Utility and/or Drainage) 3

Size and Location o Proposed Water Bodies o Existing Wetlands o Delineation Line (Labeled) o 25 Undisturbed Buffer Line (Labeled) o High Water Elevation o Proposed Detention Ponds o High Water Elevation Grading & Drainage May be shown on Plan & Profile. Existing and proposed contour lines shown. Spot elevations. Minimum storm sewer pipe diameter equal to 18. RCP used under all paved areas. The use of CMP is prohibited. Identify all storm structures to include Georgia D.O.T. standard details. Pipe size, length and slopes are provided. Emergency Spillway included in detention pond design to include standard detail. Detail of outlet control structure. Elevations to match plans. Open ditch drainage easements minimum size 30. Piped drainage easements minimum size 20. Rip Rap (ST) found at the outfall of all storm pipes and emergency spillways. Plan & Profile North arrow, legend, scale (horizontal & vertical). Station Numbers. Match Lines. Horizontal Curve Data in accordance with AASHTO (Data to include Design Speed). Vertical Curve Data in accordance with AASHTO. Traffic Control Sign Design (Must include M.U.T.C.D. standard). o Stop Signs o Stop Bars (Thermoplastic) o Yield Signs o No Outlet o Pavement Ends o No Parking 4

Call out stationing of intersecting road centerlines. Show Plan & Profile of Sewer Main Run. Show Water and Storm Water Crossings. Radii of curbs. Cul-de-sac Radius (40 to EOP, 50 to ROW). Utilities May be shown on plan & profile. Water Main (In accordance with Standards & Specifications found in the utilities section of the Lowndes County Technical Standards Manual). o Size of Main o Length of Main o Method of Termination o Fire Hydrant Separation (As the Truck Travels) 600 in single family residential areas 500 in commercial, industrial, and multifamily residential areas. o Gate valves installed at a minimum 1,200 intervals. o Proper cover is achieved. o Proper separation from Storm and Sanitary Sewer. o Services shown to all lots. Sewer Main (In accordance with Standards & Specifications found in the utilities section of the Lowndes County Technical Standards Manual). o Size, length and slope of main. o Proper slope used for size of main. o Manhole spacing is < 400.00. o Manholes are found in the centerline of the road. o Positive flow maintained throughout system (.10 drop from invert in to invert out). o Indicate Drop Manholes and label as lined & Coated. o Proper cover is achieved. o Proper separation from Water Main and Storm Sewer is achieved. o Services shown to all lots. Lift Station & Force Main designed in accordance with Standards & Specifications found in the utilities section of the Lowndes County Technical Standards Manual. E-1 sanitary sewer system narrative notes and standard details are provided on plan in accordance with the Standards & Specifications found in the utilities section of the Lowndes County Technical Standards Manual. 5

Lowndes County Standard Details for utilities is provided as found in the utilities section of the Lowndes County Technical Standards Manual. (If you would like to obtain a copy of the Lowndes County Technical Standards Manual for Utilities contact 229-671-2500) Erosion Control Design criteria conform to the State of Georgia Manual for Erosion and Sediment Control, Fifth Edition 2000. All design has been done in accordance with Lowndes County Land Disturbance Activity Permit Application and Checklist. Please provide the following statement in bold print: Additional Erosion Control measures may be required by field Inspector. Cross Sections Cross section provided every 50 showing improvements along roadway and ditch. No damming of storm water behind curb. General Notes Must appear in bold print. All work shall be done in accordance with Lowndes County Standards and Specifications. Contractor shall notify the County Engineer at least 24 hours prior to the beginning of each phase of construction. Contractor shall notify the Lowndes County Utilities Department at least 24 hours prior to any connection to the Lowndes County Utility System. All extensions and additions to the County Utility System shall be performed by a Georgia Licensed Utility Contractor. A minimum of 18 of vertical and 10 of horizontal separation shall be maintained between all utilities. Any cross connection to the Lowndes County Water System is prohibited. All T s and Bends shall be Ductile Iron. General Requirements Lowndes County Encroachment Permit Required for all work being accomplished within Lowndes County right-of-ways. Georgia Department of Transportation Encroachment Permit Required for all work being accomplished within State of Georgia D.O.T. right-of-ways. 6

Letter of approval from the Army Corps of Engineers Cumulative Wetland Impacts totaling acreage of 0.10 or greater. Letter of approval or permission for encroachment from Utility Company Encroachment into or through an electric company s easement. Land Disturbance Permit A full Land Disturbance Permit and Application will have to be submitted, to the Lowndes County Engineering Department, if the proposed development will disturb 1.0 acre of land or more. o 4 copies of the Application and Checklist. o 4 copies of Erosion Control Plan. o 2 copies of the Storm Water Runoff Analysis. o 1 copy of the Notice of Intent and EPD Land Disturbance Fee Form. Water calculations provided To include fire flow using I.S.O criteria and pressure calculations. Sewer calculations provided. Lift Station & Force Main calculations provided. Hydrology calculations and gutter spread calculations provided. All plans shall be stamped, signed and dated by a Registered State of Georgia Engineer. The requirements of the Lowndes County Engineering Department are not limited to the above referenced checklist and notes. Additional or revised information and drawings may be required by the Lowndes County Engineering Department before approval and acceptance of submitted drawings and related materials. The submitted plans shall be in full compliance with the most recent versions of the following documents: Lowndes County Unified Land Development Code and the Lowndes County Technical Standards Manual. Project Title Design Professional Date 7