ClearSpan Mini Grab Bag Shelters

Similar documents
ClearSpan Mini Cold Frames

ClearSpan Mini Grab Bag Shelters

ClearSpan Attached-Style Awning

ClearSpan Grab Bag Canopy

Moo-Tel Small Animal Hut

WeatherShield Covered Walkway and Connect-A-Building

WeatherShield Daddy Long Legs Canopy

GrowSpan Round Cold Frames

ClearSpan Round Style Mini Garage

Moo-Tel Calf Hutch CLEARSPAN ANIMAL HOUSING W x 12 L W x 18 L W x 24 L

ClearSpan End Frame Kit 26' Wide x 12' High

ClearSpan Front Roll-Up Kit Installation Guide

ClearSpan PolyMax Windbreak Wall

ClearSpan Economy Round Style High Tunnel

ClearSpan SolarGuard Round Style Storage Building

ClearSpan 20' Wide Free-Standing Building

ClearSpan End Frame Kit 30' Wide x 11' High

GrowSpan Gothic Cold Frames

ClearSpan Cedar 12' Wide End Frame Kit with Dutch Door

Premium Solar Star Greenhouse

GrowSpan Round Premium High Tunnels

ClearSpan Open Garages

ClearView Panels Mil 3 Finished Sides with Grommets 1 Hem Side Mil 3 Finished Sides with Grommets 1 Hem Side DESCRIPTION

ClearSpan PolyMax Windbreak Wall

ClearSpan Corrugated Polycarbonate End Panel Kit

ClearSpan Twin-Wall Polycarbonate End Panel Kit

ClearSpan Majestic Greenhouse Film Roof with Roll-up Sides

GrowSpan Series 2000 End Wall Cladding Kits

GrowSpan Series 2000 End Wall Cladding Kits

ClearSpan Majestic Greenhouse Film Roof with Roll-up Sides

GrowSpan Series 1000 End Wall Cladding Kits

GrowSpan Series 1000 End Wall Cladding Kits

Assembly Guide for Series 500 Ridge Vent Kits

GrowSpan Round Premium Corrugated Greenhouses

ClearSpan 36' Wide Pony Wall Building

Sliding Door Kit

GrowSpan Estate Pro I Greenhouse

GrowSpan Gothic HobbyPro Greenhouses

ClearSpan Hydroponic Table Kit

ClearSpan 38' Wide Aircraft Hangar

ClearSpan Majestic Greenhouse Film Roof with Polycarbonate Sides

ClearSpan Super Moo-Tel Building 26' Wide

Double Truss Shelter Model# SST W9.14xL14.2xH4.88m Assembly Instructions

GrowSpan Round Pro Greenhouses and Systems

Moo-Tel Calf Nurseries

ClearSpan 34' Wide Aircraft Hangar

GrowSpan Heavy-Duty Commercial Cold Frame

GrowSpan Gothic Premium Greenhouses

GrowSpan Gothic Pro Greenhouses and Systems

Sliding Door Kit

GrowSpan Gothic Pro Greenhouses and Systems

GrowSpan Round Pro Greenhouses and Systems

GrowSpan Gothic Pro Greenhouses and Systems

6' Wide Premium Greenhouse Benches

GrowSpan Series 500 Automated Ridge Vent Kits

GrowSpan Gothic Pro Greenhouses and Systems

ClearSpan Pro Solar Star High Tunnels

ClearSpan Pro Solar Star Greenhouses

PASSIVE SOLAR-HEATED GREENHOUSE

ClearSpan Raised Bed Kits

Mini Brute Feed Bunks

GrowSpan Series 500 Door Kits

GrowSpan Series 500 Roll-Up Ends

ClearSpan Pro Solar Star High Tunnels

GrowSpan Single Swinging Door Black-Out Door Kit

Elite Home-Attached Greenhouse

6' Wide Premium Greenhouse Benches

EZ-Grow Professional Greenhouse Bench

GrowSpan Gothic Premium High Tunnels (All H Models)

Premium Low-Profile Benches for Dutch Buckets Single Row

GrowSpan 42' Wide Series 500 Tall High Tunnels with Roll-Up Sides

GrowSpan 24' Wide Series 500 Tall High Tunnels with Roll-Up Sides

Twin-Wall Double Swinging Door Kit

GrowSpan 30' Wide Series 500 Tall Greenhouses

ClearSpan 30' Wide Econoline Storage Building

Twin-Wall Double Swinging Door Kit

ClearSpan 30' Wide Pony Wall Building

WHITE - Accessories. Series 500 Greenhouse Kit w/blackout System, Ventilation & Evaporative Cooling

Insect Screen for Exhaust Fans

GREEN - Main Frame Film Cladding

Breathable Wall Light Traps & Blackout Fan & Shutter Kits

Blackout Fan Kits with Breathable Wall Light Traps

RED - Main Frame. Series 500 Greenhouse Kit w/blackout System, Ventilation & Evaporative Cooling

Assembly Guide for Over-The-Top Blackout System

Blackout Fan Kit with Breathable Wall Light Trap

ClearSpan Pro Solar Star Greenhouse

Blackout Fan Kits with Breathable Wall Light Traps

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

ClearSpan Twist-of-the-Wrist Assembly Instructions

Roof Only Lean-to Instruction Manual

Gazebo GZ3584 Aluminum Composite Roof Panels

111628W FodderPro 2.0 Full Feed System Wall Mount

11 x11 Pergola. Assembly Instructions. Paragon Group USA cm cm cm

Storage Master. Shed Row. Poly Buildings

Ledger Board Lean-to Instruction Manual

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

LAWN AND GARDEN GREENHOUSE

Transcription:

ClearSpan Mini Grab Bag Shelters Photo may show a different but similar model. Baseboard is not included. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 108162 4' W x 2' 9'' H x 6' L 108163 4' W x 2' 9'' H x 8' L 108164 4' W x 2' 9'' H x 12' L 108165 4' W x 2' 9'' H x 16' L 1

YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER. Thank you for purchasing this ClearSpan Grab Bag Shelter. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the grab bag shelter. Please read these instructions before you begin. If you have any questions during the assembly, contact Customer Service for assistance. SAFETY PRECAUTIONS Wear eye protection. Wear head protection. Wear gloves when handling metal parts. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords. Do not climb on the frame during or after construction. Do not occupy the structure during high winds, tornadoes, or hurricanes. Provide adequate ventilation if the structure is enclosed. Do not store hazardous materials in the structure. Provide proper ingress and egress to prevent entrapment. LOCATION Choosing the proper location is an important step before you begin to assemble the structure. The following suggestions and precautions will help you determine whether your selected location is the best location. Never erect the structure under power lines. Identify whether underground cables and pipes are present before preparing the site or anchoring the structure. Location should be away from structures that could cause snow to drift on or around the building. Do not position the structure where large loads such as snow and ice, large tree branches, or other overhead obstacles could fall. SITE After choosing a location, proper preparation of the site is essential. Follow the information below. A level site is required. The site must be level to properly and safely erect and anchor the structure. Drainage: Water draining off the structure and from areas surrounding the site should drain away from the site to prevent damage to the site, the structure, and contents of the structure. WARNING: The individuals assembling this structure are responsible for designing and furnishing all temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor. Anchoring the Frame Before installing a cover, the frame must be anchored to prevent personal injury and property damage. Anchor kits are not included with the shipment and must be purchased or supplied by the customer. Consult the MUST READ document for anchoring information and suggestions. Please call Customer Service at 1-800-245-9881 for additional anchoring information and to purchase anchors for your grab bag shelter. 2

ASSEMBLY PROCEDURE Following the instructions as presented will help ensure the proper assembly of your structure. Failing to follow these steps may result in an improperly assembled and anchored structure and will void all warranty and protection the owner is entitled to. The steps outlining the assembly process are as follows: 1. Verify that all parts are included in the shipment. Notify Customer Service for questions or concerns. 2. 3. Read these instructions, and all additional documentation included with the shipment before you begin assembling the structure. Gather the tools, bracing, ladders (or lifts), and assistance needed to assemble the structure. 4. Check the weather before you install the roof cover and any panels (if equipped). Do not install covers or panels on a windy or stormy day. 5. 6. 7. 8. 9. Re-evaluate the location and site based on the information and precautions presented in the documentation included with the shipment. Prepare the site (if applicable). Assemble the frame components in the order they are presented in these instructions. Properly connect the assembled frame to the ground posts. Install, tighten, and secure the main cover. (This applies to fabric and film covers that stretch over the frame assembly.) 10. Read the care and maintenance information at the end of these instructions. 11. Complete and return all warranty information as instructed. LIST OF WORDS AND PHRASES Before you begin, it is important to become familiar with the words and phrases used in this instruction manual. These words and phrases are common to most ClearSpan shelters and identify the different parts of the shelter. (Some are used in this document. Others may not apply to this particular shelter.) These terms describe the shipped parts and can also be found on the materials list/spec sheets included with the shipment. To aid in the assembly, read through the following definitions before you begin to assemble your shelter. CLEARSPAN GRAB BAG SHELTERS Clip or Fabric Clip: A short, half-section piece of conduit (cut lengthwise) used to secure the end panel or main cover (or both) to the leg or rafter assembly. The clip or fabric clip is typically fastened in place using self-tapping Tek screw. Conduit: An assembly of pipes used to secure the main cover and end panels (if equipped). Purlins and some strut assemblies also consist of connected pipes to form a conduit. Each pipe joint of a conduit assembly is secured with a self-tapping Tek screw. End Panel: Fabric or material used to cover the end wall assemblies. End wall assemblies are optional for many shelters. (Some shelters do not have end panels.) Main Cover: Fabric or material used to cover the roof and, in some instances, the sides of the shelter. Must Read Document: This document includes building and shelter anchoring instructions, steps for end wall reinforcement, safety precautions, and notices and warnings. The Must Read document is sent with all shelters and buildings. If you did not receive a Must Read document, contact Customer Service at 1-800- 245-9881 to request one. Purlin: The pipe assembly that runs perpendicular to the rafters or framework that supports the main cover. Purlins are found on the sides and roof areas of the assembled frame, are evenly spaced, and typically run from the front to the back of the shelter. Small shelters and frames do not include purlins. Plain or Straight Pipe: A term used to describe a pipe that has the same diameter throughout its entire length. Rafter: A rafter is an assembly of pipes used to support the roof or cover of a building or shelter. Rafters are typically the main component of a frame and consist of various sections depending on the size of the shelter. Rafters can be attached to a base assembly, or can be position on the site using ground posts. Swaged End or Swaged Pipe: The term "swaged" refers to the tapered end of the pipe. Swaged ends of a pipe can be inserted into couplers and the straight ends of other pipes. Tek Screw: A self-tapping fastener used to secure pipe joints and to fasten brackets to rafters. 3

REQUIRED TOOLS The following list identifies the main tools needed to assemble the shelter. Additional tools and supports may be needed depending on the structure, location, and application. Tape measure or measuring device String to lay out the site Variable speed drill and impact driver (cordless with extra batteries works best) Scissors, utility knife, or tin snips Hammers and gloves to drive ground posts Adjustable pliers Eye Protection Space below is reserved for customer notes. UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin to assemble the shelter frame. 1. 2. Unpack the contents of the shipment and place where you can easily inventory the parts. Refer to the Bill of Materials/Spec Sheets. Verify that all parts listed on the Bill of Materials/Spec Sheets are present. If anything is missing or you have questions, consult the Pictorial Parts Guide and all diagrams for clarification, or contact Customer Service. NOTE: At this time, you do not need to open the plastic bags containing smaller parts such as fasteners or washers (if equipped). SPECIAL NOTE: Baseboard Installation Procedure These instructions describe installing a baseboard (recommended) at ground level along each side of the frame. The baseboard runs from the front to the back of the frame on the outside of the ground posts. This baseboard is not included with the shipment and must be supplied by the customer. Treated or recycled plastic lumber can be used for a baseboard. The baseboard, when installed properly, helps prevent the ground posts from sinking into the ground when anchored. Depending on the building, it also provides a surface to attach struts or other building components. Consult these instructions, or contact Customer Service for additional information regarding baseboards. 4

The following diagrams and photos will help you identify the different parts. (Some parts are not shown.) FA4482B Tek Screw 104545 Post Driver 105107 Fabric Clip 100441 Nut Setter Plain Swaged 104543 Ground Post Swaged and Plain Rafter Sections 5

ClearSpan Mini Grab Bag Shelter OVERVIEW This section describes assembling your Mini Grab Bag Shelter. For details of each assembly procedure, consult the individual sections of these instructions. See illustration below to identify main parts of the grab bag shelter. 1. 2. 3. 4. 5. Locate the required parts for each assembly procedure. Assemble the rafters and frame. Anchor the frame. Attach recommended baseboards. (Supplied by customer.) Attach cover film. Interior Rafter End Rafter Ground Post Customer- Supplied Baseboard Shelter shown above may be of a different length than actual shelter. 6

Lay Out the Building Site After the site is prepared, lay out the grab bag shelter position on the site. Taking these steps before assembling the shelter saves time and ensures that the structure is positioned as desired. Drive ground posts to the same depth. Width of the shelter is measured from the center of one ground post to the center of the remaining ground post. Square the Site Gather the parts: Ground posts (#104543) Tek screws (#FA4482B) 4. CLEARSPAN GRAB BAG SHELTERS String a line at least as long as the building from the first stake at 90. NOTE: A transit can be used to ensure an accurate 90 angle, or the 3-4-5 rule can be used. Refer to diagram. Using multiples of 3-4-5 such as 6-8-10 or 12-16-20 helps to maintain an accurate 90 angle. 1. Identify a corner where a ground post will be positioned and drive the first ground post into the ground. 2. NOTE: Insert the ground post driver (104545) into the top of the ground post to protect the post and drive the post into the ground. The top of the post must be six (6) inches above the finished grade when properly driven. After the first corner ground post is in place, string a line the width of the building (4' center-to-center) and drive the second ground post into the ground just enough to hold it in place. 5. After squaring the position of the grab bag shelter, measure the length and drive the next corner ground post. NOTE: Rafter spacing is 2' on-center. Measure the length from the center of the first ground post to the center of the last ground post on the same side of the shelter. 6. Repeat Step 5 for the last corner post. Rafter Pipes NOTE: The distance measured diagonally between corner posts must be equal for the building to be square. 3. 4' center-to-center NOTE: Rafter width is measured from the center of one rafter leg to the center of the other rafter leg as shown. Use a transit or line level to drive the second corner post to the same depth as the first ground post. 7. 8. 9. Check all dimensions (and adjust if needed) before driving the remaining posts to the required height. After all corner posts are accurately installed, tie a string line between the tops of the corner ground posts on the same side of the shelter. The string is used to identify the tops of all remaining ground posts. The string must remain tight and level. Use a tape measure to mark the two (2) feet on-center locations of the remaining ground posts. 10. Drive the remaining ground posts into the ground at the required two (2) feet on-center width and the height identified by the string. NOTE: Verify that each post is plumb and driven to the correct depth. 11. Continue with the Rafter Assembly steps that follow. 7

ASSEMBLING THE FRAME COMPONENTS NOTE: Assistance may be required to assemble the frame. RAFTER ASSEMBLY Gather the parts: Rafter pipe (#04R105P1) Rafter pipe (#04R105S2) Tek screws (#FA4482B) Nut setter (3/8'' x 2-9/16" magnetic) Rafter Assembly Procedure Each rafter assembly consists of two (2) rafter sections. 3. With the main rafter pipes seated at the joint and the rafter positioned on a flat surface, secure the joint using a single self-tapping Tek screw. Position Tek screw approximately 1" from pipe joint. 1" Tek screw 1. Select the two (2) pipes needed to assemble a rafter and arrange these on a flat surface as shown below for assembly. ATTENTION: Install the screws so they will not touch the cover once it is installed. This is typically on the backside of the rafter, which will be the surface visible from the inside of the shelter once the frame is assembled. 4. Repeat the same steps for the remaining rafters. (04R105P1) (04R105S2) 5. Determine how much of the rafter leg you want to insert into the ground post and mark this length on each leg of each rafter. This will ensure that all rafters are set into the ground posts at the same depth. Rafter Leg Mark here. 2. Slide the swaged portion of each rafter pipe into the plain end of the pipe as shown. Minimum of 6" 6. After the rafters are assembled and marked, continue with assembling the frame. 8

FRAME ASSEMBLY Gather the parts: All rafter assemblies Tek screws (#FA4482B) Frame Assembly Procedure 1. 2. With assistance, carefully stand the first rafter assembly and place the leg pipes into the first set of ground posts. Lower the rafter legs into the ground posts to the marked lines on the pipes and secure the rafter to the ground post using Tek screws. Outside of Shelter Rafter IMPORTANT: Position the Tek screws on the inside of the ground post so they do not interfere with the installation of the cover. CLEARSPAN GRAB BAG SHELTERS ANCHOR THE ASSEMBLED FRAME At this point, anchor the grab bag shelter. Consult the MUST READ document for anchoring information and suggestions. Please call customer service at 1-800-245-9881 for additional anchoring information. CAUTION: The anchor assembly is an integral part of the grab bag shelter construction. Improper anchoring may cause instability and failure of the structure to perform as designed. Failing to anchor the shelter properly will void the manufacturer s warranty and may cause serious injury and damage. Space below reserved for customer notes. Ground Post Inside of Shelter 3. Install the remaining assembled rafters in the ground posts and secure these as previously described. 2' on-center Customer-Supplied Baseboard Actual frame length may differ from what is shown in the above diagram. Frame diagram shows the ground posts attached to the rafter legs and customer-supplied baseboard. 4. After the frame is assembled as shown above, use duct tape to tape any sharp edges or Tek screws that could damage the cover when installed and continue with the cover installation procedure. 9

INSTALL THE MAIN COVER The main cover is attached to the assembled frame using fabric clips (105107) and Tek screws. It is attached to the end rafter assemblies. Complete these steps. 1. 2. Locate the fabric clips and the Tek screws needed to attach the main cover. Divide the quantities of each in half. Locate the main cover and unfold it next to the assembled frame. 6. 7. Once the cover is attached to one end rafter, move to the remaining end, stretch the cover in place, and secure it as previously described. Continue by attaching the cover to the customersupplied baseboard, if used. ATTACH COVER TO BASEBOARD (if used) Use customer-supplied dimension lumber as a retaining board for the lower edges of the cover. The retaining board must be at least 1" x 2" to adequately secure the cover to the baseboard. 3. NOTE: It is easiest to install the cover when there is no wind. Use additional help to secure the cover if needed. With adequate assistance, pull the cover over the frame and center it front-to-back and side-to-side on the frame. NOTE: If no baseboard is used, skip this section and read the "No Baseboard: Secure Main Cover Along The Sides" section. 1. Move to the bottom of the cover and with assistance, evenly stretch the cover end-to-end along the baseboard. Outside View Main Cover 4. Shelter shown above may be of a different length than actual shelter. Take a fabric clip and Tek screw and attach the cover at the peak on the front side of an end rafter as shown below. Baseboard and Retaining Board 2. Take the first section of customer-supplied retaining board and place it against the cover and the baseboard to hold the cover in position. NOTE: Evenly and gently pull the cover edge down to remove wrinkles. Tek screw Fabric clip 5. Continue working down the end rafter to secure the main cover. NOTE: Use one-half of the fabric clips on one end of the shelter and the other half on the remaining end. 10

INSTALL MAIN COVER (CONTINUED) 3. 4. 5. Using the customer-supplied fasteners, secure the retaining board to the baseboard as shown.. Outside View Main Cover Space fasteners at 24" m/l Retaining Board Lower Edge of Main Cover Repeat the steps to attach the cover to the other side of the building. Continue by reading the Shelter Care and Maintenance information. NO BASEBOARD: SECURE MAIN COVER ALONG THE SIDES CLEARSPAN GRAB BAG SHELTERS SHELTER CARE AND MAINTENANCE Proper care and maintenance of the shelter is important. Check the following items periodically to properly maintain the shelter: Check the ground posts and anchoring system to see that all components are tight and in good repair. Check connections and all fasteners to verify that they remain tight. Verify that all connections and connectors are secure. Tighten these if necessary. Check the cover material to verify that it is in good repair. Do not climb or stand on the grab bag shelter at anytime. Remove debris and objects that can accumulate on the grab bag shelter. Use tools that will not damage the cover when removing debris. Remove snow to prevent excess accumulation. Use tools that will not damage the cover when removing snow. Check the contents of the shelter to verify that nothing is touching the cover that could cause damage. If the grab bag shelter is moved, inspect all parts and connections before reassembling. Check the ground posts to ensure that they do not work out of the ground. For replacement or missing parts, call 1-800-245-9881 for assistance. NOTE: With the exception of Truss Arch buildings, ClearSpan shelters and greenhouses do not have any tested loading criteria. If no baseboard is used, secure the main cover by placing heavy objects against the rafters along the sides. Heavy Objects Actual frame may differ in length and model than frame shown. Diagram is for illustration purposes. 11

2'9" Height 4' Wide Grab Bag Shelters Frames are shown with the recommended customersupplied baseboard. 4'0" Width FRONT Grid Represents 12" Squares Actual frame may differ in length from frame shown. 12

04R105P1 104543 Ground Post FRONT PROFILE 105107 Fabric Clip 04R105S2 104543 Ground Post 13

2'0" Rafter On-Center Spacing SIDE PROFILE - 108162 6'0" Length Center-to-Center 14

2'0" Rafter On-Center Spacing SIDE PROFILE - 108163 8'0" Length Center-to-Center 15

2'0" Rafter On-Center Spacing SIDE PROFILE - 108164 12'0" Length Center-to-Center 16

2'0" Rafter On-Center Spacing SIDE PROFILE - 108165 16'0" Length Center-to-Center 17

Fabric Clip Tek Screw Ground Post Rafter Tek Screws CONNECTIONS Tek Screw 18

Space below is reserved for customer notes. 19