HOW IMPORTANT IS THE NATIONAL CONTEXT IN PLANNING ROMANIAN GEOLOGICAL DISPOSAL?

Similar documents
Development of the Strategic Research Agenda of the Implementing Geological Disposal of Radioactive Waste Technology Platform

GOVERNMENT OF ROMANIA

Application and adaptation of mature geological disposal concepts to less advanced programmes

SAFETY ASSESSMENT METHODOLOGIES AND THEIR APPLICATION IN DEVELOPMENT OF NEAR SURFACE WASTE DISPOSAL FACILITIES ASAM PROJECT

European Initiative: Implementing Geological Disposal of Radioactive Waste Technology Platform IGD-TP

Sustainable Network of Independent Technical Expertise for Radioactive Waste Disposal (SITEX)

SWEDEN. Statement. H.E. Ambassador Mikaela Kumlin Granit. International Atomic Energy Agency. General Conference. 62 nd session.

WM2015 Conference, March 15 19, 2015, Phoenix, Arizona, USA

A SYSTEMIC APPROACH TO KNOWLEDGE SOCIETY FORESIGHT. THE ROMANIAN CASE

Stakeholder Involvement. Nuclear Issues. INSAG and IAEA perspective BASIS FOR KNOWN PUBLIC CONCERN. INSAG-20 Stakeholder Involvement in

WG1 - Industrialisation and optimisation

Goals, progress and difficulties with regard to the development of German nuclear standards on the example of KTA 2000

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Planning of Knowledge Management System for Decommissioning of Nuclear Facilities

Radiological Protection: Old Questions Needing New Answers

The creation of the Emergency Preparedness and Response Expert Group (EPREG) which held its second meeting last month.

Torsti Loikkanen, Principal Scientist, Research Coordinator VTT Innovation Studies

Working together to deliver on Europe 2020

STRATEGY FOR SAFETY CASE DEVELOPMENT: IMPACT OF A VOLUNTEER APPROACH TO SITING A JAPANESE HLW REPOSITORY

COUNCIL OF THE EUROPEAN UNION. Brussels, 18 May /06 Interinstitutional File: 2005/0044 (CNS) RECH 130 ATO 48 COMPET 129

The Norwegian Context PTIL/PSA 1

At its meeting on 18 May 2016, the Permanent Representatives Committee noted the unanimous agreement on the above conclusions.

HUMAN RESOURCE DEVELOPMENT STRATEGY NATIONAL NUCLEAR ENERGY AGENCY INDONESIA For FNCA Human Resource Development 2003 Guritno Lokollo

Proposal for the IGD-TP Knowledge Management Portal

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

Integration of MGDS Design into the Licensing Process' This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design

Stakeholder involvement in Canadian Initiatives for Deep Geological Repositories for the Long Term Management of Radioactive Wastes

Education and Training in Nuclear Decommissioning

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

2. At its meeting on 3 November 2008, the Working Party reached agreement on the attached draft conclusions.

Co-operative Programme on Decommissioning Projects CPD. Jean-Guy Nokhamzon CEA/DEN/DPA

Improving Education, Training and Communication with the Public on Ionizing Radiation

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.

Principle Administrator: Claudio PESCATORE

ENRESA (National Enterprise for Radioactive Waste)

ETSON: Role and activities for harmonizing safety assessment practices. Benoit De Boeck ETSON President. N2017 ETSON - Pitesti (May 2017) 1

IV/10. Measures for implementing the Convention on Biological Diversity

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

NERIS Platform An attempt to enhance European response to and recovery from radiological emergencies

IGD-TP's Eighth Exchange Forum

Work package 4: Towards a virtual foundry

Raw Materials: Study on Innovative Technologies and Possible Pilot Plants

The NUMO Strategy for HLW and TRU Waste Disposal. K. Kitayama, Y. Oda Nuclear Waste Management Organization of Japan (NUMO) Tokyo, Japan

Communication and social aspects in D&WM program

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION RECOMMENDATION

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

(INPRO CP SYNERGIES)

Information Sheet. A. Background. IAEA Headquarters Vienna, Austria. 3 7 September Ref. No: EVT

The UK Generic Design Assessment

INTERNATIONAL WORKSHOP ON ADVANCED REACTOR SYSTEMS AND FUTURE ENERGY MARKET NEEDS

KNOWLEDGE MANAGEMENT. IAEA Program and Activities on NKM. Keiko Hanamitsu, Nuclear Knowledge Management Section Department of Nuclear Energy, IAEA

FUTURE IAEA ROLES IN SUPPORT OF SUSTAINABLE NUCLEAR ENERGY. Roberto Cirimello Argentina

10246/10 EV/ek 1 DG C II

The Concept of Oversight, its Connection to Memory Keeping and its Relevance for the Medium Term: The Findings of the RK&M Initiative

Item 4.2 of the Draft Provisional Agenda COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE

Guide to Water-Related Collective Action. CEO Water Mandate Mumbai Working Session March 7, 2012

International Radiation Protection Association (IRPA)

International Cooperation in Strengthening Nuclear Security Capacities within Public Company Nuclear Facilities of Serbia

demonstrator approach real market conditions would be useful to provide a unified partner search instrument for the CIP programme

Publishing date: 22/12/2014 Document title: ACER Opinion on the draft ENTSO-E Work Programme We appreciate your feedback

University of Massachusetts Amherst Libraries. Digital Preservation Policy, Version 1.3

WG1 - Industrialisation and optimisation

MINISTRY OF ENERGY AND PETROLEUM (MPE) ON NORWAY S PETROLEUM ACTIVITIES: WHITE PAPER (2011) AND THE STATE

Contribution of civil society to industrial safety and safety culture: lessons from the ECCSSafe European research project

Pakistan Nuclear Regulatory Authority

MINERVA: IMPROVING THE PRODUCTION OF DIGITAL CULTURAL HERITAGE IN EUROPE. Rossella Caffo - Ministero per i Beni e le Attività Culturali, Italia

Building the ERA of Knowledge for Growth. Proposals for the 7 th Research Framework Programme

Kohta Juraku Department of Nuclear Engineering and Management

Foresight Impact on Policy making and Lessons for New Member States and Candidate Countries Insights from the FORLEARN mutual learning process

Strategy for a Digital Preservation Program. Library and Archives Canada

Please send your responses by to: This consultation closes on Friday, 8 April 2016.

Improving Nuclear Emergency Preparedness and Response the Need to Exercise. Abstract

EXPLORATION DEVELOPMENT OPERATION CLOSURE

North Sea Safety Regulators responses to Macondo/Montara

COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the

SAFETY CULTURE IN VIET NAM

Implementing the International Safety Framework for Space Nuclear Power Sources at ESA Options and Open Questions

Iran's Nuclear Talks with July A framework for comprehensive and targeted dialogue. for long term cooperation among 7 countries

Committee on Development and Intellectual Property (CDIP)

Maldives: Strengthening Capacity for Operations Management

Department of Energy s Legacy Management Program Development

DEVELOPMENT OF SCIENCE, TECNOLOGY, AND INNOVATION IN UKRAINE Oleg Khymenko

WM2013 Conference, February 24-28, 2013, Phoenix, Arizona, USA

Public Involvement in the Regional Sustainable Development

SASAR POSITION PAPER ON: GREEN PAPER ON A COMMON STRATEGIC FRAMEWORK FOR FUTURE EU RESEARCH AND INNOVATION FUNDING

Our position. ICDPPC declaration on ethics and data protection in artificial intelligence

A Research and Innovation Agenda for a global Europe: Priorities and Opportunities for the 9 th Framework Programme

(EC) ), 11(8) 347/ /2009, (EC)

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

Procedia - Social and Behavioral Sciences 156 ( 2014 ) 58 62

Social Sciences and Humanities in the Framework Programmes

An overview of the activities of the CNRA* Working Group on Public Communication of Nuclear Regulatory Organisations (WGPC)

4th BioHorizon International Brokerage Event 26 th of June Fare clic per modificare lo stile del titolo

Conclusions concerning various issues related to the development of the European Research Area

Decommissioning conduct Working Group

National Standard of the People s Republic of China

Vienna Declaration: The most needed social innovations and related research topics

STI OUTLOOK 2002 COUNTRY RESPONSE TO POLICY QUESTIONNAIRE CZECH REPUBLIC. 1. General framework and trends in science, technology and industry policy

EuropeAid. Sustainable and Cleaner Production in the Manufacturing Industries of Pakistan (SCI-Pak)

Transcription:

HOW IMPORTANT IS THE NATIONAL CONTEXT IN PLANNING ROMANIAN GEOLOGICAL DISPOSAL? V. Andrei- AREN I. Prisecaru- UPB 7th Annual International Conference on Sustainable Development through Nuclear Research and Education NUCLEAR 2014 28-30 May 2014 Pitesti, Romania

CONTENT I. IMPORTANCE OF THE NATIONAL CONTEXT IN GEOLOGICAL DISPOSAL II. SYSTEMATIC APPROACH THROUGH A PESTEL ANALYIS IN ROMANIAN NGR PROGRAM

I. IMPORTANCE OF THE NATIONAL CONTEXT IN GEOLOGICAL DISPOSAL

Introduction/Context towards a decision for a GR program By general consensus, geological disposal (GD) is the solution for the backend of the open or closed nuclear fuel cycles. The process for siting a geological repository (GR) started early in 80s and where it successfully concluded with an approved site it has taken about 25-30 years. First geological repositories are planned to be commissioned by 2025 (Finland, Sweden, France). This means that currently, a reasonable time duration for commissioning a GR might be considered to last about 35-40 years. Governmental commitment for effectively starting a GR program is a major prerequisite to have trust on the reasonability of the schedule. [A French expert declaration in IFNEC Meeting in Bucharest, May 2014] Further to the in principle-declarations and declarations of support for organization responsible with GD, the Governmental commitment, in fact the State commitment, might need to be highly substantiated. Reason for that is the reality of several national GR programs which have registered failures in schedules or even reconsidered the siting process.

Approach to failure of a GR program Formally, reasons for suspension or reconsidering of GR programs were due to insufficient support from the society [ the objections of local mayors and environmental groups had not been properly considered. (Czech Rep. Environ. authority- Jan. 2014)] No technical reasons were invocated in suspending the programs. However, technical activities obviously, have been jeopardized by these decisions. In the case of the advanced programs (e.g. USA, Canada, UK) that were delayed/suspended there has been a tremendous existing luggage of valuable work done and experience for learning from feedback or lessons learned and these supported reconsideration of the programs. The intrinsic national capacity for adapting and setting such kind of situations also played a crucial role.

Approach to failure of a GR program(cont d) Background for handling delays/failures in GR program might not be relevant in some cases in countries which are at the beginning of GD implementation. [ we do not know from where to start again a Czech governmental official said in a meeting organized within the Euratom FP7 IPPA project, in Prague, in Sept. 2013] International knowledge and experience is tremendous and international cooperation is necessary during development of a GR program. However, international expertise could not guaranty that delay/failures would not appear. So, where to look more to find out why failures happened?

Questions and potential answers in case of GR program failures 1. Where might have been weak points which were not proper addressed or at all? Answer: In any international standard and report, national specificity is recognized as an important factor to be taken into account when approaching the geological disposal. The national specificity exceeds the competence and environment of the organization responsible for GD. If the analysis of national context to develop the repository program was not well defined, acknowledged and addressed by the Governmental factors/state from the elaboration phase of the program, a failure in GR program might be possible.

Questions and potential answers in case of GR program failures (cont d) 2 Should these weaknesses concentrate to the social acceptance field? Answer: Weaknesses should not only concentrate to the social acceptance field. There is not a guideline on what national specificity means and there are not criteria allowing to make it proper for developing the program. Hence, a systematic analysis should be approached to identify weakness.

Questions and potential answers in case of GR program failures (cont d) 3 Are these weaknesses easy to handle? Answer: In fact, weakness could be risks that have high likelihood to trigger or some of them are already triggered. To handle all of them might also need a systematic approach. Remarks: The answers in detail are not at all easy. Case by case, an expert analysis is necessary. International expertise could help to answer in many aspects. However, there might be some parts of the answers that traditional international expertise could entail large uncertainties in any analysis made on a very early national GR program. A systematic study of the national context for developing a sustainable NGR program might be strongly recommended.

Systematic approach of the NC vs. seeing and do approach We define here Seeing and do approach which means the management identify and handle the issues: i) on a case by case basis, when activity or action of the program is planned or ii) during the implementation of activity(ies) or action(s) of the program when impact of issue(s) is encountered. i) Evolution of existing GR programs indicates to analyze issues as early as necessary and in an integrated manner. ii) Not recommended In support of a systematic approach Potential issues of the national context are mentioned in standards and guidelines but their enunciation or description might be general. They could represent start points for analysis but real issues could be in more depth of the aspects of the national context.

Systematic approach of the NC vs. seeing and do approach (cont d) Real issues could be picked up from other national experiences but: These needs every time expertise to detect them, Most of the time are time consumers and When identified, it might be late to apply their treatment solutions The real issues picked up from other national experiences might have different weaknesses/causes in the country preparing a GR program. The individual issues or different weakness are often interrelated and the interrelations could not be easily recognized or they can be seen only by a knowledgeable eye. To identify, analyze and handle the issues there is a need to involve experts with extensive knowledge on how the national context acted in other nuclear projects and extensive background to propose effective treatment solutions inspired adopted both from national and international experiences. There might a problem to get them every time they are necessary.

Systematic approach of the NC vs. seeing and do approach (cont d) How deep systematic approach should be? Keep it simple even it might involve complex matters. Concentrate on issues of the national context that represents or could evolve in significant risks. Use tools and expert/engineering judgment that facilitates: Analysis and identification of significant risks; Identification of causes that need treatment between risk breakdown structures; and A staged approach for optimizing treatment of the risks

II. SISTEMATIC APPROACH THROUGH A PESTEL ANALYIS IN ROMANIAN NGR PROGRAM

Romanian NGR strategy In Romania, on-map and desktop studies for identification of potential host rock for a geological disposal repository have been initiated since 1995. During 2008-2009, based on preliminary investigations and international experience a deep geological repository strategy for commissioning the NGR in 2055 was elaborated by Romanian experts supported by IAEA experts. The strategy schedule is delayed today. The intention of this presentation is not to provide reasons for delays but it is in support of a more systematic approach based on efficient tools and expert judgment to develop the NGR program.

SWOT or PEST Analysis? SWOT Analysis Situation analysis in which internal strengths and weaknesses and external opportunities and threats faced by it are closed examined to chart a strategy. SWOT stands for strengths, weaknesses, opportunities and threats. PEST Analysis A type of situation analysis in which political-legal (governmental stability, spending, taxation), economic (inflation, interest rate, unemployment ), socio-cultural (demographics, education, income distribution), and technological (knowledge, generation, conversion of discoveries into products, rates of obsolescence) factors are examined to chart an organization s long-term plans. (http://www.businessdictionary.com/definition/)

PESTEL Analysis A PESTEL (PEST+ Environmental and Legal) analysis was made being: a first approach of the geological disposal field in Romania a tool for an audit of the national context allowing in principal the identification of those issues induced by the luggage of national specificity with potential impact on program elaboration. based on targeted information from several international standards, studies and reports and a comprehensive information from formal and public documents related to the development of the project of a geological repository in Romania.

The process adopted in the PESTEL analysis For each factor of the PESTEL analysis there were identified aspects characterizing the current national environment for initiating the NGR program. Limitations Accent has been put on screening issues that are outside or beyond the control of a single organization having main responsibilities in disposal of radioactive waste in Romania (i.e. ANDR) by law. Note: There were not considered any internal risks within the environment of the current ANDR organization in relation with any external factors identified in the PESTEL analysis. It was assumed the NGR program will be elaborated by a dedicated organizational structure established and empowered by ANDR and its supervisory Ministry. A realistic horizon for analysis of the national context was considered from elaboration of the NGR program till the stage of construction license.

The process adopted in the PESTEL analysis (cont d) The aspects describing the current national environment mainly resulted from a knowledgeable and attentive combination of the following: Screening the PESTEL analyses factors recommended for development of large projects/business that can be appreciated similar with the project of a geological repository; Observation of a PEST analysis made for US nuclear industry; Taking into account applicable questions and answers from the questionnaire on geological disposal issued under IAEA GEOSAF II project; Observation of state-of-art in geological disposal planning at international level by using international standards and reports published by IAEA, OECD/NEA or EC; Overview of the lessons learned/issues specific to the development of new built nuclear projects (e.g. lessons learned from EIA process for Cernavoda Units 3&4, environmental and safety licensing of Spent Fuel Interim Storage Facility DICA).

Identified aspects for characterizing the current national environment POLITICAL Political parties opinions Radioactive waste disposal strategy Financing of national radioactive waste disposal strategy Roles of institutions involved in radioactive waste management IAEA and EC Taxes SOCIAL Decision and responsibility Organizational legitimacy Public participation Nuclear industry s liaison with public Antinuclear NGOs ENVIRONMENTAL Approach for SEA and EIA processes Environmental licensing procedure ECONOMICAL Interest rates Inflation Economical growth Exchange rate Level of accumulated financial resources and financing mechanisms for their increases TECHNOLOGICAL Status of radioactive waste geological disposal Preliminary phase in geological disposal repository program Medium term strategy for nuclear spent fuel and long-lived radioactive waste LEGAL Specific regulations in nuclear field Licensing/Approval of repository siting Environmental Agreement Correlation between legislative requirements preceding approval of siting in Parliament

Several important issues resulted from the PESTEL analysis Several important issues likely to develop significant risks in NGR program if not addressed are further presented (Source: CIEM 2013, The use of PESTEL analysis in development of the Romanian Geological Repository). POLITICAL ECONOMICAL SOCIAL Political decision on continuation of nuclear power program at Cernavoda NPP should be substantiated. It is not clear if the revision of national energy strategy announced by Government will include capacity for a new NPP. National research strategy for 2014-2020 should include objectives that allow building national research and development capacity in deep geological disposal of radioactive waste. The funds collected from actual operational Cernavoda NPP units are kept in deposits at State Treasury in Ro lei with a low interest annual rate of 2%. During the period 2007-2013, the evolution of inflation and interest rate globally affected the financial resources collected for radioactive waste disposal. Decision and responsibility on developing and implementing a geological disposal program are concentrated at Government and State authorities levels. There is no experience on public involvement in the decision making process for projects with a long time horizon and needing extensive research-development to be confirmed such as the NGR project is (see today s confusions registered in the debates of shale gas explorations/exploitations).

Some important issues resulted from the PESTEL analysis (cont d) TEHNIC ENVIRONMENTAL LEGAL The Romanian Deep Geological Repository Strategy (2009-2055) has to be updated. Foreign expertise can help with how to build the NGR program but for national specific aspects many of them treated in this PESTEL analysis understanding of things, identification of problems and their solving are very difficult to come from outside. In Romania there is no experience in Strategic Environmental Assessment or Environmental Impact Assessment processes for a radioactive waste repository. Environmental requirements have to be correlated and integrated with other requirements mainly those introduced by the Nuclear Regulatory Authority-CNCAN for the different stages of licensing. Presently, there are no any specific regulations in the field of geological disposal The present legal requirement (Ordinance No. 7/2003 modified and approved by Law 57/2006) that siting of radioactive waste disposal facilities is approved by law (by Parliament) on the basis of National Strategy for developing the nuclear field and licenses issued by the Regulatory Body.

Follow-up to PESTEL analysis The focus of PESTEL analysis usually is on identifying the issues rather than trying to resolve them. In this PESTEL Analysis: Broadly implications of each issue that might evolve in a certain risk for developing the NGR program have been described ( Analysis of NC and identification of issues -1 st step in a risk management process) Description of issues has allowed identification and analysis of potential risks (impact) for NGR program (Risk identification and risk analysis-2 nd and 3 rd steps in a risk management process) The description of issues has revealed clear needs to address incipient solutions for some significant risks very early in the elaboration of the NGR program. Questions such as: which are these risks, how to priorities them, what treatment solutions to adopt or how to integrate these solutions in a rational manner, need more systematic study and for providing answers extensive knowledge and expertise are needed. The PESTEL analysis could become an integrative part of a risk management process.

Communication/consultation Documentation Feedback/ New information Follow-up to PESTEL analysis (cont d) Assessment of national context and identify issue Risk identification Risk Analysis Risk treatment National Context Risk Management Process scheme

Conclusions National specificity is recognized as an important factor to be taken into account when approaching the geological disposal. In authors opinion, in case the analysis of the national context to develop the geological repository program has been not well defined, a failure in program could be early possible. The PESTEL analysis in Romanian geological disposal: has proven being an optimum tool for describing and identifying issues of the national context to developing the NGR program, could become an integrative part of a risk management process for developing a sustainable NGR program. Further to the PESTEL Analysis, a national context risk management process could be further defined to allow treating risks in an integrated manner since a case by case approach increases likelihood of failures.

THANK YOU FOR YOUR ATTENTION! veronica_andrei@yahoo.com prisec@gmail.com

Other authors papers on same topics: Veronica ANDREI, Ilie PRISECARU, The use of Pestel analysis in development of the Romanian Geological Repository, U.P.B. Sci. Bull., Series C, Vol. 76, Iss. 4, 2014, ISSN 2286-3540. Veronica Andrei, Ilie Prisecaru, Risk Management Process for National Geological Repository Program, WEC CENTRAL & EASTERN EUROPE REGIONAL ENERGY FORUM FOREN 2014, 22-26 June 2014, Bucharest, Romania, PROCEEDINGS - PAPERS AND POSTERS ISSN-L: 2284-9491 Contact the authors or access on Internet: http://www.scientificbulletin.upb.ro, and look for Series C - Number 4 2014 http://www.cnr-cme.ro/foren2014/, on main page: Presentation an photos, link http://www.cnrcme.ro/foren2014/presentations_and_photos_2014.html, and download FOREN 2014 PROCEEDINGS - PAPERS AND POSTERS, respectively Reference no: s3-45-en