ADVANCED WATER AND MOISTURE BARRIER SYSTEM

Similar documents
I n s t a l l a t i o n I n s t r u c t i o n s

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Butyl Flash. Installation Instructions. Prep & General Conditions

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

WindowSeal. Installation Instructions. Prep & General Conditions

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

ForceField Air & Water Barrier System. installation instructions

How To Install Windows: Nail-Fin Application

Eagle clad double-hung window installation instructions

Providing 3 Layers of Protection

All Window Installation Instruction

Integrity Polygon and Round Top Installation and Finishing Instructions

Before installation, check your local and state requirements for this type of install.

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2

Installation of Fiberglass Windows

New Window. in an Old Opening. A leak-free installation depends on compatible materials and multiple layers of defense

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Vinyl Windows and Doors Manufactured by Pella Corporation

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Tools required by installer: Materials required by installer:

Pocket Door Installation Instructions

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

United States 32" Features and Benefits of WEATHERMATE Sill Pan

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

DuPont Flashing Systems Installation Guidelines

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

UNIT 5: EXTERIOR DOORS AND WINDOWS

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

Window with Nail fin (New construction)

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Features & Benefits: For Use with OSI QUAD Window & Door System. Recommended For:

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

DuPont Self-Adhered Flashing Systems Products

Vinyl Windows and Doors

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Sun Windows General Information New Construction Hinged Door Installation Instructions

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Norwood Windows Permaglass Fiberglass Products Installation Instruction

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Vinyl Windows and Doors

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

window installation Guide wood FRaMinG New Construction

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

Flashing Materials. Rough Opening Preparation

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Vinyl Windows Manufactured by VPI Quality Windows

French. Doors. Installing. In California, contractors have been

DuPont Flashing Systems Installation Guidelines

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

CLEAR SILICONE CAULKING, (DOW 1199), IS OUR PREFERENCE. 1/16 or 1/8 GLAZING TAPE ACCORDING TO WIDTH OF IG BEING REPLACED

Keeping Water Out of. Stucco Walls. by Gene Summy. Assume that the cladding will leak, but make sure the envelope is watertight

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

INSTALLATION MANUAL. ZIP System Roof & Wall Sheathing FASTER. TIGHTER. ENERGY EFFICIENT.

DuPont Flashing Systems Installation Guidelines. Version 2

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

Curtain Wall Installation Guide

DuPont Flashing Systems Installation Guidelines. Version 2

Series 7650 Installation Instructions Sliding Glass Door

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

Window Frame Installation Instructions For Nail-on and Block Frames

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD SLIDING PATIO DOOR PUERTA CORREDERA PARA PATIO

FrameSaver Jamb Bottom Replacement Instructions

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

STACKING MULTI-SLIDE DOOR SYSTEM

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

Kinro Metal, Vinyl, Flush mounted and Recessed Fin Windows (HUD) OEM INSTALLATION MANUAL

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Commercial Installation Guidelines

GIRTS ON BACK OF BUILDING

HUB REV 9/18 ROOF INSTALLATION MANUAL ZIPSYSTEM.COM

Installation Instructions for Siding

INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin

Installation Instructions

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR SLIDING PATIO DOOR

Transcription:

ADVANCED WATER AND MOISTURE BARRIER SYSTEM PRESENTED BY: INDUSTRIAL SUPPLY www.premierindustrial.net

INDUSTRIAL SUPPLY www.premierindustrial.net 23040 N 11th Ave. Suite 112 Phoenix, AZ 85027 PH: (623) 780-3160 FX: (623) 478-2566 This installation manual is designed to assist experienced tradesmen install nail fin windows in flush mount wall conditions. This manual assumes installers will have some basic industry knowledge and understanding of carpentry principles. Additionally, this manual assumes installers understand how to properly and safely use power tools. The purpose of this manual is to provide basic instruction to Installers on how to properly flash windows using methods and materials that eliminate rain related leaks. If the directions in this manual are closely followed, proper window installations will sustain a very long useful life without experiencing rain related water intrusion problems. These methods and materials are tried and true. They will prove to be very effective for those who are serious about preventing water intrusion in their homes. Rather than eliminate any steps that may be unclear, please call Premier Industrial at (623) 780-3160 for clarification on any portion and/or step that is not understood. Different parts of the country have different building requirements. The steps in this manual should be able to address most areas adequately. If your area has unique requirements that do not appear to be addressed within this manual, please contact Premier Industrial. Thank you!

PRODUCT DESCRIPTION: The XtraFlash Plus Advanced Moisture Barrier System creates an impenetrable seal between the window and the wall. Highlighted by the patentpending revolutionary five-seal system; the factory folded, dual-strip butyl sealing system is folded over the nail fin during installation, finalized with a dual layer of polyurethane sealant. Wind, water, and moisture are virtually stopped in their tracks. STEP 1: The correct rough opening is typically ½ greater in width and height than the net frame size of the window. The rough opening must be level, square and plumb. IMPORTANT TIP! Plumb measurements are taken from both directions: Side to Side Front to Back.

STEP 2: Once the rough opening is correctly prepared, apply the sill flashing. This should measure the dimension of the rough opening plus 2X the width of the flashing material. STEP 3: Using a sharp razor knife, slice the flashing material where the jamb flashing will intersect the sill flashing (through the butyl area only). This will allow the sill flashing to be folded up on to the window flange. STEP 4: Next, apply the jamb flashing. Keep staples to a minimum and tight to the rough opening. Cut the flashing to the correct dimension: The correct dimension is the rough opening height plus 2 x the flashing material dimension minus ½. The jamb flashing will run ½ short over the sill flashing.

STEP 5: Next, apply a continuous bead of sealant onto the window flange. Sealant should be ½ wide and offset ½ from the frame of the window. This will ensure good squeeze out between the framed wall and the window flange after the window is set into place and fasteners are applied. IMPORTANT TIP! Without squeeze out, sealant can be of very little value. Ensure the sealant is properly squeezed out after the window is set. This will help eliminate water intrusion. STEP 6: Set the window in place. Ensure the window is centered in the rough opening and the sill of the window is fully supported.

STEP 7: Next, apply fasteners every 8-12 keeping fasteners 3 away from each corner of the window flange. All four sides of the window require fasteners, including the top window flange. Sealant squeeze out is important, but should be wiped away after fasteners are applied. Check for plumb and level before and after fasteners are applied. IMPORTANT TIP! Ensure the building is completely sheathed and the roof is stacked before window installation begins. Check for plumb and level before and after fasteners are applied. STEP 8: Next, fold the flashing over the top of the window flange. Fold the sill flashing first, then the jamb. Carefully fold the flashing to avoid wrinkles.

STEP 9: Next, use a J-Roller to ensure a good bond between the butyl sealant strip of the flashing and the face of the window flange. STEP 10: After the flashing is folded into place it should closely resemble the picture to the left. STEP 11: Now it is time to apply the head flashing. Cut the head flashing to the dimension of the rough opening plus 2X the flashing dimension, plus an additional 2 inches. The flashing should run wider than the jamb flashing by 1 inch on each side.

STEP 12: The final step is to apply sealant between the frame of the window and the fabric of the flashing material. After the sealant has been applied, tool it into place to ensure a good seal; sealant should bridge the gap between the frame of the window and the fabric of the flashing. STEP 13: After the sealant is applied, the bottom of the window should closely resemble the picture to the left. STEP 14: After the sealant is applied, the top of the window should closely resemble the picture to the left.

RESIDENTIAL & INDUSTRIAL SEALING SOLUTIONS Premier Industrial Supply, Inc. is the proud developer of the XtraBond family of Sealants, Adhesives, Flashing and related Construction & Building products. The XtraBond name signifies Xtra quality in the manufacturing of Xtra durable, high performing products designed to meet and exceed your needs. Premier Industrial Supply, Inc. is dedicated to providing Xtra professionalism, care and service in the sale, Manufacture and distribution of our products. Latex Silicone Polyurethane Flashing Cleaner Applicators Butyl Tape OEM Sealants TOLL-FREE 866-512-GLUE XTRABOND SEALANTS (4583) INDUSTRIAL SUPPLY www.premierindustrial.net 23040 N 11th Ave. Suite 112 Phoenix, AZ 85027 PH: (623) 780-3160 FX: (623) 478-2566