Flush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing

Similar documents
Flush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing

Empire & SunWise Collectors. Imperial Collectors. Copperheart ICS (asphalt shingles)

CSS Central Mount System

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

Installation Instructions for Solar Snow Pad (SSP-T-3)

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

Structural Criteria for Residential Rooftop Solar Energy Installations

PV System Structural Criteria

Structural Criteria for Residential Rooftop Solar Energy Installations

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Structural Criteria for Residential Flush-Mounted Solar Arrays

SolarMount (E)volution

orientation Conergy SunTop Instructions for professional installation

SunPower Installation Manual

Installation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)

Installation Guidelines

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Roof Attachment Overview

Series 100 Roof Mount

BLACK WIDOW COMPOSITE

PV MOUNTING SYSTEM INSTALLATION MANUAL

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

Unirac Installation Manual

EZ Tile Hook System. SunModo PV Rack Mount System UL2703 Compliant

MONKEY BARS OVERHEAD RACK INSTALLATION

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

12 x 12 Flat Top Pergola

Unirac Installation Manual

CYCL E STAT IO N. High Capacity

On-Roof Mounting Sets for Flat-Plate Collectors

Vinyl Gazebo Instructions

SolarMount-I INSTALLATION MANUAL Broadway Boulevard NE Albuquerque, NM USA A HILTI GROUP COMPANY

Steep-Slope ApplicAtionS

Intex Engineered Pergola System Installation Instructions. NOTE: See Appendix for Foundation Requirements

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

Independent Containment System (ICS)

12 x 12 Flat Top Pergola

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted

Pocket Shelter. Covered bike parking earns your site LEED credits.

Leveling Foot RB210. Leg Extender RLT66

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

Rayport G Eco Ballasted

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

Installation Manual Tilt Leg

SolarMount-I INSTALLATION MANUAL

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

Roof Mount Ground Mount Specialised Clamps Spares Application Notes

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V016

May 14, Installation Manual

Rayport G Eco Dealer Kit

Project A. AC Section 4.1 Rain Test of V1 and V2 Tile Base With Butyl Strips. For

Assembly Instructions

28" Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount

Installation Guidelines

Installation Instructions

Installing Quick Mount PV Products on. Metal Shingle Roofs RESPECT THE ROOF

12 x 12 Flat Top Pergola

8 x 8 Flat Top Pergola

Pole Mount Installation Manual

Installation Instructions

10 x 10 Arch Top Pergola

Installation Instructions

3-gun Wall Rack. Please keep this instruction manual for future reference

10 x 10 Flat Top Pergola

Desk/Wall-Mount Rack

SolarRoofHook CATALOG. (844) A DIVISION OF QUICKSCREWS INTERNATIONAL CORP.

Catalog. Mounts. Racking. Systems. Rail Clamps L-Feet. Pub. C10001-V020

RT-2632 OWNER'S MANUAL TAPERED TOWER. Call (800)

MTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2

Five Star Panel Installation Instructions

Solar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

Track Rack. * Track Racks are not lockable

Unirac Flat Flashing INSTALLATION MANUAL

KO LO SH E LT E R. High Capacity and Flexibility

TURNSTILE CANOPIES OPTIONS. We offer a complete line of rollformed and extruded aluminum

Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails

Installation of Balustrade Systems

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

Assembly Instructions for model: VMPR1

Originally Issued: 09/26/2012 Revised: 10/15/2018 Valid Through: 09/30/2019

Installation Instructions

ALL SEASON PATIO COVER

8 x 8 Flat Top Pergola

INDEX PAGE RELEASE SECTION NUMBER DATE

Installation Manual. / / 8641 S. Warhawk Road, Conifer, CO /

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Assembly Instructions for 12x16 Floating Dock

STRATUS SHELTER. Take bike parking to new heights

Quick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails

The Mirage Pergola ASSEMBLY GUIDE. OPTIONAL ACCESSORY Bolt Down Bracket Kit. Ver 3/2009

1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.

Lodge II Pergola. Manual and Installation Instructions. Please read these instructions before removing parts from crate

Transcription:

Flush Mount Kit SunEarth Flush Mount Kit Installation Manual Thank you for purchasing the SunEarth flush mount kit. The flush mount kit (MTG-EC-FM) is our simplest and least expensive mounting system. It provides a strong durable solution for mounting SunEarth collectors on composition shingle roofs. The flush kit components consist of 6063-T6 anodized aluminum mounting feet and collectors clips and stainless steel fasteners that can withstand the harshest weather conditions. The components have pre-punched holes to expedite field installation. SunEarth s flush mount kit has been designed for composition shingle style roofs with a maximum of two (2) layers of shingles and a minimum roof pitch of 2/12 or 10. Collectors must be installed parallel to the roof surface. The flush mount kit should not be used in areas that experience positive panel loading (snow) greater than 40 psf or negative panel loading (wind) greater than 30 psf. If expected loading exceeds these values please contact SunEarth for other mounting options. SunEarth Flush Mount Kit Asphalt Shingle Roofing The use of mounting systems that do not conform to the materials and methods detailed in this or any of SunEarth s other published installation manuals, guidelines, and technical bulletins is not recommended and may void your collector warranty. 1 May.2011 Rev.D

Flush Mount Kit Location The optimal siting of the solar collector is facing true south. If this is not possible the annual performance will suffer very little if the collector is oriented no more than 45 east or west of true south. Warning: The SunEarth flush mount kit is inappropriate for any roof pitch less than 2/12 or 10, or for tilting (racking) the solar collectors to an angle greater than the pitch of the roof. S The solar collector should be placed on the roof in an area and orientation that minimizes wind and snow loading. It is not advisable to install solar collectors in locations 2 (yellow) and 3 (red). Note: Roof area (a) : Dimension a is 10% of the least horizontal dimension LHD or 40% of the mean roof height MRH whichever is smaller, but not less that either 4% of the least horizontal dimension or 3 feet of the building as stated in Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers (ASCE) 7-05. Example: If the installation site has a roof that is 35 feet wide, 60 feet long and has a mean roof height of 30 feet. 10% of LHD = 0.10 X 35 = 3.5 4% of LHD = 0.04 X 35 = 1.4 40% of MRH = 0.40 X 30 = 12 a = 6 feet since 1.4<3<3.5<12 Therefore collectors should not be installed less than 3.5 feet from any roof peak or edge. 2 May.2011 Rev.D

Flush Mount Kit Components Flush Mount Kit SunEarth Part # MTG-EFK Includes The Collector Clip Assembly (C-SSN) attaches the collector to the aluminum flush mount foot. Flush Mount Foot X 4 each C-SSN X 4 each Galvanized Roof Flashing (8 X 4 ) The stainless steel lag bolts should be no less than 5/16 diameter for standard 2 rafters. The lag bolts should be sufficiently long to ensure that no less than two (2) inches of the lag is embedded into the rafter. X 4 each Additional Required Parts (Not Included in Flush Mount Kit)* (8 X Stainless Steel Lag Bolt, 8 X Stainless Steel Flat Washer, Roof Sealant) Note: The pilot hole for the lag bolt should be 75% of the bolt diameter and 75% of the embedded depth. SunEarth Part Number Index SunEarth Part # Extension Description 10110-384 3/8" X 4" Stainless Steel Lag Bolt 385 3/8" X 5" Stainless Steel Lag Bolt 5163.5 5/16" X 3.5" Stainless Steel Lag Bolt 10 5/16" Stainless Steel Flat Washer 10130-2 3/8" Stainless Steel Flat Washer LEXEL Clear Roof Sealant Example: PN 10110-385 = 3/8 X 5 Stainless Steel Lag Bolt Example: The pilot hole for a 5/16 lag bolt to be embedded 2-1/2 into the rafter should be 15/64 X 1-7/8 in depth. * Not Supplied with Flush Mount Kit, when ordering specify required size and length. 3 May.2011 Rev.D

Flush Mount Kit Layout Portrait Configuration Select either a portrait or landscape collector(s) orientation. Portrait is generally recommended for arrays of two or more collectors, or if moderate annual snow loads are anticipated. Landscape Configuration The flush mount kit is not an appropriate mounting solution for locations that experience positive panel loading (snow) greater than 40 psf or negative panel loading (wind) greater than 30 psf. If expected loading exceeds these values please contact SunEarth for other mounting options. 4 May.2011 Rev.D

Flush Mount Kit Portrait Layout Table 1 provides detail on the proper placement of the flush mount feet for various SunEarth collectors mounted in a portrait orientation. Portrait Layout Dimensions Rafter Spacing Layout Dimension "A" Dimension "B" Dimension "C" Collector Model 16" 24" 16" 24" 16" 24" EP/EC 21 33 3/4 24 3/4 80 80 3 1/8 7 1/8 EP/EC 24 17 3/4 24 3/4 102 1/4 102 1/4 9 1/4 5 1/4 EP/EC 32 & 40 33 3/4 24 3/4 126 1/4 126 1/4 7 1/4 11 1/4 Table 1 If the rafter spacing is not 16 or 24 on center, position the flush mount feet such that the overhang (Dimension C ) is plus or minus 1 of the shown in Table 1. 5 May.2011 Rev.D

Flush Mount Kit Landscape Layout Table 2 provides detail on the proper placement of the flush mount feet for various SunEarth collectors mounted in a landscape orientation. If the rafter spacing is not 16 or 24 on center, position the flush mount feet such that the overhang (Dimension C ) is plus or minus 1 of the shown in Table 1. Landscape Layout Dimensions Rafter Spacing Layout Dimension "A" Dimension "B" Dimension "C" Collector Model 16" 24" 16" 24" 16" 24" EP/EC 21 65 3/4 49 3/4 44 44 5 1/8 13 1/8 EP/EC 24 & 32 65 3/4 73 3/4 40 1/8 40 1/8 16 1/4 12 1/4 EP/EC 40 97 3/4 97 3/4 52 1/8 52 1/8 12 1/4 12 1/4 Table 2 6 May.2011 Rev.D

Flush Mount Kit Flush Mount Foot Installation 1. Position galvanized roof flashing by tucking flashing under nearest upper shingle. 2. Drill pilot holes that are 75% of the lag bolt diameter through the flashing, shingles, and decking 75% of the full embedded depth into the rafter. 3. Apply roof sealant between the flashing and shingles on both sides. 4. Fill pilot holes with roof sealant. 5. Apply sealant to underside of flush mount foot and position flush mount foot. 6. Drive stainless steel lag bolts with flat washers a minimum of 2 inches into roof beam. 7. Apply roof sealant over lag bolts. 8. Apply roof sealant around parameter of fastened flush mount foot. Flush Mount Foot Detail Warning: Always follow all local building codes, ordinances and regulations when creating roof penetrations as well as standard roofing trade practices. 7 May.2011 Rev.D

Flush Mount Kit Collector Placement and Anchoring Position the collector(s) on the flush mount feet as shown on pages 5 and 6. C-SSN Torque Specifications FASTENER SIZE IN*LB FT*LB 3/8 X 16 230 19 Insert four (4) collector clip assemblies (C-SSN) per collector and tighten to specification shown in Table 3. Table 3 Note: Do NOT over tighten the mounting hardware. Over tightening can damage the fasteners and affect mounting stability. There should be no visible deflection of the mounting clip attached to the collector after tightening. 8 May.2011 Rev.D