Arbor BUILD TIME. Cutting parts: 2 3 hours Assembly: 2 hours Finishing: 2 4 hours Total: 6 9 hours. *Note: Drill pilot holes for all screws

Similar documents
Adirondack Chair BUILD TIME

Bird Feeder BUILD TIME

POTTING BENCH. SAFETY EQUIPMENT Gloves Goggles Dust mask

Residential Treated Wood Use Category Guide

Sienna. MicroPro. An all-round exterior wood product

Build your own Cherrypine pergola with the coloured timber that lasts

Build your own. Treated Pine DIY SHED

Build your own. Treated Pine DIY PERGOLA

TREATED PINE PERGOLAS

TREATED PINE POOL FENCE

Eximcorp India Pvt. Ltd. Lumber and Building Materials. Lumber and Building Material 1

Build your own. Treated Pine DIY FENCE

Internal timber. Preservation. Timber preservation, fire retardants and coatings

COMPACT DECK. Compact Deck SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

The following instructions will guide you through the installation of your new vinyl railing stair kit.

2x2 Baluster Railings FPO REDWOOD. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects

10 x 10 Flat Top Two Tone Pergola

Outdoor Swing and Arbor

Balustrade Systems / Installation Instructions

10 x 10 Arch Top Pergola

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

The following instructions will guide you through the installation of your new vinyl railing.

Balustrade System Installation - Cambridge & Huntington

the consumer s best choice: Wood for Outdoor Applications Protected by CA-C Preservative

HR175 Sash Replacement Kit Installation Instructions

USED POLES RELEASE. Rev. 10/19/17

OUTDOOR COOLER STAND. ProWood Project Plan

STORAGE SHED. Storage Shed SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

DECKING INSTALLATION GUIDE

TRELLIS. Trellis SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

U. M. ARMY Texas Conference. Wheel Chair Ramp Manual

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

OUTDOOR STOOL. ProWood Project Plan

DIY Shed Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintenance

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

Chief s Shop: Simple Woodworking Bench

COMPOSITE RAILING INSTALLATION

How to Build a Simple Corner Trellis

10 x 10 Flat Top Pergola

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

SECTION CARPENTRY

WOODWORKS: intermediate project

Salter Industries Spiral Stair

Luna Cedar Sauna Assembly Instructions

DIY Pergola Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintainence

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

12 x 12 Flat Top Pergola

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

ITEM NAME:Carmona Faux Wood Slat Extension Table SKU: ALZ For assistance with assembly, please contact customer service /5

8 x 10 Timber-frame Garden Shed

PAT installation of a Sun Dome over a in-ground

BUILDING A STORM DOOR

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

10 Octagon Cedar Gazebo Assembly Instructions

12 x 12 Flat Top Pergola

GARDEN SCREEN FENCE 232

Dundalk LeisureCraft Cedar Pod Sauna Assembly Instructions

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual

Bob Print this document and take it to your local Lowe's. One of our associates will help you find the materials you need.

COMPLIMENTARY WOODWORKING PLAN

COMPACT DECK. Compact Deck Project Plan #850 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

Project 18202EZ: Picnic Table

woodworkersjournal.com MATERIAL LIST

ADULT. Adirondack / Muskoka Chair Plans

Fan Back Adirondack Chair Assembly Instructions How To Assemble Your Chair in 12 Easy Steps Parts List 5 9

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

Eagle clad double-hung window installation instructions

Kentucky 4H Wood Science Plans Notebook. Plans Level 3

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

DuraLife Porch Collection Installation Instructions

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Installation Instructions for. Before You Begin TOOLS REQUIRED

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

Old Adirondack Inc. Natural Cedar Furniture

Hudson Dresser [1] Hudson Dresser Published on Ana White ( Submitted by dan-k [2] on Fri, :43 [1]

The Nantucket Legacy Arbor

CONTINUED. TABLE TOPS: 1. Sort one 2x6x8 piece from your lumber. 2. Measure and mark two 48 pieces from each, then cut.

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

Installa on Guide: Fence Distributors. YourNextFence.com

Make every component count.

8 x 8 Flat Top Pergola

English/French 06/04

Installation Guide. 203 Chesterra Drive, Dahlonega, GA Toll-Free ~ Fax ~

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

Chapter 17 - Porch Trim

Professional Quality FOR THE Professional Contractor. Marketing Offerings. 225 Elm Ave Galt, Ca bmdusa.com

Outdoor Cooler Cart. Outdoor Cooler Cart Construction Instructions

Deck Designer Specification Kit. TimberTech Designer. All rights reserved copyright 2007 DIY Technologies

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

Installation Manual For ToddPod Outdoor Shower Enclosures

Pa For assistance with assembly, please contact customer service ITEM NAME: Belham Living Vella Eucalyptus Porch Swing - White

Transcription:

rbor Perfect for framing a garden path or creating an outdoor entryway to your front walk, arbors are not only classic and elegant, but also simple and fun to build. This arbor features a lattice design perfect for climbing flowers. However, you can create your own to either close it in more for added privacy or open it up for a lighter feel. This structure is pretty heavy and cumbersome to move around, so enlist a helper to aid you in moving it around as you build it and especially as you install it. BUILD TIME utting parts: 2 hours ssembly: 2 hours Finishing: 2 4 hours Total: 6 9 hours *Note: Drill pilot holes for all screws 1

rbor TOOLS Miter saw or circular saw Table saw Drill/driver 8" drill bit at least 5" long 1 ¼" forstner or spade bit 1 8" drill bit Square Socket wrench hisel Damp rag to wipe up excess glue B SUPPLIES (4) 4 x 4 x 10' (4) 2 x 4 x 8' (14) 2 x 2 x 42" deck balusters with bevels cut at both ends () 1 x 6 x 8' " deck screws 2" deck screws 1 ¼" deck screws (4) 8" x 4 ½" galvanized bolts, flat washers and nuts Waterproof wood glue D E X 10 X 14 UT LIST (4) ½ x ½ x 96" B (4) 1 ½ x ½ x 96" (4) ½ x ½ x 24" D (14) 1 ½ x 1 ½ x 42" E (10) ¾ x 1 x 1" F (4) ¾ x 1 x 69" G (22) ¾ x 1 x 15 ½" H (12) ¾ x 1 x 12" F G X 22 H X 12 2

rbor Exploded view 6" spacing between top slats D B End slats 9¾" from the end of B B H 1 / 8 " Post detail G E F 96" 9" " Brace detail 45 1 / 8 " " side view 24" end view 45

rbor BUILDING STEPS 01 ut your posts () to 8' and then mark " down from the top end and cut a tenon 1 8" deep on either side. To do this, set your saw s depth to 1 8" and make several passes in your layout marks, then clean out the waste and flatten the surfaces with a sharp chisel. ut your braces () from the waste ends of your 10' posts, using the same principles to cut a tenon on one end of each brace (see illustration detail). 02 ut your 2 x 4 top rails (B) to exactly 96" long and clamp them together in pairs, with the best sides (faces) facing outward. Mark a 60 angle on each, then find where that angle intersects the midpoint (1 ¾") of the 2 x 4 and use that as a center point to drill a 1 ¼" diameter hole. Use your miter saw or circular saw to then cut the angle. 0 Rip 1" wide pieces from your 1 x 6 and then cut them to length for lattice pieces (E, F, G, and H), cutting a 45 angle on both ends. 04 Lay the posts () on a flat surface with their ends flush and measure 18" up from the bottom and then make a mark every " until you reach 15" from the bottom of your tenon cut. Square the marks across all four posts, making sure you are marking the outside end faces of each post. 05 Group your lattice pieces together (group E, F, G, H), keeping ends flush and mark them in the following manner: 12" in from both ends on the outside face of part E; every " along the inside face of part F; " in from one end on the outside face of part G; and " in from both ends on part H. Mark a square line across all pieces of each group according to those marks. 4

rbor 06 ttach the lattice pieces to the outside faces of each pair of posts, starting with E first, then F and then filling in with G and H. You will not be using every layout mark on these pieces (meaning that you will have some visible marks once you ve attached all lattice pieces). Use the illustration detail as a guide. Use 2" screws when attaching lattice pieces to your posts (), and use 1 ¼" screws when attaching lattice pieces to each other. 07 With each lattice/post assembly on edge on a pair of sawhorses, sandwich the top rails (B) on each tenon, keeping the outside face of each post 19" in from the long point of the top rail. Drill a 8" pilot hole through the rails and post tenons and insert your carriage bolts from the outside and secure the washer and nut from the inside. 08 With the assembly laying flat, attach the braces () at each corner, making sure the top and bottom angles meet flat against the posts and top rails. Drive " deck screws through each brace and into the post, as well as one " screw from the front and back of the rails and into the brace tenon. 09 ttach the top slats to the rails, starting 9 ¾" in from each end and keeping 6" spacing between slats. arefully drill pilot holes and attach with " screws. You may need to tack some temporary bracing around the bottom of the posts to keep everything square during this step. 10 Break all edges with sandpaper and smooth any rough spots. pply a waterproofing finish of your choice according to manufacturer specifications. This arbor can be installed simply by placing the bottoms of the posts on four flat stones or pavers (leveled with each other), or more permanently by setting them in concrete research various methods and choose the one that fits your situation. 5

FSTENER ND HRDWRE INFORMTION SHEET For interior or exterior applications Use fasteners and hardware that are in compliance with the manufacturer s recommendations and the building codes for their intended use. s with any good design and construction practices, treated wood should not be used in applications where trapped moisture or water can occur. Where design and/or actual conditions allow for constant, repetitive or long periods of wet conditions, only stainless steel fasteners should be used. For exterior applications The following minimum galvanization levels may be used for connectors, joist hangers, fasteners and other hardware that are placed in direct contact with exterior applications of micronized copper treated wood: We recommend you contact the aluminum building products manufacturer for its recommendations regarding use of its aluminum products in contact with treated wood in ground contact applications or when exposed to salt water, brackish water, or chlorinated water, such as swimming pools or hot tubs. lso check with the aluminum building products manufacturer regarding compatibility with other chemicals and cleaning agents and the use of their aluminum products in commercial, industrial, and specialty applications such as boat construction. Fasteners - nails, screws, etc. STM 15 (1 oz/ft²) Hardware - connectors, joist hangers, etc. STM 65 G90 (0.90 oz/ft²) The effects of other building materials within a given assembly, along with environmental factors, should also be considered when selecting the appropriate hardware and fasteners to use for a given project containing treated wood. Stainless Steel fasteners and hardware are required for Permanent Wood Foundations below grade and are recommended for use with treated wood in other severe exterior applications such as swimming pools, salt water exposure, etc. - Type 04 and 16 are recommended grades to use. luminum building products may be placed in direct contact with YellaWood brand products used for interior uses and above ground exterior applications such as decks, fencing, and landscaping projects. Examples of aluminum products include siding, roofing, gutters, door and window trim, flashing, nails, fasteners and other hardware connectors. However, direct contact of treated products and aluminum building products should be limited to code-compliant construction applications that provide proper water drainage and do not allow the wood to be exposed to standing water or water immersion. YellaWood brand pressure treated products are treated with copper and other preservatives (the Preservatives ) and preservative methods, systems, and technologies of unrelated third parties. For details regarding the Preservatives, methods, systems, and technologies used by Great Southern Wood Preserving, Incorporated, see http://www.greatsouthernwood.com/products/ yellawood or write us at P.O. Box 610, bbeville, L 610. sk dealer for warranty details or visit http://www.greatsouthernwood.com/products/ warranties. For important handling and other information concerning our products or for a copy of the YellaWood brand Material Safety Data Sheet (MSDS), please visit us at www. greatsouthernwood.com or write us at P.O. Box 610, bbeville, L 610. YellaWood and the yellow tag are federally registered trademarks of Great Southern Wood Preserving, Incorporated. Great Southern Wood Preserving, Incorporated makes no warranties expressed or implied as to the fitness for a particular purpose of this plan. 6

IMPORTNT INFORMTION onsult the end tag to determine which preservative or preservative system was used in the treatment of that particular product. YellaWood brand products may be used in direct contact with aluminum building products when limited to code-compliant construction applications that provide proper water drainage and do not allow the wood to be exposed to standing water or water immersion. Use fasteners and other hardware that are in compliance with building codes for the intended use. Do not burn preserved wood. Wear a dust mask and goggles when cutting or sanding wood. Wear gloves when working with wood. Some preservative may migrate from the treated wood into soil/water or may dislodge from the treated wood surface upon contact with skin. Wash exposed skin areas thoroughly. ll sawdust and construction debris should be cleaned up and disposed of after construction. Wash work clothes separately from other household clothing before reuse. Preserved wood should not be used where it may come into direct or indirect contact with drinking water, except for uses involving incidental contact such as fresh water docks and bridges. Do not use preserved wood under circumstances when the preservative may become a component of food, animal feed or beehives. Do not use preserved wood as mulch. Only preserved wood that is visibly clean and free of surface residue should be used. If the wood is to be used in an interior application and becomes wet during construction, it should be allowed to dry before being covered or enclosed. If you desire to apply a paint, stain, clear water repellent or other finish to your preservativetreated wood, we recommend following the manufacturer s instructions and label of the finishing product. Before you start, we recommend you apply the finishing product to a small exposed test area before finishing the entire project to ensure it provides the intended result before proceeding. Mold growth can and does occur on the surface of many products, including untreated and treated wood, during prolonged surface exposure to excessive moisture conditions. To remove mold from the treated wood surface, wood should be allowed to dry. Typically, mild soap and water can be used to remove remaining surface mold. For more information visit www.epa.gov. Projects should be designed and installed in accordance with federal, state and local building codes and ordinances governing construction in your area, and in accordance with the National Design Specifications (NDS) and the Wood Handbook. Disposal Recommendations: Preserved wood may be disposed of in landfills or burned in commercial or industrial incinerators or boilers in accordance with federal, state and local regulations. 7