12x24x10 Run-In Shed #51451

Similar documents
12'W x 20'L x 10'H Run-in-Shed Assembly Instructions

12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.

22'W x 13'H Peak Style Shelter Frame Assembly Instructions

Peak Style Shelter Assembly Instructions

10' W x 8' H or 10' H Round Style Shelter Assembly Instructions

6' x 8' x 6'6" Quad-Vent Greenhouse-in-a-Box Assembly Instructions

Garage-in-a-Box SUV/Truck 13' x 20' x 12' Peak Style Shelter Assembly Instructions

20' x 20' Celebration Canopy

Assembly Instructions

Assembly Instructions

Instant Shed - Peak Style 8' x 8' x 8'

8' x 4' x 5'6" Pet Kennel

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC

Manual for Shelter W3,5xL8,0xH3,8m

20 x 20 / 3.35M x 6M EVENT CANOPY Assembly Manual

SHELTER ASSEMBLY MANUAL Model # 3085GL-17P

Hip Roof Canopy Instructions

CARPORT/SHELTER MODEL: JIT L12.0xW6.2xH4.0M Installation Manual

11 x 20 ALL SEASON GARAGE / 3.35M x 6M Carport Assembly Manual

SHELTER ASSEMBLY MANUAL MODEL: SIZE:24X12X6M

10 x 20 / 3.35M x 6M Carport Assembly Manual

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO

Assembly Instructions 60x40x18 Domed Style Truss Building. ASSEMBLY INSTRUCTIONS DOMED STYLE 60x40x18

Double Truss Shelter Model# SST W9.14xL14.2xH4.88m Assembly Instructions

SHELTER ASSEMBLY MANUAL MODEL # 1326P. L8.0xW4.0xH3.8m

Assembly Instructions Barn Style 12 x 28 x 12

50 W ide. Future Trac G able E nd. Installation Instructions AIGE

Installation Manual. T1220 Storage Shelter. v

CARPORT/SHELTER JIT-1333HZ. L10.0xW4.0xH4.5M Installation Manual MODEL:

Assembly Instructions 40x60x18 Domed Style Truss Building. ASSEMBLY INSTRUCTIONS DOMED STYLE 40x60x18

Pergola YJSG-108C Assembly Instructions

Assembly Instructions 14X30X12 Round Utility

1. Layout. Step 1. Step 2. Step 3. Fig. 1

Assembly Instructions 30x40x15 Round Style Portable Building With Single Door. ASSEMBLY INSTRUCTIONS ROUND STYLE 30x40x15 WITH SINGLE DOOR

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

Assembly Instructions 30x65x15 Industrial Round Style Building

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

flex Installation multiflex

Assembly Instructions Greenhouse House Style 12 x 24 x 8

REV: 1.2 TRAMPOLINE MANUAL

Assembly Instructions Round Style 30x65x15 Industrial Round Style Building

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

SHELTER ASSEMBLY MANUAL CONTAINER COVER

SHOREMASTER CANOPY TABLE OF CONTENTS

ClearSpan Mini Grab Bag Shelters

Assembly Instructions Greenhouse Round Style 12 x 24 x 8

Assembly Instructions 40x60x18 Domed Style Truss Building. ASSEMBLY INSTRUCTIONS DOMED STYLE 40x60x18

DASHLEY COLLECTION GAZEBO

WeatherShield Daddy Long Legs Canopy

Assembly Instructions Round Style 30x65x15-4 Industrial Round Style Building

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

Assembly Instructions Shed House Style 12 x 12 x 8

ASSEMBLY INSTRUCTIONS

NON-ELECTRIC DOG FENCES

Lakeside Gazebo. Assembly Instructions. Product No

Hardware and Components:

Assembly Instructions Barn Style 12 x 20 x 12

The Queen Quilter Professional Quilters Kit Frame

PAT installation of a Sun Dome over a in-ground

6a. Eight Steps to Chain-Link Fence Installation

RUN-IN SHED INSTRUCTIONS

Assembly Instructions 30x30x15 Round Style Portable Building. ASSEMBLY INSTRUCTIONS ROUND STYLE 30x30x15

ClearSpan Super Moo-Tel Building 26' Wide

Directions for the 25' Jr Batting Cage & Frame

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

Installation Manual. for. Kroftman Storage Tent T520

ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

ASSEMBLY INSTRUCTIONS

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Moo-Tel Small Animal Hut

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Windsor Arbor. Parts List: General Information: Tools required: Assembly & installation Instructions

ClearSpan Mini Grab Bag Shelters

INSTALLATION GUIDE FOR SR-CANOPY KIT SNOWRATOR

ClearSpan Round Style Mini Garage

US RACK, Inc Falcon Drive, Madera, CA

CARE AND MAINTENANCE OF THE SHADE STRUCTURE

ClearSpan End Frame Kit 30' Wide x 11' High

INSTALLATION INSTRUCTIONS CHAIN-LINK FENCE AND GATE

Essex Gazebo. Assembly Instructions. Model No

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE

Octagon Gazebo. Assembly Instructions. Product No

GrowSpan Round Cold Frames

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Assembly Instructions Music Library System

Modular Shelter Breezeway Assembly Instructions

x12 GAZEBO ASSEMBLY INSTRUCTIONS

10 Ft. x10 Ft. Hard Top Garden House

LSP inc. READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

ASSEMBLY INSTRUCTIONS

ClearSpan SolarGuard Round Style Storage Building

ClearSpan End Frame Kit 26' Wide x 12' High

Opslagtent/Lagerzelt/Storage tent/abri de stockage. Kroftman T825. (7,90 x 25 m)

Congratulations! Your dog is going to love you!

ClearSpan Mini Cold Frames

Transcription:

12x24x10 Run-In Shed #51451 Please read instructions completely before assembly ATTENTION: BOLTS ARE NOT NEED- ED OR INCLUDED FOR EVERY CONNECTION BUT MAY BE PURCHASED BY CALL- ING THE NUMBER BELOW Description Part # Qty. Cover Rail Plain Ends 45 3/4"L 10110 10 Cross Rail Plain Ends 48 1/2 L 2031 3 FOR MISSING OR REPLACEMENT PARTS OR QUESTIONS PLEASE CONTACT CUSTOMER SERVICE: 1-800-524-9970 Cross Rail Swedged 50 1/2 L 2030 12 Middle Upright Tube 56 L 10203 8 Wind Brace (Flat Ends) 55 1/2 L 10205 2 Bent Corner Leg 10226 4 Side Bend Plain 80 L 10225 6 Side Bend Swedged 80 L 10224 6 Extension 27 L 10223 12 All-Weather Cover 10277 1 Boot 800196 1 Ratchet - 1" 10040 4 150 Callender Rd. Watertown, CT. 06795 Manufactured Under U.S. Patents D415,571 D409,310 D430,306 D414,564 Other Patents Pending PAGE 1

Description Part # Qty. 4-Way Cover Rail Clamp 10111 16 3-Way Cover Rail Clamp 10112 8 1/4 x 3 Bolt (For Cross Rail) 10210 14 1/4 x 3 Round Head Bolt (Top) 00669 4 1/4 x 2 Bolts 10114 4 1/4 x 1 5/8 Bolts (for Clamps) 00671 20 1/4 Nuts 01010 48 Bolt Cap s 10150 16 Frame Assembly Overview ATTENTION: BOLTS ARE NOT NEEDED OR INCLUDED FOR EVERY CONNECTION BUT MAY BE PURCHASED BY CALL- ING THE NUMBER BELOW FOR MISSING OR REPLACEMENT PARTS OR QUESTIONS PLEASE CONTACT CUSTOMER SERVICE: 1-800-524-9970 PAGE 2

Frame Assembly 1 Step 1 Fit together an end rib using the following parts (1) #10224 Bent Tube Swedged, (1) #10225 Bent Tube Plain, (2) #10223 Extension and (2) #10226 Bent Corner Leg. Using (4) #10114 1/4 x 2 L Carriage Bolts and (4) #1010 1/4 Nuts securely fasten the joints of the Corner legs to the extensions and the extensions to the bends. Lay this rib on the ground at the rear of your shelters designated location. 2 Bolts 2 Step 2 Fit together a middle rib using the following parts (1) #10224 Bent Tube Swedged, (1) #10225 Bent Tube Plain (2) #10223 Extension and (2) #10203 Middle Upright Tube. Lay this rib on the ground near the first end rib. Note 1: The joint between the upright tubes and the extension will not be bolted, only the joint of the extension to the bend requires a bolt. 2 Bolts No Bolts Step 3 Stand the rear end rib vertically and lean against a permanent structure such as a tree or fence. Attach the plain end of a #2030 Cross Rail Swedged to the first rib using a 1/4 x 3 L Carriage Bolt and 1/4 Nut on the INSIDE of the bow, on each side bend just above the joint of the side bend to the extension. Next, attach a #10205 Wind Brace using a 1/4 x 2 L Carriage Bolt and Nut to each corner upright tube. Place (2) #10112 3-Way Connectors around the bent corner leg, insert the end of a #10110 Cover Rail Tube into the 3- Way connector and fasten these with a 1/4 x 1 5/8 Bolt and Nut. Slide the connector until it is 5 up from the ground and loosely tighten. Repeat at the other bent corner leg. 3 Step 4 Attach a #10111 4-Way Connector to the end of the 2 cover rail tubes and loosely fasten with a 1/4 x 1 3/4 Bolt and 1/4 Nut. Insert another cover rail tube into each 4-Way connector and loosely fasten with a 1/4 x 1 3/4 Bolt and Nut. Place the plain end of another #2030 Cross Rail Swedged over the swedged end of those already attached and lean them down. Stand the middle rib vertically and insert the bottom of each upright tube into the 4-way connector. Raise the cross rail assemblies up and bolt them to the middle rib with a 1/4 x 3 L Carriage Bolt and Nut. Attach the lower end of the wind braces to the middle rib with 1/4 x 2 L Carriage Bolt and Nut. Slide the 4-Way connectors until they are 5 up from the ground and tighten loosely. 4 Step 5 Repeat Step 4 for the remaining middle ribs and finish with the final end rib. PAGE 3

INSTALLING TOP RAIL Install top cross rail assembly starting with (1) #2031 Plain Cross Rail Tube UNDER the last bow and on TOP of the all the middle bows. End with the plain end of the Cross Rail Tapered End UNDER the the front bow. Install the Top Rail OVER all Middle Ribs UNDER First & Last Ribs NOTE: Use the Special Round Head 1/4 x 3 Bolts for securing the top rail to the Middle Ribs only! End Panel Installation Slit's Wrap to inside Step 1 Hold the end panel from the top center with the white inner surface facing the inside of the shelter. (If your shelter is white the inner surface has the visible welded seams.) Remove the nut holding the top cross rail to the rib and carefully pull down the cross rail to free it from the bolt. Wrap the end panel material up over the rib and down towards the ground. Place the free end of the cross rail through the slit in the panel and re-attach the bolt and nut. You may now tighten the nut firmly. Your end panel will now hang from the top of the bow. Be sure to keep the zippers completely closed while installing a door panel. Step 2 Repeat the process of removing the cross rail, placing the rail through the slit and securing the bolts at both upper side rails one side at a time. The wind braces also need to be disconnected from their upper bolt and placed through slits. Check that the material is not trapped between cross rail or wind brace and the rib. The rope welded into the pocket should now be on the inside of the shelter and follow the shape of the rib. Step 3 Locate where the rope exits the pocket, grasp the rope on one side of the shelter and pull downwards taking out some of the slack in the rope; be sure that you do not pull the rope up into the pocket on the other side. Tie the rope around the bent leg firmly between the hole and the end of the leg. Repeat the process of taking out slack and tying the rope on the other side making sure to make it as tight as possible. When complete the bottom edge of the end panel should be approximately 1 up off of the surface, there should be no wrinkles in the fabric and it should be taught across the end of the frame. PAGE 4

SECURING YOUR COVER Pull the cover over the frame. The welded in webbing should be at the front and back of the building. Also note that the pcoket with cutouts, running along the sides of the cover should be on the inside and near the ground. Insert the "S" hook from the ratchets into the hole in the leg of the frame. Next insert the webbing into the spindle of the ratchet and tighten rathchet until the webbing overlaps itself, do not tighten all the way yet. Check to be sure the cover still has an even overhang on the front and rear, adjust as necessary. Once the cover is even finish tightening the ratchets, alternating from corner to corner to ensure the cover stays even. After the cover is tight end to end, remove the 45" crossrails and connectors on one side of the frame and place them into the pockets between the cutouts. Attach the crossrails using the 3-way and 4-way cover rail clamps around the uprights and loosely fasten with the 1/4 X 1 3/4" bolts and 1/4" nuts. Check that the rails are evenly spaced above the ground on both sides. Push down on the connectors one at a time to tension the cover and tighten the bolts to hold tightly. Warning: Do not leave a partially or fully covered unit without being fully anchored. Serious injury to persons or property could result. Outside Corner View * The ratchets should should be checked monthly to make sure the cover is tight. PAGE 5

STEP 8 Find the open side of the protective boot and open it. Insert the foot of the corner leg into the protective boot. When the foot is all the way in the boot insert the top edge of the boot into the hem of the cover (Fig 13). When complete secure the Velcro on the open side of the boot to close the boot. Fig. 13 Page 5

Installing Earth Grabber Anchors Using the provided steel driving rod and a sledge hammer (an electric rotary hammer may also be used) drive each anchor into the ground leaving approximately 8 inches of cable exposed above the surface. The anchors should be located at the four corners and the remaining should be spaced evenly on both sides. Remove the driving rod; insert it through the loop in the cable and pull up on the cable to set the anchor. After the anchors are firmly set, wrap the cable around the cover rail and clamp with the provided clamps. Be sure to take all the slack from the cable. CARE & CLEANING INFORMATION DO NOT expose top or walls to open fire or flame. DO NOT use barbeque grills or smokers underneath shelter. DO NOT use harsh abrasives, bleach or cleansers. Cover and walls can be easily cleaned with mild soap and water. Periodically check stakes or anchors to ensure stability of unit, especially following exposure to high winds or heavy rain. NOT meant to hold heavy snow or ice loads, brush snow & ice off top with a broom or mop. IMPORTANT: PLEASE READ CAREFULLY: ShelterLogic LLC. has no control over the elements such as wind, heavy snow or heavy rain We cannot be responsible tof damage caused by the shelter or to the shelter. We suggest you cnotact your insurance carrier for information just as you would for any other outside structure. Improper Anchoring, Strong Winds, Heavy Snow or Ice: ShelterLogic LLC. does not guarantee these canopies in heavy snow or ice under any circumstances. Shelters are designed to offer protection from damage caused by sun, rain, light snow, tree sap & birds, and are not designed to hold heavy loads that accompany snow or ice. Any shelter that is not achonred securely or properly will fly away. We will not be resposible for any shelter that blows away. Proper anchoring is your responsibility. we offer several anchoring kits, call cusumer support for more information or to place an order. Warning!Prior to installation check all local and municipal laws regarding these shelters.choose your shelter's location carefully. Check for overhead utility lines, branches, etc. Do NOT install near roofs or other structures that may shed snow or ice onto shelter.do NOT hang objects from the roof structure or cables. Do NOT store flammable liquids (eg. Gasoline, Kerosene, etc) in your shelter.do NOT expose top or sides to open fire or flame. Do NOT use barbeque grills, fire pits, deep fryers or smokers inside this shelter.be sure to remove any accumulated snow from roof. Care should be used when removing snow to prevent punctures being made in the cover with rakes, shovels etc. PAGE 6 U.S. Patent s D415,571 D409,310 D430,306 D414,564 Other Patents Pending