Appendix G. Visual Simulations and Illustrations

Similar documents
King Mill Lambert DRI# 2035 Henry County, Georgia

Exit 61 I-90 Interchange Modification Justification Study

1050 Page Mill Road Office Development

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

State Road A1A North Bridge over ICWW Bridge

Attachment #2 PPW133-07

RETAIL FOR LEASE. brewpub TRACY CORNELL AARON BENNETT

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DESIGN PUBLIC HEARING

BAY MEADOWS SPECIFIC PLAN

ACEC OC February 22, 2017

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

Diversion Analysis. Appendix K

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Public School Facilities Element

%&g( %&g( ) Bridge Projects DRAFT

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018

SOUTH BAY CORPORATE CENTER

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Planarization & Routing Guide

Article 4.0 Measurements and Exceptions

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

SHDP BUILDING. For Lease $28.00 SF/yr (NNN) 8129 Lake Ballinger Way, Edmonds, WA PROPERTY HIGHLIGHTS

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment

The New Transit Oriented Town Center Development. metrocentreom.com 100 Painters Mill Road, Owings Mills, MD

Moorhead / Dilworth Fixed Route Expansion Study

Charlton/Oxford Route 20 Reconstruction Project

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

AMES INDUSTRIAL PARK AND OFFICE PLAZA

Updated: April 7, 2016

BOARD OF DIRECTORS MEETING MINUTES

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING

Locate Request Information

Newtown SGA Master Plan

Plan Preparation Checklist

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM)

Noise Study Report. Addendum. Interstate 10 Corridor Project. In the Counties of San Bernardino and Los Angeles

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

[LLOR L DP0000.LXSSH X.HAG ] Notice of Availability of the Draft Resource Management Plan/Environmental

th Ave SE - Building II - Plaza at the Park

CITY OF NEW HOPE 4401 XYLON AVENUE NORTH NEW HOPE, MINNESOTA Chair Riley called the meeting to order at 7 p.m. None

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

Summary of Subarea Workshop Feedback Related to the BART/MTC/Madison Square Blocks

TUSCAN VILLAGE - MASTERPLAN

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

LATITUDE CENTER TH AVENUE S KENT, WA 98032

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

City of San José, California CITY COUNCIL POLICY

3 Economic Development

APPENDIX Q MSP 2020 Improvements EA Traffic Noise Proposed Roadway Improvements Memorandum

This page is intentionally left blank

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

3. Project Alternatives

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations

FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Amajor transportation infrastructure undertaking, billed

A. INTRODUCTION PRINCIPAL CONCLUSIONS

Mixed Use Case Studies: The Price of Success

RETAIL PADS AT THE PLANNED HIGHWAY 65 INTERCHANGE. SWC Whitney Ranch Parkway and Wildcat Boulevard, Rocklin California

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

The Shoppes at Forney Crossings

[LLORW00000.L ER0000.LVRWH09H XL5017AP.WAOR Notice of Availability of the Record of Decision for the Proposed Vantage to

SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

VALUE-ADD RETAIL & REDEVELOPMENT

PENSACOLA BAY BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY. Noise Study Report. SR 30 (US 98) From 17th Avenue To Baybridge Drive

Buildings for Sale & Spaces for Lease

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Update on Traffic Results and Findings

CTA Blue Line Forest Park Branch Feasibility/Vision Study

PREMIER BIG BOX SPACE FOR LEASE

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Interchange Feasibility Study

Memorandum 1.0 Highway Traffic Noise

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

Item 2. September 28, 2017

Level 2 RET Memo September 2018

Appendix F: Archaeology VEIRS MILL CORRIDOR MASTER PLAN PUBLIC HEARING DRAFT

Medicine Bow. National Forest. Columbine. Routt. National Forest. Steamboat. Springs. Eagle. White River. Glenwood. National Forest. Springs.

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

Photo 4: Looking north

( PRICE REDUCED ) SOUTH EVERETT MULTIFAMILY/ ADULT LIVING DEVELOPMENT SITE

City of St. Petersburg Planning & Visioning Commission October 11, 2011

Transcription:

Appendix G Visual Simulations and Illustrations

5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99 Viewshed ed 4 MERIDIAN AVE N SHORELINE N 155TH ST 5 2ND AVE NE 5TH AVE NE NE 162ND ST 19 20 18 3RD AVE NE 17 NE 170TH ST NE 165TH ST NE 160TH ST NE 175TH ST 15TH AVE NE NE 155th Street Station (A5, A7) LAKE FOREST PA RK Path: K:\gis\3164_soundtransit\5543164021_NCorrPh2\Ph_VisualQuality\NorthCorridor_8x11_2Tiles_VQ1.mxd 0 N Miles Viewpoints 0.5 Light Rail Alternatives Station Location Viewshed 3 Bitter Lake Viewshed e 2 AURORA AVE N Viewshed 1 Park Waterbody N 143RD ST ROOSEVELT ELT WAY N N 130TH ST SEATTLET Data Sources: (King County, Snohomish County, WSDOT, Sound Transit) N 145TH ST Haller Lake 5 1ST AVE NE 1ST AVE NE 1 2 3 3RD AVE NE 16 12 4TH AVE NE 4 5 A1, A3, A5, A7, A10, A11 10 5TH AVE NE Northgate Station and Transit Center 5TH AVE NE 15 13 14 NE 148TH ST 11 9 8 7 6 NE 145th Street Station (A1, A3, A10, A11) NE 145TH ST NE 130th Street Station (A5, A7, A10, A11) NE 117TH 17 ST NE 115TH ST NE NORTHGATE WAY NE 97TH ST 523 NE 125TH ST 522 Figure G-1 Viewpoints Segment A

Figure G-2. Viewpoint 1 I-5 Northbound at NE 97th Street (does not show pending Northgate Extension) Figure G-3. Viewpoint 1 I-5 Northbound at NE 97th Street Simulation: All Alternatives (with Northgate Extension and )

Figure G-4. Viewpoint 2 1st Avenue NE at NE 97th Street (does not show pending Northgate Extension) Note: Does not yet show vegetation removal or replacement landscaping. Figure G-5. Viewpoint 2 1st Avenue NE at NE 97th Street Simulation: All Alternatives (pending Northgate Extension in blue, in gray)

Figure G-6. Viewpoint 3 1st Avenue NE at NE 113th Street Note: Relandscaping or vegetation replacement not yet shown. Figure G-7. Viewpoint 3 1st Avenue NE at NE 113th Street Simulation: Alternative A1

Note: Relandscaping or vegetation replacement not yet shown. Figure G-8. Viewpoint 3 1st Avenue NE at NE 113th Street Simulation: Alternatives A3, A7 and A11 Note: Relandscaping or vegetation replacement not yet shown. Figure G-9. Viewpoint 3 1st Avenue NE at NE 113th Street Simulation: Alternatives A5 and A10

Figure G-10. Viewpoint 4 NE 115th Street at 3rd Avenue NE View to the west Figure G-11. Viewpoint 4 NE 115th Street at 3rd Avenue NE View to the west Simulation: Alternative A1

Note: Some ground level vegetation removal and landscaping not shown. Figure G-12. Viewpoint 4 NE 115th Street at 3rd Avenue NE View to the west Simulation: Alternatives A3, A7, and A11 Note: Potential landscaping not shown. Figure G-13. Viewpoint 4 NE 115th Street at 3rd Avenue NE View to the west Simulation: Alternatives A5 and A10

Note: Some ground level vegetation removal and landscaping not shown. Figure G-14. Viewpoint 4 NE 115th Street at 3rd Avenue NE View to the west Simulation: Alternative A7 Figure G-15. Viewpoint 5 Latvian Evangelical Lutheran Church Property 3rd Avenue NE North of NE 117th St View to the west

Figure G-16. Viewpoint 5 Latvian Evangelical Lutheran Church Property 3rd Avenue NE North of NE 117th St View to the west Simulation: Alternative A1 Figure G-17. Viewpoint 5 Latvian Evangelical Lutheran Church Property 3rd Avenue NE North of NE 117th St View to the west Simulation: Alternatives A3, A7, and A11

Figure G-18. Viewpoint 5 Latvian Evangelical Lutheran Church Property 3rd Avenue NE North of NE 117th St View to the west Simulation: Alternatives A5 and A10 Figure G-19. Viewpoint 6 NE 124th Street east of 5th Avenue NE View to the west

Note: Potential landscaping not yet shown. Figure G-20. Viewpoint 6 NE 124th Street east of 5th Avenue NE View to the west Simulation: Alternatives A1, A5, and A10 Note: Potential landscaping not yet shown; noise wall also could be replaced. Figure G-21. Viewpoint 6 NE 124th Street east of 5th Avenue NE View to the west Simulation: Alternatives A3, A7, and A11

Figure G-22. Viewpoint 7 5th Avenue NE South of NE 130th Street Figure G-23. Viewpoint 7 5th Avenue NE South of NE 130th Street Simulation: Alternative A3

Figure G-24. Viewpoint 7 5th Avenue NE South of NE 130th Street Simulation: Alternatives A7 and A11 Figure G-25. Viewpoint 8 Roosevelt Way NE (NE 130th Street) east of 5th Avenue NE View to the west

Figure G-26. Viewpoint 8 Roosevelt Way NE (NE 130th Street) east of 5th Avenue NE View to the west Simulation: Alternative A1 Note: Potential re-landscaping not shown. Figure G-27. Viewpoint 8 Roosevelt Way NE (NE 130th Street) east of 5th Avenue NE View to the west Simulation: Alternative A3

Note: Potential landscaping not shown. Figure G-28. Viewpoint 8 Roosevelt Way NE (NE 130th Street) east of 5th Avenue NE View to the west Simulation: Alternatives A5 and A10 Note: Potential landscaping not shown. Figure G-29. Viewpoint 8 Roosevelt Way NE (NE 130th Street) east of 5th Avenue NE View to the west Simulation: Alternatives A7 and A11

Figure G-30. Viewpoint 9 Jackson Park Golf Course Figure G-31. Viewpoint 9 Jackson Park Golf Course Simulation: Alternatives A1, A5, and A10

Figure G-32. Viewpoint 9 Jackson Park Golf Course Simulation: Alternatives A3, A7 and A11 Figure G-33. Viewpoint 10 I-5 Northbound at NE 143rd Street

Figure G-34. Viewpoint 10 I-5 Northbound at NE 143rd Street Simulation: Alternatives A1 and A10 Figure G-35. Viewpoint 10 I-5 Northbound at NE 143rd Street Simulation: Alternatives A3 and A11

Figure G-36. Viewpoint 11 5th Avenue NE south of NE 145th Street Figure G-37. Viewpoint 11 5th Avenue NE south of NE 145th Street Simulation: Alternatives A1 and A10

Figure G-38. Viewpoint 11 5th Avenue NE south of NE 145th Street Simulation: Alternatives A3 and A11 Figure G-39. Viewpoint 12 N 145th Street at 4th Avenue NE View to the east

Note: Potential landscaping not shown. Figure G-40. Viewpoint 12 N 145th Street at 4th Avenue NE View to the east Simulation: Alternatives A1 and A10 Note: Potential landscaping not shown. Figure G-41. Viewpoint 12 N 145th Street at 4th Avenue NE View to the east Simulation: Alternatives A3 and A11

Note: Potential landscaping not shown. Figure G-42. Viewpoint 12 N 145th Street at 4th Avenue NE View to the east Simulation: Alternatives A5 and A7 Note: Potential landscaping not shown. Figure G-43. Viewpoint 12 N 145th Street at 4th Avenue NE View to the east Simulation: Alternative A7

Figure G-44. Viewpoint 13 NE 148th Street west of 5th Avenue NE View to the west Note: Potential landscaping not shown. Figure G-45. Viewpoint 13 NE 148th Street west of 5th Avenue NE View to the west Simulation: Alternatives A1 and A10

Note: Potential landscaping not shown. Figure G-46. Viewpoint 13 NE 148th Street west of 5th Avenue NE View to the west Simulation: Alternatives A3 and A11 Note: Potential landscaping not shown. Figure G-47. Viewpoint 13 NE 148th Street west of 5th Avenue NE View to the west Simulation: Alternative A7 (Alternative A5 would be similar)

Figure G-48. Viewpoint 14 NE 148th Street west of 5th Avenue NE View to the southeast Note: Potential landscaping not shown. Figure G-49. Viewpoint 14 NE 148th Street west of 5th Avenue NE View to the southeast Simulation: Alternatives A1 and A10

Figure G-50. Viewpoint 15 5th Avenue NE at NE 149th Street View to the south Note: Potential landscaping not shown. Figure G-51. Viewpoint 15 5th Avenue NE at NE 149th Street View to the south Simulation: Alternatives A1 and A10

Figure G-52. Viewpoint 16 I-5 Southbound at NE 148th Street View to the south Figure G-53. Viewpoint 16 I-5 Southbound at NE 148th Street View to the south Simulation: Alternatives A1 and A10

Figure G-54. Viewpoint 16 I-5 Southbound at NE 148th Street View to the south Simulation: Alternatives A3 and A11 Figure G-55. Viewpoint 16 I-5 Southbound at NE 148th Street View to the south Simulation: Alternative A5

Figure G-56. Viewpoint 16 I-5 Southbound at NE 148th Street View to the south Simulation: Alternative A7 Figure G-57. Viewpoint 17 NE 155th Street west of 3rd Avenue NE View to the west

Figure G-58. Viewpoint 17 NE 155th Street west of 3rd Avenue NE View to the west Simulation: Alternatives A1, A3. A10 and A11 Figure G-59. Viewpoint 17 NE 155th Street west of 3rd Avenue NE View to the west Simulation: Alternatives A5 and A7

Figure G-60. Viewpoint 18 1st Avenue NE south of NE 159th Street Figure G-61. Viewpoint 18 1st Avenue NE south of NE 159th Street Simulation: Alternatives A5 and A7 (All segment A alternatives would be similar)

Figure G-62. Viewpoint 19 Ridgecrest Park, 1st Avenue NE and NE 162nd Street Note: Potential re-landscaping not shown. Figure G-63. Viewpoint 19 Ridgecrest Park, 1st Avenue NE and NE 162nd Street Simulation: All Segment A Alternatives

Figure G-64. Viewpoint 20 Ridgecrest Park, 1st Avenue NE and NE 162nd Street Note: Potential re-landscaping not shown. Figure G-65. Viewpoint 20 Ridgecrest Park, 1st Avenue NE and NE 162nd Street Simulation: All Segment A Alternatives

Figure G-66. Viewpoint 21 I-5 Northbound at NE 183th Street Figure G-67. Viewpoint 21 I-5 Northbound at NE 183th Street Simulation: Alternative A1

Figure G-68. Viewpoint 21 I-5 Northbound at NE 183th Street Simulation: Alternatives A3, A7, and A11 Figure G-69. Viewpoint 21 I-5 Northbound at NE 183th Street Simulation: Alternatives A5 and A10

Figure G-70. Viewpoint 22 NE 185th Street east of 8th Avenue NE View of potential parking area to the north Note: Potential re-landscaping not shown. Figure G-71. Viewpoint 22 NE 185th Street east of 8th Avenue NE View of potential parking area to the north Simulation: Alternative A5

Figure G-72. Viewpoint 23 NE 185th Street west of 8th Avenue NE View to the west Figure G-73. Viewpoint 23 NE 185th Street west of 8th Avenue NE View to the west Simulation: Alternative A1

Figure G-74. Viewpoint 23 NE 185th Street west of 8th Avenue NE View to the west Simulation: Alternatives A3, A7, and A11 Note: Potential re-landscaping not shown. Figure G-75. Viewpoint 23 NE 185th Street west of 8th Avenue NE View to the west Simulation: Alternatives A5 and A10

Figure G-76. Viewpoint 24 NE 185th Street west of 5th Avenue NE View to the east Figure G-77. Viewpoint 24 NE 185th Street west of 5th Avenue NE View to the east Simulation: Alternative A1

Figure G-78. Viewpoint 24 NE 185th Street west of 5th Avenue NE View to the east Simulation: Alternatives A3, A7, and A11 Figure G-79. Viewpoint 25 5th Avenue NE (west of I-5) north of NE 185th Street View to the south

Figure G-80. Viewpoint 25 5th Avenue NE (west of I-5) north of NE 185th Street View to the south Simulation: A1 Figure G-81. Viewpoint 26 I-5 Southbound at NE 187th Street View to the south

Figure G-82. Viewpoint 26 I-5 Southbound at NE 187th Street View to the south Simulation: Alternative A1 Figure G-83. Viewpoint 26 I-5 Southbound at NE 187th Street View to the south Simulation: Alternatives A3, A7, and A11

Figure G-84. Viewpoint 26 I-5 Southbound at NE 187th Street View to the south Simulation: Alternatives A5 and A10

524 200TH ST SW 50TH AVE W 200th Street SW Station (C1) 39 40 44TH AVE W Lynnwood Transit Center Station (C2) L Y N N W O O D Viewshed 10 99 208TH ST SW C1C2 43 37 38 41 42 C3 44 45 5 Lynnwood P&R Station (C3) E D M O NDS Viewshed 8 Viewshed 9 INTERURBAN TRAIL 220TH ST SW 220th Street SW Station (B2A) 33 Hall Lake 35 34 36 Segment C Segment B 212TH ST SW 44TH AVE W M O U N T L AKE T E R RACE BRI E R B2 32 B1, B4 31 230TH ST SW Path: K:\gis\3164_soundtransit\5543164021_NCorrPh2\Ph_VisualQuality\NorthCorridor_8x11_2Tiles_VQ1.mxd 0 Snohomish County King County Miles AURORA AVE N 0.5 Viewshed 7 Viewshed 6 Viewshed 5 N N 205TH ST S H O R E L I N E N 185TH ST Lake Ballinger Data Sources: (King County, Snohomish County, WSDOT, Sound Transit) Viewpoints 99 Light Rail Alternatives Station Location Park Waterbody 5 2ND AVE NE Mountlake Terrace Freeway Station (B4) 5TH AVE NE 27 29 B4 28 30 NE 195TH ST Segment B Segment A NE 175TH ST 56TH AVE W NE 185th Street Station (A1, A3, A5, A7, A10, A11) NE 180TH ST 232ND ST SW Mountlake Terrace Transit Center Station (B1, B2, B2A) 240TH ST SW 104 236TH ST SW NE 205TH ST L AKE F O R E S T P A R K Snohomish County King County L AKE F O R E S T P A R K DRAFT Figure G-85 Viewpoints Segments B and C

Figure G-86. Viewpoint 27 I-5 Northbound at NE 195th Street Figure G-87. Viewpoint 27 I-5 Northbound at NE 195th Street Simulation: All Alternatives

Figure G-88. Viewpoint 28 I-5 Northbound at 240th Street SW Figure G-89. Viewpoint 28 I-5 Northbound at 240th Street SW Simulation: Alternatives B1, B2, and B2A

Figure G-90. Viewpoint 28 I-5 Northbound at 240th Street SW Simulation: Alternative B4 Figure G-91. Viewpoint 29 236th Street SW View to the east

Figure G-92. Viewpoint 29 236th Street SW View to the east Simulation: Alternatives B1, B2, and B2A Figure G-93. Viewpoint 29 236th Street SW View to the east Simulation: Alternative B4

Figure G-94. Viewpoint 30 I-5 Northbound at 232nd Street SW Figure G-95. Viewpoint 30 I-5 Northbound at 232nd Street SW Simulation: Alternative B1

Figure G-96. Viewpoint 30 I-5 Northbound at 232nd Street SW Simulation: Alternatives B2 and B2A Figure G-97. Viewpoint 30 I-5 Northbound at 232nd Street SW Simulation: Alternative B4

Figure G-98. Viewpoint 31 I-5 Southbound at 230th Street SW View to the south Figure G-99. Viewpoint 31 I-5 Southbound at 230th Street SW View to the south Simulation: Alternative B1

Figure G-100. Viewpoint 31 I-5 Southbound at 230th Street SW View to the south Simulation: Alternatives B2 and B2A Figure G-101. Viewpoint 31 I-5 Southbound at 230th Street SW View to the south Simulation: Alternative B4

Figure G-102. Viewpoint 32 I-5 Southbound at 230th Street SW View to the south Figure G-103. Viewpoint 32 I-5 Southbound at 230th Street SW View to the south Simulation: Alternatives B2 and B2A

Figure G-104. Viewpoint 33 220th Street SW, west of I-5 View to the east Figure G-105. Viewpoint 33 220th Street SW, west of I-5 View to the east Simulation: Alternative B2

Figure G-106. Viewpoint 33 220th Street SW, west of I-5 View to the east Simulation: Alternative B2A Figure G-107. Viewpoint 34 I-5 Northbound at 212th Street SW

Figure G-108. Viewpoint 34 I-5 Northbound at 212th Street SW Simulation: Alternatives B1 and B4 (Transitioning to Segment C alternatives with a median option) Figure G-109. Viewpoint 34 I-5 Northbound at 212th Street SW Simulation: Alternative B2 and B2A (Transitioning to Segment C alternatives with west side option)

Figure G-110. Viewpoint 35 Hall Lake View to the east Figure G-111. Viewpoint 35 Hall Lake View to the east Simulation: Alternatives B1 and B4

Figure G-112. Viewpoint 35 Hall Lake View to the east Simulation: Alternatives B2 and B2A Figure G-113. Viewpoint 36 I-5 Southbound at 50th Avenue West View to the south

Figure G-114. Viewpoint 36 I-5 Southbound at 50th Avenue West View to the south Simulation: Alternatives C1 and C2 with Alignment Option 1 in Median Figure G-115. Viewpoint 36 I-5 Southbound at 50th Avenue West View to the south Simulation: Alternatives C1 and C2 with Option 2 on West side

Figure G-116. Viewpoint 36 I-5 Southbound at 50th Avenue West View to the south Simulation: Alternative C3 with Alignment Option 2 on West side Figure G-117. Viewpoint 37 52nd Avenue West at 208th Street SW View to the south

Figure G-118. Viewpoint 37 52nd Avenue West at 208th Street SW View to the south Simulation: Alternatives C1 and C2 with Alignment Option 1 from I-5 Median Figure G-119. Viewpoint 37 52nd Avenue West at 208th Street SW View to the south Simulation: Alternatives C3 with Alignment Option 2 from West side of I-5

Figure G-120. Viewpoint 38 Scriber Creek Park Figure G-121. Viewpoint 38 Scriber Creek Park Simulation: Alternative C1

Figure G-122. Viewpoint 39 50th Avenue West at 200th Street SW View to the south Figure G-123. Viewpoint 39 50th Avenue West at 200th Street SW View to the south Simulation: Alternative C1

Figure G-124. Viewpoint 40 200th Street SW at 49th Avenue West View to the east Figure G-125. Viewpoint 40 200th Street SW at 49th Avenue West View to the east Simulation: Alternative C1

Figure G-126. Viewpoint 41 Scriber Park Trail View to the east Note: Includes landscaping and replantings. Figure G-127. Viewpoint 41 Scriber Park Trail View to the east Simulation: Alternative C2

Figure G-128. Viewpoint 42 Lynnwood Transit Center View to the west to Scriber Creek Trail Figure G-129. Viewpoint 42 Lynnwood Transit Center View to the west to Scriber Creek Trail Simulation: Alternative C2

Figure G-130. Viewpoint 43 Interurban Trail at 48th Avenue West View to the east Figure G-131. Viewpoint 43 Interurban Trail at 48th Avenue West View to the east Simulation: Alternative C3

Figure G-132. Viewpoint 44 44th Avenue West View to the south Figure G-133. Viewpoint 44 44th Avenue West View to the south Simulation: Alternative C3

Figure G-134. Viewpoint 45 Interurban Trail at 44th Avenue West View to the west Figure G-135. Viewpoint 45 Interurban Trail at 44th Avenue West View to the west Simulation: Alternative C2

Figure G-136. Viewpoint 45 Interurban Trail at 44th Avenue West View to the west Simulation: Alternative C3

Appendix H Other Projects and Actions Considered in Cumulative Effects

Draft Environmental Impact Statement Appendix H Other Projects Considered for Cumulative Effects NEPA requires that any agency proposing a major federal action, which may significantly affect the environment, consider the environmental impacts of the proposed action, any unavoidable adverse environmental impacts, and the relationship between local short term uses and long term productivity of the environment (42 U.S.C. 4332(c)). As part of the project s analysis of cumulative effects and the predictions of conditions for the future regional transportation system, Sound Transit identified other projects that are reasonably foreseeable. This includes project planned in the Puget Sound region s federally required Metropolitan Transportation Plan (MTP), Transportation 2040, as well as the funded or committed project s included within the region s Transportation Improvement Plan and the related PSRC travel demand forecast model. In addition, the EIS analysis has identified other non-transportation projects and actions that are planned or in development that could alter the level of impacts a resource or an area may experience, compared to the impacts defined for the No Build or light rail alternatives alone. The actions described below are separate actions undertaken even if the project is not developed. Under each environmental topic in the EIS, there is a discussion of the cumulative effects of the in combination with the projects described here and other past, current, or planned projects. Transportation Projects SR 520 Bridge Replacement and HOV Program A new floating bridge will be constructed across Lake Washington with four GP lanes and two inside HOV lanes. A reversible transit/hov ramp will operate from SR 520 to the existing I 5 Express Lanes this ramp facilitates westbound SR 520 HOV lane movements to the southbound I 5 Express Lanes in the AM period, and northbound I 5 Express Lanes movements to the eastbound SR 520 HOV lane in the PM period. I-90 Two-Way Transit and HOV Operations Project This project will provide two-way transit and HOV operations on I-90 between Bellevue and Seattle by providing HOV lanes on the outer roadways. It will retain the existing reversible operations on the center roadway, with both lanes operating in the same direction, westbound in the AM and eastbound in the PM. SOVs will only be allowed to use the center roadway between Rainier Avenue in Seattle and Island Crest Way on Mercer Island. The center and outer roadway HOV lanes will likely operate with a 2 + occupants per vehicle restriction. Appendix H Other Projects Considered for Cumulative Effects H-1 July 2013

Draft Environmental Impact Statement SR 99 Alaskan Way Viaduct Seawall Replacement Program This project will build a new SR 99 corridor through downtown Seattle. The project includes boring a two-mile tunnel beneath Seattle, constructing a mile-long stretch of new highway that connects to the south entrance of the tunnel, and constructing a new Alaskan Way surface street along the waterfront that connects SR 99 to downtown. King Country Metro Bus Rapid Transt (BRT) Implementation; E Line: Aurora RapidRide (PSRC TIP project) The RapidRide E Line will connect Shoreline with downtown Seattle in 2013. It will replace the existing Route 358. Features of the E Line include enhanced stations, limited stops, BAT lanes, and transit signal priority all of which will improve speed and reliability. The goal is for more frequent service than what is operated by Route 358 currently. Lakeview Trail, Mountlake Terrace Transit Center to Interurban Trail (PSRC TIP#: MOU-19) The project will construct a combination of bike lanes, sidewalks, and a new non-motorized trail from the Interurban Trail at 228th Street SW to the west end of the 236th Street SW bridge over Interstate 5, which is adjacent to Community Transit`s Mountlake Terrace Transit Center and Sound Transit`s Mountlake Terrace Freeway Station. "Main Street" Reconstruction (PSRC TIP#: MOU-23) This project includes improvements to 56th Ave W (236th to 230th) and 236th St SW (Transit Center to 56th). It will reconstruct existing roadways to allow two travel lanes, bike lanes, and curbside parking. Interurban Trail Improvement Project - Missing Links (PSRC TIP# LYN- 40) The project will complete two missing links along the Interurban Trail located between 212th Street SW and 52nd Avenue W by constructing a continuous 12`-wide nonmotorized bicycle/pedestrian trail that is separated from traffic. 196th Street SW (SR-524) Improvement Project (48th Avenue W to 36th Avenue W) (PSRC TIP#: LYN-43) The project will improve 196th Street SW (SR-524) by providing additional multi-modal capacity and safety/aesthetic boulevard features. Improvements include installation of Business Access and Transit (BAT) lanes in each direction, a planted center median/left-turn/u-turn, new curb, gutter, 12-foot sidewalks, landscaping, undergrounding of overhead utilities, street lighting and new traffic signals beginning at 48th Avenue W and extending east to 36th Avenue W. H-2 Appendix H Other Projects Considered for Cumulative Effects July 2013

Draft Environmental Impact Statement 44th Avenue W, I-5 to 194th Street SW Improvement Project (upcoming project in Lynnwood) The project plans to widen the roadway to seven lanes with eight lanes just south of 196th Street SW and will include wider sidewalks and landscape features. The improvements are needed to accommodate future growth envisioned for City Center and to create an enhanced pedestrian environment with a boulevard appearance. 200th Street SW, 64th Avenue W to 40th Avenue W Improvement Project (upcoming project in Lynnwood) The project plans to add additional lanes (exact locations have not yet been identified), wider sidewalks, landscape features, and bicycle facilities. The improvements are needed to accommodate future growth envisioned for the City Center and the extension of light rail to the Lynnwood Transit Center by 2023. Other Development Projects A NEPA/SEPA EIS is being prepared by Sound Transit and FTA for the Link Operations and Maintenance Satellite Facility. Sound Transit is proposing this facility to provide operations and maintenance capacity for the expanded light rail fleet called for in the ST2 Plan. In conjunction with Sound Transit s operations and maintenance facility in Seattle, this new facility will provide storage and maintenance capacity to serve the vehicle fleet operating on the existing system, and the extensions to be developed with ST2, such as the East Link Extension and the Lynnwood Link Extension. The new facility requires 20 to 25 acres of land and needs to be located adjacent to a planned operating line in the north or the east to provide efficient and reliable light rail service system-wide. Potential sites for the new Link Operations and Maintenance Satellite Facility being evaluated in that project s EIS include one location in Lynnwood and two locations in Bellevue. The Lynnwood alternative is north of I-5, west of the Lynnwood Transit Center, and east of 52nd Avenue West/Cedar Valley Road. It is configured to operate with any of the light rail alternatives. Similarly, the can be served by a maintenance facility in either Lynnwood or in Bellevue, in conjunction with the existing facility in Seattle. Edmonds School District Melody Hill property, 6205 222nd Street SW, Mountlake Terrace This site was recently zoned for higher density use by the City of Mountlake Terrace. The school district has commented that the site, no longer in use as a school, could be made available for redevelopment. Appendix H Other Projects Considered for Cumulative Effects H-3 July 2013

Draft Environmental Impact Statement Edmonds School District, District Support Site. The District has adopted plans and completed its SEPA review to develop a Support Center that would relocate all of the District s existing support functions onto one site. The consolidated functions would include Administrative Offices, a bus base and vehicle maintenance facilities, facilities maintenance, a district warehouse, and a fuel and wash island (with a below ground tank). A comprehensive plan amendment and rezone application for portions of the property were approved by the Lynnwood City Council in September 2006. The Link Operations and Maintenance Facility Lynnwood site alternative overlaps with the District s planned development. Both of these potential projects are considered in the cumulative effects analysis. Arbor Village: 23601 56th Avenue W, in Mountlake Terrace (Land Use approved, under construction) Construct a 5-story mixed use building on a 1.3 acre parcel with about 10,000 sq. ft. commercial and 123 leased residences, with 2 levels of parking garage and interior courtyard. Vineyard Park: 23008 56th Avenue W (Land Use approved, under construction in Mountlake Terrace) Construct a 3-story mixed-use assisted living community development consisting of 80 housing units and 29-30 memory care beds, 8,241 sf. commercial space, under-structure and surface parking consisting of 38 parking spaces, pedestrian activity area, shared open space, and landscaping. All existing structures have been demolished. Kings Gate: 240007 56th Avenue W (Land Use approved, on hold in Mountlake Terrace) Construct a mixed-use (commercial/residential) project in the Town Center District with 3,475 square feet of commercial space and 46 residential units on a 0.93-acre site. Includes shared open space, landscaping, and vehicular/bicycle parking, and pedestrian activity area. The existing structures will be demolished. Mountlake Terrace Senior Living Apartments: 5525 244th Street SW (Land Use pending in Mountlake Terrace) Develop a 0.86-acre vacant lot with approximately 96 units of affordable, independent senior housing (not state licensed). The proposal also includes bicycle and vehicular parking spaces, pedestrian activity area, shared open space, and landscaping. Request to reduce parking requirements approved. Mountlake Terrace Town Center An adopted Town Center Plan calls for development of new stores, restaurants, offices, and housing in the 68-acre downtown zone. Wider sidewalks, street trees, and a public plaza for community use are part of the mix. See Town Center Plan, amended Dec. 2009, on city s website. H-4 Appendix H Other Projects Considered for Cumulative Effects July 2013