Network Standard NS

Similar documents
-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

June 2014 For any information or queries relating to fundraising for headspace, please contact:

This Call for Qualifications does not require the preparation of a design proposal.

ACCESS TO HIGH VOLTAGE APPARATUS

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

Artist Guidelines & Requirements

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Radiocommunication Facility Review Protocol

Public Art Mural Packet

LICENCE. for WEB LINKS. Check if this document is current Find similar documents StandardsWatch (info and login) Visit our website

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer

Public Art Network Best Practice Goals and Guidelines

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

June 2014 For any information or queries relating to fundraising for headspace, please contact:

Australian Standard. Safety of machinery. Part 1801: Safety distances to prevent danger zones being reached by the upper limbs AS 4024.

THE HILLCREST VILLAGE HOMEOWNERS ASSOCIATION, INC. RULES FOR INSTALLATION OF ANTENNAS

PUBLIC ART PROGRAM Guidelines for Site Plan Projects

Road signs Specifications

Temporary Sign Permit

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

AS/NZS 1200:2000 AS/NZS

OPERATION AND MAINTENANCE MANUAL fervi.com Riveter for threaded inserts Art ORIGINAL INSTRUCTIONS

Australian/New Zealand Standard

Planishing hammer stand For use with SKU Planishing hammer

Manager Development and Statutory Services

Safety in the science Classroom. Safety in the. K-12 science. worksafesask.ca 10/13 600

14 Piece Slide Hammer and Puller Set

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

Pushbutton Bollard. Wireless Control for BlinkerSign, RRFB or BlinkerBeacon User Guide. Blinker Division Solar LED Solutions

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)

Standards Update Notice (SUN) Issued: March 22, 2017

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

OPERATING INSTRUCTIONS

PLANNED SIGN PROGRAM CHECKLIST

Measurement of Signalling Distances

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

The Forestville/ Goodwood Tram Overpass Murals Project (Good Forest Murals) 1 PROJECT AIMS AND OBJECTIVES

RELEVANT ELECTRICAL STANDARDS

It is envisaged that the artwork commissioned for the exterior of the APT will:

Instructions for Fitting, Operating and Maintenance

PAPILLON BRANDING AND SOCIAL MEDIA GUIDELINES

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

30 Bending Brake. Model Assembly and Operating Instructions. Distributed exclusively by Harbor Freight Tools.

Privacy Policy SOP-031

15 Planer Stand. Model Due to continuing improvements, actual product may differ slightly from the product described herein.

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048

Introduction. Unit 1. Unit 2. 2D and 3D Visual Language. Materials, Techniques and Technology

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment

SECTION 2 GENERAL REQUIREMENTS

Interim Distribution Substation Manual (DSM)

OPEN CALL FOR ARTISTS

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Operators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017]

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

SPECIFICATION FOR SINGLE-MODE OPTICAL FIBRES

AS Australian Standard. Guarding and safe use of woodworking machinery. This is a free 7 page sample. Access the full version online.

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology

S 0342 S T A T E O F R H O D E I S L A N D

ISO 2575 INTERNATIONAL STANDARD. Road vehicles Symbols for controls, indicators and tell-tales

Town of Skowhegan Application For Development Review

Provläsningsexemplar / Preview

iant200 iant212 iant213 iant214 iant215 iant216 iant217 iant218 iant219 iant220 iant221 iant222 Operating Manual iant2xx Series of Antennas

Operating Manual 6 Industrial Bench Grinder ATBG280/

Knowledge Requirements. Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator. trainthepainter.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Reference Number PCP 02 (RIC Standard: EP SP)

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

East Lansing Urban Mural Project Crack Art Guidelines and Application

INSTRUCTION MANUAL LKG 601 Electrical Safety Analyzer

A Bill Regular Session, 2017 HOUSE BILL 1926

Supply of Paint for FEA s Administration Building, Training Center & Guard House in Navutu, Lautoka

ANTENNAS AND SATELLITE DISHES

DESIGN REVIEW PROCESS AND APPLICATION

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

REQUEST FOR PROPOSALS

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

2001A. 200KHz Function Generator Instruction Manual. 99 Washington Street Melrose, MA Phone Toll Free

Dogs must be kept on a short leash at all times, and a visitor in control of a dog must remove any waste from the Cemetery.

A frame advertising boards and shopfront display

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

Summerlin South Community Association. Model Rules for Installation of Antennas in Planned Unit Developments. Satellite Antenna Resolution & Criteria

Status Date Prepared Reviewed Endorsed Approved

List of Figures. List of Forms

1 SERVICE DESCRIPTION

D165A Z3040 X 10 RADIAL DRILL INSTRUCTION & PARTS MANUAL

SUBJECT HEADING: Switching Programmes ISSUE: 18

REF42plus HMI Cutting Tool Operating Guide

EI HIGH VOLTAGE INSULATION TESTING POLICY

PUBLIC ART PROCUREMENT GUIDELINES

Wedding Photography Contract

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

DEVON & CORNWALL C O N S T A B U L A R Y

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

TS RES - OUTSTANDING ISSUES

SYNCHRONISING AND VOLTAGE SELECTION

Transcription:

Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets

REVISION HISTORY REVISION NO. ISSUE DATE DESCRIPTION OF AMENDMENT Draft 2001 Draft standard. Original Jul 2003 Original Issue. Revision 1 Nov 2003 Minor typographical corrections. Revision 2 Aug 2006 Minor typographical, formatting, branding updates Copyright 2001-2006, Asset Management Standards, Policy and Data Quality, Western Power Apart from any fair dealing for the purposes of study, research, criticism or review, as permitted under the Copyright Act, no part may be reproduced by any process without prior written permission from Western Power. All correspondence should be directed to: Asset Management Standards, Policy and Data Quality Western Power 85 Prinsep Road, Jandakot PERTH WA 6164 NS 21-2006 Artwork on Western Power Assets i

TABLE OF CONTENTS 1 PURPOSE... 1 2 APPLICATION... 1 3 DEFINITIONS... 2 3.1 GENERAL... 2 3.2 ABBREVIATIONS... 2 3.3 REFERENCES... 2 4 SAFETY AND WORK SKILLS... 3 4.1 GENERAL... 3 5 ADMINISTRATION... 4 5.1 GENERAL... 4 5.2 RISK MANAGEMENT, INSURANCE AND LIABILITY... 5 6 ARTWORK CONDITIONS... 6 6.1 GENERAL... 6 6.2 STREETLIGHT COLUMNS... 8 6.3 STEEL LATTICE TOWERS... 8 6.4 TRANSMISSION ASSETS... 8 6.5 ENCLOSURES... 8 NS 21-2006 Artwork on Western Power Assets ii

Purpose and Application 1 Purpose This standard defines the technical requirements for the application of artwork on Western Power Corporation s network assets. The applicant shall be responsible for ensuring that these Technical Requirements are met. 2 Application Written approval shall be obtained from Western Power for each and every artwork within the scope of this standard prior to it being applied to a Western Power asset (unless notified otherwise by Western Power). This standard addresses only the technical requirements associated with the application of artwork to Western Power s network assets. The process for management of graffiti and non-approved artwork, including work contracts, is beyond the scope of this standard. Western Power reserves the right to modify or change these requirements without notice. Where the decorative artwork is applied to a Western Power s asset, Western Power does not guarantee the permanency of the artwork. The asset concerned may be replaced or repaired as required. NS 21-2006 Artwork on Western Power Assets 1

Definitions 3 Definitions 3.1 General Applicant Any organisation or individual requesting permission for artwork to be applied to a Western Power asset. Artwork Enclosure Graffiti Pole Streetlight Column Wall 3.2 Abbreviations WP 3.3 References Decorative painting approved by Western Power and the Local Councils. Kiosk, ground mounted transformer or any Western Power asset used to house other Western Power equipment (generally of powder coated aluminium construction). Any artwork NOT approved by Western Power. A Western Power asset used for the support of aerial network equipment. A Western Power asset used for the support of streetlights only (generally a galvanized or coloured steel construction). A Western Power asset used for enclosing ground mounted network equipment. Western Power None NS 21-2006 Artwork on Western Power Assets 2

Safety and Work Skills 4 Safety and Work Skills 4.1 General Western Power management is committed to the philosophy that all accidents are preventable. All work is to be conducted in a safe manner. Operations associated with any task must cease if the safety of our people or the public cannot be assured. Further to the requirements detailed therein, Western Power may require the applicant to; (a) Apply for a Vicinity Authority Permit (VA) prior to commencement of approved work. (b) Wear personal protective equipment (eg. Gloves, clothing, footwear, safety glasses and helmets) to the satisfaction of Western Power. (c) Have a Western Power observer on site during any approved work. (d) Perform all work off-site and have the equipment installed by Western Power or approved staff. NS 21-2006 Artwork on Western Power Assets 3

Administration 5 Administration 5.1 General (a) The applicant shall forward to Western Power the following documentation: A letter endorsing the proposed artwork by the local council and/or other governing bodies. A suitable representation of the intended artwork to allow Western Power to assess the application. This may be in the form of a sketch, worded description or photograph(s) of similar artwork A suitably detailed description of the asset eg. exact location, type etc. to allow Western Power to precisely identify the asset and confirm Western Power s ownership of the asset. (b) The applicant is responsible for maintaining a record of correspondence relating to the approval of the application. (c) Written approval must be obtained from Western Power for each and every proposed artwork within the scope of this standard. (d) Once approved, the artwork may not deviate from the originally submitted design without the approval of Western Power. Any changes must be forwarded to Western Power for approval at least 10 days prior to the works commencing. (e) Western Power reserves the right to approve or reject any application, irrespective of the requirements contained in this document. (f) (g) The applicant may be responsible for costs incurred by Western Power in the assessment of artworks where special investigation for suitability is required eg. Artworks spanning large numbers of poles. The applicant shall comply with Western Power s Safety and Environmental Policy which are available at http://www.westernpower.com.au NS 21-2006 Artwork on Western Power Assets 4

Administration 5.2 Risk Management, Insurance and Liability Western Power requires the applicant to have the following insurances and provide satisfactory evidence of the currency of the policies before commencing any work under this agreement. Insurances for: (a) Public Liability covering all liability to any third party for death, injury and loss of damage to property caused by or attributable to the work undertaken under this agreement for a limit of not less than $10 million. (b) (i) Workers Compensation - covering all paid persons who will be engaged in the work detailed in this agreement. The policy to be written under Western Australian legislation. (ii) Voluntary Workers Personal Accident Insurance - Covering all non paid persons who will be engaged in the work detailed in this agreement. (c) Motor Vehicle Third Party property insurance - covering all loss or damage to property to any third party caused by or attributable to the use of a motor vehicle in the performance of this agreement for a limit of not less than $10 million. The applicant shall consider road safety and protection of the work site during site works particularly when applying artwork to assets on or near roadways. Applicants are referred to WorkSafe s website for further information - http://www.safetyline.wa.gov.au NS 21-2006 Artwork on Western Power Assets 5

Artwork Conditions 6 Artwork Conditions 6.1 General All artwork on Western Power assets shall comply with the following conditions: (a) (b) (c) (d) (e) (f) Political posters, commercial artwork and any statement which advantages or disadvantages one business or group, may NOT be located on Western Power assets. Preference may be given to artwork following a nature, environmental or community theme, such as landscapes, animals etc. Artwork shall not contain hidden messages. Where the artwork is applied to a pole, the artwork shall not extend more than 1.8 metres above ground level. The artwork shall not involve attaching anything to the asset other than paint. Where the artwork is to be applied to an enclosure, it shall not obstruct ventilation or doors from opening. (g) All artwork shall have the words ARTWORK APPROVED BY LOCAL COUNCIL, in approximately 20mm high lettering in a visible colour, applied at the right bottom corner of the artwork (or 100 mm from base of the pole). (h) (i) (j) (k) (l) (m) The artwork shall not obscure any signage (such as pole detail disks, pole danger plates or fire hydrant location signs), identification labels or any other authorized markings on the pole or enclosure. Any artwork shall leave a 20mm zone around any markings to aid visibility of the markings. Artwork shall not be applied to poles identified in poor condition or those due for replacement (these are typically identified with grey or white plastic bands). The applicant shall comply with Western Australian traffic act and Police department requirements for traffic control, in conjunction with Western Power code of practice for traffic control. Western Power will not be liable for any cost associated with the artwork, or for any loss or damage to the artwork, which may occur during maintenance, repairs or replacement of the poles or enclosures. If the artwork deteriorates whereby Western Power believes is no longer in the community interest or detrimental to the condition of the asset, Western Power may cover the artwork at the Council s expense. In the event that the artwork is found to contravene road safety, the council shall be responsible to return the NS 21-2006 Artwork on Western Power Assets 6

Artwork Conditions assets to their original condition or paint over any artwork with a paint of colour specified by Western Power. (n) (o) (p) (q) (r) (s) (t) (u) (v) Any damage to Western Power equipment shall be immediately reported to Western Power. Repair shall be the responsibility of the applicant but no repairs shall be carried out without the prior written approval of Western Power. Western Power does not guarantee that assets to which artwork is applied will remain in their existing locations. Good quality grade material shall be used in the artwork. All materials shall be: Stable and non-reactive up to a temperature of 85 0 C. Non toxic Non hazardous Non detrimental to the finished product of Western Power s asset A Vicinity Authority Permit must be obtained from Western Power if artwork is to be applied on enclosures containing energised equipment or poles where access to equipment (eg. cables) has been identified. Supervision by Western Power may be required. The applicant shall be responsible for the cost of any Western Power supervision. Installed equipment must be isolated and earthed for children to work on. Isolation and earthing must be carried out by Authorised Switching Operators only. The applicant is to maintain the artwork in good order by way of regular inspection and repair. The size, location and type of artwork shall not be distracting to vehicle drivers. The artwork shall not be obtrusive or disturb the general ambience of the local community or be considered as offensive. Nothing (including ladder) shall be placed/leaned against any power pole or streetlight column NS 21-2006 Artwork on Western Power Assets 7

Artwork Conditions 6.2 Streetlight Columns 6.3 Steel Lattice Towers Artwork is NOT permitted on streetlight columns. Artwork is NOT permitted on steel lattice towers. 6.4 Transmission Assets Generally, approval will not be given to artworks on transmission ( 66kV) assets or assets with co-located transmission and distribution equipment. 6.5 Enclosures By agreement and special arrangement with Western Power, enclosures may be prepared and artwork applied off-site prior to installation. All costs incurred by Western Power under these arrangements shall be the responsibility of the applicant. NS 21-2006 Artwork on Western Power Assets 8