Similar documents
BIM/VDC on TAA Projects:

SUPPORT ROADS ALL AIRPORT SERVICES BUILDINGS. ONLY CARGO BUILDINGS (Tenants) Sign Types Summary SIGN TYPES - A.SERVICES

Trusted Power Distribution Unit MCB 24 Vdc

ELECTRICAL RISER & DISTRIBUTION. Co-X/FMD/SOP06

Informative (*Customer to review then remove this page from submitted witness test procedure)

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

CBCT TM CIRCUIT BREAKER COIL TESTER

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

PROTECTION of electricity distribution networks

Arc Flash Analysis Training

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

Remote Maintenance Box, RMB

Operating Manual. isolate501

WIRELESS THREE PHASE LINE FAULT MONITORING

SUBJECT HEADING: Switching Programmes ISSUE: 18

Technical Newsletter #tnl e # 1 / 23

Installation Manual REbus Beacon. Part of the Pika Energy Island M

ELECTRIC TRANSMISSION (ET) Guideline G0104

Licensed Electricians Practical Assessment (LEP)

Minnesota Rules, Chapter 4732 X-ray Revision

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT OFFICE

TABLE OF CONTENT

Tentative Program. ***For available speaker slots*** Mindfulness, Philosophy and Stress Management. conferenceseries.com Mindfulness 2018 B2B

Licensed Electricians Practical Assessment (LEP)

Table of Contents. Introduction... 1

MV network design & devices selection EXERCISE BOOK

PC IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List

Low Voltage Grid Monitoring

SECTION ELECTRICAL IDENTIFICATION

Model 3725/2M. Line Impedance Stabilization Network (LISN) User Manual

Chapter 25. Lighting Plans

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Catalogue 1SFC en, Edition 3 November 2003 Supersedes Catalogue 1SFC en, Edition 2 November Arc Guard System TVOC

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces

2014 NEC Changes Part 1

iant200 iant212 iant213 iant214 iant215 iant216 iant217 iant218 iant219 iant220 iant221 iant222 Operating Manual iant2xx Series of Antennas

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12

Section 7 Inteli-Touch Series Casablanca Fan Co. - Factory Service Department - Technical Library

Southern Company Interconnection Requirements for Inverter-Based Generation

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

The Upgradabilty of Conventional Three Phase Delta/Star Networks

SPECIAL NOTICE. All references to NAT product part numbers (and associated images) are equivalent to AEM product part numbers.

Circuit Breaker Based Feeder Pillar

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.

Survey of Operational Events

EI HIGH VOLTAGE INSULATION TESTING POLICY

Minnesota Rules, Chapter 4732 X-ray Revision

Christopher Substation

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks

RAIL MOUNTED NETWORK METER TYPE N27D USER S MANUAL

VACUUM INTERRUPTER APPLICATION NOTES Filename: VIAN X-Rays and Vacuum Interrupters Revision: 0 PAGE 1

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y

WRM-10 TM TRANSFORMER WINDING RESISTANCE METER

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

MidAmerican Energy Company 69 kv Facility Ratings Methodology

S&C Vista Underground Distribution Switchgear Outdoor Distribution

Low Voltage Products & Systems. ABB Arc Guard System TM TVOC

Protection of Electrical Networks. Christophe Prévé

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

SWITCHING SAFETY & RELIABILITY CONFERENCE

SECTION 16483D ADJUSTABLE FREQUENCY DRIVE - MICRODRIVE (MVX <10-HP)

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

SPECIAL SPECIFICATION 1806 Spread Spectrum Wireless Modem

Substation: From the Outside Looking In.

ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems

For Medium Voltage Motors, Generators, Switchgear, Bus Duct and Cable Terminations

SYNCHRONISING AND VOLTAGE SELECTION

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

IEEE sion/1547revision_index.html

SPECIFICATION FOR SINGLE-MODE OPTICAL FIBRES

EN V1.6.3 ( )

MICO Intelligent Power

INSTRUCTION MANUAL LKG 601 Electrical Safety Analyzer

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

Optimize Cell-Site Deployments

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

Tel: Fax:

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Low Frequency Demand Disconnection Summary

EISCAT Scientific Association Technical Specification and Requirements for Antenna Unit V 2.0

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

CP CU1. Coupling unit for line and ground testing

I Pr I P I OUT R L. Applications. Standards

Communication by power line carrier technology. For medium voltage networks

SECTION DISTRIBUTION SWITCHBOARDS

ECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE

BCV-1203 Barcode Verification System Users Guide Version 1.2

SEL Serial Radio Transceiver. The industry-recognized standard for reliable, low-latency wireless communications

TECHNICAL MEMORANDUM

Primary Metering. What is Primary Metering?

HUTCHINSON UTILITIES COMMISSION TRANSMISSION INTERCONNECTION GUIDELINES

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

AcuMesh Wireless RS485 Network. User's Manual SOLUTION

Transcription:

BIRD ISLAND FLATS SUBSTATION (BUILDING 67) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS CABLE CONNECTION POTENTIAL TRANSFORMER CURRENT TRANSFORMER VOLTAGE TRANSFORMER NORMALLY OPEN BUILDING NUMBER SUBSTATION & ASSOCIATED FEEDER COLOR CODES WOOD ISLAND SUB. 486 HARBORSIDE SUBSTATION INTERTIE (15A1-7) WOOD ISLAND SUBSTATION [2] INTERTIE (15W1-13) HARBORSIDE SUBSTATION INTERTIE (15A2-7) 15AE1-3 PORTER STREET SUB. 308 BIRD ISLAND FLATS SUB. 592 HARBORSIDE SUB. 152 UTILITY FEEDER (#592-70H) (#592-72X & Y) WARNING! This one line diagram has been prepared based on the latest available information from as-built drawings and visual field survey, updated and revised as marked. The accuracy and completeness of the information are not guaranteed or represented as correct. Actual field verification is required and all safety measures must be taken prior to operations and/or maintenance work. Only authorized personnel are allowed access to this equipment. This plan is intended for informational purposes only and no use shall be made of the same without the express written permission of the Massachusetts Port Authority ("Massport"). REVISION DATE: 12/23/16 MASSACHUSETTS PORT AUTHORITY LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MA CAPITAL PROGRAMS DEPARTMENT ELECTRICAL DISTRIBUTION SYSTEM ONE LINE DIAGRAMS BIRD ISLAND FLATS SUBSTATION (BUILDING 67) 4 105 S1L-02

WOOD ISLAND SUBSTATION (486) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES B.I.F. SUBSTATION [67] INTERTIE (15B1-8) DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS POTENTIAL TRANSFORMER PORTER ST. SUBSTATION [41] INTERTIE #1 (15P1-7) CURRENT TRANSFORMER VOLTAGE TRANSFORMER NORMALLY OPEN BUILDING NUMBER PREFERRED FEEDER SUBSTATION & ASSOCIATED FEEDER COLOR CODES WOOD ISLAND SUB. 486 PORTER STREET SUB. 308 BIRD ISLAND FLATS SUB. 592 (#486-199H) 15AE1-3 HARBORSIDE SUB. 152 UTILITY FEEDER (#486-198) WARNING! This one line diagram has been prepared based on the latest available information from as-built drawings and visual field survey, updated and revised as marked. The accuracy and completeness of the information are not guaranteed or represented as correct. Actual field verification is required and all safety measures must be taken prior to operations and/or maintenance work. Only authorized personnel are allowed access to this equipment. This plan is intended for informational purposes only and no use shall be made of the same without the express written permission of the Massachusetts Port Authority ("Massport"). REVISION DATE: 12/23/16 MASSACHUSETTS PORT AUTHORITY LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MA PORTER ST. SUBSTATION [41] INTERTIE #2 (15P2-6) CAPITAL PROGRAMS DEPARTMENT ELECTRICAL DISTRIBUTION SYSTEM ONE LINE DIAGRAMS WOOD ISLAND SUBSTATION (486) 5 105 S1L-03

PORTER STREET SUBSTATION (308) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS POTENTIAL TRANSFORMER UTILITY INCOMING (#308-197) UTILITY INCOMING (#308-54) CURRENT TRANSFORMER VOLTAGE TRANSFORMER NORMALLY OPEN BUILDING NUMBER PREFERRED FEEDER SUBSTATION & ASSOCIATED FEEDER COLOR CODES WOOD ISLAND SUB. 486 PORTER STREET SUB. 308 BIRD ISLAND FLATS SUB. 592 HARBORSIDE SUB. 152 WOOD ISLAND SUBSTATION [2] INTERTIE (15W2-8) 15AE1-3 UTILITY FEEDER WOOD ISLAND SUBSTATION [2] INTERTIE (15W1-2) HARBORSIDE SUBSTATION INTERTIE (15A2-2) HARBORSIDE SUBSTATION INTERTIE (15A1-2) WARNING! This one line diagram has been prepared based on the latest available information from as-built drawings and visual field survey, updated and revised as marked. The accuracy and completeness of the information are not guaranteed or represented as correct. Actual field verification is required and all safety measures must be taken prior to operations and/or maintenance work. Only authorized personnel are allowed access to this equipment. This plan is intended for informational purposes only and no use shall be made of the same without the express written permission of the Massachusetts Port Authority ("Massport"). REVISION DATE: 12/23/16 MASSACHUSETTS PORT AUTHORITY LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MA CAPITAL PROGRAMS DEPARTMENT ELECTRICAL DISTRIBUTION SYSTEM ONE LINE DIAGRAMS PORTER STREET SUBSTATION (308) 6 105 S1L-04

HARBORSIDE SUBSTATION (152) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS POTENTIAL TRANSFORMER CONTROL POTENTIAL TRANSFORMER VOLTAGE TRANSFORMER NORMALLY OPEN (#152-53H) (#152-87H) SUBSTATION & ASSOCIATED FEEDER COLOR CODES WOOD ISLAND SUB. 486 PORTER STREET SUB. 308 BIRD ISLAND FLATS SUB. 592 HARBORSIDE SUB. 152 UTILITY FEEDER 15AE1-3 BIF SUBSTATION INTERTIE (15B2-8) PORTER ST. SUBSTATION INTERTIE (15P2-12) PORTER ST. SUBSTATION INTERTIE (15P1-12) BIF SUBSTATION INTERTIE #1 (15B1-14) WARNING! This one line diagram has been prepared based on the latest available information from as-built drawings and visual field survey, updated and revised as marked. The accuracy and completeness of the information are not guaranteed or represented as correct. Actual field verification is required and all safety measures must be taken prior to operations and/or maintenance work. Only authorized personnel are allowed access to this equipment. This plan is intended for informational purposes only and no use shall be made of the same without the express written permission of the Massachusetts Port Authority ("Massport"). REVISION DATE: 10/14/15 MASSACHUSETTS PORT AUTHORITY LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MA CAPITAL PROGRAMS DEPARTMENT ELECTRICAL DISTRIBUTION SYSTEM ONE LINE DIAGRAMS HARBORSIDE SUBSTATION (152) 7 105 S1L-05