ELT Instrument Roadmap Mark Casali

Similar documents
Content. Instrumentation Programmes at ESO Mark Casali. Instrumentation at ESO. Future Instrument Programmes

The E-ELT Instrumentation Roadmap Presentation to the Project Science Team

Science Detectors for E-ELT Instruments. Mark Casali

MAORY E-ELT MCAO module project overview

Monica Tosi INAF Osservatorio Astronomico di Bologna

MAORY for E-ELT. Emiliano Diolaiti (INAF Osservatorio Astronomico di Bologna) On behalf of the MAORY Consortium

GMT Instruments and AO. GMT Science Meeting - March

The MCAO module for the E-ELT.

OWL Phase A Review - Garching - 2 nd to 4 th Nov Adaptive Optics. (Presented by N. Hubin) European Southern Observatory

High-contrast imaging with E-ELT/METIS. Olivier Absil Université de Liège

Preliminary Design Phase Activities, Priorities and Opportunities

ESO Industry Information Day. The UK Experience. 26 March 2015, Trinity College, Dublin

High Resolution Optical Spectroscopy in the ELT Era. Cynthia S. Froning University of Texas at Austin May 25, 2016

FP7 Workpackage 9 Minutes of Steering Group Meeting Edinburgh Sept 2013

PLATO Preliminary Requirements Review Technical Report

Technology Roadmapping An Overview for MAA Thrust Area Work Groups

Robo-AO: Robotic Laser Guide Star Adaptive Optics on the Palomar 60 in Christoph Baranec (PI) & Nick Law (PS)

Some Lessons Learned from Ground-based Telescope Operations. Markus Kissler-Patig ESO Deputy Director for Science

D/SCI/DJS/SV/val/21851 Paris, 5 March 2007 CALL FOR PROPOSALS FOR THE FIRST PLANNING CYCLE OF COSMIC VISION

NATIONAL MINISTRIES. GSO Framework for Global Infrastructures G8 + 5

Detector Control for the ELT (and the VLT) What we are doing and why?

The Research Infrastructures in FP7

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO)

OPTICON Firenze Meeting 8-10 November 2004

The Italian Industry Initiative for Large Astrophysical Projects

Square Kilometre Array where Science meets Industry

MAORY ADAPTIVE OPTICS

Toronto Reference Library Premium Rental Space Renovation Award of Tender

Engineering Grand Challenges. Information slides

Gemini 8m Telescopes Instrument Science Requirements. R. McGonegal Controls Group. January 27, 1996

Funding New Innovations

Technology Research Programme Italian Contribution

JRA5: Smart Focal Planes

Astrophysics. Paul Hertz Director, Astrophysics Division Science Mission

Research Infrastructures in FP7

PCS: E-ELT Planet finder

UKRI research and innovation infrastructure roadmap: frequently asked questions

An integral eld spectrograph for the 4-m European Solar Telescope

Robo-AO: The first autonomous laser guide star adaptive optics system for 1 to 3 meter telescopes

FP7-INFRASTRUCTURES

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES

The Next Generation CFHT *

PROGRAM UPDATEPDATE. Has anyone heard any good rumors lately? Steve Guilfoos AF SBIR/STTR Program Manager Spring 2007

Simulation team in Vienna. Joao Alves, Werner Zeilinger, Rainer Köhler, Michael Mach

e-infrastructures for open science

1. The life cycle of an ESA science mission and how to get involved

H2020 Theme Oriented Training on ICT. H2020 Overview. Thies Wittig. Deputy Team Leader Project "Turkey in Horizon 2020"

Astrophysics. Internal Scientist Funding Model Astrophysics Advisory Committee July 19, 2017

ERDF Stakeholder Workshop 4 th May 2016: Overview and Priorities

Wide-field Adaptive Optics for MOSAIC

The ELI-ALPS project ELI: Extreme Light Infrastructure ALPS: Attosecond Light Pulse Source. Zsolt Fülöp

pill Los Angeles World Airports

Foundations Required for Novel Compute (FRANC) BAA Frequently Asked Questions (FAQ) Updated: October 24, 2017

M1/M2 Ray Tracer. for High-Speed Mirror Metrology in the E-ELT. Ron Holzlöhner, 21 Sep 2016 European Southern Observatory (ESO)

Panel 2: Observatories

Role of the PI type instrument

Office Of Information Technology. Emerging Technology Adoption Process for General Purpose Classrooms

EX-ANTE EVALUATION METHODOLOGY FOR LARGE RESEARCH INFRASTRUCTURES

16502/14 GT/nj 1 DG G 3 C

Funding Opportunities for SME

Success Factors for downstreaming research results into CEN/CENELEC committees. Andreea Gulacsi CEN-CENELEC Management Centre

Project Overview. Kei Szeto MSE Project Manager

Consultation on Long Term sustainability of Research Infrastructures

For personal use only

Robotics: from FP7 to Horizon Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission

The Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages

Kevin Lesko LBNL. Introduction and Background

EGS-CC. System Engineering Team. Commonality of Ground Systems. Executive Summary

Typical Project Life Cycle

TOWARD THE NEXT EUROPEAN RESEARCH PROGRAMME

European Research Infrastructures Framework Programme 7

Establishing a reference framework for assessing the Socio-economic impact of Research Infrastructures

E-ELT Programme Science drivers

CAPACITIES. 7FRDP Specific Programme ECTRI INPUT. 14 June REPORT ECTRI number

A New Platform for escience and data research into the European Ecosystem.

FET Flagships in Horizon 2020

Public Art Network Best Practice Goals and Guidelines

LTS of Ris - Action plan - prospects for the future programming period

ESA Technology Programmes: Spanish Participation in TRP and GSTP

Astrophysics. Paul Hertz. First Response to Midterm Assessment. Director, Astrophysics Division Science Mission

The Public Agency for Technology of the Republic of Slovenia

FP7 Funding Opportunities for the ICT Industry

Tools of strategic governance of industrial innovation: Smart specialisation. 24 October, ECRN Jan Larosse

Executive Summary Fecha de preparación del Plan Estratégico: Marzo 2017

Terms of Reference for the Sub-committees and ad hoc Groups of the CIPM

Starshade Technology Development Status

!!! DELIVERABLE!D60.2!

Access to Research Infrastructures under Horizon 2020 and beyond

Research Infrastructures in FP6 WORKING DOCUMENT

Developing Research Infrastructures for 2020 and beyond

Developing Research Infrastructures for 2020 and beyond

Army Research Laboratory -Orlando TSIS 2017

AVOIDING TO TRADE SENSITIVITY FOR LINEARITY IN A REAL WORLD WFS

Request for Proposal WELLINGTON MUSEUM SUFFRAGE125 CONTEMPORARY ARTWORK. Page 1 of 8

Potential benefits of freeform optics for the ELT instruments. J. Kosmalski

An introduction to the 7 th Framework Programme for Research and Technological Development. Gorgias Garofalakis

learning progression diagrams

Tekes in the Finnish innovation system encouraging change in construction

Stakeholder and process alignment in Navy installation technology transitions

GLAO instrument specifications and sensitivities. Yosuke Minowa

Transcription:

ELT Instrument Roadmap Mark Casali AO module

ESO/COU 1275, December 2009 Nr. Selection process: criteria Evaluation Criteria for E-ELT instrument selection 1 Scientific Merit : (a) the instrument addresses science goals identified as of highest priority for the E-ELT (b) the instrument can be conceived as an E-ELT workhorse to be used for a variety of programmes, leading to a broad spectrum of potential discoveries (c) the instrument will benefit and complement observations of other major facilities in astrophysics like ALMA and the JWST, which will be already in operation at the time of first light 2 Proven Technical Feasibility and Simulated Performance: the instrument feasibility and its expected performance have been properly demonstrated in the study 3 Affordability: (a) the instrument cost is well estimated and justified (b) the cost to ESO falls within or close to the preliminary budget envelope. 4 Timely Match to the telescope + PFAO performance: the instrument schedule of implementation is well matched to the path of the telescope +AO to full performance. The instrument includes the possibility to do prime science even during the time when the telescope cannot operate with AO.

Science based prioritisation All instruments candidates for selection at first light with the exception of the planet camera and spectrograph, EPICS (highest scientific priority but long technology development) Science Working Group Criteria for selection of first light instruments Scientific impact, including certainty of scientific return Complementarity with other facilities Scientific Flexibility Selection process: scientific priority Coverage of expected observing conditions

First light instruments ELT-CAM: NIR diffraction-limited camera ELT-IFU: NIR IFU spectrograph with optical-ir coverage and seeing limited to diffraction limited capabilities ELT-MCAO (& LTAO): Adaptive optics systems as required to meet the science cases of each instrument A planetary camera/spectrograph with Extreme AO has high scientific priority and must be built once the technology is developed Instruments thereafter of equal scientific priority MIR/MOS/HIRES Selection process: the instrumentation plan

E-ELT Instrument Programme 2011 Approved Roadmap year ELT-IFU ELT-CAM ELT-3 ELT-4 ELT-5 ELT-6 ELT-PCS 2012 Decide science reqmts, AO architecture. VISIR start onsky Develop science requirements for MOS/HIRES proposals for ETD 2013 Selection ELT-MIR/MOS/HIRES proposals for MOS/HIRES 2014 2015 Selection ELT-MOS/HIRES proposals slipped 6 months 2016 2017 TRL check 2018 TRL check 2019 Selection TRL check 2020 TRL check 2021 TRL check 2022 Tel technical 1 st light Pre-studies taking the form of Phase-A or -Phase-A work and/or ESO-funded enabling technology development (ETD) Decision point Development of Technical Specifications, Statement of Work, Agreement, Instrument Start.

E-ELT Instrument Programme Approved Roadmap year ELT-IFU ELT-CAM ELT-3 ELT-4 ELT-5 ELT-6 ELT-PCS 2012 Decide science reqmts, AO architecture. VISIR start onsky Develop science requirements for MOS/HIRES proposals for ETD first-light Instruments 1 & 2 2013 Selection ELT-MIR/MOS/HIRES proposals for MOS/HIRES 2014 2015 Selection ELT-MOS/HIRES proposals ELT-CAM + ELT-MCAO ELT-IFU (+ LTAO) 2016 2017 TRL check 2018 TRL check 2019 Selection TRL check 2020 TRL check 2021 TRL check 2022 Tel technical 1 st light Pre-studies taking the form of Phase-A or -Phase-A work and/or ESO-funded enabling technology development (ETD) Decision point Development of Technical Specifications, Statement of Work, Agreement, Instrument Start.

E-ELT Instrument Programme Approved Roadmap year ELT-IFU ELT-CAM ELT-3 ELT-4 ELT-5 ELT-6 ELT-PCS 2012 Decide science reqmts, AO architecture. VISIR start onsky Develop science requirements for MOS/HIRES proposals for ETD first-light Instruments 1 & 2 2013 Selection ELT-MIR/MOS/HIRES proposals for MOS/HIRES 2014 2015 Selection ELT-MOS/HIRES 2016 proposals 2017 TRL check 2018 TRL check ELT-CAM + ELT-MCAO ELT-IFU (+ LTAO) Instruments 3,4,5 ELT-MIR ELT-MOS or HIRES 2019 Selection TRL check 2020 TRL check 2021 TRL check 2022 Tel technical 1 st light Pre-studies taking the form of Phase-A or -Phase-A work and/or ESO-funded enabling technology development (ETD) Decision point Development of Technical Specifications, Statement of Work, Agreement, Instrument Start.

E-ELT Instrument Programme Approved Roadmap year ELT-IFU ELT-CAM ELT-3 ELT-4 ELT-5 ELT-6 ELT-PCS 2012 Decide science reqmts, AO architecture. VISIR start onsky Develop science requirements for MOS/HIRES proposals for ETD first-light Instruments 1 & 2 2013 Selection ELT-MIR/MOS/HIRES proposals for MOS/HIRES 2014 2015 Selection ELT-MOS/HIRES 2016 proposals 2017 TRL check 2018 TRL check ELT-CAM + ELT-MCAO ELT-IFU (+ LTAO) Instruments 3,4,5 ELT-MIR ELT-MOS or HIRES 2019 Selection TRL check 2020 TRL check 2021 TRL check 2022 Tel technical 1 st light Instrument 6 open Pre-studies taking the form of Phase-A or -Phase-A work and/or ESO-funded enabling technology development (ETD) Decision point Development of Technical Specifications, Statement of Work, Agreement, Instrument Start.

E-ELT Instrument Programme Approved Roadmap year ELT-IFU ELT-CAM ELT-3 ELT-4 ELT-5 ELT-6 ELT-PCS 2012 Decide science reqmts, AO architecture. VISIR start onsky Develop science requirements for MOS/HIRES proposals for ETD first-light Instruments 1 & 2 2013 Selection ELT-MIR/MOS/HIRES proposals for MOS/HIRES 2014 2015 Selection ELT-MOS/HIRES 2016 proposals 2017 TRL check 2018 TRL check ELT-CAM + ELT-MCAO ELT-IFU (+ LTAO) Instruments 3,4,5 ELT-MIR ELT-MOS or HIRES 2019 Selection TRL check 2020 TRL check 2021 TRL check 2022 Tel technical 1 st light Pre-studies taking the form of Phase-A or -Phase-A work and/or ESO-funded enabling technology development (ETD) Decision point Development of Technical Specifications, Statement of Work, Agreement, Instrument Start. Instrument 6 open ELT-PCS Tech development start at suitable TRL

Current work Science requirements Project organisation FL instruments Specifications 2014 Enabling technology Telescope interfaces

Science Requirements ELT Science Office J.Spyromilio ELT Project Science Team G.Bono Science Community ELT Instrumentation Programme M.Casali Instrument Community Specifications, contracts, management plans financing + regular discussions with ESO senior committees

Enabling technology Funding available to bring key technologies to sufficient maturity Deformable mirrors Detectors (both WFS and science) High contrast observations (PCS)

Telescope Interfaces General requirements document under revision Cryo-infrastructure currently in design. Phase A review in 2013. Standard components (detector controllers, RTCs) under study. Reviews and conclusions late 2013.

Project Organisation Consortium organisation is key to success Management plans under discussion Revision/discussion till agreement on both sides Convergence by mid-2013. Subsequently SoW & Instrument specifications. ESO Instrument management meeting working together Exchange of views, ideas, experience from both sides, methods for remote collaboration Early 2014

status Instrument/ module ELT-CAM ELT-IFU status PI: Davies (MPE) PST Science requirements prepared Discussing organisation and PMP PI: Thatte (Oxford/ATC) PST Science requirements prepared Discussing organisation and PMP agreement 2014 2014 ELT-MCAO PI: Diolaiti (INAF) Discussing organisation and PMP 2014 ELT-LTAO TBD Still examining possible designs and interfaces TBD Slide 15

procurement As stated in construction proposal. Phase-A consortia will be contracted to take firstlight instruments to construction subject to agreement on both sides regarding the project organisation. Subsequent calls will be competitive ESO will pay for capital costs Consortia effort will be compensated by GTO

GTO availability GTO remains below 15%. Paper to council in 2010.

Community Effort and GTO Community (non-eso) FTEs/year for instrumentation 180 160 140 120 100 80 60 40 20 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 KMOS MUSE SPHERE AOF Matisse Gravity Espresso VLTnew1 VLTnew2 VLTnew3 ELT PhA ELT-CAM ELT-IFU ELT-3 ELT-4 ELT-5 ELT-6 ELT-PCS ELT-ETD Staff resources in the community are available at approximately the current levels of ESO commitment

END and Questions Slide 19