BLDG. OG-8 PLUMBING 1ST FLOOR PLAN

Similar documents
NEW YORK CITY HOUSING AUTHORITY 250 BROADW AY NEW YORK, NY ADDENDUM #6

SECTION FUEL OIL SYSTEM (PLUMBING)

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

Mechanical Design. Brian Brinson Mechanical Design Manager.

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION BASIC MATERIALS AND METHODS

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

Standard Specifications

Compliant to DOE 10, CFR Part 431 (effective as of January 1 st, 2016)

SECTION METAL FABRICATIONS

Manholes Table of Contents

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

Allentown, PA - Plant Expansion Steel Pipe Spec. No. 671-S40 December 31, 2015

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

Requ est fo r sea led bids for an addition to Be ave r Lake Bathhouse

Code Review The following is a review of selected portions of the International Building Code 2015 (IBC2015) which apply to this project.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS

SECTION TRANSFORMERS

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Square Straight Steel - 4 Bolt Base Light Poles

SECTION MECHANICAL IDENTIFICATION

How to Identify a PBM VALVE SERIES

Requirement for Holes - Holes for Hanging

DISTRIBUTION VAULT 8' x 14' x 9'-4" DEEP TRAFFIC FLAT WALL WITH 5' x 8' OPENING

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

PENINSULA - TYPE 1 3/8"=1'-0" ADA PENINSULA - TYPE 3 3/8"=1'-0" PENINSULA - TYPE 2 3/8"=1'-0" VANITY TYPES - NOTES 3/8"=1'-0"

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

This specification describes the minimum requirements for piping systems for the following service:

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service:

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

We Are the Worldwide Provider for All Your Valve and Fitting Needs

Project: # Solano Community College District

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

American Safe Room. Explosion Resistant Blast Hatch with Integrated Riser

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

BUILDING PLAN REVIEW REQUIREMENTS

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

SECTION MANHOLES

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements.

STEEL PIPE GUIDERAIL 01/01/

SECTION PROJECT COORDINATION VIA BIM

Buffer Tanks. Hydronic Accessories

GENERAL ISOMETRIC LAYOUT

ROCK DRILLS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

Compressors, Chillers & Condensers

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

Series 80 In-Line Mounted Centrifugal Pumps

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.

SECTION CABLE TRAYS

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

SECTION MECHANICAL IDENTIFICATION

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION MECHANICAL IDENTIFICATION

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

Training Manual The Installation of Siphonic Pipework

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

SECTION BULLET- RESISTANT DOORS

SECTION 025 INDUSTRIAL PAINTING

General Information...SA1-SA4

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

Residential Construction Checklist Single and Two Family Construction

CITY OF MUSKEGO DRAFTING STANDARDS

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

QUALITY ASSURANCE SPECIFICATION

EARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL:

744 Kent Minh, Project Engineer

NCCER Progress Blvd, Alachua, Florida Phone: (888)

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY

SIG-032-B TRAFFIC SIGNAL MAST ARM POLE AND MAST ARM DETAILS - CATEGORY III LUMINAIRE ARM (SEE CONTRACT) 6'-0", 8'-0", 10'-0" NOMINAL SPREAD

INSTRUCTIONS FOR AIRFLEX 36WCBEP/36WCSEP WEAR PLATE REPLACEMENT USING GASKET SEALING TAPE

Midwest Roadside Safety Facility

Ritz Instrument Transformers GmbH. Welcome

Thru Wall Floor Seals For New Installation

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

Submittal Packages Detailed with Items and Reviewers

Transcription:

3 4. 3 4 P PROGRM UNIT: SNDY PROGRM UNIT (ROOKLYN) rchitect PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. IR ELEVTOR PLUMING SHFT IR MEPF LKHNI & JORDN ENGINEERS, P.. Lighting Design onsultant T..D. Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN Expediting onsultant WILLIM VITO SSOITES, LTD. Elevator onsultant IROS ORRIDOR OIL PUMP P GS SERVIE G 08/5/8 0//8 y Date Rev. No. Development: DDENDUM # 0 ID ISSUE Submissions uilding ddress: 9 WE 33RD REET ROOKLYN, NEW YORK 4 uilding No.(s): 0G-8 orough of: ORLE No: rooklyn TD 3 REET ORGE G NEPTUNE VE 3ND REET 33RD REET 35TH REET NORTH MERMID VENUE E WE SITE 8 SOUTH SURF VENUE OIL TNK 3TH REET P Key Plan Zone No.: R lock No.: 7047 E.D.P. No.: TD Development No.: TD Zoning Map No.: 8d Lot No.: 4 ontract Title: REORTION SSOITED WITH SNDY REOVERY PROGRM - ONEY ISLND SITES, ROOKLYN ontract No.: E509 +G Project No.: 504 Drawing Title: PLUMING FLOOR PLN Seal & Signature D Drawn y: hecked y: SI Date: Scale: S NOTED LDG. OG-8 PLUMING FLOOR PLN N OG-8 Sheet 3 Drawing No.: P-0.00 of 4 SLE: /4" = '-0" 3 4

3 4.4 3 PROGRM UNIT: PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 SNDY PROGRM UNIT (ROOKLYN) rchitect 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. MEPF LKHNI & JORDN ENGINEERS, P.. Lighting Design onsultant T..D. Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN Expediting onsultant WILLIM VITO SSOITES, LTD. P Elevator onsultant IROS FE FE FIR FLOOR IR 08/5/8 DDENDUM # PUMP ROOM 0//8 y Date 0 ID ISSUE Rev. No. Submissions G Development: uilding ddress: 83 WE 3ND REET ROOKLYN, NEW YORK 4 uilding No.(s): SG- orough of: rooklyn ORLE No: TD FUEL OIL ORGE TNK ROOM G NEPTUNE VE 3 REET 3ND REET 33RD REET 35TH REET NORTH MERMID VENUE E WE SITE 8 SOUTH SURF VENUE IR 3TH REET Key Plan.7 GS ROOM PLUMING SHFT P Zone No.: R lock No.: 7007 E.D.P. No.: TD Development No.: ontract Title: TD Zoning Map No.: 8d Lot No.: REORTION SSOITED WITH SNDY REOVERY PROGRM - ONEY ISLND SITES, ROOKLYN ontract No.: E509 +G Project No.: 504 Drawing Title: PLUMING FLOOR PLN Seal & Signature Drawn y: hecked y: SI Date: Scale: S NOTED LDG. SG- PLUMING FLOOR PLN SLE: /4" = '-0" N SG- Sheet 3 Drawing No.: P-0.00 of 4 3 4

3 4. 3 4 PROGRM UNIT: PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 SNDY PROGRM UNIT (ROOKLYN) rchitect IR 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. PLUMING SHFT IR MEPF LKHNI & JORDN ENGINEERS, P.. Lighting Design onsultant T..D. Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN TOILET Expediting onsultant WILLIM VITO SSOITES, LTD. Elevator onsultant IROS P G 08/5/8 DDENDUM # 0//8 y Date 0 ID ISSUE Rev. No. Submissions Development: OILER ROOM uilding ddress: 9 WE 33RD REET ROOKLYN, NEW YORK 4 uilding No.(s): 0G-8 orough of: ORLE No: rooklyn TD G 3 REET 3ND REET NORTH E SOUTH NEPTUNE VE 33RD REET 35TH REET MERMID VENUE WE SITE 8 SURF VENUE 3TH REET Key Plan Zone No.: R lock No.: 7047 E.D.P. No.: TD Development No.: TD Zoning Map No.: 8d Lot No.: 4 ontract Title: REORTION SSOITED WITH SNDY REOVERY PROGRM - ONEY ISLND SITES, ROOKLYN ontract No.: E509 +G Project No.: 504 Drawing Title: PLUMING ND FLOOR PLN Seal & Signature D Drawn y: hecked y: SI LDG. OG-8 PLUMING ND FLOOR PLN SLE: /4" = '-0" N Date: Scale: OG-8 Sheet 4 Drawing No.: P-0.00 of S NOTED 4 3 4

3 4 3 PROGRM UNIT: PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 SNDY PROGRM UNIT (ROOKLYN) rchitect 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. MEPF LKHNI & JORDN ENGINEERS, P.. Lighting Design onsultant T..D. IR Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN G Expediting onsultant WILLIM VITO SSOITES, LTD. Elevator onsultant IROS ELETRIL SERVIE 08/5/8 DDENDUM # SEURITY ORRIDOR 0//8 y Date Rev. No. Development: uilding ddress: 97 WE 3ND REET ROOKLYN, NEW YORK 4 uilding No.(s): OG-0 orough of: rooklyn 0 ID ISSUE Submissions ORLE No: TD P 3 REET NEPTUNE VE 3ND REET 33RD REET 35TH REET NORTH MERMID VENUE E WE SITE 8 SOUTH SURF VENUE 3TH REET Key Plan PLUMING SERVIE TOILET Zone No.: R lock No.: 7048 E.D.P. No.: TD Development No.: TD Zoning Map No.: 8d Lot No.: 5 ontract Title: REORTION SSOITED WITH SNDY REOVERY PROGRM - ONEY ISLND SITES, ROOKLYN ontract No.: E509 D PLUMING SHFT EXIT. IR +G Project No.: 504 Drawing Title: PLUMING ND FLOOR PLN Seal & Signature LDG. OG-0 PLUMING ND FLOOR PLN SLE: /4" = '-0" N Drawn y: hecked y: Date: Scale: OG-0 Sheet 4 Drawing No.: P-0.00 of SI S NOTED 3 3 4

3 4 3 4 5 PROGRM UNIT: SNDY PROGRM UNIT (ROOKLYN) rchitect PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. MEPF LKHNI & JORDN ENGINEERS, P.. Lighting Design onsultant T..D. G Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN IR ORRIDOR IR Expediting onsultant WILLIM VITO SSOITES, LTD. Elevator onsultant IROS FE FE TOILET G 08/5/8 DDENDUM # 0//8 y Date 0 ID ISSUE Rev. No. Submissions Development: ELETRIL SERVIE uilding ddress: 94 WE 3 REET ROOKLYN, NEW YORK 4 uilding No.(s): SG-7 orough of: rooklyn ORLE No: TD PLUMING SHFT PLUMING 3 REET 3ND REET NORTH E SOUTH NEPTUNE VE 33RD REET 35TH REET MERMID VENUE WE SITE 8 SURF VENUE 3TH REET Key Plan Zone No.: R lock No.: 7049 E.D.P. No.: TD Development No.: TD Zoning Map No.: 8d Lot No.: 5 ontract Title: REORTION SSOITED WITH SNDY REOVERY PROGRM - ONEY ISLND SITES, ROOKLYN ontract No.: E509 +G Project No.: 504 Drawing Title: PLUMING ND FLOOR PLN Seal & Signature LDG. SG-7 PLUMING ND FLOOR PLN N SLE: /4" = '-0" Drawn y: hecked y: SI Date: Scale: S NOTED SG-7 Sheet 4 Drawing No.: P-0.00 of 4 3 4

3 4 PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 PROGRM UNIT: 3 4 5 SNDY PROGRM UNIT (ROOKLYN) rchitect 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. MEPF LKHNI & JORDN ENGINEERS, P.. G Lighting Design onsultant T..D. Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN Expediting onsultant WILLIM VITO SSOITES, LTD. Elevator onsultant IROS IR IR FE FE GENERTOR 08/5/8 DDENDUM # 0//8 y Date 0 ID ISSUE Rev. No. Submissions Development: uilding ddress: 94 WE 3 REET ROOKLYN, NEW YORK 4 uilding No.(s): SG-7 orough of: rooklyn ORLE No: TD 3 REET FIRE SERVIE ROOM.T.S NEPTUNE VE 3ND REET 33RD REET 35TH REET 3TH REET NORTH MERMID VENUE E WE SITE 8 SOUTH SURF VENUE Key Plan Zone No.: R lock No.: 7049 E.D.P. No.: TD Development No.: TD Zoning Map No.: 8d Lot No.: 5 SEURITY ROOM ontract Title: REORTION SSOITED WITH SNDY REOVERY PROGRM - ONEY ISLND SITES, ROOKLYN ontract No.: E509 +G Project No.: 504 Drawing Title: PLUMING 3RD FLOOR PLN Seal & Signature LDG. SG-7 PLUMING 3RD FLOOR PLN N SLE: /4" = '-0" Drawn y: hecked y: SI Date: Scale: S NOTED SG-7 Sheet 5 Drawing No.: P-03.00 of 4 3 4

3 4 PROGRM UNIT: PITL PROJETS DIVISION OFFIE OF REOVERY & RESILIENE TEL.30.474 FX.30.854 50 roadway, 7th FL New York, New York 0007 SNDY PROGRM UNIT (ROOKLYN) rchitect RHITETS LLP 0 0 0.8 0.9 03 03. 99 roadway, Suite 07 New York, New York 0007 Storm Water & Urban Planning, ivil Eng & L.. NTE Structural Engineer YSREL. SEINUK, P.. MEPF LKHNI & JORDN ENGINEERS, P.. -H Lighting Design onsultant T..D. Facade/ Roof onsultant ONSULTING SSOITES OF NY, IN Geotechnical Engineering GT ENGINEERING SERVIES Environmental/ Hazmat onsultant ENVIRONMENTL PLNNING & MGMT, IN Expediting onsultant WILLIM VITO SSOITES, LTD. Elevator onsultant IROS -H ELETRIL PLUMING SHFT -H D-H P G 08/5/8 0//8 y Date Development: ONEY ISLND SITE 8 uilding ddress: 950/95 WE 35TH REET ROOKLYN, NEW YORK 4-455 uilding No.(s): S8- orough of: rooklyn Rev. No. DDENDUM # 0 ID ISSUE Submissions ORLE No: 8304 PLUMING.. 3 REET 3ND REET NORTH E SOUTH NEPTUNE VE 33RD REET 35TH REET MERMID VENUE WE SITE 8 SURF VENUE 3TH REET D IR FE FE HLL IR ESS E-H Key Plan Zone No.: R Zoning Map No.: 8b lock No.: 704 Lot No.: E.D.P. No.: 334 Development No.: NY00557 ontract Title: REORTION SSOITED WITH SNDY REOVERY PROGRM T ONEY ISLND SITES, ROOKLYN ontract No.: E509 +G Project No.: 504 LDG. S8- PLUMING ND FLOOR DDITION PLN N Drawing Title: PLUMING ND FLOOR DDITION PLN Seal & Signature SLE: /4" = '-0" Drawn y: hecked y: Date: Scale: S8- Sheet 0// Drawing No.: P-4.00 of SI S NOTED 8 3 4

E-0.00

E-0.00

E-04.00

E-05.00

REORTION SSOITED WITH ONTRT #:GR889 SNDY REOVERY PROGRM ONEY ISLND SITES ugust, 08 NOT USED DIVISION 4 - ONVEYING EQUIPMENT 440 HYDRULI ELEVTORS DIVISION - FIRE SPRESSION 0500 OMMON WORK RESULTS FOR FIRE-SPRESSION 057 SLEEVES ND SLEEVE SELS FOR FIRE-SPRESSION PIPING 058 ESUTHEONS FOR FIRE-SPRESSION PIPING 00 FIRE-SPRESSION NDPIPES 33 WET-PIPE SPRINKLER SYEMS 3 DRY PIPE SYEM DIVISION - PLUMING 000 GENERL REQUIREMENTS FOR PLUMING WORK 0500 OMMON WORK RESULTS FOR PLUMING 057 SLEEVES ND SLEEVE SELS FOR PLUMING PIPING 058 ESUTHEONS FOR PLUMING PIPING 053 GENERL DUTY VLVES 059 HNGERS ND SPORTS 0533 HET TRING FOR PLUMING PIPING 0553 IDENTIFITION FOR PLUMING PIPING ND EQUIPMENT 0700 PLUMING PIPING INSULTION DOMEI WTER PIPING 9 DOMEI WTER PIPING SPEILTIES 3 DOMEI WTER PUMPING SYEM 3 SNITRY WE PIPING 39 SNITRY WE PIPING SPEILTIES 43 ORM DRINGE PIPING SPEILTIES 49 EJETOR PUMPS, SUMP PUMPS ND HOT WTER IRULTION PUMPS 3500 DOMEI EM-T0-WTER SEMI-INNTNEOUS HETER 300 GS SERVIE ND PIPING 400 PLUMING FIXTURES 33 UNDERGROUND DOMEI OLD ND HOT WTER DIRIUTION PIPING DIVISION 3 - HETING VENTILTING ND IR ONDITIONING 30000 - SPEIL REQUIREMENTS FOR MEHNIL ND ELETRIL WORK 3000 GENERL PROVISIONS FOR HV WORK 30500 OMMON WORK RESULTS FOR HV 3053 OMMON MOTOR REQUIREMENTS FOR HV EQUIPMENT 305 EXPNSION FITTINGS ND LOOPS FOR HV PIPING 3057 SLEEVES ND SLEEVE SELS FOR HV PIPING 3058 ESUTHEONS FOR HV PIPING 3059 METERS ND GUGES FOR HV PIPING 3053 GENERL DUTY VLVES FOR HV PIPING 3059 HNGERS ND SPORTS FOR HV PIPING ND EQUIPMENT id ddendum # ugust, 08 Table of ontents T - Page 4 of 7

REORTION SSOITED WITH ONTRT #:E509 SNDY REOVERY PROGRM ONEY ISLND SITES February, 08. INSULTED, EEL, FUEL-OIL. Manufacturers: Subject to compliance with requirements, provide products by one of the following:. ontainment Solutions, Inc.. ce Tank & Equipment ompany. 3. damson Global Technology orporation. 4. reo Power Unitized Fueler Inc. 5. rown Tank Enviro Safe.. onvault, Inc. 7. Hamilton Tanks. 8. Highland Tank & Manufacturing ompany, Inc. 9. Modern Welding ompany, Inc. 0. Palmer Manufacturing & Tank Inc.. Steel Tank & Fabricating o., Inc.. We-Mac Manufacturing, Inc.. Description: UL 085, thermally insulated and fire-resistant, double-wall, horizontal, steel tank; with primary- and secondary-containment walls and insulation and with interstitial space.. onstruction: Fabricated with welded, carbon steel and insulation; suitable for operation at atmospheric pressure and for storing fuel oil with specific gravity up to. and with test temperature according to UL 085. D. apacities and haracteristics: ldg. OG-8:. apacity: 8,000 gal.. Diameter: 8 -. 3. Length: 3-0". 4. Tank Height: 9-4 5. Tank Fitting Sizes: a. Fill Line: 4. b. Normal Vent, Primary Tank: 4. c. Emergency Vent, Primary Tank: 8". d. Emergency Vent, Secondary Tank: 8" e. Outlet: 3. f. Return:. g. Liquid Level Gauge:. h. Electronic Level Gauge: 4.. Manholes: a. Number Required:. b. Diameter: 4 8". 7. Fuel-Oil Grade Number:. ldg. SG-:. apacity:,000 gal.. Diameter: 5-4. id ddendum # - ugust 5, 08 Facility Fuel-Oil Piping Division 3 3 3 - Page 0 of

REORTION SSOITED WITH ONTRT #:E509 SNDY REOVERY PROGRM ONEY ISLND SITES February, 08 3. Length: 0. 4. Tank Height: - 5. Tank Fitting Sizes: a. Fill Line: 3. b. Normal Vent, Primary Tank: 4 ". c. Emergency Vent, Primary Tank:. d. Emergency Vent, Secondary Tank: ". e. Outlet:. f. Return: ¼. g. Liquid Level Gauge:. h. Electronic Level Gauge: 3.. Manholes: a. Number Required:. b. Diameter: 4 8". 7. Fuel-Oil Grade Number:..7 SHOP PINTING OF. pply manufacturer's standard prime coat to exterior steel surface of and supports.. Prepare exterior steel surface of and tank supports.. Shop leaning: fter fabrication, blast clean according to SSP-SP /NE No. 3. D. fter cleaning, remove dust or residue from cleaned surfaces. E. If surface develops rust before prime coat is applied, repeat surface preparation. F. pply manufacturer's standard prime coat to shop-cleaned, dry surface same day as surface preparation. G. pply manufacturer's standard two-component, epoxy finish coats..8 FUEL-OIL ESSORIES. Tank Manholes: 4-inch- minimum diameter; bolted, flanged, and gasketed; centered on top of tank.. Threaded pipe connection fittings on top of tank, for fill, supply, return, vent, sounding, and gaging. Include cast-iron plugs for shipping.. Striker Plates: Inside tank, on bottom below fill, vent, sounding, gage, and other tube openings. D. Lifting Lugs: For handling and installation. E. Ladders: arbon-steel ladder outside tank, anchored to top and side wall. omply with requirements in Section 055000 "Metal Fabrications" for exterior steel ladder. id ddendum # - ugust 5, 08 Facility Fuel-Oil Piping Division 3 3 3 - Page of

REORTION SSOITED WITH ONTRT #:E509 SNDY REOVERY PROGRM ONEY ISLND SITES February, 08 SETION 33 - UNDERGROUND PRE-ENGINEERED PIPING SYEMS PRT - GENERL. RELTED DOUMENTS. Drawings and general provisions of the ontract, including General and Supplementary onditions and Division 0 Specification Sections, apply to this Section.. Only the latest editions of referenced standards, codes, and specifications enforced at the date of bid opening shall be applicable. These shall be supplemented by, and superseded by, if in conflict, by the New York ity uilding ode unless otherwise directed by the uthority.. Thermal insulation shall be applied to the piping systems of materials as specified herein and as required by the 0 NY Energy onservation ode.. SUMMRY. Section Includes:. Service pipes and fittings.. onduit piping systems. 3. ased piping systems..3 PERFORMNE REQUIREMENTS. Provide components and installation capable of producing hydronic piping systems with the following minimum working-pressure ratings:. Low Pressure Steam Piping: 5 psig at 50 deg F.. Pumped ondensate Piping: 85 psig at 0 deg F. 3. Domestic old Water Piping: 85 psig at 50 deg F. 4. Domestic Hot Water and Return Piping 85 psi at 40 deg F..4 TION SUMITTLS. Product Data: For the following:. onduit piping.. ased piping. 3. Thermal insulation.. Shop Drawings: For underground pre-engineered piping. Signed and sealed by a professional engineer.. alculate requirements for expansion compensation for underground piping. id ddendum # - ugust 5, 08 Underground Pre-engineered Piping Systems Division 3 3 3 - Page of 0