SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

Arc Flash Analysis and Documentation SOP

ARC FLASH & PPE UPDATE. Michael Olivo, P.E. Aaron Ramirez, E.I.T.

The advantages of transformers. EMC-ESD in de praktijk Jan-Kees van der Ven

REDUCING ARC FLASH HAZARD BY REMOTE SWITCHING

NATIONAL ELECTRIC SAFETY CODE 2012 EDITION

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis

Steve Kovach District Sales Engineer

THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA

A Guide to Establish an Arc Flash Safety Program for Electric Utilities

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013

DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE

Key factors to maintaining arc flash safety

Arc Flash and NFPA 70E

Arc Flash Calculation Methods

STANDARDIZING ARC FLASH PPE LABELS

Paul Dobrowsky Innovative Technology Services

2014 NEC Changes Part 1

Arc Flash Analysis Training

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010

CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS

Electrical Measurement Safety. Sponsored By:

Cause, Effect & Mitigation Strategies

APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY

NOTICE ER Roland Flood Pumping Station Arc Flash Study

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

SECTION POWER SYSTEMS STUDIES

DESIGN STANDARD DS 29

Education & Training

Webinar: An Effective Arc Flash Safety Program

Electrical Overcurrent Studies

Selection of PPE Practical experience of different arc assessment methods and their comparison

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS

Ft Worth IEEE-PES. Presented by: Doug Harris Specifications Engineer Dallas, TX. Arc-Flash Hazard Mitigation & Selectivity

Arc Flash Hazard Standards:

Arc Hazard Assessment for DC Applications in the Transit Industry

Electrical Safety Policy Health and Safety FCX-HS03 Release 07/2018 Version 1

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

Electrical Severity Measurement Tool Revision 4

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

Arc Flash Study Principles & Procedures for below 15 kv AC Systems. Xuan Wu, Dennis Hoffman, Ronald Wellman, and Manish Thakur

Electrical Wiring: Commercial, Seventh Canadian Edition

3Ø Short-Circuit Calculations

ARC FLASH HAZARD ANALYSIS AND MITIGATION

Electrical PIP ELEGL03 Guidelines for Power Systems Analysis

Power System Study for the Pebble #2 Lift Station Las Vegas, Nevada

Selective Coordination for Emergency and Legally-Required Standby Power Distribution Systems

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

Short Circuit Current Calculations

CREATING A COMPARATIVE MAP OF RELATIVE POWER FOR DC ARC FLASH METHODOLOGIES. A Thesis. presented to

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

INTELLIMETER REGISTER

THREE-PHASE SHORT-CIRCUIT TESTING OF HIGH-VOLTAGE CIRCUIT-BREAKERS USING SYNTHETIC CIRCUITS

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017

Licensed Electricians Practical Assessment (LEP)

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

I Pr I P I OUT R L. Applications. Standards

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

7. INSPECTION AND TEST PROCEDURES

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Electric Arc and associated Hazards in the Rail Transit Industry Are we up to date with current developments?

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

APS M1P Single-phase Micro-inverter Installation and User Manual

OSHA & Arc Flash. Scott Ray Distribution Project Engineer POWER Engineers, Inc.

Industrial Electrician Level 3

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

Best Practice Reducing The Risk of Arc Flash Cross Over

I P I OUT R L. Applications. Standards. N 52.D ; Page 1/8

Licensed Electricians Practical Assessment (LEP)

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET

PRODUCTIVELY SAFER LOCK-OUT TAG-OUT PROCEDURE

SECTION DISTRIBUTION SWITCHBOARDS

APS M1P Single-phase Micro-inverter Installation and User Manual

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

ETAP PowerStation 4.0

Lookout Brook Hydro Plant Refurbishment (Clustered), p. 4 of 96, $2,155,000

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

Bruce L. Graves /01/$ IEEE. IEEE Industry Applications Magazine PhotoDisc, Inc.

VIP ESI. Electrical Service Industry Voltage and Impedance Indicator. Instruction Manual & Specification

Transcription:

110.16 First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1) Nominal system voltage (2) Arc flash boundary (3) At least one of the following: (a) (b) (c) Available incident energy and the corresponding working distance Minimum arc rating of clothing Site-specific level of PPE Informational Note No. 1: NFPA 70E-2012, Standard for Electrical Safety in the Workplace, provides guidance, such as determining severity of potential exposure, planning safe work practices, arc flash labeling, and selecting personal protective equipment. Informational Note No. 2: ANSI Z535.4-1998, Product Safety Signs and Labels, provides guidelines for the design of safety signs and labels for application to products.

1. Fault current on primary side 2. Fault current at secondary terminals of transformer. 3. Fault current based upon maximum transformer that can be installed

3

33.0 33.0 12.5 12.5 12.5 12.5 4

5

Section Source Limitations/Parameters D.2 D.3 D.4 Lee The Other Electrical Hazard: Electrical Arc Flash Burns Doughty, et al., Predicting Incident Energy to Better Manage the Electrical Arc Hazard on 600 V Power Distribution Systems IEEE 1584, Guide for Performing Arc Flash Calculations Calculates incident energy and arc flash boundary for arc in open air; conservative over 600 V and becomes more conservative as voltage increases Calculates incident energy for three-phase arc on systems rated 600 V and below; applies to shortcircuit currents between 16 ka and 50 ka Calculates incident energy and arc flash boundary for: 208 V to 15 kv; three-phase; 50 Hz to 60 Hz; 700 A to 106,000 A short-circuit current; and 13 mm to 152 mm conductor gaps D.5 Doan, Arc Flash Calculations for Exposure to DC Systems Calculates incident energy for dc systems rated up to1000 V dc

130.5(D) Labeling (NFPA 70E) (D) Equipment Labeling. Electrical equipment such as switchboards, panelboards, industrial control panels, meter socket enclosures, and motor control centers that are in other than dwelling units and that are likely to require examination, adjustment, servicing, or maintenance while energized shall be field-marked with a label containing all the following information: (1) Nominal system voltage (2) Arc flash boundary (3) At least one of the following: a. Available incident energy and the corresponding working distance, or the arc flash PPE category in Table 130.7(C)(15)(A)(b) or Table 130.7(C)(15)(B) for the equipment, but not both b. Minimum arc rating of clothing c. Site-specific level of PPE

Equipment Category Risk Category AFB Panelboards or other equipment rated 240 V and below Maximum of 25 ka short-circuit current available; maximum of 0.03 sec (2 cycles) bolted-fault clearing time; working distance 18 inches Panelboards or other equipment rated > 240 V and up to 60 Maximum of 25 ka short-circuit current available; maximum of 0.03 sec (2 cycles) bolted-fault clearing time; working distance 18 inches 600-V class motor control centers (MCCs) Maximum of 65 ka short-circuit current available; maximum of 0.03 sec (2 cycles) bolted-fault clearing time; working distance 18 inches 600-V class motor control centers (MCCs) Maximum of 42 ka short-circuit current available; maximum of 0.33 sec (20 cycles) bolted-fault clearing time; working distance 18 inches 600-V class switchgear (with power circuit breakers or fused switches) and 600 V class switchboards Maximum of 35 ka short-circuit current available; maximum of up to 0.5 sec (30 cycles) bolted-fault clearing time; working distance 18 inches 1 2 2 3 2 5 4 14 4 20

Issues with proposed 110.16 Too many ways to calculate Incident Energy from Fault Current. First Draft Language missing Arc Flash PPE Categories Most dangerous part of electrical system is line side of service disconnect and we are ignoring this. Most installers do not even use the label In our opinion we are not ready for 2017. Recommend a task group to address all concerns and see if common ground can be achieved to achieve a more clear, easier approach to address the issue.