Assembly instruction Shelving System Hi280 Silverline
|
|
- Britton Hicks
- 5 years ago
- Views:
Transcription
1 A Member of the Constructor Group Assembly instruction Shelving System Hi280 Silverline. Read these instructions carefully before putting your shelving system into operation. Use them regularly during the lifetime of the rack.
2 A Member of the Constructor Group Thank you for choosing this shelving system by Constructor. It is very important that you follow the instructions in this manual if your system is to fulfill your requirements and meet the prevailing standards. The intention of this manual is to inform your warehouse staff and management of the risks involved in a shelving system and how these can be avoided. If you have any questions, you are always welcome to call our local sales representative for more information. The safety of a shelving system is best guaranteed by regular inspections and maintenance. Content - Assembly instructions: Side brace/ Side stiffener... sid 3 Side panel... sid 4 Mesh side panel... sid 5 Base... sid 6 Shelf- and long span beam... sid 7 Shelf... sid 8 Back panel/mesh back panel/double rack... sid 9 Door... sid 10 Drawers and pull out shelves... sid 11 Reinforced shelf... sid 12 Accessories... sid 13 Bench top/tool panel and light... sid 14 - The most important checkpoints... sid 15 - Safety on the job... sid 16 - Checklist for periodic inspections... sid 17 2
3 Assembly instructions Assembly of frames To make the assembling of frames easier we recommend you to use a bench or table. Side brace / Side stiffener Insert the end of the side/stiffener into the U-shaped part of the post rib (1) and secure it in the oval hole in the post rib using the assembly key turning the key through 180 (2-3). Make sure that it is fixed to the post. Fix all braces/stiffeners to on of the posts first and then to the other (4). Assemble the footplates (5). The side brace and the side stiffener 800 and 1000 are fastened with pop rivets 4, 8 x 9. Make sure the footplates are fixed securely. 3
4 A Member of the Constructor Group Assembly instructions Side panel Insert the long side of the side panel into the U-shaped part of the rib of the post (1) and secure it in the oval hole in the post using the assembly key turning the key trough 180 (2-3). Make sure that it is properly fixed to the post. The side panel should be fixed in six places, on in each end and the rest evenly distributed, in the post. Assemble the other post in the same way. Assemble the footplates (5). Make sure they are fixed securely. 4
5 Assembly instructions Mesh side panel Place the mesh side panel and the post side by side. Assemble four side mesh holder in the mesh, place them where you have oval holes in the post (1-2). NOTE! Turn the holder to the right as shown in fig. 1. Insert the holder into U-shaped part of rib of the post (3) and secure it in the oval hole in the post using the assembly key turning the key through 180 (4). Make sure that it is firmly fixed to the post. Assemble the other post in the same way. Depending upon bay load mount the side brace as shown in fig Assemble the footplates (5). Make sure they are fixed securely. 5
6 A Member of the Constructor Group Assembly instructions Base Before assembling, check the hooks in post and the base not are damaged. Assemble the base in the bottom of one of the front posts (1-2). Make sure the hooks are in place. Assemble the base in the other frame in the same way. 6
7 Assembly instructions Shelf beam/long span beam Before assembling, check the hooks in post and the beams not are damaged. When a base is used, assemble the first beam on the fourth hook from the bottom. Assemble the rest of the beams. Use the oval and the round holes in the positions to find the right positions. Make sure that the hooks are in place. NOTE! A shelf rack provided with drawers or full out shelves, or if the height to the highest loaded top shelf is more then five times the shelf depth, the rack shall be fixed to the floor with screw and plug. 7
8 A Member of the Constructor Group Shelf Assembly instructions Before assembling check that the hooks in the shelf, beam and post not are damaged. Assemble the shelf according to step 1-3. After step 2 the shelf should be in a horizontal position. Use the holes in the post to find this position.check that the angle between the front and the frame is 90 before pressing the shelf down into the hooks in the beam. Make sure that the hooks are in place. Assemble the rest of the shelves in the same way. Shelf for long span Assemble the beams according to Shelf beam/long span beam page 7. Board shelf: Hang in the cross beam between the two long span beams in the hooks at the back. One in each end, the rest at a maximum distance of 500 mm. Mesh shelf: Put in the shelf in-between the long span beams and press it down into the hooks. Make sure that the shelf is resting in the hooks. Steel in-fill shelf: Put the shelves in-between the long span beams and press then down into the hooks. Make sure that the shelf is resting in the hooks. Placing and shelf width according to table below. Bay width Placing of in-fill shelves
9 Assembly instructions Back Panel Lay down two back panels on a flat surface, overlapping each other so that the oval flanged holes corresponds to the plain oval holes, secure by using the assembly tool, turning the key 180. Make sure that they are properly fixed. Back panel / Mesh back panel Place the panel in between the pack posts. Hook in the clips, four on each side of the panel, locate the panel and clip it into the post as shown in fig Full back panel When more than one back panel is used in height you must use a joint profile between the panels. Use six clips for each panel of heights 800, 1000, 1200 and 1300 mm. Double Rack Connect back posts to each other with screws and nuts at the top and bottom. If necessary put levelling shims under the feet so that all the posts stand on the floor when the rack is unloaded. 9
10 A Member of the Constructor Group Assembly instructions Door Put in the bottom piece (A) on the bottom shelf (1-2). Lift the top shelf and put in the top piece (B) in the same way (3). Hold the top piece and place the door (C), with the hinge in the hole, on the bottom piece (B). Adapt the top piece on the hinge of the door (4-5). Assemble the other door in the same way. Put back the top shelf (D) in place. Secure the top shelf with a foot (E) in the top of each post (6). Assemble the locking system. Door with built-in handle Put the bottom piece on the bottom shelf. Place the door on the bottom piece. Take the top piece and place above the door, then assembled the top piece to the top-shelf with fittings. 10
11 Assembly instructions Drawers and pull out shelves Assemble four expansion slide clips (1-2). Make sure that they are properly fixed to the post (3). If you have two or more in height, then start with the bottom clip. Assemble the expansion slide. Put in the tongue at the back first and then hang the slide to the front expansion slide clip. Pull out the slides and hang in the drawers or shelf in the hooks in the expansion slide. NOTE! Shelf rack provided with drawers or pull out shelves shall be fixed to the floor with screws and plugs to eliminate the overturning risk. 11
12 A Member of the Constructor Group Assembly instructions Reinforced shelf Assemble the shelf beam between the back posts, then the depth reinforces between the front and back post, hang in the length reinforces, one in the middle or two in the end positions. Make sure that the hooks in beams, reinforces and shelves are correct in place. 12
13 Assembly instructions Accessories Assemble the different accessories according to the fig. Make sure that hooks in beams and profiles are correctly in place. 13
14 A Member of the Constructor Group Assembly instructions Bench top, Tool panel and Light Assemble the different parts consecutively (1-9) as shown in the fig. The bracket (2) should be placed as close to the corner as possible. Make sure that hooks and beams and profiles are correctly in place. 14
15 Important checkpoints Overturning risk A shelf provided with pull out drawers or shelves, or if the height to the highest loaded shelf is more than 5 times the shelf-depth, the rack shall be fixed to the floor with screw and plug. The foot shall in this case be secured to the post with a screw. Using the assembly key When using the assembly key for jointing parts, measure as shown in the fig. If the measurement will be less than 9, 5 mm the assembly key shall be replaced. Hook in Make sure that hooks in beams, shelves etc. are correctly in place before loading the parts. Hooks Always check that hooks in beams, shelves, posts etc. are in good shape before assembly the parts. A slightly deformed hook (B) can be adjusted with a screwdriver. Otherwise (A) the part shall be replaced. Accessories To avoid accidents, use only accessories approved by Constructor. 15
16 A Member of the Constructor Group Safety on the job Make your warehouse safer by preventing accidents before they occur. Use the Assembly instruction.. Determine WHEN and WHERE problems can occur. - conduct a safety analysis - make corrections according the instructions. - conduct regular inspections. Where safety is concerned, it is important that the shelving is always erected according to the instructions given in these Assembly instructions. The shelving has to be inspected in conjunction with the erection and periodically there after. Bearing safety in mind, it is very important that the shelving system is complemented with collision guards. Capacity signs shall be displayed prominently and management shall to see that they are observed. The technical safety of shelving is best guaranteed by regular inspections. Product safety and product liability Constructor assumes product liability for 10 years from when Hi280 is purchased directly from Constructor or from an authorized Constructor dealer. Product liability includes manufacturing defects and the product s good condition where questions of safety are concerned. This means that the performance specifications indicated in this manual are observed and are otherwise followed during normal handling. Inspection of Hi280 shelving system The safety of the shelving system is checked by making regular inspections. Those who use the shelving, the management, the industrial safety office etc. should require that the following inspections are carried out: - Assembly inspection: before the shelving system is put into operation it should be inspected according to the instruction in this manual. -Frequent inspection: the shelving system should be frequently inspected where it concerns safety devices, fenders etc, which affect the shelving system strength and stability. - Periodic inspection: at least one a year the shelving should be inspected to determine if it corresponds with the manual. - Re-inspection: re-inspection should always be carried out when re-positioning of shelves or other rebuilding. Contact your local sales representative. When repairing the shelving, all load bearing parts that have been damaged should be replaced. Other parts can be repaired. It is the responsibility of the purchaser or end-user to see that the above inspections are carried out. Sale to a third part (second-hand sale) Observe that Constructor s product liability is terminated when the shelving is sold to a third part. The total installation liability is transferred to the part who has sold the installation and it is his responsibility to support the end-user with the requisite information regarding load capacities, assembly instructions and the other documentation that is described in the manual. If a collapse or any other undesirable incident occurs at an installation sold by a third part or directly by an earlier owner, the liability for the products becomes the responsibility of the sellers. 16 Example of damage The most important checkpoints.
17 Checklist for periodic inspection of shelving system. Storage space Manufacturer / Supplier Year of delivery Last inspection date Check point No defects Actions Remark 1. Condition of floor 2. Vertical posts 3. Bearer beams/shelf beams 4. Foot plates/levelling 5. Braces 6. Accessories 7. Load capacity/deformation 8. Capacity indicators 9. Lighting/lamps 14. Transport aisles: Condition Markings Accessibility Personnel traffic Others Last date for the next inspection Inspected by Place Date 17
18 co lys I ana adv ns S Pr Ins oduct tal lat s / Ion sys t Pro ems / duc ts Io tat ry Quo li ve Ice on ServiceS t jec nt Pro geme na a M ns Ti Hse Pec / tio n s S g Ins De Constructor Sverige AB Besöksadress: Bergsjödalen 60 Box Göteborg Tel Fax info.se@constructor.se Af Te le Tin ul SA e/ vic e ser enanc t MaIn r The choice So lu
Shelving for picking STORAGE TECHNOLOGIES & MATERIAL HANDLING
M7 Shelving for picking General features - Storage system for manual picking of products following the man-to-goods principle - Possibility of storing medium to heavy loads - Easy assembly - Gauging between
More informationBefore Assembling the Storage Wall
Chapter 1 Assembling the Lista Storage Wall Lista provides two types of standard Storage Walls: B251 and B255. The design, construction, assembly, and quality are identical for both types, however, B251
More informationInstallation Manual for Metal Emperor Lockers
P a g e 1 Table of Contents Page General Notes and Tools Required 2-3 Assemble Shelves with Coat Hooks/Coat Rods 4 Fastening Chart 5 Knock Down Locker Assembly (Banks of Three) 6-12 Appendix A: Dress End
More informationCopyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM3010A RM315-R2 RM323-R2 RM329 RM451 RM457 RM3020A RM316 RM324-R2
More informationBox Edge Plus Steel Shelving Installation Instructions
Box Edge Plus Steel Shelving Installation Instructions IMPORTANT PRODUCT LIABILITY INFORMATION Read all instructions before proceeding with installation or shelf loading. Vital product information pertaining
More informationOWNER S MANUAL with Assembly Instructions
OWNER S MANUAL with Assembly Instructions VISIT E LIFETIME WEB SITE: WWW.LIFETIME.COM ** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at: 1 (800)
More informationAssembly Instructions
Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C Selling Station Components (2) 2' x 6' Side s Have a channel
More informationGeneral Mounting/Installation manual 2019
General Mounting/Installation manual 209 Important, before you start! Read this manual thoroughly! Think about this before you start to mount. Note that this is a general mounting instruction! Pre-assemble
More informationCABINETRY Assembly Instructions
www.hdicabinetry.com Assembly Instructions TABLE OF CONTENTS Category Page(s) Section 1: Framed Series Base Cabinet Instructions Wall Cabinet Instructions Easy Reach Cabinet Instructions 1.01-1.04 1.05-1.06
More informationTITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF
TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF DXST10000 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS
More informationPOP PLUS / SPIDER SET-UP INSTRUCTIONS
POP PLUS / SPIDER SET-UP INSTRUCTIONS 1 Place system frame on floor with screws indicating top. Expand upwards & outwards and secure frame connectors. Pop-Up display systems are made to be set-up and taken
More informationGEARGRID Seattle / SCUBA Storage System
GEARGRID Seattle / SCUBA Storage System Assembly Instructions & Owners Manual Thank you for choosing the Geargrid Seattle / SCUBA Storage System. Geargrid is committed to high-quality products and your
More informationSTORAGE & SHELVING SYSTEM - INSTALLATION GUIDE
STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE If you have ordered storage drawers, shelving, hanging rails or shoe racks this guide will help you install your storage and shelving system, together with
More informationINSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY
NEWAGE STEEL WELDED CABINETRY WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES ALL CABINETS MUST BE MOUNTED TO STUDS ON A SECURE WALL, AS PER THESE INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS
More informationLinear Hook- on Worksurfaces
Linear Hook- on Worksurfaces Linear Hook-On Worksurfaces come in three depths and seven lengths. Different worksurfaces have different reqirements for installation that are outlined below. 27 inch deep
More informationMighty Mo GX Series Cabinet Installation Guide. OR Rev /11
Mighty Mo GX Series Cabinet Installation Guide OR-71601787 Safety and Warning ATTENTION The exclamation point within an equilateral triangle is intended to alert the user to the presence of important operating
More informationDesk/Wall-Mount Rack
Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware
More informationPRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)
More informationACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE
acorn WIRE ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES 10 22 13 WIRE MESH PARTITION 10 22 16 FOLDING GATE GUIDE Page 4 / 5 No. 130A All wire type for normal industrial use. 7, 8, 9, 10 and
More informationL & T Open Shelf Filing System
L & T Open Shelf Filing System Contemporary Styling Shelf covers shelf supports for a clean contemporary look. Sleek, Attractive Appearance With no exposed holes on uprights. Easy Assembly Shelf supports
More informationBalishutters. INSTALLATION guide FOR L-FRAME MOUNT INSTALL OPTIONS B OR C
Balishutters INSTALLATION guide FOR L-FRAME MOUNT INSTALL OPTIONS B OR C Tools needed for installation Drill Phillips bit 1/8" drill bit 4. Hammer (preferably hard plastic) 5. Level 6. Phillips-head screwdriver
More informationGreenhouse Assembly Instructions
Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800
More informationPLEATED SHADE ARCH INSIDE MOUNT GETTING STARTED. A few simple tools are required: STANDARD HARDWARE
HONEYCOMB AND PLEATED SHADE ARCH GETTING STARTED INSIDE MOUNT A few simple tools are required: HALF ARCH INSTALLATION Your half arch has been shipped in the closed osition. When fanned, the rails will
More informationAIR MASTER SYSTEMS INSTALLATION GUIDE TABLE OF CONTENTS
AIR MASTER SYSTEMS INSTALLATION GUIDE TABLE OF CONTENTS GENERAL INFORMATION...1 Freight Damage... 1 Repairing Paint Scratches...1 BASE CABINETS... 2 Drawer Removal and Reinstallation...2 Replacing Drawer
More informationSteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF
SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF Please read fully before commencing work...any queries will be promptly answered, contact theboss@steelchief.com.aui MPORTANT
More informationPATRIOT DOCKS ASSEMBLY INSTRUCTIONS
6/1/2008 PATRIOT DOCKS ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical shoreline application.
More informationINSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED
INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.
More informationPRE-ENGINEERED HORSE STALL SYSTEMS 4884 HSD STANDARD SLIDING DOOR. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4884 HSD STANDARD SLIDING DOOR & Assembly Installation Instructions 4884 HSD Standard Sliding Door Components Some Considerations When Choosing Your Stall System - 1
More informationParts list. Model:10400
Manufacturing, Inc. Instruction sheet -- VTI Flat panel TV cart with cabinet Model number: 10400 Congratulations for having chosen this excellent VTI product. To assure your complete satisfaction, this
More informationSystem 3000 specifications
System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be
More informationLF Series Assembly Instructions
LF Series Assembly Instructions 1998760 Revision A-10 Complete Series Master Packet 2010 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Footprint Storage and Metal Filing Systems Assembly Instructions
More informationBulk Storage Rack Assembly Instructions
Bulk Storage Rack Assembly Instructions Upright Frame Assembly Determine which end of the post goes up. The keystone slots on the front face of the post are wider at the top than at the bottom (see diagram
More informationGardman Lean-to Greenhouse Assembly Instructions
Page 1 Gardman Lean-to Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free
More informationASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL
ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL January 2013 The SL500A is a square upright glass cabinet with a single hinged lockable door. It has five adjustable shelves plus the base. It also has an optional
More informationINSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #
INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART # PARTS LIST: Qty Description Qty Description 1 Grille Guard 8 12-1.75mm x 35mm Hex Bolts 2 Brackets (for trucks without 22 12mm x 30.1mm OD
More informationOwner's Manual. Contents of Box. (Fits RT400/450/500 Routertops) Tools Required. Symbols
Contents of Box Owner's Manual model number CB400u (Fits RT400/450/500 Routertops) This upgraded cabinet base is designed for use with Model RT400, 450, and 500 routertops. This cabinet uses Euro hinges,
More informationRouter Table Floor Stand
Router Table Floor Stand Owner s Manual 05J20.40 Introduction The Veritas Router Table Floor Stand has been designed as a free-standing router table workstation to work with the existing Veritas Router
More informationFURNITURE HARDWARE & ACCESSORIES - PART 3 : LEVELLERS AND HANGERS
www.hafeleindia.com FURNITURE HARDWARE & ACCESSORIES - PART 3 : LEVELLERS AND HANGERS ABOUT ITALIANA FERRAMENTA ITALIANA FERRAMENTA is specialized in the production of high quality accessories and ironmongery
More informationSetup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.
Faraday CageSetup, 2017 Setup The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on 63-500 series tables. Cage with a base plate for use on a
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More informationHEAVY DUTY 11 STEEL CABINET
HEAVY DUTY STEEL CABINET ASSEMBLY INSTRUCTIONS ONE DRAWER BASE CABINET 05-206 Parts List Part No Description Qty Image ONE DRAWER BASE CABINET Part No Description Qty Image SB- Cabinet Body EH-0 Euro Hinge
More informationMounting Instructions Item No.: /521/522/420/421/422
Mounting Instructions Item No.: 541.35.520/521/522/420/421/422 Revolving Corner Unit In addition to these general mounting instructions, please refer to the fitting instructions, where the individual drilling
More informationMerloni Elettrodomestici. Technical Fitting Manual FRIDGE. Language Issue/Edition Page GB /
GB 99-11-03/01 1-38 Index 1 CONFORMITY OF APPLIANCE 3 2 MAIN ASSEMBLY TYPES 3 2.1 Under worktop 3 2.2 Double door 10 2.3 Combined 14 2.4 Single door Fridge or single door Freezer 19 2.5 Combined free-standing
More informationIn addition to this general mounting and adjustment instruction you need the fitting specification document, where the individual drilling dimensions
Mounting and Adjustment Instruction for corner carrousel fitting In addition to this general mounting and adjustment instruction you need the fitting specification document, where the individual drilling
More informationASSEMBLY INSTRUCTIONS MANUAL
PAGE 1 OF 9 RECOMMENDED TOOLS FOR ASSEMBLY: ALLEN WRENCH (INCLUDED) BOX WRENCH (INCLUDED) PHILLIPS SCREW DRIVER (NOT INCLUDED) PARTS IN CARTON: ALLEN WRENCH SCREWS (20 EACH) ROUND HEAD SCREWS (8 EACH)
More informationINSTRUCTIONS FOR: 2 DOOR WALL CABINET. MODEL No: AP02WC
INSTRUCTIONS FOR: 2 DOOR WALL CABINET MODEL No: AP02WC Thank you for purchasing a Sealey product. Manufactured to a high standard, this product will, if used according to these instructions, and properly
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationCloset System Installation Manual
Closet System Manual Thank you For choosing our Custom Closet Collection to fit all your needs Closets come fully assembled to make your project an enjoyable and satisfying experience. With quality Custom
More informationCopyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
Copyright 2004. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JANUARY 2004 RF500A RF507A RF514A RF521A RF501A RF508A RF515A RF522A RF502A
More informationtable of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops
table of contents Square Track & Accessories Pages 4-7 Square Track Options Page 4 Light Duty Track Page 4 Square Track Brackets Page 5 Square Track Accessories Page 5 Square Track Trolleys Page 6-7 Offset
More informationINSTALLATION INSTRUCTIONS
POST THIS WARNING IN A CONSPICUOUS PLACE, CLEARLY VISIBLE TO ALL STORE PERSONNEL Install all components according to installation instructions. READ BEFORE ASSEMBLING WARNING FOR YOUR SAFETY Installation
More informationINSTALLATION GUIDE CABINETRY
INSTALLATION GUIDE CABINETRY The instructions given here serve as general guidelines on how to install full-access cabinets in a reasonably simple installation. Many cabinet designs and installations may
More informationFig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7
FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track
More informationInstruction sheet -- VTI Flat panel TV cart
VTI Manufacturing, Inc. Instruction sheet -- VTI Flat panel TV cart Model number: 10235 Congratulations for having chosen this excellent VTI product. To assure your complete satisfaction, this product
More informationM3 Shelving for picking. for light and medium loads
M3 Shelving for picking for light and medium loads A basic manual storage and archive system for light and medium loads. Combining the different components offers a whole range of features. The main advantages
More informationCALL US FIRST! Do not return this item to the store
Model # 1210AFLSOa; 1210AFDAOa 5-Drawer Prairie City Lingerie AFLSO = Summer Oak finish AFDAO = Autumn Oak finish Congratulations! This fine piece of furniture will make a gorgeous addition to your home.
More informationPATIO INSTALLATION MANUAL
PATIO INSTALLATION MANUAL A few minutes spent reviewing the following instructions will help insure quick and proper assembly. The Patio Sauna Kit will arrive on a stretchwrapped pallet including pre-built
More informationEnsure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.
INSTALLATION GUIDE TM Flat Roof Homesheds THE POTTER BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Potter Flat Roof
More informationVWR LABORATORY BENCHES
VWR LABORATORY BENCHES Ergonomic, Flexible Lab System for Today s Modern Laboratories Your first choice for spectrophotometry VWR LAB BENCHES VWR LABORATORY BENCHES VWR Lab Benches are ergonomically designed
More informationYes 20 Charging Wall Cabinet for Tablets
Built with Anthro-DNA Owner's Manual for Yes 20 Charging Wall Cabinet for Tablets Part # YESCABGMPW Components at a Glance 1 2 4 5 8 7 10 3 6 9 Front of Cabinet (closed) 1. Locking front door to User area.
More informationWorktop INDEX eight Capacity Unpacking
Pro.0 Series Warning: Excessive weight hazard! Use two or more people to move, assemble or install cabinets and locker to avoid back injury. Do not leave children unattended near cabinets. High risk of
More informationParts List (Continued) 18 each: #8 x 0.625" Truss Head Phillips Screw 20 each: #8 x 1.75" Flat Head Phillips Screw 4 each: #8 x 1.25" Flat Head Philli
EVO Tall Pull-Out Wood Pantry Important Notes Always read the instructions completely and carefully before beginning assembly. Remove and check contents for damage and/or missing parts. Keep the original
More informationINSTALLATION GUIDE FOR METAL LABORATORY CASEWORK
LABORATORY Casework & Cabinets INSTALLATION GUIDE FOR METAL LABORATORY CASEWORK RDM Industrial Products, Inc. RDM LAB CABINET INSTALLATION GUIDE TABLE OF CONTENTS GENERAL INFORMATION...1 Freight Damage...1
More informationInstallation Manual Porter Road, Sarasota FL fax
072015 Installation Manual BEFORE YOU BEGIN: Read these instructions completely and carefully. FOR YOUR SAFETY: Read and observe all CAUTIONS and WARNINGS shown throughout these instructions. Risk of injury.
More informationINSTALLATION INSTRUCTIONS
TOOLS REQUIRED: Level Square Phillips Screw Driver Slot Screw Driver Pliers Clamp PARTS PROVIDED: Frame Installations Screws. 4 per door. (#8 x 1-3/4 ) Sex Bolt. 4 per frame joint. Torque Lever 2 Shelf
More informationInstallation Instructions
Installation Instructions 30 Built-In Wall Oven with Microwave JTP86, JT965 If you have questions, call 1.800.GE.CARES or visit our website at: ge.com Before You Begin Read these instructions carefully
More informationSCI-FAB Product Specifications. Casework Section 1. Part 1 General
SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.
More informationInstallation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:
Installation Manual Solid Plastic Toilet Partitions Toilet Partitions & Lockers IN THE U.S.A.: Hadrian Inc., 7420 Clover Avenue, Mentor, OH 44060 Telephone: 440-942-9118 Fax: 440-942-9618 U.S. toll free
More informationC-Series & S-Series Classic Frame with Transom (Single or Pair)
1. TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Safety Glasses Screw gun #2 Screwdriver tip #3 Screwdriver tip Philips Head screwdriver (Used to move frame on wall using oval slots on
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationSection 1 Safety working at height
Contents Section 1 Safety working at height. Section 2 Hi-Step package contents & parts identification. Section 3 Assembly. Section 4 Operation. Section 5 Maintenance. Section 6 Extender package contents
More informationInstallation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays
Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays Models: PLA60, PLA60-S, PLAV60, PLAV60-S Max UL Load Capacity: 175 lb (79 kg) 2300 White Oak Circle Aurora, Il 60502
More informationAssembly Instructions
Unite Panel System Hinge Door July 2016 #12 x / slotted hex washer head bolt Figure 1 threshold bracket frame Detail F threshold bracket threshold bracket (installed) #12 x / slotted hex washer head bolt
More informationTOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.
TOOLS REQUIRED FOR ASSEMBLY Rubber Mallet or Plastic Tip Hammer Top Cover Support PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER Back Stop Divider Closed 'L' Upright Slotted Reinforcement Support
More informationASSEMBLY GUIDE. Mia Narrow Bookcase
ASSEMBLY GUIDE Mia Narrow Bookcase Components: Upon unpacking your bookcase from it s delivery box, you should have the pieces shown. Follow the steps on the next pages to assemble your new bookcase. Step
More information#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS
Thank you for purchasing this quality product. A list of PARTS and INSTRUCTIONS is included to assist you. Unpack and identify all parts included on the Parts List and Hardware List. If parts are missing,
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More information1. Show the following information with additional information necessary to indicate shop compliance with the requirements of this section.
SECTION 12360 LIBRARY SHELVING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 06100 - Carpentry. 2. 09200 - Metal Studs, Lath, Suspension Ceiling, Plaster and Stucco. 3. 09660 - Resilient Tile Flooring.
More informationUNIDOOR (STYLE B & C)
UNIDOOR (STYLE B & C) SHOWER DOOR GLASS PANEL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest
More informationSS/SW3230RTA Assembly Instructions Ready to Assemble Multimedia Lectern
650 Anthony Trail, Suite D, Northbrook, IL 60062 Phone: (800)267-5486 Fax: (800)267-5489 www.ampli.com - info@ampli.com SS/SW3230RTA Assembly Instructions Ready to Assemble Multimedia Lectern Thank you
More information5-SHELF RACK OWNER S MANUAL
5-SHELF RACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious personal
More informationMETAL BLINDS. Deluxe GETTING STARTED OPTIONAL HARDWARE. A few simple tools are required: STANDARD HARDWARE
METAL BLINDS Deluxe GETTING STARTED OPTIONAL HARDWARE A few simple tools are required: Steel Tape Measure Pencil Level Hold Down Brackets with Screws Extension Bracket Power Drill and Drill Bits Flathead
More informationVWR LABORATORY BENCHES. Ergonomic, Flexible Lab System for Today s Modern Laboratories
VWR LABORATORY BENCHES Ergonomic, Flexible Lab System for Today s Modern Laboratories VWR LAB BENCHES VWR lab benches are ergonomically designed to meet the needs of laboratory personnel. There are many
More informationrevised. You can make sure you are looking at the most recent KEEPING SERVICE INFORMATION CURRENT
1 to the Kwikee Products Service Training. It is our sincere hope that the information you gain from this training will enhance your confidence in and familiarity with the products we manufacture. The
More informationTIP FOR GETTING STARTED
Tip for getting started TIP FOR GETTING STARTED Be careful not to drill into any electrical wires, ductwork, plumbing or other damagable components. If you have any questions on the locations of these
More informationQwik-Fence Installation Instructions
Qwik-Fence Installation Instructions 1 Tools Required The following installation instructions should be used as a guide for installing Folding Guard Qwik-Fence Partitions. Good common sense and appropriate
More informationINSTALLATION GUIDE. Flat Roof Homesheds TM BEFORE YOU START TOOLS REQUIRED
INSTALLATION GUIDE Flat Roof Homesheds TM BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed. Read these
More informationTITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF
TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF DXST4500 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS TECHNICAL
More informationPlease Do Not Return This Product To The Store!
MODEL NOS. T8512 TOURNAMENT SERIES 3 TABLE TENNIS TABLE OWNER'S MANUAL 1. Read this manual carefully before starting assembly. Read each step completely before beginning each step. 2. Some smaller parts
More informationOrganisational Kitchen Fittings Kitchen Cabinet Accessories
Kitchen waste bin systems Single waste bin, capacity 1 litres Carcase width: Min. 400 mm For door mounting: For left and right hand use Installation: Screw fixing to side panel Housing: Steel, plastic
More informationINSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058
INSTALLATION INSTRUCTIONS 2009-13 DODGE RAM 2 & 4WD 1500 PART # P5058 PARTS LIST: Qty Description Qty Description 1 Grille Guard 12 12-1.75mm Hex Nuts 2 Upper Frame Mounting s (for trucks without tow hooks
More informationHiddenbed ASSEMBLY INSTRUCTIONS. MODEL DOUBLE DECKER
ASSEMBLY INSTRUCTIONS MODEL DOUBLE DECKER www.hiddenbed.com CONGRATULATIONS! YOU ARE A PROUD OWNER OF HIDDENBED The ultimate furniture that Doubles your Space Please read carefully the Assembly Instructions.
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationLPR System Installation instructions
Toll LPR System Installation instructions 1 General Information The following installation instructions should be used as a guide for installing Folding Guard LPR System. Good common sense and appropriate
More informationCloset Carousel Installation Instructions. Models TKA 5 Through TKA 14 Equipped with Footswitch Controls
Tools Required: Phillips Screwdriver (#2) Adjustable Wrench Level Tape Measure Utility Knife Electric Drill Drill Bits for Anchors Ladder (4 foot) Models TKA 5 Through TKA 14 Equipped with Footswitch Controls
More informationItem # Thanks for shopping with Improvements!
Thanks for shopping with Improvements! Hampshire -Door Cabinet Item #5505 To order, call -800-64- West Chester, OH 45069 Made in China PR-6 If you have questions regarding this product, call -800-64- Mon.-Fri.
More informationYes 20 Charging Wall Cabinet for Tablets
Built with Anthro-DNA Owner's Manual for Yes 20 Charging Wall Cabinet for Tablets Part # YESCABGMPW Components at a Glance 1 2 4 5 8 7 10 Front of Cabinet (closed) 1. Locking front door to User area. 2.
More informationSAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.
SAFETY Your safety and the safety of others is very important. In order to help you make informed decisions about safety, we have provided installation instructions and other information. These instructions
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationMelamine Plastic Laminate. Toilet Partition Installation Manual
Melamine Plastic Laminate Toilet Partition Installation Manual PHONE: FAX: 1-866-317-2786 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS, BARRELS AND SCREWS TO INSTALL THE
More information