1 Procedure 3.155A WING CLOSE-OUT PROCEDURES In this procedure The lower wing skin will be bonded to the upper wing For this procedure, the following parts will be required: Part Number Description Qty Lower Left Wing Skin Lower Right Wing Skin 1 Step 1. ENSURE WING FIXTURES ARE LEVEL. Recheck the alignment of the wing saddle jig to ensure that all saddles are level to prevent an undesirable twist in the wing. Once the wing is closed you cannot remove any twist or alignment problems. Step 2. CUT GROOVE FOR MILLED-FIBER SQUASH IN ALL UNFLANGED RIBS AND SHEARWEBS. Use a box knife and cut a ¼ deep cut between the fiberglass skin and the foam on the rib. Make a second 45 º cut down the center of the rib with the blade slanting outward to the skin. Remove the triangle shaped piece of foam. Repeat this cut on the other side of the rib. These grooves will be used to hold the Milled-Fiber material during the close-out. Hard points are too hard to cut with a box knife and can be V grooved with a right angle hand grinder. (Fig through 155.8) (Note: Do not cut grooves in the cut out area of the fuel baffle ribs that were sealed with resin and Q-cell in section 3.010) 2000 Express Aircraft Co LLC Rev.7/10 Page

2 Fig Fig GROOVE CUTOUT DETAIL Fig Fig Fig Fig Express Aircraft Co LLC Rev.7/10 Page

3 Fig Fig Step 3. CHECK FUEL FILLER CAP INSTALLATION. Check the fuel filler cap installation to ensure a proper seal and that attachment nuts are secure and properly sealed. Step 4. INSPECT FUEL BAYS. Inspect the four fuel bays to ensure there are no holes in the wing skins, which will allow fuel to leak into foam core. Ensure that exposed foam in cutouts on baffle ribs is coated with resin to prevent fuel from seeping into foam. Check laminations on forward shearweb, and the inboard and outboard ribs to ensure a good seal is present. Step 5. INSPECT NAV ANTENNA. Inspect the Nav antenna to ensure cable is secure and that copper tape has not been damaged. (Fig ) Fig Express Aircraft Co LLC Rev.7/10 Page

4 Step 6. INSPECT TIE-DOWN BRACKET. Inspect the tie-down bracket to ensure all laminates have been installed. Step 7. FABRICATE AND INTALL TEMPORARY TIE-DOWN BRACKET ALIGNMENT PIN. Locate one spare bolt of equal size as threaded tie-down insert (approx. 2 in length). Remove head and cut slot across shank end of bolt. This slot must be wide enough to accommodate slotted screwdriver. Grind (sharpen) slotted end to cone shape. This bolt will serve as a temporary alignment pin during wing close-out. Thread alignment pin into threaded hole in tiedown. Fig Express Aircraft Co LLC Rev.7/10 Page

5 Step 8. PREPARE LOWER WING SKIN FOR ALIGNMENT AND FIT. Place the lower wing skin on the wing assembly. Align unpainted strip on wing skin with spar cap. Check the outboard end of the wing to ensure that the lower wing skin joggle aligns with the upper wing skin joggle (as it sets in the jig). Slide the wing skin in or out to align joggles. Once aligned, locate tie-down area and tap with a rubber hammer over tie-down alignment pin to score inside of wing skin. Temporarily remove wing skin and drill hole for tie-down alignment pin. Relocate the wing skin over the wing assembly, using newly-drilled tie-down hole in wing skin and tie-down bracket pin for alignment. Recheck spar and outboard joggle alignment. Press wing skin down and check all visible areas for rib fit. If necessary sand ribs to ensure a proper fit. Laminates will be completed on ribs G and A after close-out. A small gap between the rear shearweb and the skin is normal. This gap will be pulled down during the squash. Once wing skin alignment is established, drill alignment holes through the wing skin, into spar cap and shearwebs. On inboard end, drill Cleco holes through wing skin, into shearwebs, ½ - ¾ in from inboard edge of wing skin. On outboard end, drill Cleco hole through wing skin, into spar cap, 1 in from joggle and through spar cap flange. Remove wing skin and prepare for wing close-out. Step 9. PREPARE MATING SURFACES. Sand white all mating areas with 36 grit sandpaper and wipe with acetone (Fig ). This includes Ribs, spar cap, shearwebs, and the contact areas on the lower wing skin. Vacuum the wing bays and wipe with acetone. Pay particular attention to the fuel bay. Fig Fig Express Aircraft Co LLC Rev.7/10 Page

6 Step 10. INSTALL PROTECTIVE COVER IN ACCESSIBLE AREAS In bays where access is available (gas cap, inspection covers, etc.) cover bay, tubes, cables, brackets, etc. with protective material that can be removed through access holes after wing closeout ( Fig ). This helps to catch as much excess resin as possible in order to prevent drips of resin from coming loose in the future, especially in the fuel cells. Fig Fig Fig Fig Express Aircraft Co LLC Rev.7/10 Page

7 Step 11. PREPARE TOOLS AND RESIN FOR CLOSE-OUT. Arrange all clamps, angle bars, Cleco s, sand bags and wood planks (use as load spreaders) so that they are readily available when needed (Fig ). It is best to familiarize at least three able-bodied personnel with this procedure and make a dry-run prior to continuing on. You will need approximately 3200 grams of resin and 1400 grams of Milled-Fiber. Do not catalyze all the resin at once. Pour resin into 300 to 400 gram cups and catalyze as needed. Mix Milled-Fiber to a consistency of oatmeal for ribs and shearwebs. For the spar cap, mix Cabosil to the thicker consistency of peanut butter. Use cake decorator bags to apply Cabosil. Fig Fig Express Aircraft Co LLC Rev.7/10 Page

8 Step 12. APPLY RESIN AND MILLED-FIBER TO ALL CONTACT AREAS. Add catalyst to resin and brush resin on all contact areas, including those on the lower wing skin. No pooling. Brush out resin in thin layer ensuring 100% coverage of contact areas (Fig ). Fig Place 4 mat over resin full-length of spar cap from inboard edge of wing skin to outboard end of spar. Wet out with resin and repeat with second mat in same manner. Wet out with resin. Add third mat in same manner from inboard edge of wing skin to BL Wet out with resin. Apply (2) layers of 4 mat on flanged rib R (BL 36.00) in same manner as spar cap (Fig ). Fig Fig Express Aircraft Co LLC Rev.7/10 Page

9 Fig Fig Mix the Milled-Fiber Cabosil to the consistency of oatmeal and with cake decorator bag, apply to ribs and shearwebs. Ensure that the Milled-Fiber fills the V cutouts in the ribs and shearwebs. The Cabosil bead should extend approx. ½ above the rib and shearwebs (Fig ). Spread an even layer of cabosil on the rib R flange. Fig Fig Express Aircraft Co LLC Rev.7/10 Page

10 Fig Fig Mix the Milled-Fiber Cabosil to a thicker consistency of peanut butter and with cake decorator bag, squeeze out approx. 1-1 ½ bead down center of spar cap full length of wing skin contact area. Do not spread. Cabosil will spread slightly on its own. Fig Express Aircraft Co LLC Rev.7/10 Page

11 Step 13. INSTALL LOWER WING SKIN. With the help of assistants (preferably three) lift the lower wing skin over the wing and place in position, using tie-down bracket pin and previously drilled Cleco holes for alignment (Fig ). Try to place the skin in position with minimal horizontal movement. Install Clecos in alignment holes. Fig Fig Place 1 x6 board full-length over spar and cover with shot bags laid end-to-end, full-length of spar. Place heavy bars (square tube or 2 x6 lumber) full-length over both forward and aft shearwebs. Tape bars at both ends to keep in place. Place shot bags over rib R, inboard ribs, and over areas requiring additional weight for proper bond (Fig ) Fig Express Aircraft Co LLC Rev.7/10 Page

12 Check Cabosil for proper bond under wing skin. Radius cabosil with tongue depressor all around underside of wing skin. Remove protective coverings through access holes and vacuum inside wing where possible. Step 14. INSTALL UNI-DIRECTIONAL CLOTH AND 7781 CLOSEOUT LAMINATES A. Apply Q-Cell radius to newly bonded wing skin and shearwebs. B. Sand white entire forward and aft shearweb faces and wing skin surface with 36 grit sand paper. C. From BL to inboard end of shearwebs, apply (2) layers each of 6 uni-directional tape onto outside face of forward and aft shearwebs to radius at wing skin. D. On forward shearweb, apply (3) 7781 close-out laminates entire length, overlapping radius onto wing skin and covering entire uni-directional tape layers. Overlap butt joints 2. E. On aft shearweb, apply (4) 7781 close-out laminates entire length, overlapping radius onto wing skin and covering entire uni-directional tape layers. Overlap butt joints 2. Recheck alignment. Clean all excess Milled-Fiber from accessible areas. Allow wing to cure for 24 hours. See Step 15 for FG Landing Gear Cutout in wing skin Express Aircraft Co LLC Rev.7/10 Page

13 Step 15. CUTOUT FG LANDING GEAR OPENING IN WING SKIN. Measure 3.25 aft from centerline of spar and mark forward edge of cutout. From this mark, measure 7 aft and mark aft edge of cutout. Measure 5 outboard from BL line in wingskin and mark inboard edge of cutout. From this mark, measure 6.5 outboard and mark outboard edge of cutout. Using these marks, draw rectangle and cutout for FG landing gear installation (Fig ). Fig Express Aircraft Co LLC Rev.7/10 Page

10. Wing prep and subassembly

10. Wing prep and subassembly Date Section Objective: Construct and fabricate the sub-assemblies of the wing panel. Required Parts: Wing left 11gal PN104-300, Wing right 1gal PN104-400, Wing left 15 gal option PN104-322, Wing right

More information

11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410).

11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410). 11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410). 12) Chromate the Root Rib Attach Bracket and rivet to the Root

More information

Kam Aero 43% Extra 300.

Kam Aero 43% Extra 300. Stab Sheeting Kam Aero 43% Extra 300. Stabs / Elevator: Make your skins using the same method as you did for the fuselage foam parts. The stabs require 8 sheets (4 per stab) of 4 x 48 A grain sheeting.

More information

Section C75-WA-1. Wing Skeleton

Section C75-WA-1. Wing Skeleton Section C75-WA-1 This manual has been prepared for assembly of the wing skeleton supplied with match drilled parts. This photo assembly manual is intended as a supplement to the drawings. If there is any

More information

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue Written by: Sean Cole September 19, 2008 When fitting the stiffener use 3/32 clecos to hold it in place, it makes a smaller hole and is easier to work with. Only use the amount needed to hold the stiffener

More information

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above. REVISION LIST CHAPTER 25: The following list of revisions will allow you to update the Legacy construction manual chapter listed above. Under the Action column, R&R directs you to remove and replace the

More information

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator Pre-Paint>Fuselage>Empennage>Fit elevator Objectives of this task: To fit the elevator to the horizontal stabiliser, to fit the trim tabs to the elevator and the end caps to the elevator and the horizontal

More information

Pre-Paint>Wings>Fit ailerons. Objectives of this task: Materials and equipment required: Size the ailerons and pre-mould strips

Pre-Paint>Wings>Fit ailerons. Objectives of this task: Materials and equipment required: Size the ailerons and pre-mould strips Pre-Paint>Wings>Fit ailerons Objectives of this task: In this task the ailerons and the pre-mould strips will be sized and trimmed, then flocked onto the wings and glassed in place, and the next day the

More information

L20500 REPAIR APPENDIX

L20500 REPAIR APPENDIX L20500 REPAIR APPENDIX Airglas, Inc. created this repair guidance to assist repair technicians in evaluating and repairing the L20500 skis, used on the UH-60 skis. WES LANDES (FOUNDER OF AIRGLAS, INC.

More information

12. Wings, Flaps, Ailerons and Struts

12. Wings, Flaps, Ailerons and Struts 12. Wings, Flaps, Ailerons and Struts Fit Aileron Hinges Reference: Drawing 20270K2 Photo 12.1 Parts Required: 2007092 Aileron LS 200809N Aileron RS 2001394 Hinge 3/16 A1 (4) 2001694 Hinge Pin (4) PH0059N

More information

75-TA-4. Elevator Skins

75-TA-4. Elevator Skins 75-TA-4 This manual has been prepared for assembly of the. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy between this manual and the drawings, the

More information

Zeon PDF Driver Trial

Zeon PDF Driver Trial Opus retro-fit tray assembly kit Features: CNC machined G10/FR4 fiberglass tray assembly. CNC machined G10/FR4 fiberglass replacement control horns. Milled aluminum servo mount system Servo mount is pre-drilled

More information

STOL CH 701. Layout the cut line along the bend tangent line on the web. 7V6-1 and 7V6-2SP

STOL CH 701. Layout the cut line along the bend tangent line on the web. 7V6-1 and 7V6-2SP Layout the cut line along the bend tangent line on the web. 7V6-1 and 7V6-2SP ORIENTATION: 90 degree flange is up Layout the bend line, 20mm from the end. Ref. bottom right diagram 7-V-6 Use a square to

More information

FLITZEBOGEN-2 Assembly instructions

FLITZEBOGEN-2 Assembly instructions FLITZEBOGEN-2 Assembly instructions Trim the end of the fuselage to the length of 925mm from the nose. Be careful to avoid splitting the carbon fibers. Sand the base of the stab mount in preparation for

More information

American Champion Aircraft Corp. Rochester, WI Page 1 of 5

American Champion Aircraft Corp. Rochester, WI Page 1 of 5 Service Letter: 444 Initial Revision Date: August 18, 2017 Title: American Champion Aircraft Corp. Rochester, WI 53167 Page 1 of 5 Installation of Aileron Hinge Reinforcement Models: 8KCAB serial numbers

More information

STOL CH 701. Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Rear Root Rib 7V4-2

STOL CH 701. Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Rear Root Rib 7V4-2 Rear Root Rib 7V4-2 Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Cleco the root nose rib to the spar Position the rear root rib at station

More information

This section describes those structural components which make up the main frame including bulkheads, spar cover, and roll cage.

This section describes those structural components which make up the main frame including bulkheads, spar cover, and roll cage. CIRRUS AIRPLANE MAINTENANCE MANUAL Main Frame CHAPTER 53-10: MAIN FRAME GENERAL 53-10: MAIN FRAME 1. General This section describes those structural components which make up the main frame including bulkheads,

More information

SERVICE LETTER SL REV B

SERVICE LETTER SL REV B SERVICE LETTER SL34 65-17510 REV B NOTES: 1. For all illustrations in this service letter refer to Drawing 65-17510-SUPP. 2. Aerocet recommends one of two methods to accomplish the replacement of hinges:

More information

Piper Cherokee /3 scale. Construction Manual

Piper Cherokee /3 scale. Construction Manual Piper Cherokee 140 1/3 scale Construction Manual STAB CONSTRUCTION 1. Remove foam cores from cradle and place on flat surface. Inspect pieces before you epoxy halves together making sure leading and trailing

More information

14401 NE Keil Road, Aurora, Oregon, USA PHONE FAX

14401 NE Keil Road, Aurora, Oregon, USA PHONE FAX VAN S AIRCRAFT, INC. 14401 NE Keil Road, Aurora, Oregon, USA 97002 PHONE 503-678-6545 FAX 503-678-6560 www.vansaircraft.com info@vansaircraft.com FF-1207 Cooling Shroud Modification 11-19-10 Background:

More information

CIRRUS AIRPLANE MAINTENANCE MANUAL

CIRRUS AIRPLANE MAINTENANCE MANUAL MAIN FRAME 1. DESCRIPTION This section describes those structural components which make up the main frame including vertical stabilizer, firewall, bulkheads, spar cover, and roll cage. A. Firewall The

More information

WING ASSEMBLY 23.5 (Continued)

WING ASSEMBLY 23.5 (Continued) A VERY IMPORTANT NOTE found on many wing drawings states Do not drill any unspecified holes into spar. This is extremely important as any extra holes may, under extreme conditions, WEAKEN THE SPAR. Note;

More information

How-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español

How-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español FREE brochure Reverso en español How-to-Install Laminate Countertops and Easy to install instructions provided inside Multiple colors available for unique design options Durable and easy to care for Accessory

More information

9.3 FUSELAGE ASSEMBLY 14/03/02

9.3 FUSELAGE ASSEMBLY 14/03/02 9.3 MATING THE TAIL CONE TO THE CABIN 1) Trim the bottom flange of both FUS-339 side skins on the tailcone assembly as in Figure 1. 2) Remove the bottom two RBULK 2A s of bulkhead A on the tailcone. 3)

More information

Step by Step Wing Bagging

Step by Step Wing Bagging Step by Step Wing Bagging By Evan Shaw 073 589 9339 evanevshaw@gmail.com Preparing the Leading Edge 1. Cut cores. (Cutting of wing cores is covered in another article elsewhere) 2. Sand the LE to a nice

More information

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708)

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708) Congratulations on your purchase of the finest Sprint Car Filter and stack sealing system available. This system has been designed for unparalleled ease of assembly, disassembly and cleaning while providing

More information

HORIZONTAL STABILIZER AND ELEVATOR

HORIZONTAL STABILIZER AND ELEVATOR HORIZONTAL STABILIZER AND ELEVATOR CONSTRUCTION OF THE HORIZONTALSTABILIZER Inspect the pre-molded top and bottom horizontal tail skins. Note that each skin consists of a horizontal stabilizer skin and

More information

Check the jig with the Slat Ribs. Notice the front tip is cut off, this will allow the slat to fit in the jig correctly.

Check the jig with the Slat Ribs. Notice the front tip is cut off, this will allow the slat to fit in the jig correctly. Slat Jig A slat jig will be needed to obtain the correct curvature of the slat. The Slat drawing is located on 7-F-13, cutout and trace on plywood. The length of the jig is 1830mm, which is the outboard

More information

Glass Cloth (supplied pre cut) Fibre Flock

Glass Cloth (supplied pre cut) Fibre Flock Fitting Horizontal stabiliser:- Reference: Parts required: Drawing Photos Upper & Lower Fuselage Assy Horizontal Stabiliser Material required; LC 3600 LC 3600 AF 244 Resin Hardener Glass Cloth (supplied

More information

Section 6-T-3 Elevator

Section 6-T-3 Elevator Section 6-T-3 Elevator This manual has been prepared for assembly of the Elevator using match drilled parts. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy

More information

07 - Landing Gear. Landing Gear. February EGF Page 7-1

07 - Landing Gear. Landing Gear. February EGF Page 7-1 Landing Gear February 2003 07-EGF Page 7-1 This Page Intentionally Left Blank Page 7-2 07-EGF February 2003 Contents 7.0 - Chapter Preface...7-4 7.0.1 - Parts List...7-4 7.0.2 - Tools List...7-4 7.0.3

More information

Jabiru Aircraft. Fit Ailerons

Jabiru Aircraft. Fit Ailerons Fit Ailerons Reference: Drawings 2033091 and 20210K1 Photos Parts Required: 2021091 Wing LS 202209N Wing RS 2027092 Aileron LS 202809N Aileron RS 2036034 Aileron reinforcement Left 203703N Aileron Reinforcement

More information

Instruction Manual book

Instruction Manual book Instruction Manual book ITEM CODE BH53. SPECIFICATION Wingspan : 1,250mm 49.21 in. Length : 930mm 36.61in. Weight : 1.1kg 2.42 Lbs. Parts listing required (not included). Battery: 3 CELLS-LI-POLY-11.1V-2,500

More information

SPUNKY ASSEMBLY MANUAL

SPUNKY ASSEMBLY MANUAL SPUNKY ASSEMBLY MANUAL Please read the tips section at the back of this manual regarding the use of laser cut parts. The proper removal and preparation of these parts is important. When laser cut, some

More information

03 - Canard / Elevators. Canard / Elevators. April XLG Page 3-1

03 - Canard / Elevators. Canard / Elevators. April XLG Page 3-1 03 - Canard / Elevators Canard / Elevators April 2006 03-XLG Page 3-1 03 - Canard / Elevators This Page Intentionally Left Blank Page 3-2 03-XLG April 2006 03 - Canard / Elevators Contents 3.0 - Chapter

More information

FORWARD FUSELAGE SIDES & REAR TOP SKINS

FORWARD FUSELAGE SIDES & REAR TOP SKINS FORWARD FUSELAGE SIDES & REAR TOP SKINS WORK REPORT Step No. Check Parts / Tools Qty Preparations. 1 [ ] 6F5-3 Upper Front Longerons 2 2 [ ] 6F5-5 Heel Support 1 3 [ ] 6F5-2 Front Floor Skin 1 3 [ ] Firewall

More information

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Installing your new Bevella Top L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Bevella RTI Countertops are engineered and manufactured to the highest quality standards, built

More information

Dublin Stalls Installation Instructions

Dublin Stalls Installation Instructions Dublin Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 9/13/17 Part Identification Round Track Bracket (4) (Not Painted) Round

More information

4. Instrument Panel Support

4. Instrument Panel Support Instrument Panel installation for serial numbers 52 to current Section Objective: Installation of the instrument panel pod. Installation of all the accessories including; vents gas strut supports, engine

More information

Section 6-B-4 Rear Fuselage Riveting

Section 6-B-4 Rear Fuselage Riveting Section 6-B-4 Rear Fuselage Riveting This manual has been prepared for assembly of the rear fuselage. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy

More information

REVISION LIST CHAPTER 9: CANOPY PAGE(S) AFFECTED REVISION # & DATE ACTION DESCRIPTION

REVISION LIST CHAPTER 9: CANOPY PAGE(S) AFFECTED REVISION # & DATE ACTION DESCRIPTION REVISION LIST CHAPTER 9: CANOPY The following list of revisions will allow you to update the Legacy construction manual chapter listed above. Under the Action column, R&R directs you to remove and replace

More information

Three vertical L angles must be riveted to each main spar (length = 206mm see boxed diagram on drawing 7-V-2).

Three vertical L angles must be riveted to each main spar (length = 206mm see boxed diagram on drawing 7-V-2). Cut over-sized (left); Trim and file (above). Note: Six needed. Three vertical L angles must be riveted to each main spar (length = 206mm see boxed diagram on drawing 7-V-2). Trace line down center of

More information

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage.

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage. LANDING GEAR 1. Fit landing gear into slots on bottom of fuselage. 4. Use channel-lock pliers to press blind nuts into position (note: drilled hole should be slightly smaller than shaft of blind nut for

More information

96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED

96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED 96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED GENERAL INSTRUCTIONS Should you elect to use the recommended Door Skin, which is 1/8 mahogany plywood measuring 36 x 88. Have it cut

More information

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Ford Pick Up Rear leaf Spring Kit Installation Instructions 1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4

More information

Elevator Assembly. To assemble the SR3500 Elevator, you will need the following tools:

Elevator Assembly. To assemble the SR3500 Elevator, you will need the following tools: Elevator Assembly To assemble the SR3500 Elevator, you will need the following tools: 1. Drill 2. Tape Measure 3. Felt Marker 4. #40, #30, 3/16, #11 Drill Bits 5. #40, #30 and 3/16 Clecos 6. Cleco Pliers

More information

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger Citabria Pro Aerobatic Parkflyer by Joel Dirnberger Revision C: December 21, 2004 Citabria Pro Building Instructions Length: Wingspan: Wing Area: Flying Weight: Wing Loading: Functions: Specifications:

More information

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30 Pack Stages 2-0 Contents Stage Page Number 2 72-74 22 75-78 2 79-8 24 82-84 25 85-88 26 89-9 27 92-94 28 95-97 29 98-00 0 0-05 Editorial and design by Continuo Creative, 9-4 North Road, London N7 9DP All

More information

Traditional Undermount: S Method (Undermount):

Traditional Undermount: S Method (Undermount): TOOLS REQUIRED 15.1 TOOLS REQUIRED The installation of Corian shape product must be a precise and exacting process to ensure that a good fit is always created. Using the correct tools is essential. In

More information

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions For Under-Mount Installation please refer to page 14 FOR EXPERIENCED AND PROFESSIONAL INSTALLATION ONLY This installation project is designed for an advanced skill level. Disclaimer: Undermount Application

More information

1/6 PA-25 PAWNEE. *Specifications are subject to change without notice.*

1/6 PA-25 PAWNEE. *Specifications are subject to change without notice.* 1/6 PA-25 PAWNEE INSTRUCTION MANUAL [ A335 Kit ] Wing Span : 72 in / 1830 mm Wing Area : 736 sq in / 47.5 sq dm Flying Weight : 6.6 lbs / 3000 g Fuselage Length : 48 in / 1220 mm Requires : "Glow Power"

More information

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount: RYCA CS-1 BODY PARTS INSTALLATION GUIDE [The CS-1 installation guides should be used as supplements to the videos found on our Youtube Channel. There is no strict order to the build process, but it is

More information

77.5 degrees REAR CHANNEL PLYWOOD TEMPLATE

77.5 degrees REAR CHANNEL PLYWOOD TEMPLATE 77.5 degrees REAR CHANNEL PLYWOOD TEMPLATE Ref. 6-B-14 Make following template: Vertical distance = 300mm Layout dimensions shown in the bottom right table on drawing 6-B-14 Top and bottom are square to

More information

84 WING SPAN MESSERSCHMITT BF-109

84 WING SPAN MESSERSCHMITT BF-109 84 WING SPAN MESSERSCHMITT BF-109 (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED MEISTER 84 ME-109 SIERRA GEAR UPDATE PLEASE NOTE: THE MAIN GEAR MOUNTING PLATE FROM SIERRA IS NOT SQUARE. YOU HAVE TO ROUND

More information

ZODIAC 601 XL. Detail of outboard end. Full length recessed elevator trim tab. Detail of inboard end. Trim tab along left trailing edge of elevator.

ZODIAC 601 XL. Detail of outboard end. Full length recessed elevator trim tab. Detail of inboard end. Trim tab along left trailing edge of elevator. Full length recessed elevator trim tab. Detail of outboard end. Detail of inboard end. Trim tab along left trailing edge of elevator. Trim tab in neutral position 6-T-6 - Page 1 of 12 Drill out the middle

More information

Land Rover Defender 110 Station Wagon External Front-Internal Mid Roll Cage (L148) Fitting Instructions

Land Rover Defender 110 Station Wagon External Front-Internal Mid Roll Cage (L148) Fitting Instructions Land Rover Defender 110 Station Wagon External Front-Internal Mid Roll Cage (L148) Fitting Instructions Unwrap the roll cage and unpack the individual fitting kits. At this point it is recommended that

More information

Building Tips This model can be built using the following types of adhesives:

Building Tips This model can be built using the following types of adhesives: Page 1 Building Tips This model can be built using the following types of adhesives: Epoxy (with or without microballons) Odorless cyanoacrylate (CA) with accelerator UHU Creativ for Styrofoam (or UHU

More information

PAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top

PAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top PAK901 4 Drum Roll Top Assembly Instructions Note: 2 people will be required to assemble roll top PLEASE READ ASSEMBLY INSTRUCTIONS CARFULLY Tools required: 5/8 Socket & Ratchet 9/16 Deep Well Socket &

More information

FUSELAGE CONSTRUCTION

FUSELAGE CONSTRUCTION FUSELAGE CONSTRUCTION Note: prior to building and gluing on the work surface use protective covering on your building surface. (wax paper or clear wrap) Fit the laser cut Fuselage Front and Fuselage Rear

More information

Stearman PT-17 KIT WARRANTY

Stearman PT-17 KIT WARRANTY Stearman PT-17 KIT # K-306 Assembly Instructions Version 2 02-17-16 Designed by Tom Herr WARRANTY Sig Manufacturing Co, Inc. guarantees this kit to be free from defects in both material and workmanship

More information

Join Neck and Body Wednesday, January 16, :08 PM

Join Neck and Body Wednesday, January 16, :08 PM ASL Breakdown Page 1 Join Neck and Body Wednesday, January 16, 2013 10:08 PM 1. 2. 3. 4. Charles did the following steps to speed things up: Lightly sanded the top of the lower bout with an orbital sander.

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Note: These instructions vary from those provided by the manufacturer of the rocket kits. There is also considerable varying discussion

More information

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website Grade 11 Woods Lift Lid Coffee Table Based on Under the big Top from Popular Mechanics Website TABLE TOP 1. Select enough lumber to construct a top that is between 22 ½ and 24 wide after jointing. Ensure

More information

SE5a Wing Panels rev 1.0

SE5a Wing Panels rev 1.0 SE5a Wing Panels rev 1.0 The top and bottom wings are different. They might look the same but the bottom wing has one less rib and some rib spacing difference. This is due to where the wooden interplane

More information

PITTS S2S CONSTRUCTION

PITTS S2S CONSTRUCTION PITTS S2S CONSTRUCTION FUSELAGE CONSTRUCTION 1) Place the right fuselage side over the plan and mark the former positions. Place the left side over the right side and mark the former positions. Glue F1

More information

09 - Fuel System. Fuel System. April XLR Page 9-1

09 - Fuel System. Fuel System. April XLR Page 9-1 09 - Fuel System Fuel System April 2006 09-XLR Page 9-1 09 - Fuel System This Page Intentionally Left Blank Page 9-2 09-XLR April 2006 09 - Fuel System Contents 9.0 - Chapter Preface...9-4 9.0.1 - Parts

More information

CENTER WING SECTION (CWS) WORK REPORT

CENTER WING SECTION (CWS) WORK REPORT CENTER WING SECTION (CWS) WORK REPORT No. Check Parts / Description Qty PHASE 1: Preparations 1 [ ] 6V1-3 Rear ribs 2R & 2L 1 [ ] L Angle 6 2 [ ] 6V2-1 Rear Ribs.032 2R & 2L 2 [ ] 6V5-1 Gear Rib Doubler

More information

RESolution V2 Manual

RESolution V2 Manual RESolution V2 Manual Note for the German Manual: Yellow Bottle thick CA Pink Bottle Med CA Blue tube 5 minute Epoxy Green tube 90 Minute Epoxy Construction of the Fuselage Step 1: Cover the plan with a

More information

Frameless Fixed Panel Slider QCI5279

Frameless Fixed Panel Slider QCI5279 Frameless Fixed Panel Slider QCI5279 F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com Frameless Fixed Panel

More information

Access Risers and Tank Adapters

Access Risers and Tank Adapters Access Risers and Tank Adapters Installation Instructions Access risers provide access to septic tank openings, simplifying inspection and maintenance procedures. It is important that the riser be sized

More information

STOL CH H3-3SP Center Hinge Bracket. IMPORTANT: The Bracket 7H5-3SP is not symmetrical

STOL CH H3-3SP Center Hinge Bracket. IMPORTANT: The Bracket 7H5-3SP is not symmetrical 7H3-3SP Center Hinge Bracket IMPORTANT: The Bracket 7H5-3SP is not symmetrical Using a square helps layout and mark the perpendicular and the hinge hole. Note: Position of 1/4 hinge hole is 115.5mm from

More information

'Mutiny' Ozone Reactor Kit

'Mutiny' Ozone Reactor Kit 'Mutiny' Ozone Reactor Kit Skill Level: Beginner Tools Required: Scissors or razor blade Other Materials: Teflon tape Time to Build: Approximately 1 hour not including drying time Version: 2012 spray nozzle

More information

Frameless Fixed Panel Slider

Frameless Fixed Panel Slider INSTALLATION INSTRUCTIONS Frameless Fixed Panel Slider QCI-5279 SINGLE ROLLER WITH ANTI-JUMP DOUBLE ROLLERS QCI5279 Rev Page Certified 08/09/6 Tools: To install your New Shower Enclosure, you may need

More information

JAMISON SPECIAL. Building Guide

JAMISON SPECIAL. Building Guide JAMISON SPECIAL Building Guide WING Mark then drill holes for wing jig rods. Slide Ribs onto jig rods Mark the rib positions on 1/16 x 1 trailing edge, 1/4 x 1/4 leading edge & 1/4 x 1/4 spars Pin ribs

More information

Answer Power Beam and Boundary Screen

Answer Power Beam and Boundary Screen Answer Power Beam and Boundary Screen 5/16 MAGNETIC 3/8 If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by

More information

Zip Block MODEL ZB INSTALLATION INSTRUCTIONS

Zip Block MODEL ZB INSTALLATION INSTRUCTIONS Zip Block MODEL ZB 100-400 INSTALLATION INSTRUCTIONS 12BT EXPOSED SURFACE SEAL WIDTH Zip Block SEAL 3/4" ± 1/8" [19.05mm ± 3.18mm] BLOCKOUT EDGE 3 1/2" [88.90mm] MAXIMUM BLOCKOUT NOMINAL JOINT WIDTH EPOXY

More information

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

3.2.3 Rear Door Window and Quarter Window Carrier Assembly Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without

More information

Section # /2" x 1 1/2" x 20" /4" x 15 3/4" x 82 1/2" /4" x 1 5/8" x 82 1/2"

Section # /2 x 1 1/2 x 20 /4 x 15 3/4 x 82 1/2 /4 x 1 5/8 x 82 1/2 Hardware & Miscellaneous Items: A 2 3 1/2" chest handles B 7 3" T-hinges and screws C 4 1/4" T nuts D 4 1/4" x 2 1/2" Carage bolts E 2 1/4" x 2" Barrel Bolts F 2 1" x 5' Straps G 8 1/4" 3 1/2" Carage Bolts

More information

Clearview Railing System Installation Instructions

Clearview Railing System Installation Instructions Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national

More information

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line: `48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line: 1-855-693-1259 www.totalcostinvolved.com CHECK ALL PARTS INCLUDED IN THIS KIT TO THE PARTS LIST BEFORE INSTALLING THE KIT.

More information

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A 1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com

More information

Wing rear attachment reinforcement

Wing rear attachment reinforcement Wing rear attachment reinforcement Classification: Applicability: Compliance: Mandatory All Europa Classic aircraft fitted with Styrofoam core wings. Within 10 flying hours after August 1, 2007, or before

More information

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS INSTALLATION AND CARE INSTRUCTIONS Vertical Applications Honeycomb Shades 52 C8-10-3401 Rev 2/14 CONTENTS Introduction...2 Before You Begin...3 Vertical Application Parts Overview...4 Materials Required...5

More information

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS / OR / FRAMELESS SWING DOOR WITH SINGLE INLINE OR TWO INLINE S This instruction sheet applies to the following units with a magnetic handle. C7, C7, C79 This instruction sheet also applies to the following

More information

SERVICE MANUAL. For the Vermont Castings. Please place picture here. MODELS: 2181 (Small) 2183 (Large) 2184 (Extra Large)

SERVICE MANUAL. For the Vermont Castings. Please place picture here. MODELS: 2181 (Small) 2183 (Large) 2184 (Extra Large) SERVICE MANUAL For the Vermont Castings Please place picture here. 1990-1993 DUTCHWEST CONVECTION HEATERS MODELS: 2181 (Small) 2183 (Large) 2184 (Extra Large) HISTORY OF CHANGES 1990 1993 DUTCHWEST CONVECTION

More information

Contents. Build the Spitfire: Step-By-step

Contents. Build the Spitfire: Step-By-step Pack 2 Stages -20 Contents Stage Page Number 8-0 2 - - 7 8-50 5 5-5 6 5-57 7 58-60 8 6-6 9 6-67 20 68-7 Editorial and design by Continuo Creative, 9- North Road, London N7 9DP All rights reserved 20 De

More information

ULTRA-TOTE BASIC INSTRUCTION MANUAL

ULTRA-TOTE BASIC INSTRUCTION MANUAL ULTRA-TOTE BASIC INSTRUCTION MANUAL Thank you for purchasing the Ultra-Tote Basic! You have purchased one of the finest values available in field support equipment. We think you will be impressed with

More information

Super Sky Surfer 2000 Assembly Instructions

Super Sky Surfer 2000 Assembly Instructions Super Sky Surfer 2000 Assembly Instructions Note: Plug and Play version of the Sky Surfer comes with fuselage pre-glued and motor/servos installed. If you wish to route antennas or wires through the tail,

More information

8 x 10 Sandwich Panel

8 x 10 Sandwich Panel *Before starting, please read entire manual *Changes can be made in order for this manual to work for you 8 x 10 Sandwich Panel Follow all applicable sections of the attached Manufacturing Plan. Objectives:

More information

Hobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions

Hobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions Materials needed: 15 or 30 minute epoxy Medium CA Masking tape Scotch tape Servo Tape Wax paper Tools Needed: Pencil or marker Flat building surface Hobby knife or razor blade 7/64" or 3mm drill bit 3/16"

More information

BUILDING A STORM DOOR

BUILDING A STORM DOOR BUILDING A STORM DOOR BY NEAL BARRETT Illustrations by George Retseck If you're in the market for a storm door, you probably know that there are many styles and models available. However, most of them

More information

Replacing worn out MS hinges

Replacing worn out MS hinges Replacing worn out MS hinges C. Zavatson, 4-3-2014, rev A For the hinging of ailerons, flaps, inboard gear doors and the elevators of the small tail, Lancair utilized MS20001 hinge material. Unfortunately

More information

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel INSTALLATION INSTRUCTIONS Frame Reinforcement Kit 11102 (Patent Pending) 1964-67 GM A-Body Coupe/2dr Sedan Read Instructions FULLY before starting Installation Important Note Installation of this kit requires

More information

Ch. 9.0 ELITE FUSELAGE ASSEMBLY 14/02/2003

Ch. 9.0 ELITE FUSELAGE ASSEMBLY 14/02/2003 Fuselage Assembly In the front of the fuselage manual you will find an exploded view of the fuselage and a side view schematic. We suggest that you tape these to the wall of your workshop. Refer to them

More information

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay

More information

Installation And Care Instructions. Vertical Honeycomb Shades

Installation And Care Instructions. Vertical Honeycomb Shades Installation And Care Instructions Vertical Honeycomb Shades Rev 5/2013 Table Of Contents Getting Started... 3 Parts Overview... 4 Materials Required... 5 Tools Required... 6 Outside Mount Installation...

More information

7. Ailerons. Overview.

7. Ailerons. Overview. 7. Ailerons Overview. The ailerons are made in much the same way as the rudder. The only difference being that the ends are not rounded but have close-out ribs instead and the aileron cores are supplied

More information

Above are the offsets for the plywood panels.

Above are the offsets for the plywood panels. DinkyDink Plans Bottom Panel Half Station X Y X2 Y2 1 1/4 3/4 0 11 5/16 2 4 9/16 4 12 9/16 3 11 11/16 1/4 11 7/16 14 1/2 4 18 5/8 1/16 18 5/8 15 11/16 5 25 3/4 0 25 3/4 16 5/16 6 32 13/16 0 32 13/16 16

More information

Body Repair. Collision Repair. Specification. Fastener Specifications Fastener Specifications. Blind Rivet. Flow Drill Screw (FDS) Torque FDS

Body Repair. Collision Repair. Specification. Fastener Specifications Fastener Specifications. Blind Rivet. Flow Drill Screw (FDS) Torque FDS Body Repair Collision Repair Specifications Fastener Specifications Fastener Specifications Application Specification Metric English Cross-Car Brace Mounting Bolts 25 Y 18 lb ft Windshield Frame Mounting

More information