ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS
|
|
- Noreen White
- 6 years ago
- Views:
Transcription
1 Heliostar 252 S4 and 218 S4 FREE-STANDING INSTALLATION vertical ASSEMBLY INSTRUCTIONS Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS
2 Safety instructions Safety instructions Please read these assembly instructions carefully prior to installation and ensure adherence to all safety instructions. Always ensure adherence to all relevant Work Safety regulations and that all technology is state-of-the-art, in particular where relevant to roof work Important: With this type of assembly, it may not be possible to completely empty the collectors. For this reason, the solar system should only be filled with a mixture of water and antifreeze. This means that it is also essential to top up the collectors with antifreeze after pressure or functional tests! Important: If collectors are stored prior to assembly, always ensure that they are never stored in the open air, lying on their glass surface and/or uncovered, as this may allow moisture to penetrate the vent holes in the frame. When installing the collector connectors, please bear in mind that they are soft-annealed, so counter-pressure should always be applied when tightening the ½ threaded joint! Failure to do so may result in damage to the collector! Work Safety regulations and state-of-the-art technology Roof installations: DIN Roof covering and roof sealing works, DIN Sheet-metal works, DIN Scaffolding works. Connecting thermal solar systems: DIN 4757 Parts 1 and 3. Electrical connection: VDE 0100 Setting up electrical equipment, VDE 0185 general information for erecting lightning protection systems, VDE 0190 main equipotential bonding of electrical systems, DIN electrical cable and wiring system in buildings. The professional builders associations provide detailed information on accident prevention regulations! Proper use of ladders Ladders should only be used for a working height below 5 m. Position the ladder at an angle of 65 to 75 and secure. The top end of the ladder must extend at least 1 m above exit point. Fall protection If working at a height above 3 m, always use fall protection equipment when working on sloping roofs (20 to 60 ) (VBG 37, 8). The vertical distance for a workplace safety device (roof safety platform or other kind of protective roof barrier) is max. 5 m. A safety harness may also be used as fall protection. Secure universal fastening safety anchors to load-bearing parts above the worker. Do not use ladder hooks! Protection against falling objects Access routes and workplaces located below the work site must be protected against falling objects. These areas must be clearly signed and cordoned off. Information is also available on the Roth Hotline: /
3 Installation requirements The free-standing mounting set is suitable for the installation of Roth Heliostar flat collectors on open ground, or on flat or low-pitched roofs. General requirements The metal pipes of the solar circuit must be connected to the main equipotential busbar by a green and yellow conductor of at least 16 mm 2 Cu (H07 V- or R). The collectors can either be included in an existing lightning protection system or can alternatively be earthed via an earth rod. The earth wire must be run down the outside of the house. The earth must also be connected to the main equipotential busbar by a wire of the same cross-section. Equipotential bonding and lightning protection The sensor must be fitted in the last collector with water flowing through it on the forward side (hot outlet). To do this, remove the rubber coupler and thread the sensor through, pushing the mineral wool inside the collector slightly to one side. Then apply a little heat conductive paste to the sensor and insert it in the immersion sleeve as far as it will go. Finally push the rubber coupler back on again until the ridge catches on the collector frame. If you need to extend the sensor wire, you can use a wire cross-section of 2 x 0.75 mm 2 up to a length of 50 m. For a longer length, you require a cross-section of 2 x 1.5 mm 2. To protect the connected controller and the sensor against power surges, we recommend extending the collector sensor over a surge plug (optional extra) directly behind the collector. Fitting the sensor Drilling machine with 8.5 mm twist drill bit or 12 mm masonry drill bit Spanner 16, 17, 19, 24 2 pipe wrenches Folding rule Metal saw for cutting sections to length (optional) List of tools 3
4 1,36 m 1,82 m 1,82 m 1,36 m 1,82 m 1,36 m 1,82 m 1,36 m 1,82 m 1,64 m 2,10 m 2,10 m 1,64 m 2,10 m 1,64 m 2,10 m 1,64 m 2,10 m System variants Heliostar 252 S4 and 218 S4 Collector area: 2.52 m 2 and 2.18 m 2 respectively Vertical collector installation, Heliostar 252 S4 0,8 m 0,8 m 1-1,2 m 0,8 m 1-1,2 m 1-1,2 m 1,20 m 2,40 m 3,60 m 1,64 m 0,8 m 1-1,2 m 1-1,2 m 1-1,2 m 4,80 m 0,8 m 1-1,2 m 1-1,2 m 1-1,2 m 1-1,2 m 6,00 m Vertical collector installation, Heliostar 218 S4 0,8 m 1-1,2 m 0,8 m 1-1,2 m 1-1,2 m 1,20 m 2,40 m 3,60 m 1,36 m 0,8 m 1-1,2 m 1-1,2 m 1-1,2 m 4,80 m 0,8 m 1-1,2 m 1-1,2 m 1-1,2 m 1-1,2 m 6,00 m 4
5 Material overview Item Material No. Description Quantity C-section, 36 x 30 x 1900 mm F Hex bolt M10 x 30 DIN 933, galvanized Hex bolt M10 x 60 DIN 933, galvanized Hex nut M10 DIN 985 (EN ISO 10511), galvanized Hex nut M10 DIN 934, galvanized Washer 10.5 mm DIN 125, galvanized U-section 25 x 10 x 25 mm, Al Hex wood bolt 8 x 60 DIN 571, galvanized Plug S12 x Mounting rail, vertical, length: 1205 mm Fixing bracket, single Assembly instructions for Heliostar free standing installation T connector 60 x 60 x 6 mm, length: 40 mm Connection nipple 1/2" Connection sleeve 1/2" End stopper sleeve End stopper nipple Including snap ring Packaging 1 Vertical free-standing installation fixing Basic set H Item Material No. Description Quantity C-section, 36 x 30 x 1900 mm F Hex bolt M10 x 30 DIN 933, galvanized Hex bolt M10 x 60 DIN 933, galvanized Hex nut M10 DIN 985 (EN ISO 10511), galvanized Washer 10.5 mm DIN 125, galvanized U-section 25 x 10 x 25 mm, Al Hex bolt M12 x 20 DIN 933, galvanized Hex nut M12 DIN 934, galvanized Washer 13 mm DIN 125, galvanized Hex wood bolt 8 x 60 DIN 571, galvanized Plug S12 x Mounting rail, vertical, length: 1205 mm U-shaped connecting element 25 x 25 x 3mm, length: 130 mm Al Fixing bracket, double Stainless steel corrugated hose, length: 300 mm 1/2" Assembly instructions for Heliostar free standing installation T connector 60 x 60 x 6 mm, length: 40 mm Snap ring for plug-in system Packaging 1 2 Vertical free-standing installation fixing Extension set H 5
6 Assembly steps 1. Fix the M10 x 60 screw in the mounting rail using the U-section Using a washer and nut, affix this to the vertical mounting rail (fully insert in end long slot) It is essential to ensure that the vertical mounting rail is pushed down until the two rails are aligned (see white line in photo). 3 6
7 4. The lateral triangle you have now created is floor-mounted using the supplied T connectors as follows. Assembly steps 4 5. Insert the M10 x 30 screw in the U-section, pass it through the upper bore hole in the T connector and affix gently with a washer and nut The thus prepared connecting piece is inserted in the mounting rail and fixed. This process must be repeated and the connecting piece inserted in the bottom of the vertical rail and the inclined rail The procedure followed thus far should be repeated to assemble the second triangle. 7 7
8 Assembly steps 8. To mount the two horizontal rails (top and bottom), proceed as follows: Important: The horizontal rails are supplied with ready-made bore holes by the factory. There are two bore holes in the top part of the rail, as shown on the rail in the photo. The top bore hole serves to position the horizontal rail when assembling the Heliostar 252 S4. the lower one is for assembling the Heliostar 218 S4. for Heliostar 218 S4 8 for Heliostar 252 S4> > 9. The horizontal rail is to be inserted into the U-shaped profile using M10 x 60 screws and pushed into the mounting rail completely The distance from the outer edge of the inclined rail should be 75 mm from the horizontal rail After the upper horizontal rail has been fixed, the lower rail is assembled with the same procedure. 11 8
9 12. Finished assembly of the lower horizontal rail. Assembly steps The two diagonal distances are to be determined to check that the two horizontal rails are the same distance apart After completing the retaining frame, this must be fixed to the ground; 2 holes are to be marked in each T-connector for this. The frame is to be moved to the side and the holes are to be made using a 12 mm masonry drill bit. Then the 12 mm plugs are knocked into the holes, the frame is to be put back on the holes and fixed to the ground with the 8 x 60 mm wood screws After the frame has been fixed to the ground, the Heliostar collector is to be placed on the frame. 15 9
10 Assembly steps 16. Affix the collector to the frame using the fixing brackets (4 lateral brackets on the first collector) Secure the lateral fixing brackets in the side slot of the horizontal mounting rail using an M10 x 30 screw, washer and nut Completed side mount A diagonal flow should be ensured when operating an individual collector and any further collectors. To do this, the end and connection plugs are to be fastened as shown, with an appropriate locking ring. Important: Ensure that the plug-in system is always sufficiently lubricated
11 21 22 Assembly steps 23. Insert the two M12 x 20 screws in the mounting rail connectors for the top and bottom mounting rail as shown in the photo Place the washer and nut on the other side of the connector and tighten gently by hand Push the connecting elements halfway into the mounting rail and turn
12 Assembly steps 27. Push the double fixing bracket onto the top and bottom mounting rail Depending on the number of Heliostar collectors you are installing, create the next triangle as described at the beginning of these instructions Insert the top and bottom horizontal mounting rail and secure in place Repeat this process until you have mounted all the Heliostar collectors
13 31. When assembling the second and each further collector, push the collectors together using the plug-in system (sleeve + nipple). Important: Ensure that the plug-in system is always sufficiently lubricated! Assembly steps /33. Use the locking ring to connect the plug-in system that has been pushed together Secure the first and last Heliostar collector with the side mounting brackets
14 Assembly steps 35. To fit the sensor, remove the rubber coupler, thread the sensor through, apply heat conductive paste and push it into the immersion sleeve as far as it will go. Then push in the rubber coupler as far as the back ridge When assembling the corrugated hose couplings, ensure that they fit correctly. When tightening the threaded connections, always hold the collector up in position. Failure to do so may cause irreparable damage to the collector. A diagonal flow should be ensured with this method of operation. To do this, end plugs are to be attached as shown in pictures 21 to 24 and installed with a locking ring. Important It should be ensured during assembly that the attachment parts are always sufficiently lubricated! 37 14
15 G Please note that for large systems of five collectors or more, a compensator must be installed! Note for large systems The collectors must be secured on the roof because loose installation frames can be knocked over and damaged by the wind. First check the structural suitability of the substructure and the permissible surface load for the roof cladding (consult a structural engineer if necessary). To avoid damaging (drilling through) the roof cladding, you can use weights (e.g. Roth gravel plate set, concrete ties) to weigh it down. Max. pressure on the collector cover is 1667 Pa. for Heliostar 252 S4 and 673 Pa. for Heliostar 218 S4. Fixing instructions Height of building Surface Heliostar (m 2 ) Wind force (N) Needed weight per Kollektor Heliostar (kg) 0 to 8 m 2,18 / 2, / ,5 / to 20 m 2,18 / 2, / / 320 > 20 m 2,18 / 2,52 Individual calculation in accordance with DIN Minimum clearance to roof edge The installation engineer bears sole responsibility for ensuring that the collectors are adequately anchored on open ground or on the roof, particularly if the location is subject to strong winds. Any data pertaining to weight contained in these assembly instructions is provided by the manufacturer for information purposes only and is not intended as any form of warranty! Roth shall accept no liability whatsoever in the event of damage or loss. This does not affect the terms of the warranty with regard to material supplied by Roth. The relevant standards and directives apply, particularly DIN , governing minimum weight loads for different building heights. Requirements for structural forces 15
16 Technical data super-transparent safety glass 2 circumference profile 3 highly selective coated full surface absorber 4 Fixing points 5 60 mm thick heat insulation 6 Grooves for easy assembly 7 Collector tray made of polycarbonate Roth Heliostar S4 flat collector technical specifications Heliostar 218 S4 Heliostar 252 S4 Length 1820 mm 2100 mm Width 1200 mm 1200 mm Height 109 mm 109 mm Gross surface area 2.18 m m 2 Aperture surface area 1.96 m m 2 Weight 35 kg 36 kg Collector housing Heavy-duty polycarbonate tray construction, sealed throughout as a result of being deep drawn seamlessly from one piece, permanently resistant to corrosion. Glass cover ESG safety glass, transmission t = 91 % Absorber vacuum highly selective coated full surface absorber Absorption a = 95 % Emission e = 5 % Fluid capacity 0.86 l 1.16 l Heat transfer medium Operating pressure (max) Solar sensor shaft Collector connection Collector yield, annual Intended use Heliostar solar fluid 10 bar Interior Ø = 6 mm Roth plug-in system over 525 kwh/m 2 a To heat water and support the heating system Idle temperature 208 C Pressure loss 17.8 mbar at 233 kg/h 41.9 mbar at 485 kg/h Slope angle range 20 to 50 Maintenance instructions Intended use to heat water and support the heating system In order for the thermal solar system to work without problems it should be subjected to annual maintenance (ideally as part of the annual heating maintenance). This should include: Visual inspection of the collectors and pipe insulation Examination of electrical connections Examination of switching functions and through flow amount Examination of the anti-freeze 16
17 Check list and commissioning log for thermal solar systems Equipment operator Installation company Name Company First name Installed by Street Street Postcode, city/town Postcode, city/town Telephone Telephone Date of first operation: Collectors Manufactured by Quantity Serial number Gross surface area total Alignment Circuitry N W E S Storage tank Type of storage tank Size Quantity Use of the solar heating equipment Preparation of domestic water Domestic water with heating support Other Control system Roth BW control system Roth BW/H control system Roth BW/H Comfort control system Roth BW efficiency control system Roth BW/H efficiency control system Solar station RS 25/6 RS 25/7 ST 20/11 ST 15/1-7 with efficiency pump Expansion tank litres System pressure bar Flow volume litre/minute System properly flushed and aired Anti-freeze content tested (recommendation: 40 %) Sensor correctly positioned Regulator functionality check yes no Operator's signature Installer's signature 17
18 ROTH WERKE GMBH Am Seerain 2 D Dautphetal Phone +49 (0)64 66/ Fax +49 (0)64 66/ Hotline +49 (0)64 66/ service@roth-werke.de Subject to technical modifications. 18
Installation Instructions
Installation Instructions SOLC 220 SOLC 220 PAG SOLC 220 PAE SOLC 220 BAG SOLC 220 BAE Flat plate collector Basic kit Frankfurt tile Extension kit Frankfurt tile Basic kit plain tile Extension kit plain
More informationInstallation Instructions
Installation Instructions Alpha SolarSmart On Roof Kits for the Installation of Alpha Solar Collectors onto Tile and Slate Type Roofs For Technical help or for Service call... ALPHA HELPLINE Tel: 0 77
More informationInstallation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs
Installation instructions Novotegra for Corrugated Fibre Cement / Sandwich Roofs I CONTENTS 1 General information... 0 2 Novotegra: mounting system planning... 1 2.1 Solar-Planit software... 1 2.1.1 General
More informationInstallation instructions for heating engineers. Vitosol 200 Type D10, D20 and D30 Direct flow vacuum tube collector VITOSOL 200
Installation instructions for heating engineers Vitosol 200 Type D10, D20 and D30 Direct flow vacuum tube collector VITOSOL 200 4/2004 Safety instructions Please follow these safety instructions closely
More informationE N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS
GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated
More informationMounting systems for solar technology
Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Crosshook 3S CrossHook 4S GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 2
More informationAssmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS
Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable
More informationMounting systems for solar technology
Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Roof Fastener System CrossHook 2G GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY
More informationClearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal In-roof mounting SRH 2.3
Clearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal In-roof mounting 22-75 SRH 2.3 www.glow-worm.co.uk 1 Guarantee Registration These Clearly Solar Flat Plate collectors
More informationOn-Roof Mounting Sets for Flat-Plate Collectors
Engineering Submittal Sheet Installation sets for collectors Fig. 1 Installation set for 2 collectors 1 basic installation set, 1 extension installation set Basic installation set for each collector array
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationSide Winder R o u t e r L i f t.
Woodpeckers PRECISION WOODWORKING TOOLS Side Winder R o u t e r L i f t. INSTALLATION INSTRUCTIONS The wrench handle must be pointing left in order to fully insert or remove it. Lift Wrench Once fully
More informationFig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7
FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationOXYGEN INSTALLATION. Revision date
12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex
More informationGardman Lean-to Greenhouse Assembly Instructions
Page 1 Gardman Lean-to Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free
More informationSunTrackerTwo Preparation
TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs
More information4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL
4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL 4.4.1 EXPLODED VIEW DRAWING REF. QTY. DB DC DF DG DJ DL DESCRIPTION PART # 1 1 ADAPTOR FRAME 034007 2 12 LOCK WASHER 3/8 x 1/8 S.S. 034004 3 12 HEX HEAD
More informationGreenhouse Assembly Instructions
Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800
More informationINSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world
energy for a better world INSTALLATION INSTRUCTIONS TRI-VENT The photovoltaic mounting system for trapezoidal sheet roofs Quick and easy installation Riveting instead of glueing Securing without screws
More informationMounting instructions SZ210 Full-frame pedestal with screw-on tube with placement hinge, for type SCHATTELLO
This height will be made to order. Mounting instructions SZ210 Full-frame pedestal with screw-on tube with placement hinge, for type SCHATTELLO The following instructions include all information necessary
More informationInstallation Instructions for Vista Air Vertically Folding Walls
Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.
More informationIMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)
ASSEMBLY ASSEMBLY INSTRUCTIONS (Internal Dimensions) Ent Spec Edition Ltr v-0- Overall dimensions including base: 7. L x 9 W x 0 H cms 97.5" L x 7" W x 8.7" H IMPORTANT!!! Please read these instructions
More informationTOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill
DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24
More informationN. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems
More informationINSTALLATION AND CARE INSTRUCTIONS
INSTALLATION AND CARE INSTRUCTIONS Skylight Manually Operated Honeycomb Shades 20 C8-10-1806 2/15 1 INTRODUCTION Thank you for purchasing our product. Your new shade has been custom built for you from
More informationAssembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A
ssembly instructions x Model GH x Model GH7 x8 Model GH0 x0 Model GH Walk-in Greenhouse Statement ear Customer! May we congratulate you on your new Greenhouse. We feel sure that by following the detailed
More informationWINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS
WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH 44660 www.wayne-dalton.com See garage door owner s manual for
More informationHANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]
PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED
More informationShowpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV
Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV Installation and Assembly Instructions 2009 Incredible Technologies Inc. Version 0109 Showpiece Cabinet Integrated Stand for 32" - 52" LCD HDTV
More informationRemoving and Replacing the Y-truck
Service Documentation Removing and Replacing the Y-truck To remove and replace the Y-truck you will need the following tools: 4mm Allen wrench 12mm stamped flat wrench #2 Phillips screwdriver (magnetic
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationLeveling Feet, Base Plates and Casters
Leveling Feet, Base Plates and Casters 77 Leveling Foot 1 1 Fastening to profile end Fastening in T-slot of profile For leveling tables and light equipment. Ratchet-type height adjustment requires no tools.
More informationUniversal flat-panel mount
I N S T A L L A T I O N M A N U A L Universal flat-panel mount www.christiedigital.com PM 2004/ REV 02 Contents - Assembly drawing - Fine tune tilt adjustments - Parts list - Installing the adapter plate
More informationAdjustable Feet Castors Accessories for Floor Elements
Adjustable Feet Castors Accessories for Floor Elements Products in this section Levelling Knuckle Feet Threaded spindles for infinite height adjustment Metal or plastic foot plate Knuckle Feet X Compatible
More informationinstallation instructions WC Frame 1180mm with Dual Flush Cistern
installation instructions WC Frame 1180mm with Dual Flush Cistern (C,D,E) K F/G N L M 12 13 14 16 1 2 11 A 5 6 Q O Y 3 C 10 E D B P,Z,AA R T V S 4 U 2 No. Part no. Description Quantity A WC Frame with
More informationRELINER INSIDE DROP SYSTEM SPECIFICATIONS
1. PRODUCT NAME RELINER INSIDE DROP SYSTEM U.S. Patent 6074130 Canadian Patent # 2269565 All RELINER Products are proudly made in the U.S.A. 2. MANUFACTURER RELINER /Duran Inc. 53 Mount Archer Rd. Lyme
More informationSTACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS
STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions
More informationVIT SB-16SS Pedestal. Conversion Guide
Converting a to Baseline This guide describes the steps for removing another manufacturer s irrigation controller from a VIT SB-16SS pedestal and installing a Baseline controller. Remove All Parts of the
More informationVarioSole SE. Installation instructions
VarioSole SE Installation instructions INTRODUTION Product Information VarioSole is a universal, easy to install system for the mounting of framed PV modules on pitched roofs with a roof pitch between
More informationFLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.
More informationInstallation instructions Vacuum tube collector CRK-12
Installation instructions Vacuum tube collector CRK-12 Wolf GmbH Postfach 1380 D-84048 Mainburg Tel. +49 8751/74-0 Fax +49 8751/741600 Internet: www.wolf-heiztechnik.de 30 62 290 04/08 GB Index 1. General
More informationCore EZ. Operating Manual. Toll Free B East Broadway Avenue Tampa, FL 33619
Operating Manual 3702 West Central Avenue Santa Ana, CA 92704 Toll Free 1-866-987-7297 11 High Street Suffield, CT 06078 www.ussaws.com 8004B East Broadway Avenue Tampa, FL 33619 Introduction This manual
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationInstallation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
More informationHANDRAIL HEIGHT PER LOCAL CODE AUTHORITY
WITH OPTIONAL S.S. S PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION
More informationNRS Installation Manual
NRS Installation Manual Chair Mount Type Standard / EU Spec. KAZE (AY-KFPLU AY-NRS1 is shown.) OTO (AY-OLL AY-NRS1 is shown.) Separate Type (AY-NRS2B-W is shown.) Installer: Read through this installation
More informationMounting Accessories. Installation Guide. VIVOTEK SD83XXE Speed Dome
VIVOTEK SD83XXE Speed Dome Mounting Accessories AM-116/117 Pendant Pipe AM-118 Pendant Head AM-221 Gooseneck AM-231 Parapet Mount AM-519 Pendant Adaptor Installation Guide Corresponding part numbers: AM-116:
More informationRear Mount Installation Instructions
Rear Mount Installation Instructions Ford Transit Low Roof 130 WB Frame Kit Part #: DTC 0809-011 V1.0.10.12.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED
More informationINSTALLATION INSTRUCTIONS
www.marwincompany.com Kit Number Door Height Rough Opening Height KD200BB68 80 84 ½ KD200BB70 84 88 ½ KD200BB80 96 100 ½ INSTALLATION INSTRUCTIONS 200BB SERIES KD POCKET DOOR FRAME FOR 2 X 4 STUD WALLS
More informationOn-roof system Alpha + Product catalogue
On-roof system Alpha + Product catalogue Contents ALPHA +... 3 1. ALPHA + BASE RAILS... 4 2. ALPHA + SPLICES... 5 3. ALPHA + TELESCOPING END PIECES... 6 4. ALPHA + INTER-MODULE CLAMPS AND MODULE END CLAMPS...
More informationUSE AND CARE GUIDE FIXED LED / LCD TV WALL MOUNT (UNIVERSAL MOUNTING PATTERN, FITS VESA
Item #302-080 Model #50710 USE ND CRE GUIDE FIXED LED / LCD TV WLL MOUNT (UNIVERSL MOUNTING PTTERN, FITS VES 100/200/300/400/600) Questions, problems, missing parts? Before returning to the store, call
More informationVideo Wall Installation Instructions 2W X 3H, 3W X 3H
Video Wall Installation Instructions 2W X 3H, 3W X 3H www.microndisplaysolutions.com Table of Contents Important Safety Instructions... 3 Configuration... 4 Package Contents, included and optional items...
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More informationBIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.
1A Parts in this box. 2pc with extra holes 2pc with extra holes & plastic stoppers Arms x 2 Back Rails and Slats x 1 Full Size: Slat Supports x 6 3pc are longer for the Back deck Back Side Rails x 2 Seat
More informationSport-Thieme. Handball Goal. Assembly instruction. 3x2 m, Free-standing with Fixed Net Brackets
Assembly instruction Sport-Thieme Handball Goal Cat.-no.: 115 0953 2392905 239 2918 113 6500 239 2400 239 2413 3x2 m, Free-standing with Fixed Net Brackets Thanks for choosing Sport-Thieme equipment! In
More informationInstallation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens
Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be
More informationInstallation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step as
More informationFEET, WHEELS, FLOOR FASTENINGS, SUPPORTS
SYSTEM COMPONENTS FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS s t r oppu S, s gn i n e t s af r oo l F, s l eehw, t e ef FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS 136 MINITEC PROFILE SYSTEM BASE AND TRANSPORT
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationSport-Thieme Handball Goal, 3x2 m, Free-Standing or socketed
Assembly instructions Art.-Nr.: 201 0915 203 4502 Sport-Thieme Handball Goal, 3x2 m, Free-Standing or socketed 0218214 2018 Sport-Thieme GmbH D-38367 Grasleben Germany sport-thieme.com info @sport-thieme.com
More informationS H E D A S S E M B L Y I N S T R U C T I O N S
T I T A N R A N G E S H E D A S S E M B L Y I N S T R U C T I O N S 6 X 4ft = 190 x 150 cm 6 X 6ft = 190 x 190 cm 6 X 8ft = 190 x 255 cm COMPONENT LIST Component illustrations are given as a visual guide
More informationMOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET
CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).
More informationSecuAnch Roof Anchor System
Height Safety Products Email: marketing@fallprotec.com SecuAnch Roof Anchor System 1 Presentation The SecuAnch lifeline is designed to be permanently installed on buildings and other structures where maintenance
More informationSB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL
SB-WM-ART1-M-BL Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL WARNING The maximum weight of this wall mount is 90 lbs (41 kg). Use with heavier than the maximum
More informationBASE & WALL CABINET SETUP GUIDE BY SUNSTONE
BASE & WALL CABINET SETUP GUIDE BY SUNSTONE Read all instructions before you install cabinet. Very important to follow each step in order as detailed in this Instruction Guide!!! To installer or person
More informationCABANA / PAVILION ASSEMBLY ALUMINUM FRAME MODELS
Assembled cabanas are large & heavy. Assemble at place of use. CABANA / PAVILION ASSEMBLY ALUMINUM FRAME MODELS Step 1 CAUTION: To avoid damage to the finish of your Cabana frame, prepare a smooth, non-scratch
More informationShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort
ShorePort PWC Lift Instructions 00-8" x 8" Sandstone ShorePort 009-8" x 8" White ShorePort 090-8" x 8" Tan ShorePort....... - PUT SAFETY FIRST To avoid the risk of personal injury or death, study and fully
More informationHEAVY DUTY CENTRIFUGAL PUMPS
HEAVY DUTY CENTRIFUGAL PUMPS Supplemental Assembly Manual DryLock 1 Static Seal Cartridge 1. Place the slide rings (24A & 24B) into the bore of the rotary seal housing (24). The shortest slide ring goes
More informationINSTALLING YOUR NEW SPRING LIFT ARM KIT
INSTALLING YOUR NEW SPRING LIFT ARM KIT 1. Measure the distance that the roof is to be raised. [If your lift system is completely non-functional, you will need to calculate or estimate this distance as
More informationInstallation Manual for Gate Guard
Installation Manual for Gate Guard Fast Opening Barrier Gate for Emergencies and Contra Flow Innovative safety technology from SGGT of Germany TABLE OF CONTENTS Page Number Preface 3 Introduction 3 System
More informationFIXED MOUNTING SHUTTERS INSTALLATION
FIXED MOUNT APPLICATIONS The following components are included for Fixed Mount Applications. (4) Polycarbonate mounting brackets (slotted) (8) #10 x ¾ Stainless Steel Mounting Screws (1) 0.5 oz. Tube All-Weather
More informationInstallation Manual for the Rockmeister Roof Ladder
Installation Manual for the Rockmeister Roof Ladder Exclusively for Mercedes-Benz Geländewagen W460, W461 & W463 with single rear door NOTE: W460 & W461 models have a different Frame Bracket than the W463.
More informationInstallation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2
Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details
More informationHBS-AP ASSEMBLING INSTRUCTIONS
ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK 97 HBS-AP ASSEMBLING INSTRUCTIONS 1. INTRODUCTION 1.1. This manual is very easy to consult and we recommend reading it before starting work,
More informationInstallation instructions for installation engineers
for installation engineers Evacuated tube collectors CPC 6 OEM / INOX CPC 12 OEM / INOX CPC 18 OEM / INOX CPC 6 XL INOX CPC 12 XL INOX With aluminium/ stainless steel mounting systems Publication details
More informationHANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]
PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-RSAN-INT INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS
More informationSpecifications. Area of use In-roof and on-roof mounting tiles, plain tiles, slate, Spanish tiles, tin roofing and as a freestanding unit
Product description FM modular collector It can be installed both horizontally and vertically. Suitable mounting systems are available for various types of roofing or with weather-resistant frames for
More informationMM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationTREX PERGOLA INSTALLATION INSTRUCTIONS
RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket
More informationGeberit Duofix. Installation Manual Montageanleitung Instructions de montage Istruzioni per il montaggio
Geberit Duofix Installation Manual Montageanleitung Instructions de montage Istruzioni per il montaggio Masse Geberit Duofix Element für Wand-WC, cm, mit Sigma Unterputzspülkasten cm 9¾" (500) 4¾" (0)
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS R5 STEP BOARD APPLICATION: 2009-2017 Dodge Ram 1500 Quad / Crew Cab 2010-2017 Dodge Ram 2500/3500 Crew Cab PART NUMBER: 28-51040, 28-51045, 28-51050, 28-51055 ITEM QUANTITY DESCRIPTION
More informationReplacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)
Follow the instructions below to replace the reciprocator in the SWF Compact series machines. The tools required can be found in the tool kit that came with the machine. Preparation 1. First, place the
More informationMANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF EN mounting system for corrugated roof for solar panels in portait setup (cross-system) ESDEC BV 2015 TABLE OF CONTENT 1. Introduction 1 2. General installation
More informationSturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models
Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Project Number ME086-05 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com January
More informationREAD BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION
edium + Heavy duty READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Pay attention to danger and safety notices. be exposed: Carefully
More informationYOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual
YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual [USA Fireplace Models [THIS ISTALLATION MANUAL INCLUDES ASSEMBLY INSTRUCTIONS FOR THESE MODELS: STAND ALONE 7565 CURVED TUNNEL DOUBLE
More informationPlease read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.
Attachment Tab Height: 16-1/2 Serial Number Attachment Tab Width: 24 Please read BOTH these and the General Instructions prior to installing or operating this equipment. 1. Blue Ox towing products and
More informationInstallation Instructions
edium + Heavy duty READ BEFORE INSTALLING UNIT Preliminary instructions: 1. Check window opening size: the mounting parts furnished with this air conditioner are made to install in a wooden sill double-hung
More informationInstallation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens
Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be
More informationMantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MantelMount TMA Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS TM Thank you for choosing the MantelMount television wall mount. Please read this entire manual before
More informationBSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers
BSM, GSM & GSS Joint Kit Instruction (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers February, 1999 JOINT ASSEMBLY PARTS LIST Item Quantity Description
More informationDual Arm Tilt LCD Mount
Installation Manual model # 51324 M o u n t i n g S y s t e m s Dual Arm Tilt LCD Mount Fits Displays 13 to 32 Supports Up to 50 lbs (23 kgs) Projection from Wall from 3 to 17 Meets VESA Standards 50/75/100,
More information28" Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount
28" Adjustable Solar Tilt Mount ADJ-28 Owner's Manual Please read this manual BEFORE installing your solar tilt mount SECTION 1 Introduction Mounting your solar panel inclined to an optimized angle with
More informationSimotec. 13.i
Products: Framo 80 13.0 Products: Framo 80 13.1 Products: Structural Elements 100/120 13.2 Products: Pipe Shoes 13.3 Framo 80: Beam Section and Screw 13.4 Framo 80: Cantilever Bracket and End Support STA
More informationMounting a BalanceBox 400 to a brick wall
Unpack the BalanceBox 400 and remove the Wall frame cover and its bag of screws. Slide the cover out at the top. NOTE: the cover is NOT included with the BalanceBox 400H LOCK SCREW HOLE MOBILE STAND MOUNTING
More informationGRILLE GUARD SPRINTER VAN (EXCLUDES X4) INCLUDES MERCEDES, FREIGHTLINER AND DODGE PARTS LIST:
PARTS LIST: 1 Grille Guard 8 12mm Hex Nuts 1 Driver/Left Side Frame Mounting Bracket 2 10-1.50mm x 25mm Button Head Bolts 1 Passenger/Right Side Frame Mounting Bracket 4 10mm x 20mm OD x 2mm Flat Washers
More informationSHELTON THERMOSTATIC SHOWER PANEL
SKU(s): 413241 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability for any damage to the plumbing, floor,
More information