EURO (3876) Euro-C3/C5 Installation Instructions Euro-Wall Systems, LLC
|
|
- Ariel O’Neal’
- 5 years ago
- Views:
Transcription
1 EURO (3876) Euro-C3/C5 Installation Instructions
2 Installation Instructions Euro-C3/C5 NOTE: A MAXIMUM HEADER DEFLECTION IS 3/`16 1. Caulk all connection points between the sill and the header using high quality water sealing caulk 2. Predrill screw bosses in the sill and header using a 11/64 drill bit 3. Line up milled holes in jam with header and sill and predrill jam holes as required to line up with screw bosses in header and sill 4. Verify that you have caulked the joints so that all connections are sealed 5. Screw 2 # 12 screws SS ( as provided ) into screw bosses. It is highly recommended that you use soap, bees wax or lubricant on the screws so the head does not strip out. It is recommended that you use a light impact screw gun which if used properly, will reduce the stripping out of the softer SS screws 6. Prior to installing the frame make sure that if you require a weep for the frame that you drill the weep using 5 /16 drill bit (At least 1 weep every 24 in length) If the frame is not embedded and the front of the sill is exposed the drilling should be on the front edge of the exterior location and should be drilled thru both walls in the sill so that water from both channels can weep out to the front and drain to the exterior 7. If the sill is and partially or fully recessed in the floor, then the weeps need to be drilled out at the bottom of the both channels in the aluminum extrusion. A tubing system or under floor drain may be required. 8. This is a top hung system, the header must be plumb and level prior to installing, use level and laser if needed to verify that the frame is plumb and level before screwing in all screws. Use shims at every pre-drilled screw location. 9. Once you have verified the frame location, drilled the weeps (if required). 10. Prior to installing the frame you must caulk the sill using a figure 8 pattern so that there is always two rows of caulk under the sill. 11. Prior to installing the door verify interior heights from header to sill are the same throughout the system and that the jams, header and sill are plumb level and square 12. All holes drilled for screws should be be vacuumed out and filled with sealant caulk to prevent water egressing under the sill 13. After all screws are installed, caulk should be spread over the top to seal, then (after inspection) the vinyl channel liner should be placed in the sill 14. Install the weatherstrip on the frame as shown in the install guide 15. Installing the doors: identify the door # 1 and adjust the hinges as need to that you can hang the panels. Verify that you have the proper gaps from both the header and sill on the first door before you connect door number Hang door # 1 from the hanger hinge and connect to door number one using the proper hinges. See hinge layout for your door system step A.1) Assemble Bottom corner 3 / #10 x 2 (Square PH) Pre-caution: it is recommended to use screw wax to prevent NOTE: screw from it is snapping. recommended to use screw wax to prevent screw from snapping NOTE: When joining two header tracks together do not butt joint - MUST be a 45 degree miter cut. When joining two sill tracks together do NOT butt joint - MUST be a 45 degree miter cut. Caulk and Seal sill to Gasket all Joints Note that track insert is in place prior to screwing sill to the jamb. sill step A.2) Assemble top corner 3 / #10 x 2 (Square PH) Do not use this screw chase Pre-caution: NOTE: it is recommended it is to use to use screw screw wax wax to to prevent screw from snapping 2
3 step A.3) Apply Horizontal Frame weather seal Header Slide Pile-Fin Weather Seal (non-adhesive) into the slot. Cut weather-strip ends at 90 degrees. Tip: In order to insert Weather Seal smoothly, apply paraffin wax in Weather Seal grooves. NOTE: When joining two header tracks together do not butt joint - MUST be a 45 degree miter cut. When joining two sill tracks together do NOT butt joint - MUST be a 45 degree miter cut. step A.4) Apply vertical Frame weather seal Header Cut vertical Weather Seal ends at 45 degree angle to match horizontal weather-stripping. Apply minimal amount of clear silicone between 45 degree angled cut ends and horizontal Weather Seal. r C5 Thermal Break Needs to be drilled for shoot bolt Sill liner to be installed after inspection sill C3/C5 Enhanced and C3/C5 Storm apply Weather Seal on frame. 3
4 step A.4) Jobsite Preparation considerations Rough opening 1. Ensure correct rough opening specifications: a) A) Measure according to signed Euro-Wall Eclipse Architectural shop drawing shop drawing b) B) Plumb opening c) C) Level opening d) D) Square Square opening opening 2. Make sure the frame header is designed to withstand the dead loads of all Panels including glass plus momentum and impact 2. Make sure the frame header is designed to withstand the dead loads of all Panels including glass plus momentum and impact loading since it is top-hung Panel system. Rough opening header must not deflect more than 1/16 (2 mm) when carrying the loading since it is a top-hung Panel system. Rough opening header must not deflect more than 5/16 (2 mm) when carrying the weight of the Panels according to hardware suppliers specifications. weight of the Panels according to hardware suppliers specifications. 3. Ensure the head of the Folding Panel system can be securely fastened to the header components of existing structural header 3. Ensure the head of the Folding Panel system can be securely fastened to the header components of existing structural header beam. beam. 4. Recommended wood framing for opening or a continuous plane of structural wood to maintain stability, ease of fastening and 4. securing. Recommended wood framing for opening or a continuous plane of structural wood to maintain stability, ease of fastening and 5. Each securing. panel can weigh up to a maximum of 176 lbs (80 kg). Weigh one Panel or consult quote to determine total weight of 5. Folding Each panel Panel can system weigh or up contact to a maximum Eclipse Architectural of 240 lbs. Weigh for the one weight Panel of or each consult Panel. quote to determine total weight of Folding Panel system or contact Euro-Wall for the weight of each Panel. step A.5) Frame placement into Rough opening Weephole 5/16 screw bit Detail A: sill Detail c: Header Detail B: Detail a: sill Euro-C3/C5 Storm Extra installation screw hole Shown Exterior Folding 1. Ensure sill is plumb and level 2. Sill sag to be no more than 1/16 1/6 *(2mm) at at centre center span 3. Sill bow to to be be avoided at at any any location of of the the sill sill Anchoring Anchoring screws screws are are not supplied supplied by Eclipse Euro-Wall by Euro-Wall Architectural Envelope Envelope details details are are not not included included in in this this guide. guide. Please Please consult consult with with your your local local building building codes. codes. 6. In order to reach enhanced performance (>DP70), (>DP60), use extra screw line located in the shootbolt channel as per images for 6. In order to reach enhanced performance (>DP70), use extra screw line located in the shootbolt channel as per images for head jamb sill. head / jamb / sill. 7. Seal off all installation screw holes in frame with silicone. 7. Seal off all installation screw holes in frame with silicone. 4
5 Detail B: Euro-C3/C5 extra installation screw hole 1. To accommodate for the wall pivot cup, it is recommended to pre-drill a 11/16 (17mm) diameter hole in the rough opening due to to the protruding wall wall cups (1/2 ( ½ or or 12mm). 2. Bow of the jamb to be kept to a maximum minimum of 1/8 (3mm). 3. Anchoring It is recommended screws are to supplied use a continuous by DS group board (as alternate apply pieces) that will act as a 4. It back-up is recommended in the hollow to use jamb. a continuous board (as alternate apply pieces) that will act as a back-up in the hollow jamb. 4. Seal off backside of the middle pivot cup(s) with silicone. 5. Seal off backside of middle pivot cup(s) with silicone NOTE: All multi-section headers and sills must be joined by a miter cut. Detail c: Header Euro-C3/C5 extra installation screw hole 1. The screw supplied used 3 must (75mm) penetrate PH track at screw least 1 is 1/2 a suggested (38mm) into screw the size rough only. opening The final structural header screw used beam must that penetrate is to carry at the least accumulative 1 ½ (38mm) Panel into load. the rough The size opening of the structural bolt head should header not beam interfere that is with to carry any the carrier accumulative wheels. Panel load. The size of the bolt 2. The head material should used not interfere for insulating with any the carrier shim space wheels. should be non-expandable material. 2. The material used for insulating the shim space should be non-expandable 3. Avoid the head from sagging after panels are installed and after full roof load is in place. material. We recommend installing the header with a slight bow (crown), but not more than 1/8 3. Avoid the head from sagging after panels are installed and after full roof load is (3mm) over the full system length. in place. We recommend installing the header with a slight bow (crown), but not 4. For Florida product approved installations see fastener details in FL#15472R-1 Guide. more than 1/8 (3mm) over the full system length. 5. The maximum header deflection allowed is 5/ Anchoring screws are supplied by Eclipse Architectural. 5
6 step A.7) Determine Panel sequence We suggest the panels are identified for the purpose of communicating sequence. Detail a Clean header track and lubricate prior to hanging panels. Do not allow panels to hang or swing on only one hing. Must secure panel or damage to hing will result. step a.7.2 step a.7.1 step A.7.1.a) Bottom Pivot set Placement step A.7.1.b) Receive Panel onto Pivot Ensure when inserted in track, the hinge pin is located on the exterior as per image. Recessed stile 2 / #8 x 1-25mm (Phillips PH) Seal off fastener holes Black plastic sleeve can only go on one way sill Apply gasket under pivot. step A.7.2) Install cup for wall-pivot 1. Seal off holes for Pivot Cups with silicone Insert Insert the the hinge hinge cap cap into into the the Bearing Bearing Tube Tube first first and and then then slide slide hinge pin down to engage hinge pin down to engage into wall-pivot cup. into wall-pivot cup. 3. Make sure sub straight is deep enough. Caution: Always support weight of Panel panels with flat/pry bar or similar tool when locating and securing any pivot or carrier vertical adjustment. 6
7 To ensure proper operation of Folding Panel System, insert the hinge while aligning the slot in the hinge flap with the rib on the Bearing Tube. step A.7.3) mounting the top wall Pivot Hinge to 1st Panel 4/ 8-32 x ¾ (Phillips FH) Important hinge consideration: Position all hinges in a way that one pushes the hinge up as per arrow. step A.8) Adjust Panel Height Adjust panel prior to operating 13/64 (5 mm) Adjust clearance between top of the panel to bottom of the head track to Adjust clearance between top of the panel to bottom of the head track to 13/64 (5 mm) by using a flathead screw driver into the yellow shipping clip 13/64" (5 mm) by using a flathead screw driver into the yellow shipping prior to operating. clip. Caution: Always support weight of Panel panels with flat/pry bar or similar tool when tool when locating locating and securing and securing any pivot any pivot or carrier or carrier vertical vertical adjustment. adjustment. Release door weight for adjustment Recessed stile 7
8 step A.9 Adjust Panel Reveal with Recessed stile sill 5/32 (4 mm) Adjust clearance between jamb and panel to 5/32 (4 mm) by using a long shafted Phillips screw driver as per image. Clearance dimension is measured when panel is in closed position. step A.10) Hanging 2nd Panel: mounting the top Intermediate carrier to 2nd Panel 6/ 8-32 x ¾ (Phillips FH) Note! Do not allow panel to swing or hang on one hing only. Make sure to block bottom of panel and to level to opposing panel. Adjust clearance between top of the panel to bottom of the head track to 13/64 (5 mm) by using a flathead screw driver into the yellow shipping clip. step A.11) Hanging 2nd Panel connecting 2nd Panel to 3rd Panel 6/ 8-32 x ¾ (Phillips FH) NOTE: Only weatherstrip every other door stile / panel 8
9 step A.12) Hanging 3rd Panel: mounting the top Intermediate carrier to 2nd Panel 3/ 8-32 x ¾ (Phillips FH) NOTE: Only weatherstrip every other door stile / panel step A.13) Hanging 4th Panel: Repeat steps A A.7.3 PHase III: Completion, Adjustments and Service Completion Check List 9 step 1: Ensure the multipoint is operating smoothly. (if applicable) 9 step 2: Ensure equal reveal to left and right of the system. 9 step 3: Ensure horizontal and vertical alignment. 9 step 4: Carrier pins at the top pivots, intermediate and end carriers are supplied with a yellow plastic shipping clip, which is installed to make the initial adjustment very easy. 9 step 5: Insert a flathead screwdriver into the slot to rotate the pin. 9 step 6: When the correct adjustment is reached and the Panels operate well, remove the shipping clip. 9 step 7: The blade will automatically snap into place once the blade and slot are aligned. 9 step 8: To readjust at a later date, simply pull the blade down to disengage it from the slot and rotate the pin. 9 step 9: Mount panel hold(s) to door at desired location/ direction with #8 32 x ¾ screws (9/64 tapped screw holes), keeping in mind the distance between the handle-set(s), alignment of Holds with one another and adjust the Hold to desired friction to open and close. 9
10 Folding Door Adjustments Carrier pins at the top pivots, intermediate and end carriers support the full door weight and it is here that the height of the panels is adjusted. Surelock ensures that once the heights are set, they stay set. using surelock : 1. Surelock is supplied with a yellow plastic shipping clip installed to make initial adjustment very easy. 2. Insert a flathead screwdriver into the slot to rotate the pin. 3. When correct adjustment is reached and doors operate well, remove the shipping clip 4. Surelock will automatically snap into place when the blade and slot are aligned. 5. To re-adjust at a later date, simply pull the blade down to disengage it from the slot and rotate the pin. NOTE - PLEASE USE INSTRUCTIONS IN HARDWARE BOXES multipoint Door Adjustments All strike plates are adjustable to en sure smooth fine tuning, by using Phillips screw driver to loosen adjust screws, sliding the strike box to desired location and fasten the adjustments screws. adjustment screws (Phillips) Panel Handle Application Ensure slotted face of the spindle is facing down to receive the insert screw 10
11 Attention: Contractor Recommended Product care after Placement 1. Keep the plastic protection inserts on the sill at all times! Create a sturdy bridge to protect sill during construction phase. PHase. In In ad- dition, place a bridge while system is in open position and protect the side jambs of the Folding Door frame from damage. 2. Protect the Folding Door system from the following: Stucco: Causes etching on aluminum clogs the track and damages rollers. Drywall: clogs the system tracks; gums up rollers. Duct tape: Some adhesives chemically react with many finishes. Therefore use tape such as 3m painter s tape, but do not leave on any surface for more than 7 days. 3. Instructions for the owner and general contractor: Do not have small children operate or play within the confines of the Folding Panel system. Do not force the Folding Door system, contact Euro-Wall Eclipse Architectural if is found if to it be is found difficult to to be operate. difficult to operate. Apply protection bumpers if exterior handles contact the metal clad of the next Panel. Anchor Panel when in open position to prevent uncontrolled movement that might cause damage. operating of the Folding Door system: 1. Open system according to the following sequence: A. Multipoint release (if applicable) B. Release Twinpoint (s) C. Slide Panels to open position starting with Panel that does not have an Astragal (if applicable) 2. Close system according to the following sequence: A. Slide Panels to close position starting with Panel that has an Astragal (if applicable) B. Lock Twinpoint(s) C. Close swing-panel with multipoint (if applicable) 11
12 Attention: Consumer / End User Recommended Product care for End-user safety tips: Do not have small children operate or play within the confines of the Folding Door System. Anchor Panels when in open position to prevent uncontrolled movement that might cause damage. Do not force the Folding Door System. Have a qualified installer remove Panels or hardware when required. Contact Euro-Wall Eclipse Architectural if Panel is difficult Panel to is operate. difficult to ( ) operate. ( ) operating of the Folding Door system: Open system according to the following sequence: A. Multipoint release (if applicable) B. Release Twinpoint (s) C. Slide Panels to open position starting with Panel that does not have an Astragal (if applicable) Close system according to the following sequence: A. Slide Panels to close position starting with Panel that has an Astragal (if applicable) B. Lock Twinpoint(s) C. Close swing-panel with multipoint (if applicable) To close the Folding Door system, slide/fold the stack of Panels one by one (perpendicular to the track). If applicable, rotate the swing Panel to the closed position, only when all Panels are in their closed position. Consult Eclipse Euro-Wall Architectural Maintenance. Warranty Consult Care specific Guide. hardware Consult Folding specific Door hardware care and Folding maintenance Door care guide: and maintenance guide: Hinges: Wipe down the visible surfaces with warm soapy water on a soft cloth and then rinse off by wiping with a clean damp cloth. twinpoint: Spray suitable lubricant, such as, CRC Marine 66, Innox or WD40 to sliding pin and lock cylinder. Use plastic tube (supplied with lubricant) to direct spray. track and bearings: Apply, approximately 1/4 teaspoon (1 ml) of white petroleum jelly (Vaseline) or equivalent, to inner lip of each side of head track. Use clean cloth. Distribute lubricant evenly along track. Ensure wheels and bearings receive sufficient lubricant. Wipe all contaminant from track surfaces with damp cloth and mild detergent, clean surfaces with clean soft cloth. Apply thin film for systems installed in severe environments by wiping surfaces of track with anti-corrosive substance, such as, CRC Marine 66, Innox or WD40. Hangers, pivots and brackets: Spray thin film to hangers, pivots and brackets with anti-corrosive substance, such as, CRC Marine 66, Innox or WD40. Wipe exposed surfaces with clean soft cloth soaked in warm soapy water; rinse clean before applying corrosive preventative. Frequency Carry out care procedures with the following minimum recommendations: General environments every 6 months. Marine and industrial environments every 3 months. Regular maintenance is required for all hardware, even stainless steel, to keep manufacturer s warranty in place. 12
EURO (3876) Euro-C2 Installation Instructions Euro-Wall Systems, LLC
888.989.EURO (3876) www.euro-wall.com Euro-C2 Installation Instructions Installation Instructions Euro-C2 step A.1) Assemble Bottom corner Pre-caution: it is recommended to use screw wax to prevent screw
More informationEuro-C3/C5 (Euro Vista Fold Aluminum Door System) Installation Instructions
888.989.EURO (3876) www.euro-wall.com Euro-C3/C5 (Euro Vista Fold Aluminum Door System) Installation Instructions STEP 1: OPENING PREP Jobsite Preparation Considerations Rough Opening 1. Ensure correct
More informationC3 INSTALLATION GUIDE Euro Vista Fold Impact Rated
C3 INSTALLATION GUIDE Euro Vista Fold Impact Rated MANUFACTURING 2200 Murphy Court North Port, Florida 34289 888.989.3876 941.979.5316 888.989.EURO (3876) www.euro-wall.com SHOWROOM 1211 Stirling Road,
More informationInstallation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit
installation instructions for CUSTOM WOOD & FIBERGLASS EXTERIOR FOLDING DOOR SYSTEMs (JII101) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for
More informationE3 Hardware Installation Instructions & E3 System Installation Manual
Exterior folding door systems E3 Hardware Installation Instructions & E3 System Installation Manual www.thedsgroup.com Tomorrow s Innovative Solutions for Today s Doors & Windows The DS Group Of Companies:
More informationFold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE
Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply
More informationSTACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS
STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions
More informationSuperior by Design. Approved for use in Miami-Dade HVHZ Zones Florida Building Code Approved Product Approval FL FOLDING SLIDING STACKING PIVOT
Superior by Design. Euro PIVOT Door INSTALLATION GUIDE Approved for use in Miami-Dade HVHZ Zones Florida Building Code Approved Product Approval FL 22410 www.euro-wall.com 888.989.EURO (3876) FOLDING SLIDING
More informationINOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS
INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.
More informationINOVO 2-LITE SLIDING PATIO DOOR
INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.
More informationPhone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels
Phone # 800-440-8785 www.lajolladoors.com La Jolla Doors Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Thank you for choosing La Jolla Doors In this manual you will
More informationSeries 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)
Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration
More informationHardware, Track, Sill System & Weathersealing For Exterior Folding Doors
Exterior folding door systems E2 Installation Manual Hardware, Track, Sill System & Weathersealing For Exterior Folding Doors www.thedsgroup.com Tomorrow s Innovative Solutions for Today s Doors & Windows
More informationSliding Glass Door Assembly and Installation Guide
Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all
More informationHeavy Wall Applied Stop Tube Frame and Door Installation
INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationASSEMBLY AND INSTALLATION INSTRUCTIONS for Premium Aluminum and Premium Atlantic Aluminum Sliding Patio Doors (JII020)
for Premium Aluminum and Premium Atlantic Aluminum Sliding Patio Doors (JII020) Thank you for selecting jeld-wen products. Attached are jeld-wen s recommended installation instructions for Premium Aluminum
More information2300 BI-FOLD INSTALLATION GUIDE
2300 BI-FOLD INSTALLATION GUIDE INSTALLATION INSTRUCTIONS OF MAIN FRAME Header #8 x 2½ zinc coated screws 2 1 2 Jamb Jamb 1 1 3 #8 x 2½ zinc coated screws 4 1 4 3 #8 x 2½ zinc coated screws 5 Threshold
More informationVinyl Sliding Glass Door Assembly Instructions
Vinyl Sliding Glass Door Assembly Instructions SERIES SGD 5470/5570 Para instrucciones en español, visite: http://bit.ly/pgtassemblyinstructions Parts List ITEM 4 5 6 7 8 9 0 4 5 6 7 8 SGD 5470/5570 PARTS
More informationSERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door
SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door RDQCI5022 Rev.0 Page 1 Certified 06/01/2016 Tools: To install your New Shower Enclosure, you may need the following: Pencil
More informationPocket Door Installation Instructions
Installation Instructions Before getting started: Read instructions thoroughly. Be sure that you have the necessary tools and materials before starting the installation. Consult your local building code
More informationtile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:
redi DOOR INSTALLATION INSTRUCTIONS tile redi Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE: 1100 Door-Door Framed sliding doors RDQCI5023
More informationFOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL
FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to
More informationI n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS
I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS Page 2-9: Installation Instructions, Figures 1, 2, & 3 Page 10-12: Figures A-1, A-2, & A-3: Installation
More information1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS
1200 SERIES 2 PANEL DOOR 10.2013 rev.1 DETAILED INSTALLATION INTRUCTIONS GENERAL: Door elevations shown in these instructions are as viewed from the outside. X denotes the active or moving panel(s). O
More informationseries 9500 top load bi4fold installation instructions
instructions Head Deflection (+0.12 / -0.00 ) Right Jamb Note: This is a top hung product. Provide adequate structure at head. Continuous threshold support is required. Left Jamb Head 4Lay bed of sealant
More informationChapter 9. Windows and Exterior Doors
Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail apron
More informationSTACKING MULTI-SLIDE DOOR SYSTEM
SMSD STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal
More information1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A
1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com
More informationINSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING
JANUARY, 2014 1 INSTALLATION Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING INSTRUCTIONS 2 FRAME ASSEMBLY JANUARY, 2014 601442 SHEAR BLOCK BALL BEARING NRP BUTT (FACTORY APPLIED
More informationSLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL
SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 0º PANEL This instruction sheet applies to the following units. C, C7, C7, C77, C, C7 This instruction sheet also applies to the following units. VTE / VSE
More informationPlease read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.
The performance and proper operation of a door is only as good as the installation. By following these instructions, the probability of a good installation greatly increases. Please read and understand
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.
More informationThermally Broken Framing and Door Installation
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationAluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement
Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement
More informationVinyl Windows and Doors
Vinyl Windows and Doors Manufactured by Pella Corporation Installation Instructions for Replacement of Aluminum Sliding Doors in Hard Coat Stucco Applications. Part Number: V981555 2009 Pella Corporation
More information3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS
3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. TOOLS NEEDED: Tape Measure
More informationWood Hinged Patio Door Installation Instructions
Wood Hinged Patio Door Installation Instructions #1029970 / 1029971 / 1182557 (12/05) Rev 4 IMPORTANT: Please read before you begin installation. Wood Hinged Patio Door Door Installation Instructions IMPORTANT:
More informationPlease read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.
The performance and proper operation of a door is only as good as the installation. By following these instructions, the probability of a good installation greatly increases. Please read and understand
More informationChapter 9. Windows and Exterior Doors
Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING BASEMENT EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail
More informationQCI0029 REV. 1 Page 1 of 11 Certified 07/06/05
QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05 MAINTENANCE: Two primary materials are used to manufacture your new Basco enclosure: tempered glass and anodized aluminum. To assure a long lasting finish
More information4-lite Patio Door. Installation Instructions
4-lite Patio Door Installation Instructions IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. Note: Only the 5-0 x 6-8
More informationAtrium Patio Door Field Service Manual
Atrium Patio Door Field Service Manual December 2005 Table of contents Service Agreement Pg 2 Release Agreement Pg 5 Inspection form Pg 6 Warranty Pg 8 Replacing swing panel Pg 12 Replacing sliding panel
More informationFrameless Inline Door QCI5250
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5250 FRAMELESS PANEL / DOOR / PANEL QCI0249 REV. 3 Page 1 Certified 10/12/12 Parts List with pivot hinges *Quantities may vary. QCI0249 REV. 3 Page 2
More informationwestern window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels
series 2600 multi-slide non-pocket 2-1/4 panels windowsystems.com windowsystems.com movement, which can cause warping and other problems. Frame kit components: Each door will have a head assembly, a threshold
More informationNEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)
NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE) Slim Line & Classic French Style Patio Doors Materials included: (2) #10 x 2-1/2" Phillips Pan head keeper s (2) 3/8" Hole plugs
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationVYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4
VYTEX PREMIUM SLIDING GLASS DOOR Table of Contents Precautions and Safety 2 Tools Required...3 Inspect and Prepare Door...4 Hardware and Parts Check List....4 Master Frame Assembly 5 Master Frame Installation..7
More informationSUPREME. Sliding Folding Patio 6 Door Set. Assembly Instructions. T14 Set - (Approx. 14ft) T16 Set - (Approx. 16ft)
SUPREME Sliding Folding Patio 6 Door Set T14 Set - (Approx. 14ft) T16 Set - (Approx. 16ft) Assembly Instructions About your patio door set All products must be installed in accordance with accepted good
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationSliding Folding Patio 6 Door Set
54 Sliding Folding Patio 6 Door Set T14 Set - (Approx. 14ft) T16 Set - (Approx. 16ft) Assembly Instructions About your patio door set All products must be installed in accordance with accepted good trade
More informationInstalling a Weiland Beefy Bifold
Installing a Weiland Beefy Bifold In 9 steps Table Of Contents 1. Overview 2 2. Setting Up 2 3. Bottom Track 3 4. Head Track and Side Jambs 4 5. Panels 4 6. Fine Tuning the System 5 7. Notes on Flooring
More information1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A
1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com
More informationCurtain Wall Installation Guide
Curtain Wall Installation Guide Curtain Wall Installation Guide 1 IMPORTANT NOTICES! Important Notices & Information Manufacturer s Notes: The building envelope must be correctly prepared with weather
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation
More informationwestern series 9500 f loor load The Volume Program window systems westernwindowsystems.com bi fold installation instructions
series 9500 f loor load bi fold The Volume Program Note: This is a bottom hung product. Provide adequate structure at threshold. Continuous threshold support is required. Right Jamb Head Deflection (+0.12
More informationMira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions
PREMIUM SERIES W I N D O W S Mira Premium Series Bi-Parting French Sliding Recommended Tools & Accessories Tape Measure Level (3 or longer) Hammer Power Screwdriver Load bearing Shims Flashing (recommended)
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation
More informationtile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:
redi DOOR INSTALLATION INSTRUCTIONS tile redi Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE: 3000 Door-Door Header, sliding doors RDQCI5301
More informationICU TRACKLESS SLIDING DOOR
Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and #4 screws Wrenches / Sockets
More information1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER
1/4 FRAMELESS SLIDING DOOR FOR OR SHOWER INSTALLATION INSTRUCTIONS NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) M onda y - Friday 8 :00 A.M. - 4:30 P.M. Eastern Time MAINTENANCE: Two primary
More informationStorefront Installation Guide
Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation
More informationSERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS
Table of Contents I. Care and Maintenance...2 II. Tools / Material & Sealant Requirements...2 III. Assembly and Installation...2 IV. Glazing Assembly...3 V. Panel Assembly...3 1. X Panel...3 2. O Panel...4
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More informationInstallation And Care Instructions. Vertical Honeycomb Shades
Installation And Care Instructions Vertical Honeycomb Shades Rev 5/2013 Table Of Contents Getting Started... 3 Parts Overview... 4 Materials Required... 5 Tools Required... 6 Outside Mount Installation...
More informationFrameless Inline Door QCI5254
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS BUILDERS CHOICE FRAMED Shower Height Swing Door Model: L533 Rev. 09.03.13 MAINTENANCE: Two primary materials are used to manufacture your new Aquatic enclosure; tempered glass
More informationMagnaline Systems Block Frame Installation Manual
2515 Industry St. Oceanside, CA 92058 Magnaline Systems Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels Thank you for choosing Magnaline Systems! Congratulations!
More informationChapter 18. Interior Doors
Chapter 18. Interior Doors 18.1 SWINGING DOORS 18.2 SLIDING DOORS 18.3 BIFOLD DOORS Tools needed by volunteers: Hammer Nail apron Tape measure Square Pencil Tools and equipment needed: Extension cords
More informationRetractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)
Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) IMPORTANT: Please read before you begin. Table of Contents
More informationInstallation Instructions for Vista Air Vertically Folding Walls
Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.
More informationFrameless Inline Door QCI5248
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016 Parts List with glass to glass hinges *Quantities may vary. **Support Bar
More information6400, 8400 and 9400 Series Sliding Patio Door
Contemporary 3 Panel Classic 5 Panel French Panel 6400, 8400 and 9400 Series Sliding Patio Door (O) Fixed Panel Left (X) Operating / Mullion Panel Right (X) Operating / Lock Panel Left (O) Fixed Panel
More informationInstallation Operation Care
Installation Operation Care Palm Beach Polysatin Shutters CONTENTS Getting Started Installation Overview...1 Unpacking...1 Tools and Materials Needed...1 Fasteners...2 Frame Assembly Assemble the Frame
More informationINSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.
INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. Installer: DO NOT DISCARD Please leave the Installation Guide
More informationPanoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels
2515 Industry St. Oceanside, CA 92058 760-722-1250 www.panoramicdoors.com Panoramic Door Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels Signature Aluminum
More information1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER
1/4 FRAMELESS SLIDING DOOR FOR OR SHOWER INSTALLATION INSTRUCTIONS NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) M onda y - Friday 8 :00 A.M. - 4:30 P.M. Eastern Time MAINTENANCE: Two primary
More informationInstallation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
More informationStep by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com
Step by Step Installation Instructions Poly Shutters Customer Service 800.248.8888 or visit us online at smithandnoble.com THANK YOU for purchasing from smith+noble. Your new window treatments have been
More informationICU TRACK SLIDING DOOR
Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and # screws Wrenches / Sockets
More informationRead guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation.
Installation Guide for Andersen Clad Outswing Folding Doors with Track-In-Floor Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection
More informationINSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233
INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationSERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE
PATIO DOORS INSTALLATION GUIDE These instructions cover general installation conditions. Improper installation could affect your doors operation and warranty. Deviations from these instructions should
More informationFRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274
FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION
More informationHR175 Sash Replacement Kit Installation Instructions
HR175 Sash Replacement Kit Installation Instructions IMPORTANT: Please read before you begin. Weather Shield HR175 Sash Replacement Kits Important: Thoroughly read and follow these instructions, failure
More informationHow To Install Windows: Nail-Fin Application
How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:
More informationUnit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS
Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS MAINTENANCE: Two primary materials are used to manufacture your new Basco enclosure: tempered glass and anodized
More information675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure
INSTALLATION INSTRUCTIONS 675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure Call Technical Dept @ 1-800-452-2726 QCI1003 Page 1 of 9 Certified 10/01/09 INSTALLATION NOTES: Unpack your unit carefully
More informationWeatherfold 4s 50, 75 & 100
Codes Weatherfold 4s 50, 75 & 100 Brio Australia P: +61 2 87186718 W: brio.com.au E: sales@brio.com.au Brio RMD UK Ltd. P: +44 191 2291224 W: briouk.com E: sales@briouk.com INSTBWS1 REV D - NOV 2011 Brio
More informationVinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation
Vinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation IMPORTANT: Please read before you begin. Part No. 1221586 Install 262 02/08 Printed
More informationKnock Down Patio Door Assembly Instructions Regular & Impact
Knock Down Patio Door Assembly Instructions Regular & Impact 72 x 80 72 x 82 72 x 96 96 x 80 96 x 82 96 x 96 Impress the Weather KD Patio Door Regular & Impact Sizes 72 x 80 72 x 82 72 x 96 96 x 80 96
More informationWeatherfold 4s 50 & 100 Brio Australia P: W: brio.com.au
Codes INSTBWS2 REV J - MAR 2017 Weatherfold 4s 50 & 100 Brio Australia P: +61 2 87186718 W: brio.com.au E: brio.sales@allegion.com Brio UK P: +44 191 2291224 W: briouk.com E: brio.sales.uk@allegion.com
More informationSLIDING GLASS DOOR ASSEMBLY INSTRUCTION Series 680/780
10/07 M0200030 GENERAL NOTICE READING THESE INSTRUCTIONS FIRST AND FOLLOWING THE PROCEDURES IN PROPER SEQUENCE WILL REDUCE FRUSTRATION, COSTLY MISTAKES AND WASTED TIME. Protect main frame only with light
More informationPOCKETING MULTI-SLIDE DOOR SYSTEM
PMSD POCKETING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal
More informationContemporary 3 Panel Classic 5 Panel French Panel
Contemporary 3 Panel Classic 5 Panel French Panel (X) Operating / Lock Panel Left (O) Fixed Panel Right Note : Glazing Beads For All Panel Face To The Exterior 2 Panel XO Left Is Shown Above Opposite =
More informationMetal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions
PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations
More informationPRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit
R INSTALLATION INSTRUCTIONS PRODUCT: LOKI CONFIGURATION: SINGLE DOOR MOUNT: GLASS MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com . TOOLS + MATERIALS REQUIRED TOOLS
More informationESA-300 Full Breakout
Interior View 0 Installation Instructions For use with ESA II Controler DORMA AUTOMATICS, Inc. 94 Sherwood Drive Toll-Free: 877-67-6 DL844-00 Lake Bluff, IL 60044 Fax: 877-4-7999 Rev. /07 Tools Required:
More informationSERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS
Table of Contents I. Care and Maintenance... 2 II. Tools / Materials, Sealant Requirements, & Anchor Instructions... 2 III. Structure Verification & Sub-Sillpan Installation... 3 1. Opening Verification...3
More information