1 Modelling Parameters Affect on DER Impact Study Results
2 Agenda Distributed Energy Resources (DER) Impact Studies DER Challenge Study Steps Lessons Learned Modeling Reverse Power Transformer Configuration Regulator Current Transformer (CT) Voltage Flicker DER Interconnection Transformer
3 The Challenge Distributed energy resources (DER) are sources of electric power that are not directly connected to a bulk power transmission system The electric power system (EPS) was not designed to accommodate generation at the distribution voltage level IEEE 1547 Standard for Interconnecting Distributed Resources with Electric Power Systems DER interconnection impact studies determine potential issues and identify mitigation strategies that allow for successful integration of the proposed DER
4 Background DER can be thermal generation, renewable generation, and energy storage Point of Interconnection (POI) Point of Common Coupling (PCC)
5 DER Interconnection Impact Study Steps Screenings Reverse Power Evaluation Steady State (Voltage Drop): Thermal, Voltage, Regulation Voltage Flicker Risk of Islanding Evaluation Short Circuit Protection
6 LESSONS LEARNED
7 Model Scope Steady State Scenarios Minimum Load without Proposed DER Minimum Load with Proposed DER Peak Load without Proposed DER Peak Load with Proposed DER Chose Load Normal Load Solar Daytime Load: 8am-6pm, 10am-4pm Include DER Impact is Cumulative Existing Approved, including Mitigation Proposed Scope Substation or Feeder Contingencies Distributed Automation Substation Autotransfer Connection Direct Behind the Meter
8 Reverse Power Desktop Review Worst case analysis Substation Transformer Load (kw) Daytime Minimum Load 5,516 Approved DER Projects -3,666 Proposed DER Under Study -4,450 Total Forecasted Load -2,600 Reverse power is expected to be an issue Possible substation upgrades: regulator (LTC) controls, bidirectional meter May indicate need for transmission study or revised protection
9 Reverse Power Detailed Review Detailed Analysis: Hourly Substation Load and Forecasted Hourly Generation One Approved Solar Not Reach Nameplate Seven Hours Reverse Power at 1,266 kw Worst Case Proposed Solar At Nameplate 4 Hours
10 Transformer Parameters Our Model 69 kv Source 13.2 kv Feeder De-energized Tap Changer (DETC) Unknown Different Client 69 kv Source kv Feeder 67 kv Transformer 68.8 kv DETC Tap 70.4 kv DETC Tap
11 Transformer Parameters Correct setup Model shows low voltage Transformer LTC: -5,-5,-5 (4) 13.2 kv Caps: One 1200 kvar
12 Transformer Parameters Incorrect setup Undervoltage not detected Transformer LTC: 2, 2, kvar : 1311 kvar
13 Transformer Parameters Assume a kv transformer Compare breaker fault current center tap versus DETC Voltage Settings for Sources and Transformers with Off-Nominal Taps, Greg Shirek P.E., Milsoft, 2011
14 Transformer Parameters kvar impacted by applied voltage Standard C substation transformer X/R ratio kvar = kv 2 * 1000 X c Nominal, nameplate, and tap voltages affect load flow and fault current results
15 Regulator Current Transformer (CT) CT primary rating (not the ratio) controls regulator output appn-17.pdf V bus = V line + I load (R + jx) CT rating
16 Regulator CT ~ 100 A at 0.9 PF ~ 90 A real current Correct CT Rating 250 A V = 121 V + 90A/250A * 6 = V Incorrect CT rating 100A V = 121 V + 90A/100A * 6 = V
17 Regulator CT Substation LTC: CT on Nameplate Regulator: Typical CT Ratings powersystems/resources/library/225_voltageregulators/ TD225011EN.pdf
18 Voltage Flicker A change in electric light source intensity due to variation in input voltage of the power supply GE Flicker Curve Maximum allowable percent voltage change at 2%, 2.7%, or 2.8% Once per day changes above 2.8% would be noticeable. Voltage change is more irritable when there are more dips per second.
19 Voltage Flicker Methodology utility dependent Generation changes - On: 100%, Off: 0%, 5%, or 20% Reduce generation on the whole feeder or just on part of the feeder near the POI All generation or just solar Study flicker whole feeder or just POI and substation Quasi time series analysis IEEE Std 1453 supplanted IEEE 519 and calls for short-term (Pst) and long-term (Plt) flicker indices
20 Voltage Flicker Voltage drop generation on Record all overhead and underground voltages Lock regulators and capacitors, and generation off Second voltage drop Record second set of voltages Compare percent voltage change using Excel Voltage violations? Set up for first voltage drop Set up for second voltage drop
21 Voltage Flicker Utility has Rooftop DER information available Proposed DER under study Lesson learned: smaller DER impacting results Model had 1-phase PV (3 to 20 kw) Added 20 kw PV in low voltage area POI checked for flicker 100% generation to 0% Criteria is 2%
22 Voltage Flicker Flicker 20 kw POI: Before (120V Base) Primary POI 20 kw After (120V Base) Percent Change Example 20 kw Assuming the flicker criteria is 2%, the approved and proposed projects are exacerbating a pre-existing flicker problem Check flicker at all locations Question rooftop nameplate generation Other Small DG PV Status Approved 2000 kw Proposed 1980 kw % On to Off On Off Off % On to Off On to Off Off Off % On to Off On to Off On to Off Off % On to Off On to Off On to Off On to Off
23 Interconnection Transformer Winding Interconnection transformer winding configuration affects POI fault current Available fault for unit under study ~ 108 A 13.2 kv Fault Model Actual Results POI Grounded Wye Grounded Wye Incorrect Results POI Grounded Wye Delta
24 Summing It All Up DER interconnection impact studies identify issues and mitigation to allow successful interconnection Studies range from simple screening to multiple steps Chose the model scope based on situation Studies depend on correctly choosing model parameters and reviewing lessons learned
25 QUESTIONS
26 Impacts of Interconnecting DER on a Utility Distribution System What are the issues associated with interconnecting DER to a distribution system? Reverse power flow Thermal loading Voltage regulation Voltage flicker Protection Risk of unintentional islanding DER interconnection impact studies determine potential issues and identify mitigation strategies that allow for successful integration of the proposed DER
27 Transformer Parameters Incorrect transformer secondary LTC not correct Transformer LTC: 2, 2, 2 (4) 13.2 kv Caps: One 1200 kvar
28 Transformer Parameters System short circuit limits (8kA, 10kA) 65k fuse rated 7.1 ka first fuse on OH Results by transformer setup
29 Voltage Flicker Results at Proposed POI Before (120V Base) Proposed POI 1980 kw After (120V Base) Percent Change PV Status % Proposed Off, All other DG 100% to 0% % Proposed and all other DG 100% to 0% Annual hourly PV forecast AC Size: 20 kw DC/AC Ratio: 1.15 Tilt: 30 o (7 in 12) Azimuth: 225 o Check flicker at all locations Monitor impact of smaller DER
POWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER
POWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER Presented by Ric Austria, Principal at Pterra Consulting to the IEEE San Francisco Chapter Feb 17, 2016 California Public Utilities Commission,
More informationGENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW
GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945
More informationIEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces
IEEE PES Boston Chapter Technical Meeting IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces P1547 Chair David
More informationIEEE sion/1547revision_index.html
IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationINTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs
INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES Technical Requirements for Grid-Tied DERs Projects Division 6/29/2017 Contents 1 Definitions and Acronyms... 1 2 Technical Interconnection
More informationPhase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.
Summary Of Interconnection Technical Guidelines for Renewable Energy Systems 0-100 kw under Standard Offer Contract (Extract from JPS Guide to Interconnection of Distributed Generation) This document is
More informationHarmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits
WREF 01 Paper # 048 Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits Ketut Dartawan Ricardo Austria, Le Hui and Mark Suehiro* Pterra Consulting Maui Electric Company*
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationProtective Relaying for DER
Protective Relaying for DER Rogerio Scharlach Schweitzer Engineering Laboratories, Inc. Basking Ridge, NJ Overview IEEE 1547 general requirements to be met at point of common coupling (PCC) Distributed
More informationECE 528 Understanding Power Quality
ECE 528 Understanding Power Quality http://www.ece.uidaho.edu/ee/power/ece528/ Paul Ortmann portmann@uidaho.edu 208-733-7972 (voice) Lecture 22 1 Today Homework 5 questions Homework 6 discussion More on
More informationGENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW
GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW Electric Utility Contact Information DTE Energy Interconnection Coordinator One Energy Plaza, SB
More informationBabak Enayati National Grid Thursday, April 17
2014 IEEE PES Transmission & Distribution Conference & Exposition Impacts of the Distribution System Renewable Energy Resources on the Power System Protection Babak Enayati National Grid Thursday, April
More informationImpact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods
Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing
More informationRevised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program
1 Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program Babak Enayati, PhD, PE Lead Engineer, National Grid Waltham, MA Email:
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationInformation and Technical Requirements For the Interconnection of Distributed Energy Resources (DER)
Information and Technical Requirements For the Interconnection of Distributed Energy Resources (DER) March 24, 2017 Introduction and Scope Table of Contents 1.0 General Requirements 1.1 Documents and Standards
More informationFACILITY RATINGS METHOD TABLE OF CONTENTS
FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationThe Connecticut Light and Power Company
The Connecticut Light and Power Company and The United Illuminating Company Exhibit B - Generator Interconnection Technical Requirements May 12, 2010 Page 1 of 26 Table of Contents 1. SCOPE... 3 2. GENERAL
More informationImpact of High PV Penetration on Grid Operation. Yahia Baghzouz Professor of Electrical engineering University of Nevada Las Vegas
Impact of High PV Penetration on Grid Operation Yahia Baghzouz Professor of Electrical engineering University of Nevada Las Vegas Overview Introduction/Background Effects of High PV Penetration on Distribution
More informationDistributed Solar Integration Experiences
Distributed Solar Integration Experiences Prepared by: Philip Barker Founder and Principal Engineer Nova Energy Specialists, LLC Schenectady, NY Phone (518) 346 9770 Website: novaenergyspecialists.com
More informationExperiences in Integrating PV and Other DG to the Power System
Experiences in Integrating PV and Other DG to the Power System (Radial Distribution Systems) Prepared by: Philip Barker Founder and Principal Engineer Nova Energy Specialists, LLC Schenectady, NY Phone
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationRemotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application
General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application
More informationImpacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering
Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering Expo - Nov. 3, 2014 Index Normal Distribution System
More informationImpact Assessment Generator Form
Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project
More informationIEEE sion/1547revision_index.html
IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html
More informationUtility Interconnection and System Protection
Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationTECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM
TECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM January 5, 2017 Francesco Mannarino SVP, Electricity Operations
More informationConnection Impact Assessment Application
Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,
More informationTransmission Facilities Rating Methodology for Florida
Document title Transmission Facilities Rating Methodology for Florida Document number EGR-TRMF-00001 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning Duke
More informationNERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell
Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June
More informationFocused Directional Overcurrent Elements (67P, Q and N) for DER Interconnection Protection
Engineered Solutions for Power System Protection, Automaton and Control APPLICATION NOTE Focused Directional Overcurrent Elements (67P, Q and N) for DER Interconnection Protection 180622 Abstract This
More informationIDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)
IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone
More informationTechSurveillance. Revision of IEEE Standard New Reactive Power and Voltage Regulation Capability Requirements. Business & Technology Strategies
Business & Technology Strategies TechSurveillance Revision of IEEE Standard 1547 New Reactive Power and Voltage Regulation Capability Requirements BY REIGH WALLING, WALLING ENERGY SYSTEMS CONSULTING, LLC.
More informationTransmission Facilities Rating Methodology
Document title Transmission Facilities Rating Methodology Document number EGR-TRMC-00009 Applies to: Transmission Engineering, Transmission System Operations, and Transmission Planning- Progress Energy
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationGENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw
GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy
More informationSubstation Testing and Commissioning: Power Transformer Through Fault Test
1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of
More informationPOWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.
POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More informationCourse 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC)
Name: Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC) 1. T F In three-phase four-wire delta systems rated 240/120 volts, sometimes
More informationBED INTERCONNECTION TECHNICAL REQUIREMENTS
BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008-3 Version 3.4 1 Contents 1. Scope... 3 2. Establishment and Communication of Facility Ratings:... 3 2.1.
More informationSection G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES
Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES Purpose This section specifies the requirements for protective relays and control devices for Generation Entities interconnecting
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationCentral Hudson Gas & Electric Corporation. Transmission Planning Guidelines
Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents
More informationDP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation
DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase
More informationDistribution System Development & Preliminary Studies
Distribution System Development & Preliminary Studies IEEE CED January 27, 2016 (second night) 2016 KBR, Inc. All Rights Reserved. Agenda Distribution System Development Modeling Data Studies Overview
More informationForm B. Connection Impact Assessment Application Form Distribution System
Form B Connection Impact Assessment Application Form Distribution System This Application Form is for Generators applying for Connection Impact Assessment ( CIA ). It is important that the Generator provides
More informationNeed for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design
IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas
More informationPRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1
PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationOPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS
OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED
More informationRenewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA
Renewable Interconnection Standard & Experimental Tests Yahia Baghzouz UNLV Las Vegas, NV, USA Overview IEEE Std 1547 Voltage limitations Frequency limitations Harmonic limitations Expansion of IEEE Std
More informationE N G I N E E R I N G M A N U A L
1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn
More information1 INTRODUCTION 1.1 PRODUCT DESCRIPTION
GEK-00682D INTRODUCTION INTRODUCTION. PRODUCT DESCRIPTION The MDP Digital Time Overcurrent Relay is a digital, microprocessor based, nondirectional overcurrent relay that protects against phase-to-phase
More informationKansas City Power & Light Company. Transmission Facility Rating Methodology
Company Prepared by: KCP&L Transmission Planning December 6, 2017 Table of Contents 1. Purpose...4 2. Generator Rating Methodology...4 3....4 3.1. Equipment Rating Methodology...4 3.2. Items considered
More informationSection G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES
Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES Purpose This section specifies the requirements for protective relays and control devices for Generation Entities interconnecting
More informationMidAmerican Energy Company 69 kv Facility Ratings Methodology
MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy
More informationGridLiance Reliability Criteria
GridLiance Reliability Criteria Planning Department March 1, 2018 FOREWORD The GridLiance system is planned, designed, constructed, and operated to assure continuity of service during system disturbances
More informationOPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS
OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND
More informationMidAmerican Energy Company 100 kv and Above Facility Ratings Methodology
MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology For NERC Standard FAC-008 and FAC-009 Issued by: Dan Custer Reviewed by: Tom Mielnik Version 2.7 1 1.0 Scope: This document provides
More informationA Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationDUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning
DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation
More informationADVANCED CONTROLS FOR MITIGATION OF FLICKER USING DOUBLY-FED ASYNCHRONOUS WIND TURBINE-GENERATORS
ADVANCED CONTROLS FOR MITIGATION OF FLICKER USING DOUBLY-FED ASYNCHRONOUS WIND TURBINE-GENERATORS R. A. Walling, K. Clark, N. W. Miller, J. J. Sanchez-Gasca GE Energy USA reigh.walling@ge.com ABSTRACT
More informationNERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell
Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationIssued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY
WN U-60 Attachment C to Schedule 152, Page 1 SCHEDULE 152 APPLICATION FOR INTERCONNECTING A GENERATING FACILITY TIER 2 OR TIER 3 This Application is considered complete when it provides all applicable
More informationDocument C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting
Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.
More informationDifferential Protection for Microgrids with Embedded Generations
Differential Protection for Microgrids with Embedded Generations Paul Moroke Dept. of Electrical Engineering Tshwane University of Technology Pretoria, South Africa paulmoroke@gmail.com Abstract The permeation
More informationThe Analysis of Voltage Increase Phenomena in a Distribution Network with High Penetration of Distributed Generation
The Analysis of Voltage Increase Phenomena in a Distribution Network with High Penetration of Distributed Generation Insu Kim, Ronald G. Harley, and Raeey Regassa Georgia Institute of Technology Atlanta,
More informationTopic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017
Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length
More informationMOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE
MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer
More informationIEEE Major Revision of Interconnection Standard
IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018
More informationNORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:
NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information
More informationTransformer Protection
Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing
More informationMaine Public Service Reliability Solutions Update
Maine Public Service Reliability Solutions Update Presentation at the Planning Advisory Group 9/17/13 MPS Reliability Solutions Study Review of Previous PAG Updates RLC completed assessment of existing
More informationNetwork Monitoring and Visibility Summary
Network Monitoring and Visibility Summary This article reviews the shortfalls in legacy monitoring and what will be needed to manage the changing nature of the distribution network. This includes a particular
More informationDetermination of Smart Inverter Power Factor Control Settings for Distributed Energy Resources
21, rue d Artois, F-758 PARIS CIGRE US National Committee http : //www.cigre.org 216 Grid of the Future Symposium Determination of Smart Inverter Power Factor Control Settings for Distributed Energy Resources
More informationCentral East Voltage and Stability Analysis for Marcy FACTS Project Phase I
Prepared by NYISO Operations Engineering 1. INTRODUCTION Central East Voltage and Stability Analysis for The Marcy Flexible AC Transmission System (FACTS) project is a joint technology partnership between
More informationMidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above
MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above March 13, 2018 Issued by: Dehn Stevens, Director System Planning and Services 1.0 SCOPE This document defines the criteria
More informationg GE POWER MANAGEMENT
745 FREQUENTLY ASKED QUESTIONS 1 I get a communication error with the relay when I try to store a setpoint. This error can occur for several different reasons. First of all, verify that the address is
More informationPower Transformer Ratings' Calculation and Analysis - IEEE C
Power Transformer Ratings' Calculation and Analysis - IEEE C57.91-1995 Course No. E-3058 Credit: 3 PDH 2017 Decatur Professional Development, LLC. All rights reserved. Power Transformer Ratings Calculation
More informationGENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW
GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW Electric Utility Contact Information Detroit Edison Company Interconnection
More informationDifferential Protection Optimal differential protection for phase shifter transformers and special transformers
Differential Protection Optimal differential protection for phase shifter transformers and special transformers Due to the energy transition, a demand for renewable energy sources integration into power
More informationIntermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)
Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected
More informationROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT
ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings
More informationNERC Protection Coordination Webinar Series July 15, Jon Gardell
Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),
More informationUPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS
UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS 1 B. RAMESH, 2 K. P. VITTAL Student Member, IEEE, EEE Department, National Institute of Technology Karnataka,
More informationVoltage-based limits on PV hosting capacity of distribution circuits
Voltage-based limits on PV hosting capacity of distribution circuits Michael Ropp, Ph.D., P.E. Northern Plains Power Technologies Brookings, SD 57006 USA Brief description of NPPT What we do Simulation
More informationNERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1
NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,
More informationANALYSIS OF LIGHTNING ARRESTER OVERLOADING IN FUTURE DISTRIBUTION SYSTEMS WITH DISTRIBUTED GENERATION. A Thesis JONATHAN MICHAEL SNODGRASS
ANALYSIS OF LIGHTNING ARRESTER OVERLOADING IN FUTURE DISTRIBUTION SYSTEMS WITH DISTRIBUTED GENERATION A Thesis by JONATHAN MICHAEL SNODGRASS Submitted to the Office of Graduate and Professional Studies
More informationIMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES
IMPLEMENTATION OF ADVANCED DISTRIBUTION AUTOMATION IN U.S.A. UTILITIES (Summary) N S Markushevich and A P Berman, C J Jensen, J C Clemmer Utility Consulting International, JEA, OG&E Electric Services,
More information