1 Phasor-based wide area monitoring in the South African power system by D H Wilson, R A Folkes, Psymetrix, UK; A Edwards B Berry Eskom; N Mbuli, Tshwane University of Technology; Brian van Rensburg, Actom This paper outlines the progress in South Africa on using synchrophasor-based wide area monitoring systems (WAMS) as a means of improving system security and increasing the use of the transmission network. A pilot project was carried out to investigate the dynamic performance of the system, and the results of this project are summarised in this paper. The South African power system covers a very large geographic area, and operates with a relatively small generation capacity margin. The transmission system must therefore be operated close to its limits, while not compromising the security of the system. In view of these challenges, Eskom chose to embark on a project to commission one of the world's largest phasor-based wide-area monitoring system (WAMS) to improve the observability of the system. A pilot WAMS project was commissioned in August 2009, principally to investigate the dynamic characteristics of the power system. The project used three phasor measurement units (PMUs) located at the Muldersvlei, Grootvlei and Pegasus substations. The siting of PMUs at both ends of the long transmission corridor between Johannesburg and Cape Town areas provides valuable information of the wide-area dynamic performance of the system. The monitoring locations and circuits are shown in Fig. 1. This article reviews data that was continuously acquired over a six month period, during which the power system experienced a wide range of conditions, spanning summer and winter operation. Continuous dynamics analysis of this data allows the dynamics of the system to be characterised through all of these operating conditions. Phasor measurement data is useful for understanding the system performance during network disturbances. During the course of the pilot project, a disturbance was captured in which there were three generation unit outages and an interconnection trip. This event, captured with high-speed phasor measurement, revealed aspects of system performance that would not have been clear from conventional monitoring. Some of the characteristics of the PMUs used in the project were reviewed, identifying connection issues that may not be identified in specifications and bench testing. Eskom went on to issue a competitive tender, and selected a consortium including the authors to deliver a large-scale WAMS implementation. Some of the factors important to Eskom in the current and future use of WAMS are described in this paper. Oscillatory stability Normal oscillatory behaviour A selection of modes of oscillation commonly present in the system is shown in Fig. 2. Of these, the 0,7 Hz mode is the most strongly observable in time-domain signals monitored, and is the dominant electromechanical oscillation seen in the corridor between Muldersvlei and Grootvlei. The 0,7 Hz mode occurs at two distinct frequencies 0,66 Hz and 0,73 Hz. The frequencies were not observed simultaneously, and are variations of the same mode in different system conditions. Normally, this mode is well damped, with an average decay time constant of around 3,4 seconds. Excursions to about 12 seconds decay time are quite regularly observed, but this is not a significant security concern. However, much poorer damping was observed. The 0,7 Hz oscillations are in opposing phase at Muldersvlei and Grootvlei, and are larger at Muldersvlei. This is characteristic of an inter-area mode where the path is the long corridor connecting the Cape area with the Johannesburg area. Since the Cape area has lower inertia, it is expected that the angle swings are larger. A 0,3 Hz mode was observed in the Eskom system. This mode was normally observed at Grootvlei, but when unusually large or poorly damped, it is observed at Fig. 1: Phasor measurement unit locations. all locations with very similar amplitude and phase. Previous modal analysis of the southern African grid suggests that this mode is a regional inter-area mode with generators in Zimbabwe, Zambia and Mozambique swinging in opposite phase to the generators in South Africa. The measurements are consistent with this interpretation, but it would be useful to confirm this through measurements in the AC corridor connecting South Africa to Zimbabwe, and if possible using phasor measurements from the other Southern African countries involved. Higher frequency modes between about 1 and 3 Hz were observed, which are normally related to local plant modes. There are several local modes, and the behaviour of two of these was explored in more detail. The two modes were at 1,1 Hz and 1,4 Hz, and both were observed in power in the Pegasus-Drakensberg line. Examining the relative size of the oscillations and the daily pattern, the modes could be identified with a pumped storage plant and a coal plant in the region. It was noted that the amplitude of the mode related to the coal generation increased at night when the plant would normally run at reduced output. A very low frequency common mode at 0,05 Hz was seen in frequency throughout the system, illustrated in Fig. 4. This is likely to be related to turbine governors participating in load-frequency control. energize - June Page 32

2 two modes. In another event, although the damping was not poor, the amplitude of the mode increased over a period of about 10 h. During this particular day, several transmission lines faulted due to bush fires. The 0,7 Hz mode was also significant during a disturbance described in the next section. With the system lightly loaded, the inertia was reduced by a series of generation trips and loss of interconnection. In this disturbed condition, the 0,7 Hz mode was poorly damped. 0,25 0,35 Hz mode Measured mostly in frequency at GRO, but when larger, it is seen at MUL and PEG in frequency as a common-mode oscillation. Normally well damped (2,7 s) but typically poorer (6 s) when observed at all locations. Small, but very poorly damped oscillations (50 s) observed at 0,35 Hz, coincident with 0,7 Hz mode changes. Significant amplitude observed in event on 8th Jan'10. 0,7 Hz mode Strongly observed in power between MUL and GRO, and in frequency. Interarea mode, with opposite phase oscillations at MUL and GRO, with larger oscillations at MUL. Normally well damped (3,4 s), occasionally up to 12 s. Very lightly damped oscillations (50 s) observed, linked to 0,35 Hz mode. This is the dominant mode seen in power at MUL. 1,4 and 1,8 Hz modes These modes are observable in frequency only at Pegasus. The 1,4 Hz mode is also observable in power in the PEG-DRAK line. Note: The timetdamping values given in the decay time constant, for an oscillation to decay to 1/e (37%) of its starting value. Fig. 2: Mode shape of selected modes observed in frequency signals. These oscillations are seldom more than 15 mhz in amplitude, and therefore not a threat. In other power systems, stability problems have been observed around the same frequency, but with much larger amplitude and causing significant disturbances. It is useful to monitor these low frequency oscillations to ensure that they continue to be small and well damped. Poorly damped oscillations In a number of cases, poorly damped oscillations occurred at various frequencies. The 0,3 Hz and 0,7 Hz oscillations were of particular interest, although there were several other cases. During the period reviewed, there were no cases of largeswing oscillatory instability observed. In Fig. 3, a 0,3 Hz oscillation is shown that occurred on 8th January The oscillation was about 30 mhz in amplitude, and in phase at all three monitoring points. Power oscillations were also observed at all three locations reaching about 20 MW peak-to-peak. However, given that the 0,3 Hz mode is believed to be an oscillation between South Africa and its north-eastern neighbours, the power oscillations could be significantly larger in the international AC interconnection. It may be noted that the 0,3 Hz event follows a 300 mhz slide in frequency, crossing the boundary of normal operation at 49,85 Hz. The oscillation ends with another frequency slide of 80 mhz, possibly due to generation tripping outside South Africa or interconnection tripping. This second frequency slide crosses the 49,7 Hz boundary at which load is shed. The 0,7 Hz mode also has periods of poor damping, in some cases coinciding with poor damping of the 0,3 Hz mode. There appears to be a linkage between these Disturbances A number of disturbances were detected and studied, including both network tripping events and frequency disturbances. One event of particular significance, involving a cascade of generation and interconnection tripping is described in this section. On 27 Dec'09, three coal-fired units tripped, separated by seconds. Each unit was producing approximately 600 MW. These events are clearly seen in the frequency as three sharp steps. As the third unit tripped, a further 335 MW was lost in the Southern Africa Power Pool (SAPP). Frequency Type MW Shed 49,7 DMP ,2 UFLS Stage ,1 UFLS Stage 2517 Total 1448 Table 1: Load shedding following 27th December 17:06 SAST event. energize - June Page 34

3 Due to the large frequency excursion, under frequency load shedding stages were activated. These are noted in Table 1. Thus, a total of 2135 MW generation was lost in the space of a minute. The load was very low around 27th December because it is summer and industries are typically shut-down over the holiday period. The total load for South Africa during the time of this event was approximately MW meaning that this generation trip was around 9% of the total load. Since most of the loss was coal generation with relatively high inertia, the total reduction in inertia of the system could be significantly greater than 9%. The rate of frequency drop is related to the inertia of the system, and can be a useful indicator for validating the system model. This value can change quite significantly. On December, Fig. 3: 0,3 Hz frequency oscillation, 8th Jan'10. Fig. 4: 0,05 Hz oscillations preceding second disturbance on 27t Dec there were two significant disturbances in frequency. The event at 17:06 SAST, shown in Fig. 5, includes three frequency drops in succession. The first two show a rate of change of frequency of 0,05 4 Hz/sec, while the gradient of the third event is much steeper, around 0,20 Hz/ sec. Another event just under 8 h later (Fig. 4) showed a frequency gradient of about 0,069 Hz/sec, which is noticeably steeper than the initial two events of the previous disturbance. The gradient relates to the change in power and the system inertia. A steep gradient occurs with low inertia in the system, which in this case relates to fewer generators and less load in the network. After the two-stages of under-frequency load shedding (UFLS 1&2) occurred, the frequency recovered to approximately 49,25 Hz at which point a total of eight gas and pumped storage units autostarted. During the start-up phase of these generators, approximately 30 MW per machine is drawn until the unit can be synchronised to the system. This explains the dip in frequency after the UFLS action. Once synchronised, the units ramp up to full power which is evident in both the frequency and angle difference data from the PMUs. By observing the angle difference data for both Grootvlei-Muldersvlei as well as Grootvlei- Pegasus, it can be seen that the generators that tripped are situated in a region that supplies Pegasus. The Grootvlei-Pegasus angle increases to compensate for the power lost near Pegasus whilst the Grootvlei-Muldersvlei angle stays the constant. The Grootvlei- Muldersvlei angle decreases only when the UFLS is activated, as the load was shed nationally. The Grootvlei- Muldersvlei angle decreases further as the pumped storage and gas units in the Cape are auto-started to recover the system frequency. The auto-starting of the Drakensberg pumped storage units can be seen in both the Grootvlei-Pegasus angle difference as well as the Pegasus- Drakensberg line power. This means that the machine ramp response can be observed regionally in the angle difference data and this can be particularly useful for modelling. In terms of angle deviation, the 27/12/09 event shows a sharp drop in the angle separation between Grootvlei and Muldersvlei (see Fig. 7). Together with frequency, the relative changes in angle indicate where generation and load has been lost. In this case it shows that mainly generation is lost (frequency drops), and that the main loss is at the Grootvlei end of the corridor, rather than the Muldersvlei end of the corridor, as the angle reduces. Fig. 7 shows that the angle difference is significantly different from the normal behaviour, indicating that the system is operating well outside its normal operating conditions. If angle differences were to widen, this would indicate a greater likelihood of transient instability or thermal overload. The angle differences across the network are potentially valuable information for wide area defence schemes that intelligently respond to multiple contingencies with a locational response. Lessons learnt The following lessons were learnt about the power system from this event: The large difference between the initial load shedding (DMP) and UFLS1 levels meant that there was no load shedding to counter the second energize - June Page 35

4 contingency, leading to a continuing frequency slide. With reduced inertia because of the initial condition and the disturbance, the rate of change of frequency can be unusually large, leading to an unexpectedly deep depression of frequency. Emergency generator start-up depresses the frequency, and this must be accounted for in restoration plans. The frequency overshoots to 50,2 Hz because of the generator response. This is outside the boundary of normal operation (50,1 Hz). The inter-area damping is degraded following the disturbance. The event was also instructive in the use of WAMS during and after a severe network disturbance: Phasor measurements help to regionalise the source of the problem. In this case, the cascading disturbance events occurred over a period of 1 min, which is easily within the timeframe that an automated defence scheme could operate, but challenging for an operator. Angle information can be a key input to wide-area defence schemes. The precision of the phasor measurement timestamping and the high sampling rate provide a very valuable resource to understand the disturbance. In contrast with other data sources for investigation, the information is immediately available and time-aligned. Operational warnings could be produced, for example on angle difference and damping, which distinguish a more critical operating condition from normal disturbances. Alarms can be selective for wide-area problems. Practical PMU performance In identifying the PMU models to be used in a large-scale WAMS project, it is important to identify the steady-state and dynamic performance of the devices, and also to gain practical experience of using the devices. The current IEEE standard for synchrophasor measurement, C37.118(2005), does not define the dynamic response of PMUs, and therefore compliance to the standard is not sufficient for use in dynamics applications. The focus in this project, however, was on the practical aspects of PMU performance that are not necessarily detailed in formal product testing. In the pilot project, two different models of PMU were used, and differences were noted that informed the eventual selection of the PMUs for the large-scale WAMS deployment. PMUs communicate with the central server (or Phasor Data Concentrator, PDC) by streaming data continuously in response to a request from the PDC. This data stream may be broken by a communications interruption, for example due to congestion in the communication channels. Since no special communications were installed for the pilot project, this occurred relatively frequently. The PDC detects the break in data and re-sends a request for data. As the WAMS system becomes missioncritical, absence of data could significantly degrade the reliability of the system. The quality of the data is confirmed by formal testing for a specified range of operating Fig. 5: Frequency disturbance on 27 Dec Fig. 6: Angle difference oscillations, low inertia condition, 27 Dec conditions. However, the data should not be significantly misleading in any credible system condition. It was noted that one of the PMU models reported appeared to report a zero voltage incorrectly, showing a volatile voltage and frequency, as illustrated in Fig. 8. One of the PMU models used did not exhibit the above issues, and the experience of extended operation of this PMU was good. This informed the choice of model for largescale deployment, although there were other performance criteria that had to be satisfied before the final choice was made. energize - June Page 36

5 Fig. 7: Muldersvlei-Grootvlei angle difference during 27 Dec 2009 compared with observed distribution. Fig. 8: Incorrect reporting of low voltage condition. Large-scale WAMS system The move to a large-scale deployment of WAMS is motivated by a need for more detailed and accurate information in order to improve the security and performance of the transmission system. The information is required in real-time for operational needs, and also for post-event analysis and planning requirements. The pilot project revealed interesting and useful observations on the operation of the system, but there is a limit to the depth of analysis that can be achieved with only three points in a large power system. The large-scale WAMS will therefore involve a major roll-out of PMUs across the entire system. The initial phase of the WAMS deployment is expected to include 28 substations with multiple circuits monitored at each substation. In this phase, around circuits may be instrumented. The system has been designed to be expandable in the future to 3500 phasors, which could provide full observability of the transmission system with phasor measurements. A deep penetration of PMU measurements throughout the system is beneficial in many ways, including: Consistent identification of dynamics problems across the whole system Ability to identify the sources of oscillation problems Operational facilities to drill down and see the detailed dynamic behaviour when problems occur Clear indication of exactly where system splitting occurs, and valuable information for reducing impact and improving restoration time Improved state estimation accuracy, robustness and solution time Phasor-based WAMS also provide a new approach to alarming on events affecting a wide area. In contrast to conventional EMS signal-by-signal alarming, the WAMS approach centralises and time-aligns incoming raw data before identifying alarm conditions, and there are therefore new opportunities to identify system conditions using several signals simultaneously. This can be useful, for example, in identifying threats to voltage stability. Also, the WAMS data has a sufficiently high time resolution to observe system dynamics. As the use of the system and experience with WAMS increases, it is expected that phasor-based control mechanisms will be developed in areas such as voltage stability control and emergency defence against multiple contingencies. A robust infrastructure and monitoring platform is a pre-requisite for development of control schemes. Contact Brian van Rensburg, Actom Transmission & Distribution, Tel , brian.van-rensburg@actom.co.za energize - June Page 38

Practical PMU Applications for Utilities

Practical PMU Applications for Utilities Practical PMU Applications for Utilities University of Washington EE Graduate Seminar November 1 st, 2012 Manu Parashar Douglas Wilson SynchroPhasor Technology Phasor Measurement Units (PMUs) Next generation

More information

Real-time Monitoring of Power Oscillations and Modal Damping in the European ENTSO-E System

Real-time Monitoring of Power Oscillations and Modal Damping in the European ENTSO-E System Mats Larsson, ABB CRC Switzerland; Luis-Fabiano Santos, ABB SAS Switzerland; Galina Antonova, AB B SA Canada, Reynaldo Nuqui, ABB CRC USA NASPI meeting, February 20, 2013 Real-time Monitoring of Power

More information

Wide Area Visualization & SynchroPhasors

Wide Area Visualization & SynchroPhasors Wide Area Visualization & SynchroPhasors January 12, 2012 Manu Parashar Anil Jampala Principal Engineer GRID Holistic Generalized Grid Security Analysis Traditional MODEL-BASED Analysis (EMS) PMU MEASUREMENT-BASED

More information

Adamantios Marinakis, Scientist, 12 th IEEE SB Power Engineering Symposium, Leuven, Enhancing Power System Operation with WAMS

Adamantios Marinakis, Scientist, 12 th IEEE SB Power Engineering Symposium, Leuven, Enhancing Power System Operation with WAMS Adamantios Marinakis, Scientist, 12 th IEEE SB Power Engineering Symposium, Leuven, 24.03.2016 Enhancing Power System Operation with WAMS Presentation Outline 1. Introduction to WAMS 2. Present WAMS applications:

More information

Oscillatory Stability: Extended Range & Enhanced Source Location

Oscillatory Stability: Extended Range & Enhanced Source Location Oscillatory Stability: Extended Range & Enhanced Source Location Ricardo Lira, MSc III International Workshop on PMU in Rio December 2014 ALSTOM WAMS: Deployments Worldwide Presentation title - 12/12/2014

More information

GRID RELIABILITY MONITORING

GRID RELIABILITY MONITORING GRID RELIABILITY MONITORING Using Smart Grids WASS TM - A SynchroPhasor Technology based Real Time Wide Area Situational Awareness Software for Monitoring, Detection and Diagnosis of Power System Issues

More information

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 Baselining using large quantities of historical phasor data to identify and understand patterns in interconnection-wide grid behavior, to

More information

Sarma (NDR) Nuthalapati, PhD

Sarma (NDR) Nuthalapati, PhD SYNCHROPHASOR TECHNOLOGY PMU USE CASE EXAMPLES Sarma (NDR) Nuthalapati, PhD Research Scientist Texas A&M University, College Station, TX Control Room Solutions Task Team NASPI Work Group meeting and first

More information

Synchrophasor Technology PMU Use Case Examples

Synchrophasor Technology PMU Use Case Examples 1 IEEE Tutorial on Use of Synchrophasors in Grid Operations - Oscillation Source Detection and Operational Use of Synchrophasors Synchrophasor Technology PMU Use Case Examples Sarma (NDR) Nuthalapati,

More information

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation

More information

Application Example Document ID: SA Rev. - September 24, 2004

Application Example Document ID: SA Rev. - September 24, 2004 Application Example Rev. - September 24, 2004 1 Summary Phasor based control of braking resistors A case study applied to large power oscillations experienced in the Swedish grid 1997 Phasor measurement,

More information

Wide Area Monitoring with Phasor Measurement Data

Wide Area Monitoring with Phasor Measurement Data Wide Area Monitoring with Phasor Measurement Data Dr. Markus Wache Siemens E D EA, Nuremberg, Germany Content Content Basics of Phasor Measurement Realization of PMUs Power System Stability Standard IEEE

More information

Use of Synchronized Phasor Measurements for Model Validation in ERCOT

Use of Synchronized Phasor Measurements for Model Validation in ERCOT Use of Synchronized Phasor Measurements for Model Validation in ERCOT NDR Sarma, Jian Chen, Prakash Shrestha, Shun-Hsien Huang, John Adams, Diran Obadina, Tim Mortensen and Bill Blevins Electricity Reliability

More information

Recent Progress on Forced Oscillation Detection and Source Locating Findings at Peak Reliability. NASPI Work Group Meeting

Recent Progress on Forced Oscillation Detection and Source Locating Findings at Peak Reliability. NASPI Work Group Meeting Recent Progress on Forced Oscillation Detection and Source Locating Findings at Peak Reliability NASPI Work Group Meeting Apr 25 2018 Jiawei Alex Ning, NetApps Engineer Hongming Zhang, NetApps Manager

More information

Testing and Implementation of a Source Locating method at ISO New England

Testing and Implementation of a Source Locating method at ISO New England 1 Testing and Implementation of a Source Locating method at ISO New England Slava Maslennikov Principal Analyst Business Architecture and Technology Department ISO New England smaslennikov@iso-ne.com 2

More information

Synchrophasor Solutions Deployment at PG&E Off-Line Analysis

Synchrophasor Solutions Deployment at PG&E Off-Line Analysis Synchrophasor Solutions Deployment at PG&E Off-Line Analysis Vahid Madani - PG&E Manu Parashar - ALSTOM Grid October 24, 2013 Outline Offline Engineering Applications at PG&E Post Event Analysis (May 30

More information

Phasor Measurements for Blackout Prevention

Phasor Measurements for Blackout Prevention Phasor Measurements for Blackout Prevention Anjan Bose Washington State University Pullman, WA, USA i-pcgrid 2013 San Francisco, CA March 26-28, 2013 Monitoring the Power Grid (SCADA) Visualization Tables

More information

Use of Synchrophasors to Detect Control System and Circuit Breaker Reclosing Issues

Use of Synchrophasors to Detect Control System and Circuit Breaker Reclosing Issues Use of Synchrophasors to Detect Control System and Circuit Breaker Reclosing Issues Pramila Nirbhavane Senior Grid Operations Engineer September 26, 2017 Outline PMUs Locations in NYISO PMU Applications

More information

ROSE - Real Time Analysis Tool for Enhanced Situational Awareness

ROSE - Real Time Analysis Tool for Enhanced Situational Awareness ROSE - Real Time Analysis Tool for Enhanced Situational Awareness Marianna Vaiman V&R Energy Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved. WECC JSIS Salt Lake City, UT October

More information

In addition to wide-area monitoring systems, synchrophasors offer an impressive range of system benefits, including:

In addition to wide-area monitoring systems, synchrophasors offer an impressive range of system benefits, including: Synchrophasors Before synchrophasor technology and its contributions towards transmission resiliency are discussed, it is important to first understand the concept of phasors. A phasor is a complex number

More information

Alberta Electric System Operator (AESO) Oscillatory dynamics and corridor stress in the Alberta electric system

Alberta Electric System Operator (AESO) Oscillatory dynamics and corridor stress in the Alberta electric system Alberta Electric System Operator (AESO) Oscillatory dynamics and corridor stress in the Alberta electric system North American SynchroPhasor Initiative March 2015 Agenda Alberta Electrical System Overview

More information

Loss of Mains Protection

Loss of Mains Protection Loss of Mains Protection Summary All generators that are connected to or are capable of being connected to the Distribution Network are required to implement Loss of Mains protection. This applies to all

More information

Tor Rolv Time, Øystein Kirkeluten STATNETT Oslo, Norway

Tor Rolv Time, Øystein Kirkeluten STATNETT Oslo, Norway RAISING STABILITY LIMITS IN THE NORDIC POWER TRANSMISSION SYSTEM Kjetil Uhlen, Magni Þ. Pálsson SINTEF Energy Research Trondheim, Norway kjetil.uhlen@energy.sintef.no Tor Rolv Time, Øystein Kirkeluten

More information

Task Force on Synchrophasor Protection Applications NASPI Engineering Analysis Task Team Matthew Rhodes 3/22/16

Task Force on Synchrophasor Protection Applications NASPI Engineering Analysis Task Team Matthew Rhodes 3/22/16 NASPI White Paper: Integrating Synchrophasor Technology into Power System Protection Applications Update Report Task Force on Synchrophasor Protection Applications NASPI Engineering Analysis Task Team

More information

Considerations and Recommendations for the Harmonisation of Under Frequency Loadshedding Schemes in Multi Zone Meshed Grids

Considerations and Recommendations for the Harmonisation of Under Frequency Loadshedding Schemes in Multi Zone Meshed Grids 21, rue d Artois, F-75008 PARIS http : //www.cigre.org INNOVATION FOR SECURE AND EFFICIENT TRANSMISSION GRIDS CIGRÉ Belgium Conference Crowne-Plaza Le Palace Brussels, Belgium March 12-14, 2014 Considerations

More information

Post-Event Analysis of a Compound Event in the ERCOT System Using Synchrophasor Data

Post-Event Analysis of a Compound Event in the ERCOT System Using Synchrophasor Data 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Post-Event Analysis of a Compound Event in the ERCOT System Using Synchrophasor Data

More information

A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors

A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors Dinesh Rangana Gurusinghe Yaojie Cai Athula D. Rajapakse International Synchrophasor Symposium March 25,

More information

System Protection Schemes in Power Network based on New Principles

System Protection Schemes in Power Network based on New Principles System Protection Schemes in Power Network based on New Principles Daniel Karlsson, ABB Automation Products AB S-721 59 Västerås, SWDN daniel.h.karlsson@se.abb.com Abstract This report describes how a

More information

Eigenvalue Analysis All Information on Power System Oscillation Behavior Rapidly Analyzed

Eigenvalue Analysis All Information on Power System Oscillation Behavior Rapidly Analyzed Newsletter Issue 99 September 2006 Eigenvalue Analysis All Information on Power System Oscillation Behavior Rapidly Analyzed Olaf Ruhle Senior Consultant olaf.ruhle@siemens.com Introduction Power systems

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

Measurement tools at heart of Smart Grid need calibration to ensure reliability

Measurement tools at heart of Smart Grid need calibration to ensure reliability Measurement tools at heart of Smart Grid need calibration to ensure reliability Smart grid; PMU calibration position 1 The North American interconnections, or electric transmission grids, operate as a

More information

Operationalizing Phasor Technology. Model Validation. Webinar. Ken Martin. March 4, Presented by. Page 0

Operationalizing Phasor Technology. Model Validation. Webinar. Ken Martin. March 4, Presented by. Page 0 Operationalizing Phasor Technology Model Validation Webinar March 4, 2014 Presented by Ken Martin Page 0 Model Use and Validation for Operations and Planning Compare System Performance with Model Prediction

More information

Wide-Area Measurements to Improve System Models and System Operation

Wide-Area Measurements to Improve System Models and System Operation Wide-Area Measurements to Improve System Models and System Operation G. Zweigle, R. Moxley, B. Flerchinger, and J. Needs Schweitzer Engineering Laboratories, Inc. Presented at the 11th International Conference

More information

Events Captured and Findings To Date. John Ballance and Abhijeet Agarwal EPG John Adams and Jian Chen ERCOT

Events Captured and Findings To Date. John Ballance and Abhijeet Agarwal EPG John Adams and Jian Chen ERCOT Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in ERCOT Events Captured and Findings To Date John Ballance

More information

Prepared by Tony Weekes Husam Al Hadidi Brian Archer

Prepared by Tony Weekes Husam Al Hadidi Brian Archer Prepared by Tony Weekes Husam Al Hadidi Brian Archer 1 Topics of Discussion NASPI and the MISO Project Description of Manitoba WAMS Introduction to Birchtree SVC Project Commissioning Results Lessons Learned

More information

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon Keeping it up to Speed Off-Nominal Frequency Operations CETAC 2018 San Ramon 1 Welcome CETAC 2018 San Ramon Valley Conference Center General Class Information: Safety/Fire evacuation In event of emergency,

More information

Practical Experience with Modal Estimation Tools at Swissgrid

Practical Experience with Modal Estimation Tools at Swissgrid 1 Practical Experience with Modal Estimation Tools at Swissgrid Mats Larsson, Walter Sattinger, Luis-Fabiano Santos, Roland Notter Abstract This paper describes experience with modal estimation tools for

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Massive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades

Massive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades 1 Massive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades Paper Number: 16PESGM2419 Marianna Vaiman, V&R Energy marvaiman@vrenergy.com 2016 IEEE PES General

More information

Success Story: Practical Use of Synchrophasor Technology in ISO-NE Operations

Success Story: Practical Use of Synchrophasor Technology in ISO-NE Operations 2018-10- 23 PHILADELPHIA, PA Success Story: Practical Use of Synchrophasor Technology in ISO-NE Operations NASPI Work Group Meeting Xiaochuan Luo TECHNICAL MANAGER BUSINESS ARCHITECTURE AND TECHNOLOGY

More information

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System NERC Synchronized Measurement Subcommittee (SMS) Scope Document Objective The objective of the

More information

Using Synchrophasors for Frequency Response Analysis in the Western Interconnection. Bonneville Power Administration -- WECC JSIS Chair

Using Synchrophasors for Frequency Response Analysis in the Western Interconnection. Bonneville Power Administration -- WECC JSIS Chair 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Using Synchrophasors for Frequency Response Analysis in the Western Interconnection

More information

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM 1 VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM Thierry Van Cutsem Department of Electrical and Computer Engineering University of Liège, Belgium Modified version of a presentation at the IEEE PES General

More information

Study and Simulation of Phasor Measurement Unit for Wide Area Measurement System

Study and Simulation of Phasor Measurement Unit for Wide Area Measurement System Study and Simulation of Phasor Measurement Unit for Wide Area Measurement System Ms.Darsana M. Nair Mr. Rishi Menon Mr. Aby Joseph PG Scholar Assistant Professor Principal Engineer Dept. of EEE Dept. of

More information

Power System Reliability and Transfer Capability Improvement by VSC- HVDC (HVDC Light )

Power System Reliability and Transfer Capability Improvement by VSC- HVDC (HVDC Light ) 21, rue d Artois, F-75008 PARIS SECURITY AND RELIABILITY OF ELECTRIC POWER SYSTEMS http : //www.cigre.org CIGRÉ Regional Meeting June 18-20, 2007, Tallinn, Estonia Power System Reliability and Transfer

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Phase Angle Monitoring:

Phase Angle Monitoring: Phase Angle Monitoring: Industry Experience Following the 2011 Pacific Southwest Outage Recommendation 27 Ryan D. Quint, PhD, PE NERC SMS Coordinator NASPI Work Group Meeting October 2016 Background Purpose:

More information

Dynamic stability of power systems

Dynamic stability of power systems Dynamic stability of power systems Dr Rafael Segundo Research Associate Zurich University of Applied Science segu@zhaw.ch SCCER School- Shaping the Energy Transition Engelberg, 20 October 2017 Agenda Fundamentals

More information

Wide-Area Monitoring and Control of Power Systems using Real-Time Hardware-in-the-Loop Simulations

Wide-Area Monitoring and Control of Power Systems using Real-Time Hardware-in-the-Loop Simulations Wide-Area Monitoring and Control of Power Systems using Real-Time Hardware-in-the-Loop Simulations Matthew Weiss Thesis advisor: Dr. Aranya Chakrabortty 7/28/2016 1 Power grids are envisioned to be come

More information

The Effect of Delays on Wide-Area Damping Control of Electromechanical Oscillations

The Effect of Delays on Wide-Area Damping Control of Electromechanical Oscillations Introduction The Effect of Delays on Wide-Area Damping Control of - R. Karppanen AS-0.3100 Automaatio- ja systeemitekniikan seminaari, 2015 Outline Introduction 1 Introduction 2 3 4 Master s Thesis. 1

More information

openpdc in the Control Center

openpdc in the Control Center openpdc in the Control Center August 22 th, 2012 Barbara Motteler ALSTOM s Integrated SynchroPhasor Solution PMUs PMUs G G EMS Improved State Estimation using PMUs G PMUs e-terratransmission Phasor Data

More information

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks Working Group Meeting June 5-6, 2012 Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks Prof. Mario Paolone EPFL, Switzerland - Distributed Electrical Systems

More information

ELEMENTS OF FACTS CONTROLLERS

ELEMENTS OF FACTS CONTROLLERS 1 ELEMENTS OF FACTS CONTROLLERS Rajiv K. Varma Associate Professor Hydro One Chair in Power Systems Engineering University of Western Ontario London, ON, CANADA rkvarma@uwo.ca POWER SYSTEMS - Where are

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

Test Cases Library and Real-life Oscillation Examples

Test Cases Library and Real-life Oscillation Examples Test Cases Library and Real-life Oscillation Examples Kai Sun 1, Bin Wang 2, Slava Maslennikov 3 1- University of Tennessee, 2- Texas A&M University, 3- ISO New England Paper No. 18PESGM0563 2018 IEEE

More information

REDESIGN OF THE ESKOM CAPE CORRIDOR OUT-OF-STEP TRIPPING SCHEME. A Bartylak ESKOM System Operator

REDESIGN OF THE ESKOM CAPE CORRIDOR OUT-OF-STEP TRIPPING SCHEME. A Bartylak ESKOM System Operator REDESIGN OF THE ESKOM CAPE CORRIDOR OUT-OF-STEP TRIPPING SCHEME A Bartylak ESKOM System Operator ABSTRACT In this paper a new design of the ESKOM Out-Of- Step (OOS) tripping scheme is proposed. ESKOM commissioned

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

POWER SYSTEM OSCILLATIONS

POWER SYSTEM OSCILLATIONS Chapter 2 POWER SYSTEM OSCILLATIONS 2.1 Introduction Oscillations in power systems are classified by the system components that they effect. Some of the major system collapses attributed to oscillations

More information

Experiences of Using Synchrophasors at Duke Energy

Experiences of Using Synchrophasors at Duke Energy 1 Experiences of Using Synchrophasors at Duke Energy Tim Bradberry, Megan Vutsinas, Kat Sico Duke Energy IEEE PES Tutorial July 19 th, 2016 Duke Energy s Phasor Plans Carolinas West Currently have 125

More information

Low Frequency Local mode Oscillations in NER Grid, Validation using Model based analysis and Mitigation

Low Frequency Local mode Oscillations in NER Grid, Validation using Model based analysis and Mitigation Low Frequency Local mode Oscillations in NER Grid, Validation using Model based analysis and Mitigation T S Singh, A Mallick, Rahul Chakrabarti, Momai Dey, Jerin Jacob Presented by : Rahul Chakrabarti

More information

Energy-Based Damping Evaluation for Exciter Control in Power Systems

Energy-Based Damping Evaluation for Exciter Control in Power Systems Energy-Based Damping Evaluation for Exciter Control in Power Systems Luoyang Fang 1, Dongliang Duan 2, Liuqing Yang 1 1 Department of Electrical & Computer Engineering Colorado State University, Fort Collins,

More information

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network M. Karimi, Student Member, IEEE, H. Mokhlis, Member, IEEE, A. H. A. Bakar, Member, IEEE, J. A. Laghari, A. Shahriari,

More information

Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years

Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years 21, rue d Artois, F-758 PARIS B4-18 CIGRE 216 http : //www.cigre.org Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years T G MAGG, Power System

More information

City of Ekurhuleni power quality monitoring system

City of Ekurhuleni power quality monitoring system City of Ekurhuleni power quality monitoring system by Stephen Delport City of Ekurhuleni In a visionary step, the general manager: electricity and energy, Mark Wilson, recommended to the mayoral committee

More information

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS Giuseppe Di Marzio NTNU giuseppe.di.marzio@elkraft.ntnu.no Olav B. Fosso NTNU olav.fosso@elkraft.ntnu.no Kjetil Uhlen SINTEF

More information

Monitoring power quality beyond EN and IEC

Monitoring power quality beyond EN and IEC Monitoring power quality beyond EN 50160 and IEC 61000-4-30 by A Broshi and E Kadec, Elspec, Israel The standards currently in place provide minimum requirements, since they want to create a level playing

More information

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline Internet Seminar October 1, 2002 Vijay Vittal Students: Haibo You, Zhong Yang 2002 Iowa State University EPRI/DoD Initiative

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble: It is in the public interest for the North American Electric Reliability Corporation

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES THE OLE OF SYNCHOPHASOS IN THE INTEGATION OF DISTIBUTED ENEGY ESOUCES Alexander APOSTOLOV OMICON electronics - USA alex.apostolov@omicronusa.com ABSTACT The introduction of M and P class Synchrophasors

More information

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Real Time Stability Analysis at Peak Reliability Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Overview: Overview of Peak s DSA Application; o Set up o User Cases Transient Stability Criteria; TSAT

More information

J Project Methods. V (%) Network with high generation and low load. Network with low generation and high load

J Project Methods. V (%) Network with high generation and low load. Network with low generation and high load J Project Methods Background The management of voltage is a growing concern with the integration of low carbon technologies, particularly distributed generation (DG), within electricity networks. The issue

More information

SynchroPhasor Roadmap

SynchroPhasor Roadmap SynchroPhasor Roadmap (Voltage Stability) JSIS Meeting January 16 th, 2013 Manu Parashar Our Vision Traditional MODEL-BASED Analysis (EMS) PMU MEASUREMENT-BASED Analysis (PhasorPoint) SCADA & Alarms WAMS

More information

ANALYTICAL AND SIMULATION RESULTS

ANALYTICAL AND SIMULATION RESULTS 6 ANALYTICAL AND SIMULATION RESULTS 6.1 Small-Signal Response Without Supplementary Control As discussed in Section 5.6, the complete A-matrix equations containing all of the singlegenerator terms and

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

Online Oscillation Management at ISO New England

Online Oscillation Management at ISO New England NASPI. SEPTEMBER 27,2017 Online Oscillation Management at ISO New England SLAVA MASLENNIKOV XIAOCHUAN LUO FRANKIE ZHANG IZUDIN LELIC EUGENE LITVINOV PMU Infrastructure at ISO New England Installed in 2012

More information

Stability Improvement for Central China System

Stability Improvement for Central China System Stability Improvement for Central China System Kjell-Erik Högberg, Marie Ericsson, Abhay Kumar, Kerstin Lindén and Wen Weibing. Abstract--The stability study has been performed investigating the conditions

More information

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Industry Webinar Reactive Power Planning NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Webinar Topics Reliability Guideline on Reactive Power Planning Webinar Topics Fundamentals of

More information

Smart Transmission Grids Operation and Control

Smart Transmission Grids Operation and Control INSTITUTE OF PHYSICAL ENERGETICS Smart Transmission Grids Operation and Control Dr.sc.ing. Anna Mutule Northern Region 2017 Workshop Information, 7-8 December, Latvia Timeline and Project Partners October

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Automated Event Analysis Tool using Synchrophasor Data in Indian Grid

Automated Event Analysis Tool using Synchrophasor Data in Indian Grid Automated Event Analysis Tool using Synchrophasor Data in Indian Grid NASPI Work Group Meeting March 2015 Rajkumar Anumasula Power System Operation Corporation Ltd. India Some Typical Numbers of Indian

More information

Phasor Measurements in the WECC

Phasor Measurements in the WECC Phasor Measurements in the WECC Ken Martin Quanta Technology Dave Hawkins California ISO Bharat Bhargava Southern California Edison WECC -- DMWG & WIPP WECC Disturbance Monitor Working Group & Wide Area

More information

Relay Communication Misoperations. Southwest Power Pool System Protection and Control Working Group

Relay Communication Misoperations. Southwest Power Pool System Protection and Control Working Group Relay Communication Misoperations Southwest Power Pool System Protection and Control Working Group Relay Misoperations The fundamental objective of power system protection schemes is to quickly provide

More information

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013 Load-Frequency Control and Reserves Network Code David Bunney JESG 19 March 2013 Agenda Overview and Timescales Stakeholder Engagement Overview of the Code More detailed discussion on Frequency Quality

More information

Table of Contents Error! Bookmark not defined.

Table of Contents Error! Bookmark not defined. Table of Contents Table of Contents... 1 Introduction... 2 Background... 2 Rationale by Requirement... 204 Requirement 1... 204 Background and Rationale... 204 Requirement 2... 268 Background and Rationale...

More information

Alternatives for Primary Frequency Control Contribution from Wind Power Plants Connected to VSC-HVDC Intertie

Alternatives for Primary Frequency Control Contribution from Wind Power Plants Connected to VSC-HVDC Intertie Downloaded from orbit.dtu.dk on: Dec 20, 2018 Alternatives for Primary Frequency Control Contribution from Wind Power Plants Connected to VSC-HVDC Intertie Laukhamar, Andreas Grøsvik ; Zeni, Lorenzo; Sørensen,

More information

SDG&E Transmission Synchrophasor Project Update

SDG&E Transmission Synchrophasor Project Update SDG&E Transmission Synchrophasor Project Update Joint Synchronized Information Subcommittee (JSIS) Meeting Tariq Rahman, May 22-25, 2017 2006 San Diego Gas & Electric Company. All copyright and trademark

More information

PMU-based Voltage Instability Detection through Linear Regression

PMU-based Voltage Instability Detection through Linear Regression PMU-based Voltage Instability Detection through Linear Regression Rujiroj Leelaruji and Prof. Luigi Vanfretti Smart Transmission Systems Lab. Electric Power Systems Department KTH Royal Institute of Technology,

More information

P5 Policy 5: Emergency Operations

P5 Policy 5: Emergency Operations RG CE OH Policy 5: Emergency Operations V 3.1 Page 1 of 18 P5 Policy 5: Emergency Operations Document Control Version Number: V 3.1 Approved By: RG CE Plenary Date Approved: 43 rd RG CE Plenary Meeting

More information

Event Detection SMART Frequency Control

Event Detection SMART Frequency Control Document Type Technical Report for Knowledge Dissemination Title Event Detection SMART Frequency Control Synopsis This document describes the principles behind the event detection algorithms specifically

More information

Endorsed Assignments from ERS Framework

Endorsed Assignments from ERS Framework ERSTF Completion Endorsed Assignments from ERS Framework Ref Number Title ERS Recommendatio n Ongoing Responsibility 1 Synch Inertia at Interconnection Level Measure 2 Initial Frequency Deviation Measure

More information

A Topology-based Scheme for Adaptive Underfrequency Load Shedding

A Topology-based Scheme for Adaptive Underfrequency Load Shedding A Topology-based Scheme for Adaptive Underfrequency Load Shedding Dinh Thuc Duong and Kjetil Uhlen Department of Electric Power Engineering NTNU, Norwegian University of Science and Technology Trondheim,

More information

Coordinating Power Oscillation Damping Control using Wide Area Measurements

Coordinating Power Oscillation Damping Control using Wide Area Measurements 1 Coordinating Power Oscillation Damping Control using Wide Area Measurements E. Johansson, K. Uhlen, Member, IEEE, A. B. Leirbukt, Member, IEEE, P. Korba, Member, IEEE, J. O. Gjerde, Member, IEEE, L.

More information

C1-207 TRANSMISSION CAPACITY INCREASE BY RETURNING POWER SYSTEM STABILIZERS

C1-207 TRANSMISSION CAPACITY INCREASE BY RETURNING POWER SYSTEM STABILIZERS 21, rue d'artois, F-75008 Paris http://www.cigre.org C1-207 Session 2004 CIGRÉ TRANSMISSION CAPACITY INCREASE BY RETURNING POWER SYSTEM STABILIZERS STEFAN ELENIUS* JUSSI JYRINSALO SIMO JOKI-KORPELA HELSINKI

More information

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods

Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing Methods Proceedings of the th WSEAS International Conference on Power Systems, Beijing, China, September -, 200 Impact of Distributed Generation on Voltage Regulation by ULTC Transformer using Various Existing

More information

Application of Synchrophasors in Power Plants Incorporated with Condition Monitoring Systems K P C L

Application of Synchrophasors in Power Plants Incorporated with Condition Monitoring Systems K P C L Application of Synchrophasors in Power Plants Incorporated with Condition Monitoring Systems Nagarjun.Y Assistant Engineer Karnataka Power Corporation Limited India K P C L Outline Synchrophasor Technology

More information

SSE Offices, Glasgow and Teleconference

SSE Offices, Glasgow and Teleconference DRAFT Minutes Name NETS SQSS Sub-Synchronous Oscillations (SSO) Workgroup Number 3 Date of 28 November 2014 Time 10:00 14:00 Location SSE Offices, Glasgow and Teleconference Attendees Name Role Initials

More information

Power System Protection Where Are We Today?

Power System Protection Where Are We Today? 1 Power System Protection Where Are We Today? Meliha B. Selak Power System Protection & Control IEEE PES Distinguished Lecturer Program Preceding IEEE PES Vice President for Chapters melihas@ieee.org PES

More information