1 Blackouts EE 521 Analysis of Power Systems Chen-Ching Liu Boeing Distinguished Professor Washington State University

2 Catastrophic Power Outages

3 Sabotage OkC Oak Creek kwisconsin i October 11 th 2004 American Transmission Company- Two transmission towers were toppled by removing bolts in the support legs and their cross members. This resulted in Mitchell International Airport & 17,000 area residents losing power.

4 North East Power Grid November 9 th, 1965 Blackout 5:16 p.m. 1 of kV lines supplying power to Ontario trips due to a incorrectly set backup over current relay. Generators at Beck and dniagara speed up due to rapid unloading and are soon out of phase with the rest of the system. The East Coast Interconnect t separates into 4 areas with massive load loss. 30 million people lost power. The readjustment of power to the other kv lines causes their backup relays to operate. Tie lines to neighboring systems are severed because of instability. Approx MW was flowing East and South through the NW system seconds after the initial load separation the kV lines connecting the PANSY plant with the 345-kV trunk lines feeding New York and New England are tripped. MN VT ME Approx. 1500MW of power that had been flowing into Ontario, surges into the NY system creating instability. 5 additional generators trip due to the loss of trunk lines. This initiates the separation of the East Coast Interconnect. KS OK IA MO WI IL MI IN KY TN OH WV NH NY MA CT RI PA NJ DE MD VA NC AR SC MS AL GA LA FL

5 North East Power System July 13 th, 1977 Blackout 8:37:17 p.m. initial iti lighting strikes remove the W97 and W kV lines from service, additionally this isolated the Indian point no. 3 Nuclear Plant. 8:55:53 p.m. additional lighting strikes remove the W93/W79 and W99/W kV lines from service. 9:19:11 p.m. due to overloading the 345-kV line 92 from Niagara sags and contacts a tree isolating 1,202 MW of generation Th 9:29:41 The Consolidated dedison system becomes isolated from the rest of the Eastern Interconnect. At the time of separation the total Con Edison load was 5,981MW while generation was only 4,282 MW, a deficiency i of 1,680 MW. Immediate load shedding and generation increase was needed. Under frequency load shedders operated automatically at three levels; 59.3, 58.8, and 58.3 Hz. This shed 2,230.6 MW of load. With the loss of the Ravenswood No.3 Generator, and its 844 MW of output, the entire Con Edison system collapsed. 9 million people lost power. MN IA WI IL IN MI OH PA NY NJ DE MD VT NH MA CT RI ME 9:19:53-9:29:41 a series of equipment malfunctions and operator errors lead to the isolation of the Consolidated d Edison system. Once the load was shed, voltage rapidly increased due to extensive underground 138- kv and 345-kV lines resulting in the tripping of the Ravenswood No. 3 Generator. KS OK MO AR LA MS TN AL KY WV VA NC SC GA FL

6 Western Electric Coordinating Council (WECC) system - July 2 nd, 1996 Blackout 224 2:24 p.m. Jim Bridger-Kinport Bid 345-kV line is tripped due to sag. Due to a faulty relay the parallel Jim Bridger-Goshen also trips. 2 of the 4 generators at the Jim Bridger disconnected by a Remedial Action Scheme. Mill Creek-Antelope 230-kV line trips due to a faulty Zone 3 relay. Voltage in the Boise Idaho area as well as voltage on the COI began to rapidly collapse. Within 8 seconds of the initial iti event, 5 asynchronous islands had been formed. 2 million people lost power. The loss of 2 parallel lines was considered a single contingency event, and as such the system was able to handle the loss of kV lines and the associated loss of generation. For approx. 23 seconds the system seems to handle the events properly despite minor voltage fluctuations. Then a faulty relay destabilized the system. Due to collapsing voltages kV lines between Boise and the Brownlee substation tripped. Further, protective devices at the Malin and Captain Jack substations in southern Oregon automatically disconnected the COI. Disconnecting i the COI interrupted 4,000 MW of power flow and separated the WECC. CA WA OR NV ID AZ UT MT WY CO NM

7 Western Electricity Coordinating Council (WECC) system stem - Aug 10 th, 1996 Blackout 15:48 p.m. Keeler-Allston 500-kV line contacts a tree due to inadequate right-of-way maintenance. Additionally the Pearl-Keeler line is forced out of service due to the Keeler 500/230-Kv transformer being OOS. Mild.224 Hz oscillations were seen throughout the system and began to appear on of the PDCI. Shunt capacitor banks were switched in to raise the voltage but the oscillations were not bi being damped. d The WECC broke into 4 asynchronous islands with heavy loss of load. 7.5 million people lost power. With the loss of these 2 lines, 5 lines are now out of service, removing hundreds of MVAR. 15:48:51 p.m. Oscillations on the POI reached 1000MW and 60-kV peak-to-peak. WA MT Lines throughout the system begin to experience overloads as well as low voltage conditions. Additional lines trip due to sagging. PDCI Remedial Action Schemes (RAS) began to actuate. Shunt and series capacitors were inserted. CA OR NV ID UT WY CO 15:47:40-15:48:57 p.m. Generators at the McNary power house supplying 494 MVAR trip. The system begins to experience mild oscillations. AZ NM

8 Eastern Interconnection h August 14 th, 2003 Blackout 1:07 p.m. FE turns off their state estimator for troubleshooting. 4:05:57 p.m. The loss of 138-kV lines overloads the Sammis-Star line. 265 power plants tripped off line and 50 million people are without power. 1:31 p.m. Eastlake 5 generation unit trips and shuts down. 2:02 p.m. Stuart-Atlanta 345-kV line tips off due to contact with a tree. 4:08:59 p.m. Galion-Ohio and Central- Muskinghun 345-kV lines trip on Zone 3 causing major power swings through New York and Ontario and into Michigan. 2:14 p.m. FE s control room lost alarm functions followed by a number of the EMS consoles. 2:54 p.m. The primary and secondary alarms servers failed. Low voltage/ high load conditions and system disturbances propagate through the system tripping transmission lines and generators. KS MN IA MO WI IL MI IN KY OH WV ME VT NH NY MA CT RI PA NJ DE MD VA 3:05:41-3:57:35 p.m kV lines trip due to contact with trees. This overloads the underlying 138-kV system and depressed voltages. 4:13 p.m. most of the North East and parts of Canada blacked out. There are only a few islands which remain operating. OK AR LA MS TN AL GA NC SC FL 3:39:17-4:08:59 p.m kV lines trip due to overloading.

Areas of Composite Figures 8.4. ACTIVITY: Estimating Area. How can you find the area of. a composite figure?

Areas of Composite Figures 8.4. ACTIVITY: Estimating Area. How can you find the area of. a composite figure? .4 Areas of Composite Figures a composite figure? How can you find the area of 1 ACTIVITY: Estimating Area Work with a partner. a. Choose a state. On grid paper, draw a larger outline of the state. b.

More information

FHWA s Demonstration Project for Enhanced Durability Through Increased Density

FHWA s Demonstration Project for Enhanced Durability Through Increased Density FHWA s Demonstration Project for Enhanced Durability Through Increased Density Courtesy Asphalt Institute TIM ASCHENBRENER, P.E. SENIOR ASPHALT PAVEMENT ENGINEER PAVEMENT MATERIALS TEAM OFFICE OF PRECONSTRUCTION,

More information

Fair Game Review. Chapter 6. Identify the basic shapes in the figure

Fair Game Review. Chapter 6. Identify the basic shapes in the figure Name Date Chapter 6 Fair Game Review Identify the basic shapes in the figure. 1. 2. 3. 4. 5. Identify the basic shapes that make up the top of your teacher s desk. Big Ideas Math Green 127 Name Date Chapter

More information

Recommended Citations

Recommended Citations Recommended Citations Entire set Kunkel, K., R. Frankson, J. Runkle, S. Champion, L. Stevens, D. Easterling, and B. Stewart (Eds.), 2017: State Climate Summaries for the United States. NOAA Technical Report

More information

Meet the National Builder Division Team

Meet the National Builder Division Team Meet the National Builder Division Team WA MT ND AK OR ID WY SD MN WI MI NY VT NH MA ME NE IA IL IN OH PA NJ CT RI SFC CA CA NV UT CO KS MO KY WV VA DE MD DC HI OK AR TN NC Greater LA OC/SD/SC AZ NM MS

More information

Fair Game Review. Chapter 8. Name Date. Identify the basic shapes in the figure

Fair Game Review. Chapter 8. Name Date. Identify the basic shapes in the figure Name Date Chapter Fair Game Review Identify the basic shapes in the figure. 1. 2. 3. 4. 5. Identify the basic shapes that make up the top of your teacher s desk. Big Ideas Math Red Accelerated 165 Name

More information

State Capitals Directions:

State Capitals Directions: State Capitals Directions: Using the word bank of state capitals below, match the capitals to their state. Hint: Use a map of the United States to help you locate the capitals. State Capitals Albany -

More information

LPL Insured Cash Account (ICA): Current Priority Bank List Retail Accounts

LPL Insured Cash Account (ICA): Current Priority Bank List Retail Accounts LPL Insured Cash Account (ICA): Current Priority Bank List Retail Accounts Effective February 8, 2019 ABOUT THE PRIORITY BANK LIST (PBL) ThePriorityBankListisalistofavailableBanksintowhichyourfundsmaybedepositedandisavailable

More information

LPL Insured Cash Account (ICA): Current Priority Bank List Qualified Accounts

LPL Insured Cash Account (ICA): Current Priority Bank List Qualified Accounts LPL Insured Cash Account (ICA): Current Priority Bank List Qualified Accounts Effective February 8, 2019 ABOUT THE PRIORITY BANK LIST (PBL) ThePriorityBankListisalistofavailableBanksintowhichyourfundsmaybedepositedandisavailable

More information

Critical Thinking Use the clues below to write each decimal number. Be sure to put the decimal in the correct place.

Critical Thinking Use the clues below to write each decimal number. Be sure to put the decimal in the correct place. Name Use the clues below to write each decimal number. Be sure to put the decimal in the correct place. 1. Use the numbers: 4, 5, 8, 9 a. The 5 is in the tenths place. b. The number in the tens place is

More information

NPI Are You Ready? The presentation was created to assist Navicure clients in navigating the information received regarding NPI.

NPI Are You Ready? The presentation was created to assist Navicure clients in navigating the information received regarding NPI. NPI Are You Ready? The presentation was created to assist Navicure clients in navigating the information received regarding NPI. NPI Overview Getting an NPI is free - Not Having One Can Be Costly. The

More information

INTELLIGENT COMPACTION

INTELLIGENT COMPACTION INTELLIGENT COMPACTION Directions to the Future Jimmy Si, Ph.D., P.E. San Antonio, TX, Mar. 20, 2014 Table of Contents 1 What Is Intelligent Compaction 3-5 2 Why Use Intelligent Compaction 6-8 3 National

More information

August 14, 2003 Blackout. 3 Interconnections / 10 NERC Regions. NERC Control Areas. NERC Reliability Coordinators. Overview

August 14, 2003 Blackout. 3 Interconnections / 10 NERC Regions. NERC Control Areas. NERC Reliability Coordinators. Overview Overview August 14, 2003 Blackout Summary based on NERC reports, Power System Engineering Research Center Report, and DOE Reports Overview of power system and reliability Pre-outage conditions on August

More information

Protection System Response to Power Swings

Protection System Response to Power Swings Protection System Response to Power Swings System Protection and Control Subcommittee August 2013 3353 Peachtree Road NE Suite 600, North Tower NERC Protection System Response to Power Swings March 6,

More information

Public Policy for Angels. Angels are Important to the Economy: Public Policy Strategies to Promote More Investment in Entrepreneurial Companies

Public Policy for Angels. Angels are Important to the Economy: Public Policy Strategies to Promote More Investment in Entrepreneurial Companies Public Policy for Angels Angels are Important to the Economy: Public Policy Strategies to Promote More Investment in Entrepreneurial Companies Agenda Who angels are and how they support entrepreneurs and

More information

A domestic address must contain the following data elements:

A domestic address must contain the following data elements: ADDRESS EDITS FOR FILE MAINTENANCE ATTACHMENT TO SERVICE REQUEST #16941 FINAL 1.0 INTRODUCTION There are minimal edits in the Payroll/Personnel System (PPS) for employee address formatting which is causing

More information

MRN/SWANA-Mid Atlantic Annual Conference

MRN/SWANA-Mid Atlantic Annual Conference Richard Abramowitz Glass Recycling MRN/SWANA-Mid Atlantic Annual Conference June 9 & 20, 204 Outline Who We Are Glass Industry Background What We Do - Create a Value Stream The Structural Deficit in Glass

More information

Democracy in a Digital World. flickr: Jason Howie

Democracy in a Digital World. flickr: Jason Howie Democracy in a Digital World flickr: Jason Howie Value Skills IT Government Tools Mainframe Computing Personal Computing Internet Self-service Program-server Automation Re-engineering Remediation Consolidation

More information

State Population Yes No.Alabama 4,822,023 2 Alabama: Sessions (R-AL), Nay.Alaska 731,449 2 Alaska: Begich (D-AK), Nay.Arizona 6,553, Arizona:

State Population Yes No.Alabama 4,822,023 2 Alabama: Sessions (R-AL), Nay.Alaska 731,449 2 Alaska: Begich (D-AK), Nay.Arizona 6,553, Arizona: State Population Yes No.Alabama 4,822,023 2 Alabama: Sessions (R-AL), Nay.Alaska 731,449 2 Alaska: Begich (D-AK), Nay.Arizona 6,553,255 1 1 Arizona: Flake (R-AZ), Nay.Arkansas 2,949,131 2 Arkansas: Boozman

More information

ARRL UHF and Above Contest Details

ARRL UHF and Above Contest Details ARRL UHF and Above Contest Details 1. Objective: To work as many amateur stations as possible using authorized amateur frequencies in the bands of 222 MHz through 250 GHz using any authorized modes of

More information

Learning Lessons from the Past Power System Blackouts and using Advanced System Technologies to prevent future ones

Learning Lessons from the Past Power System Blackouts and using Advanced System Technologies to prevent future ones Learning Lessons from the Past Power System Blackouts and using Advanced System Technologies to prevent future ones Presented by: Bharat Bhargava Consulting Engineer Advanced Power System Technologies,

More information

List of Allocation Recipients

List of Allocation Recipients List of Allocation Recipients CDFI Fund 601 Thirteenth Street, NW, Suite 200, South, Washington, DC 20005 (202) 622-8662 9 2010 New s Tax Credit Program: List of s Name of Advantage Capital Fund, AI Wainwright

More information

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation

More information

Journal Article Download Ads

Journal Article Download Ads Journal Article Download Ads $ To hit your target, focus your aim 2018 MEDIA KIT What is a Journal Article Download? The Journal Article Download Within the AIP Publishing suite of journals, journal article

More information

STATE AGENCIES FOR SURPLUS PROPERTY

STATE AGENCIES FOR SURPLUS PROPERTY SUPP 1 DoD 4160.21-M STATE AGENCIES FOR SURPLUS PROPERTY ALABAMA CALIFORNIA Surplus Division California State for 4401 Northern By-Pass Surplus P.O. BOX 210487 701 Burning Tree Road Montgomery, AL 36121-0487

More information

Acknowledging Jackson s Challenges for Growth The Significance of People & Place

Acknowledging Jackson s Challenges for Growth The Significance of People & Place Acknowledging Jackson s Challenges for Growth Updated 07/29/15 The Enterprise Group of Jackson, Inc. (EG) is the economic development agency supporting all of Jackson County. The Enterprise Group of Jackson,

More information

INSTALLATION AND SERVICE INSTRUCTIONS I.D. AND O.D. GRIP COLLET CHUCKS

INSTALLATION AND SERVICE INSTRUCTIONS I.D. AND O.D. GRIP COLLET CHUCKS INSTALLATION AND SERVICE INSTRUCTIONS I.D. AND O.D. GRIP COLLET CHUCKS WWW.FORKARDT.US Main Office 2155 Traversefield Drive Traverse City, Mi. 49686 E-mail: sales@forkardt.us 800-544-3823 Toll Free 231-995-8300

More information

BendixKing Sales Bulletin. KX165A w/8.33khz Channel Spacing Promotion

BendixKing Sales Bulletin. KX165A w/8.33khz Channel Spacing Promotion BendixKing Sales Bulletin HSB 2016BK-10 Rev A ATTENTION AVIONICS SALES MANAGER KX165A w/8.33khz Channel Spacing Promotion BendixKing is pleased to offer a price discount and trade-in promotion for the

More information

Regional Innovation Ecosystems:

Regional Innovation Ecosystems: Regional Innovation Ecosystems: The Role of the University in Fostering Economic Growth Ross DeVol Chief Research Officer Milken Institute Caltech Giant High Level Forum, Leading Innovation Ecosystems

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Network Infrastructure Products for Harsh Environments

Network Infrastructure Products for Harsh Environments Salt Fog Qualified Products TK-21KMD TK-205ME CM-80KD CA-84KD Network Infrastructure Products for Harsh Environments Microlab s product line for harsh outdoor applications have been designed to protect

More information

Characteristics of Competitive Places: Changing Models of Economic Dynamism

Characteristics of Competitive Places: Changing Models of Economic Dynamism Characteristics of Competitive Places: Changing Models of Economic Dynamism IEDC/IASP 2009 Conference Technology-Led Economic Development World Science and Technology Park Research Triangle Park, NC June

More information

any questions I had after the job was done, they didn't just vanish after the bill was paid. To edit this sidebar, go to admin backend's.

any questions I had after the job was done, they didn't just vanish after the bill was paid. To edit this sidebar, go to admin backend's. Cal painters quizno santa monica california Best Painters in Santa Monica, CA - Dream Painter Santa Monica, Steve Roddey Painting & Decorating, Casa Painting Services, CertaPro Painters of Santa. Hire

More information

Third Grade. Name Week of September 15-19th. News

Third Grade. Name Week of September 15-19th. News Third Grade Name Week of September 15-19th Monday 9-15-14 Tuesday 9-16-14 Wednesday 9-17-14 Thursday 9-18-14 Math- Bar Graphs Language Arts- Math Problems Reading 20 minutes Math- Bar Graph Social Studies-

More information

IXYS. Preliminary. MX841 White LED Step-Up Converter. Features: General Description. Applications: Ordering Information

IXYS. Preliminary. MX841 White LED Step-Up Converter. Features: General Description. Applications: Ordering Information MX841 White LED Step-Up Converter Features: 1.1V to 5.5V Input Range 2 Amp Peak Switch Current High Efficiency > 80% 20V Maximum Output with Over-Voltage Protection LED Intensity Control 1.0 MHz Fixed

More information

Mourning Dove Breeding Population Status, 2001

Mourning Dove Breeding Population Status, 2001 University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln US Fish & Wildlife Publications US Fish & Wildlife Service 2001 Mourning Dove Breeding Population Status, 2001 David D.

More information

Saving Lives and Saving Money: Transforming Health in the 21 st Century to Achieve 100% Insurance Coverage

Saving Lives and Saving Money: Transforming Health in the 21 st Century to Achieve 100% Insurance Coverage Saving Lives and Saving Money: Transforming Health in the 21 st Century to Achieve 100% Insurance Coverage Newt Gingrich Founder The Center for Health KEYS TO REAL CHANGE Doing more of what you are already

More information

Slow Coherency Based Controlled Islanding in Large Power Systems

Slow Coherency Based Controlled Islanding in Large Power Systems Slow Coherency Based Controlled Islanding in Large Power Systems Vijay Vittal Ira A. Fulton Chair Professor Department of Electrical Engineering Arizona State University PSERC Webinar February 18, 2014

More information

The University of North Carolina at Chapel Hill. Kenan-Flagler Business School. Full-Time MBA Recruiting Guide

The University of North Carolina at Chapel Hill. Kenan-Flagler Business School. Full-Time MBA Recruiting Guide 2014 The University of North Carolina at Chapel Hill Kenan-Flagler Business School Full-Time MBA Recruiting Guide. FULL-TIME MBA FULL-TIME CLASS OF 2016 AT A MBA GLANCE CLASS OF 2016 AT A GLANCE We believe

More information

M08J. CNC Lathe Speed, Accuracy, Rigidity

M08J. CNC Lathe Speed, Accuracy, Rigidity M08J CNC Lathe Speed, Accuracy, Rigidity 2 - Axis Turning Center Small Footprint Machine Extreme Rigidity Value-Priced, Fast ROI Numerous Features THE RIGHT INGREDIENTS FOR SUCCESS Capability The M08J

More information

The Danish-American Entrepreneurship Summit

The Danish-American Entrepreneurship Summit The Danish-American Entrepreneurship Summit Insights Into the US Venture Capital Markets How to Create A Winning Strategy? Clare Fairfield Do Innovation Development Systems Matter? In 2003, venture backed

More information

LOVE SO MUCH PERFECT WE WANT EACH ONE TO BE YOUR PARTS OUR PEOPLE LOVE YOUR PARTS. In this Brochure:

LOVE SO MUCH PERFECT WE WANT EACH ONE TO BE YOUR PARTS OUR PEOPLE LOVE YOUR PARTS. In this Brochure: WE LOVE YOUR PARTS SO MUCH WE WANT EACH ONE TO BE PERFECT Monith Uk Miyano Department Leader In this Brochure: Performance Products for You Solid Pins: Stronger Hold is Our Goal Threaded Inserts: The Beauty

More information

Blackout Theory. EE8725 Apoorva Mysore Nataraja

Blackout Theory. EE8725 Apoorva Mysore Nataraja Blackout Theory EE8725 Apoorva Mysore Nataraja 1 Northeast Blackout of 2003 2 Major power outages in history Blackouts People affected (millions) Location Date July 2012 India blackout 620 India 30-31

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

NVESTIGATIONS OF RECENT BLACK-

NVESTIGATIONS OF RECENT BLACK- DIGITAL VISION outs indicate that the root cause of almost all major power system disturbances is voltage collapse rather than the underfrequency conditions prevalent in the blackouts of the 1960s and

More information

B0205-III & B0206-III

B0205-III & B0206-III B0205-III & B0206-III CNC Precision Automatic Lathe Speed, Accuracy, Rigidity 20mm Capacity Swissturn Designed For Superior Flexibility Electronic Integral Motor Guide Bushing Easy Access Tool Zone Front

More information

Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste. Epinephrine Salts. Medicinal Nitroglycerine

Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste. Epinephrine Salts. Medicinal Nitroglycerine Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste Following is a list of each state and whether or not they are consistent with the EPA s stance on Epinephrine Salts, Medicinal Nitroglycerine

More information

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Real Time Stability Analysis at Peak Reliability Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Overview: Overview of Peak s DSA Application; o Set up o User Cases Transient Stability Criteria; TSAT

More information

DCN Inquiry Response

DCN Inquiry Response DCN 7695 9 August 2005 Inquiry Response Re: BI-0193,CT-0818, Leases/Land Ownership at ANG Facilities Requester: Mr. Ken Small (BRAC Commission Staff) Question: Please provide a list or table that identified

More information

SBA s Certificate of Competency (COC) Program What, How, When (and even a little why)

SBA s Certificate of Competency (COC) Program What, How, When (and even a little why) SBA s Certificate of Competency (COC) Program What, How, When (and even a little why) Hosts Christopher Eischen, Procurement Center Representative SBA Office of Government Contracting, Area IV, Kansas

More information

S205/S206 LaserSwiss. Combine CNC Laser Cutting with Swiss Machining. Imagine the Possibilities...

S205/S206 LaserSwiss. Combine CNC Laser Cutting with Swiss Machining. Imagine the Possibilities... S205/S206 LaserSwiss Combine CNC Laser Cutting with Swiss Machining Imagine the Possibilities... Fully Integrated Laser Cutting System Full Swiss Machining Capability Through-Part Coolant Automatic Part

More information

BW129Z & BW209Z. CNC Precision Automatic Lathe. Speed, Accuracy, Rigidity

BW129Z & BW209Z. CNC Precision Automatic Lathe. Speed, Accuracy, Rigidity BW129Z & BW209Z CNC Precision Automatic Lathe Speed, Accuracy, Rigidity 12 mm & 20 mm Capacity Swissturn 9-Axis Machining Intelligent High Speed Spindle 28 tools Fanuc 31i-B CNC THE RIGHT INGREDIENTS FOR

More information

Health Impact Assessment (HIA) & Transportation

Health Impact Assessment (HIA) & Transportation Health Impact Assessment (HIA) & Transportation Keshia Pollack, PhD, MPH Associate Professor, Department of Health Policy & Management Johns Hopkins Bloomberg School of Public Health July 15, 2014 Professional

More information

Transmission Availability Data System Definitions

Transmission Availability Data System Definitions Table of Contents Transmission Availability Data System Definitions February 1, 2018 1 of 31 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

Power System Protection Where Are We Today?

Power System Protection Where Are We Today? 1 Power System Protection Where Are We Today? Meliha B. Selak Power System Protection & Control IEEE PES Distinguished Lecturer Program Preceding IEEE PES Vice President for Chapters melihas@ieee.org PES

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

Media Insiders Panel Sweepstakes

Media Insiders Panel Sweepstakes The Prize winners for Q4 2013 are: Media Insiders Panel Sweepstakes First Name Last Name State/Prov Prize Description Wingchau C NY MONTHLY PRIZES - Tango Card Sharena W FL MONTHLY PRIZES - Tango Card

More information

Industrial Conference 2013 Thursday, November 14, 2013

Industrial Conference 2013 Thursday, November 14, 2013 Goldman Sachs Industrial Conference 2013 Thursday, November 14, 2013 SINGLE SOURCE INTERMODAL DEDICATED FINAL MILE TRUCKLOAD LESS THAN TRUCKLOAD REFRIGERATED FLATBED EXPEDITED Disclosure This presentation

More information

Islanding and Detection of Distributed Generation Islanding using Negative Sequence Component of Current

Islanding and Detection of Distributed Generation Islanding using Negative Sequence Component of Current http:// and Detection of Distributed Generation using Negative Sequence Component of Current Doan Van Dong Danang College of Technology, Danang, Vietnam Abstract - There is a renewed interest in the distributed

More information

In addition to wide-area monitoring systems, synchrophasors offer an impressive range of system benefits, including:

In addition to wide-area monitoring systems, synchrophasors offer an impressive range of system benefits, including: Synchrophasors Before synchrophasor technology and its contributions towards transmission resiliency are discussed, it is important to first understand the concept of phasors. A phasor is a complex number

More information

Local and Wide-Area Network Protection Systems Improve Power System Reliability

Local and Wide-Area Network Protection Systems Improve Power System Reliability Local and Wide-Area Network Protection Systems Improve Power System Reliability A. Guzmán, D. Tziouvaras, and E. O. Schweitzer Schweitzer Engineering Laboratories, Inc. Ken E. Martin Bonneville Power Administration

More information

No. Name State Pet Area

No. Name State Pet Area No. Name State Pet Area 0054 TA Mobile AL YES 0111 TA Montgomery AL YES 0260 TA Lincoln AL YES 0319 Petro Bucksville AL YES 0348 Petro Shorter AL YES 0352 Petro Gadsden AL YES 0397 Petro Dodge City AL

More information

Think it. Make it. Ship it.

Think it. Make it. Ship it. Think it. Make it. Ship it. COMPUTER & ELECTRONIC INDUSTRY Greater Portland is widely regarded as Silicon Forest due to key assets and industry strength. INDUSTRY STRENGTH INFRASTRUCTURE WORKFORCE The

More information

Clear Roads Overview and Highlights

Clear Roads Overview and Highlights Clear Roads Overview and Highlights AASHTO SCOM / TRB Maintenance Conference July 20, 2015 Des Moines, Iowa Justin Droste, P.E. Roadway Operations Engineer, Michigan DOT Clear Roads Technical Advisory

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

P.1. Size: 130mm(W) x 182mm(H) Model M024 ( ) 8pages. Atomic Clock. With Wireless Outdoor and Indoor Temperature Instruction Manual

P.1. Size: 130mm(W) x 182mm(H) Model M024 ( ) 8pages. Atomic Clock. With Wireless Outdoor and Indoor Temperature Instruction Manual P.1 Size: 130mm(W) x 182mm(H) Model M024 (8733+6724) 8pages Atomic Clock PM M O N T H D A T E D A Y I N D O O R O U T D O O R With Wireless Outdoor and Indoor Temperature Instruction Manual P.2 The ATOMIC

More information

Larry Katzenstein Partner

Larry Katzenstein Partner Larry Katzenstein Partner St. Louis 314 552 6187 direct 314 552 7187 fax lkatzenstein@ Presentations 2013 Skills Training for Estate Planners; New York Law School, July 18-19, 2013 ALI-CLE Program Estate

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y

CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y CONSOLIDATED EDISON CO. OF NEW YORK, INC 4 IRVING PLACE NEW YORK, N.Y. 10003 EP 7000 5 JULY 2009 VOLTAGE SCHEDULE, CONTROL, AND OPERATION OF THE TRANSMISSION SYSTEM PURPOSE This specification describes

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

Clear Roads Overview. National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA

Clear Roads Overview. National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA Clear Roads Overview National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA Overview Clear Roads Winter Highway Operations Pooled Fund, TPF-5(353), is a national research consortium

More information

MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above

MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above March 13, 2018 Issued by: Dehn Stevens, Director System Planning and Services 1.0 SCOPE This document defines the criteria

More information

POWER SYSTEM OSCILLATIONS

POWER SYSTEM OSCILLATIONS Chapter 2 POWER SYSTEM OSCILLATIONS 2.1 Introduction Oscillations in power systems are classified by the system components that they effect. Some of the major system collapses attributed to oscillations

More information

U.S. Fish & Wildlife Service Mourning Dove

U.S. Fish & Wildlife Service Mourning Dove U.S. Fish & Wildlife Service Mourning Dove Population Status, 2018 Mourning Dove Population Status, 2018 U.S. Fish and Wildlife Service Branch of Assessment and Decision Support 11510 American Holly Drive

More information

VBGS CD Library. Last update: 11/2/09 1 of 5

VBGS CD Library. Last update: 11/2/09 1 of 5 CD# TITLE TYPE AREA 4 Marriage Index: MD, NC, VA Virginia, West Va., Maryland, Delaware 121 Military Records, VA in the Rev. and War of 1812 Virginia, West Va., Maryland, Delaware 133 Military Records:

More information

Phasor Measurements for Blackout Prevention

Phasor Measurements for Blackout Prevention Phasor Measurements for Blackout Prevention Anjan Bose Washington State University Pullman, WA, USA i-pcgrid 2013 San Francisco, CA March 26-28, 2013 Monitoring the Power Grid (SCADA) Visualization Tables

More information

Operationalizing Phasor Technology

Operationalizing Phasor Technology ELECTRIC POWER GROUP WEBINAR SERIES Operationalizing Phasor Technology Operationalizing Phasor Technology System Events Deciphering the Heartbeat of the Power Grid July 16, 2013 Webinar John W. Ballance

More information

Deployment and Initial Experience with Oscillation Detection Application at Bonneville Power Administration

Deployment and Initial Experience with Oscillation Detection Application at Bonneville Power Administration Deployment and Initial Experience with Oscillation Detection Application at Bonneville Power Administration Dmitry Kosterev, Ashley Donahoo, Nick Leitschuh BPA Jeff Dagle, Frank Tuffner PNNL Dan Trudnowski

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

THE NATION OF CALIFORNIA: alive again in 2010?

THE NATION OF CALIFORNIA: alive again in 2010? A thought to ponder More than any other time in history, mankind faces a crossroads. One path leads to despair and utter hopelessness. The other, to total extinction. Let us pray we have the wisdom to

More information

Fourth Round 2006 New Markets Tax Credit Allocations

Fourth Round 2006 New Markets Tax Credit Allocations Fourth Round 2006 New Markets Tax Credit Allocations Name of Allocatee Location Service Area Market Financing Activity Award Amount Advantage Capital Community Development Fund, American Community Renewable

More information

( ) usable, minor formatting/editing required ( ) modification needed ( ) superseded by ( ) other ( ) obsolete/archived)

( ) usable, minor formatting/editing required ( ) modification needed ( ) superseded by ( ) other ( ) obsolete/archived) Document name Category Model Validation Report for May 16, 2014 RAS Event ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy ( ) Guideline (X) Report or other ( ) Charter Document date

More information

SPEAKERS BUREAU. Disclaimer

SPEAKERS BUREAU. Disclaimer The SCHC has established an Outreach Speakers Bureau on the Globally Harmonized System of Classification and Labeling of Chemicals (GHS). The Speaker s Bureau is a list of members who have volunteered

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

Power System Stability. Course Notes PART-1

Power System Stability. Course Notes PART-1 PHILADELPHIA UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT Power System Stability Course Notes PART-1 Dr. A.Professor Mohammed Tawfeeq Al-Zuhairi September 2012 1 Power System Stability Introduction Dr.Mohammed

More information

Reflections on stability technology for reducing risk of system collapse due to cascading outages

Reflections on stability technology for reducing risk of system collapse due to cascading outages J. Mod. Power Syst. Clean Energy (2014) 2(3):264 271 DOI 10.1007/s40565-014-0067-x Reflections on stability technology for reducing risk of system collapse due to cascading outages Yongjie FANG (&) Abstract

More information

Practical PMU Applications for Utilities

Practical PMU Applications for Utilities Practical PMU Applications for Utilities University of Washington EE Graduate Seminar November 1 st, 2012 Manu Parashar Douglas Wilson SynchroPhasor Technology Phasor Measurement Units (PMUs) Next generation

More information

EE 742 Power System Components. Y. Baghzouz ECE Department UNLV

EE 742 Power System Components. Y. Baghzouz ECE Department UNLV EE 742 Power System Components Y. Baghzouz ECE Department UNLV Desire to have a system with high reliability and power quality High reliability ensured by High quality of components High level of system

More information

1

1 www.icomamerica.com 1 Welcome to the World of Ham Radio! Thank you for your interest in The Adventures of Zack and Max - The Odyssey Begins. This is your first step in discovering the excitement of amateur

More information

Infection Control The Power of Integration

Infection Control The Power of Integration Infection Control The Power of Integration Stacy Norris, RN, BSN Midas+ Clinical Product Manager Infection Prevention Over the last several years, regulatory demands, both state and federal, have increased

More information

Operational Modeling and Model Inputs

Operational Modeling and Model Inputs Operational Modeling and Model Inputs Robert W. Cummings Director, Reliability Initiatives and System Analysis NASPI Model Validation Workshop July 11, 2013 Importance of Modeling If something in not modeled,

More information

May 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_

May 30, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme Docket No. RM15-13-_ May 30, 2018 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to for the Revised Definition of Remedial Action

More information

TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line

TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line Vince Leung March 27, 2017 Reviewed by Johnny Nguyen Table of Contents Background 2 Objective 3 Base Case Assumptions

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

Arrowhead Station Special Equipment Operation. Dudley Maki Minnesota Power

Arrowhead Station Special Equipment Operation. Dudley Maki Minnesota Power Arrowhead Station Special Equipment Operation Dudley Maki Minnesota Power Arrowhead - Equipment Operation Non-Standard Equipment at Arrowhead 345 kv Phase Shifting Transformer (8TR) Voltage Regulating

More information

A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants

A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several

More information

Designing For a Critical Load using a Spot Network

Designing For a Critical Load using a Spot Network This is a photographic template your photograph should fit precisely within this rectangle. Designing For a Critical Load using a Spot Network Tony Oruga, P.E. Product and Sales Manager Network Protectors

More information

CONNECTING to the TRANSMISSION GRID in TODAY S RTO WORLD

CONNECTING to the TRANSMISSION GRID in TODAY S RTO WORLD CONNECTING to the TRANSMISSION GRID in TODAY S RTO WORLD Mike Londo, Transmission Reliability Administrator 2018 WPUI RTO conference UW-Madison, WI atcllc.com Objectives Explain the need for a Straits

More information

Montclair State University; Research Methods: Spring 2015 ON INEQUALITY: MEASUREMENT AND OTHER ISSUES

Montclair State University; Research Methods: Spring 2015 ON INEQUALITY: MEASUREMENT AND OTHER ISSUES Montclair State University; Research Methods: Spring 2015 ON INEQUALITY: MEASUREMENT AND OTHER ISSUES WHAT IS INEQUALITY? If there were in the world today any large number of people who desired their own

More information

A. df/dt Measurement principle by relays

A. df/dt Measurement principle by relays Adaptive df/dt Relay-A case study with reference to the Indian Power System P.Pentayya, U.K Verma, P. Mukhopadhyay, Gopal Mitra, S.Bannerjee, M.Thakur*, S.Sahay Abstracts: df/dt relays are used in the

More information

Online Oscillation Management at ISO New England

Online Oscillation Management at ISO New England NASPI. SEPTEMBER 27,2017 Online Oscillation Management at ISO New England SLAVA MASLENNIKOV XIAOCHUAN LUO FRANKIE ZHANG IZUDIN LELIC EUGENE LITVINOV PMU Infrastructure at ISO New England Installed in 2012