1 Arc Flash Study Principles & Procedures for below 15 kv AC Systems Xuan Wu, Dennis Hoffman, Ronald Wellman, and Manish Thakur

2 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

3 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

4 OSHA Requirements Requirement 1: employer must make a reasonable estimate Requirement 2: outer layer must be flame resistant (FR) Requirement 3: rating of arc-rated clothing must be greater than the estimated incident energy

5 Incident Energy Variations Incident energy values can vary significantly between stations, and between equipment inside the same station due to various system configuration, high-side/ low-side clearing devices, fuse amperage ratings and their timings, transformer impedance, cable length/material, etc.

6 Require appropriate PPE for a possible Arc Flash Event, e.g. Class 2 PPE is necessary for 4.1~8 cal/cm 2 and Class 3 PPE is necessary for 8.1~20 cal/cm 2. Relationship to PPEs

7 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

8 What is Arc Flash Arc flash from electrical faults on the low-side of distribution (< 15 kv) or station AC service circuits ( 480 V) are possible safety hazards that drive safe work practices, personal protective equipment requirements for substation workers, and relay and other overcurrent protection settings and practices. Manikin test arc flash hazard demonstration [3]

9 How & When to Analyze Arc Flash ASPEN using the IEEE-1584 method is the main tool to calculate the incident energy values. The incident energy threshold: 8 cal/cm 2 for open air; 4 cal/cm 2 for switchgear. In AEP, the arc flash study is triggered by a transmission project to build a brand-new substation or modify an existing substation.

10 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

11 Distribution Station High-Side Clearing Devices Arc Duration (s) Incident Energy (cal/cm 2 ) Fuse SMD-2C ( ) Circuit Switcher

12 Station AC Service

13 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

14 Engineering Flowchart

15 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

16 Original Model

17 Arc Flash Model

18 Incident Energy Calculator

19 Results Incident Energy (cal/cm 2 ) Risk Locations FRN-R MCM KTN-R MCM FRN-R MCM FRN-R MCM Safety Switch Cabinet Transfer Switch Cabinet Control Building Panels Power Transformer Panels

20 Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations & Mitigation Plans Arc Flash Study Methodology Case Study Conclusions

21 Conclusions This paper describes AEP s principles and procedures of conducting arc flash analysis for both distribution and station AC service applications. IEEE-1584 method, which is built inside ASPEN software, is mainly used to calculate risk location incident energy values for below 15 kv systems.

22 Conclusions (Cont.) If the calculated incident energy value is above the corresponding threshold, changing the high-side clearing device for the distribution systems and the low-side fuse for the station AC service systems are typically recommended. The calculated incident energy values will also be used to determine corresponding safe work practices, personal protective equipment requirements, protective relaying settings, and other practices.

23

REDUCING ARC FLASH HAZARD BY REMOTE SWITCHING

REDUCING ARC FLASH HAZARD BY REMOTE SWITCHING The Electrical Power Engineers Qual-Tech Engineers, Inc. 21 Johnson Road Building #1 Suite 23 Houston, PA 15342-13 Phone 724-873-9275 Fax 724-873-891 www.qualtecheng.com REDUCING ARC FLASH HAZARD BY REMOTE

More information

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com ARC FLASH PPE GUIDELINES FOR

More information

Electrical Arc Hazards

Electrical Arc Hazards Arc Flash Analysis 1996-2009 ETAP Workshop Operation Notes Technology, 1996-2009 Inc. Operation Workshop Technology, Notes: Arc Inc. Flash Analysis Slide 1 Electrical Arc Hazards Electrical Arcs can occur

More information

Cause, Effect & Mitigation Strategies

Cause, Effect & Mitigation Strategies WSU HANDS ON RELAY SCHOOL 2019 Arc Flash Fault Cause, Effect & Mitigation Strategies Joe Xavier, Technical Manager West Region Arc Flash Fault - Agenda What is an Arc Flash? Why and when does Arc Flash

More information

Arc Flash Analysis Training

Arc Flash Analysis Training Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is

More information

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013 Arc Flash Mitigation An Overview Gus Nasrallah, P.E. Electroswitch May 30, 2013 Agenda Origin of Modern Arc Flash studies Why Now more than before NFPA 70E Standards Protection Zone IEEE 1584 2002 IEEE

More information

Selection of PPE Practical experience of different arc assessment methods and their comparison

Selection of PPE Practical experience of different arc assessment methods and their comparison Selection of PPE Practical experience of different arc assessment methods and their comparison Dr.-Ing. Thomas Jordan Markus Kauschke Slide 1 ICOLIM 2017 Selection of Arc Flash PPE BSD Electrical Safety

More information

THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA

THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA Witnessed by: Jim Phillips, PE, Consultant Craig DeRouen, ERMCO Director

More information

First Draft Language

First Draft Language 110.16 First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1) Nominal system voltage (2) Arc flash boundary (3)

More information

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or

More information

Arc Flash Analysis and Documentation SOP

Arc Flash Analysis and Documentation SOP Arc Flash Analysis and Documentation SOP I. Purpose.... 2 II. Roles & Responsibilities.... 2 A. Facilities Maintenance (FM).... 2 B. Zone Supervisors/ Shop Foremen... 2 C. PMCS & CPC... 2 III. Procedures...

More information

Steve Kovach District Sales Engineer

Steve Kovach District Sales Engineer Steve Kovach District Sales Engineer 630-740-7463 Steveekovach@Eaton.com Institute of Electrical and Electronics Engineers American Society of Safety Engineers 1 Electrical Hazards Electrical Hazards Shock

More information

A Guide to Establish an Arc Flash Safety Program for Electric Utilities

A Guide to Establish an Arc Flash Safety Program for Electric Utilities A Guide to Establish an Arc Flash Safety Program for Electric Utilities by Craig Clarke, P.E. Eaton Corporation 50 Soccer Park Rd. Fenton, MO 63026 (636) 717-3406 CraigClarke@Eaton.com Ilanchezhian Balasubramanian,

More information

{40C54206-A3BA D8-8D8CF }

{40C54206-A3BA D8-8D8CF } Informative Annex D Incident Energy and Arc Flash Boundary Calculation Methods This informative annex is not a part of the requirements of this NFPA document but is included for informational purposes

More information

2015 NFPA 70E. SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation

2015 NFPA 70E. SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation 2015 NFPA 70E SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation Introduction Jeffrey A. Pugh, P.E. Pugh Engineering LLC Bachelor of Science Degrees in Electrical Engineering and Computer

More information

OSHA & Arc Flash. Scott Ray Distribution Project Engineer POWER Engineers, Inc.

OSHA & Arc Flash. Scott Ray Distribution Project Engineer POWER Engineers, Inc. OSHA & Arc Flash Scott Ray Distribution Project Engineer POWER Engineers, Inc. Outline Arc Flash Overview OSHA Overview Arc Flash Study Next Steps Why This Method? Questions Methodology Steps Analysis

More information

Arc Flash and NFPA 70E

Arc Flash and NFPA 70E Arc Flash and NFPA 70E Presented by: J.D. Kyle Safe Work Practices Wearing Proper PPE? OSHA 1910.333 (a) (1) not to work hot or live except : 1. De energizing introduces additional or increased hazards

More information

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition NFPA-70E Standard for Electrical Safety in the Workplace 2015 Edition NFPA-70E 90.1 Purpose. The purpose of this standard is to provide a practical safe working area for employees relative to the hazards

More information

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash

More information

ARC FLASH & PPE UPDATE. Michael Olivo, P.E. Aaron Ramirez, E.I.T.

ARC FLASH & PPE UPDATE. Michael Olivo, P.E. Aaron Ramirez, E.I.T. ARC FLASH & PPE UPDATE Michael Olivo, P.E. Aaron Ramirez, E.I.T. What is Arc Flash? Arc Flash is the release of heat and light produced when electrical current flows through an air gap between two conductors

More information

Webinar: An Effective Arc Flash Safety Program

Webinar: An Effective Arc Flash Safety Program Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of

More information

How OSHA s New Transient Overvoltage Requirements Affect Work Practices. B.A. YEUNG, H. BRANCO Leidos Engineering, LLC USA

How OSHA s New Transient Overvoltage Requirements Affect Work Practices. B.A. YEUNG, H. BRANCO Leidos Engineering, LLC USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium How OSHA s New Transient Overvoltage Requirements Affect Work Practices B.A. YEUNG,

More information

NATIONAL ELECTRIC SAFETY CODE 2012 EDITION

NATIONAL ELECTRIC SAFETY CODE 2012 EDITION NATIONAL ELECTRIC SAFETY CODE (ANSI C2 / NESC) 2012 EDITION Jim Tomaseski IBEW Director of Safety and Health EEI Safety and Health Committee Conference NESC 2012 IMPORTANT DATES SEPTEMBER 1, 2009 - Preprint

More information

DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE

DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE William Cantor, P.E. TPI Exton, PA 19341 Phil Zakielarz TPI Exton, PA 19341 Mario Spina Verizon Wireless Uniontown, OH 44685 Abstract

More information

Paul Dobrowsky Innovative Technology Services

Paul Dobrowsky Innovative Technology Services Significant Changes to NFPA 70E -2009 Edition Paul Dobrowsky Innovative Technology Services 2008 IEEE PCIC 1 Repeat Presentation This has been previously presented 2008 IEEE Electrical Safety Workshop

More information

Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010

Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010 Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010 Paul Bellomo June 14-16, 2010 2nd Workshop on Power Converters for Particle Accelerators - Arc

More information

Arc Flash Calculation Methods

Arc Flash Calculation Methods Arc Flash Calculation Methods Course No: E04-033 Credit: 4 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F:

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

ARC FLASH HAZARD ANALYSIS AND MITIGATION

ARC FLASH HAZARD ANALYSIS AND MITIGATION ARC FLASH HAZARD ANALYSIS AND MITIGATION J.C. Das IEEE PRESS SERIES 0N POWER ENGINEERING Mohamed E. El-Hawary, Series Editor IEEE IEEE PRESS WILEY A JOHN WILEY & SONS, INC., PUBLICATION CONTENTS Foreword

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

Electrical Measurement Safety. Sponsored By:

Electrical Measurement Safety. Sponsored By: Electrical Measurement Safety Sponsored By: About the Viewer Panel Slides: Go to the Links tab at the top and click on the link to download the PDF of the slides If you re watching the archive version,

More information

NOTICE ER Roland Flood Pumping Station Arc Flash Study

NOTICE ER Roland Flood Pumping Station Arc Flash Study NOTICE This document contains the expression of the professional opinion of SNC-Lavalin Inc. (SLI) as to the matters set out herein, using its professional judgment and reasonable care. It is to be read

More information

Education & Training

Education & Training Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

The advantages of transformers. EMC-ESD in de praktijk Jan-Kees van der Ven

The advantages of transformers. EMC-ESD in de praktijk Jan-Kees van der Ven The advantages of transformers EMC-ESD in de praktijk 09-11-2016 Jan-Kees van der Ven Introduction RH Marine Additional benefits Common mode reduction LF Harmonic reduction Common mode reduction HF Fault

More information

DESIGN STANDARD DS 29

DESIGN STANDARD DS 29 Assets Delivery Group Engineering DESIGN STANDARD DS 29 VERSION 1 REVISION 2 MAY 2018 FOREWORD The intent of Design Standards is to specify requirements that assure effective design and delivery of fit

More information

Arc Hazard Assessment for DC Applications in the Transit Industry

Arc Hazard Assessment for DC Applications in the Transit Industry Arc Hazard Assessment for DC Applications in the Transit Industry Kenneth S.Y. Cheng Kinectrics Inc. Toronto, Canada Stephen L. Cress Kinectrics Inc. Toronto, Canada Donald J. Minini Excalibur Associates,

More information

CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS

CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS by Abdeslem Kadri Bachelor of Engineering, Boumerdes University INELEC, 1996 A thesis presented to

More information

APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY

APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY Copyright Material IEEE Paper No. PCIC-2006-2 George Gregory Kevin J. Lippert Fellow Member, IEEE Senior Member, IEEE Schneider Electric

More information

COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS

COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS Joost Vrielink Hans Picard Wilbert Witteman Eaton Eaton SABIC-IP Europalaan 202 7559 SC Hengelo Europalaan 202 7559 SC Hengelo Plasticslaan

More information

Arc Flash Hazard Standards:

Arc Flash Hazard Standards: Arc Flash Hazard Standards: The Burning Question Presented by Sesha Prasad Specialist Power System Engineer Welcon Technologies At IDC Electrical Arc Flash Forum Melbourne April 14th & 15th 2010. Session

More information

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis 1 Summary 1.1 Provide a complete Arc Flash Hazard Analysis for the project indicated in the accompanying RFP. The Analysis may be performed: independent of the construction project in concert with the

More information

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Distance Protection for Distribution Feeders Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Why use distance protection for distribution feeders? Distance protection is mainly used for protecting

More information

STANDARDIZING ARC FLASH PPE LABELS

STANDARDIZING ARC FLASH PPE LABELS The Electrical Power Engineers Qual-Tech Engineers, Inc. 01 Johnson Road Building #1 Suite 03 Houston, PA 1534-1300 Phone 74-873-975 Fax 74-873-8910 www.qualtecheng.com STANDARDIZING ARC FLASH PPE LABELS

More information

S&C Vista Underground Distribution Switchgear Outdoor Distribution

S&C Vista Underground Distribution Switchgear Outdoor Distribution The offers superior overcurrent coordination. Among the features that provide excellent overcurrent coordination are unique coordinating speed tap and main time-current characteristic curves, which provide

More information

Electric Arc and associated Hazards in the Rail Transit Industry Are we up to date with current developments?

Electric Arc and associated Hazards in the Rail Transit Industry Are we up to date with current developments? Electric Arc and associated Hazards in the Rail Transit Industry Are we up to date with current developments? Dev Paul, P.E. AECOM Oakland, CA Abstract: Electrical arcing faults are inherent characteristics

More information

Ft Worth IEEE-PES. Presented by: Doug Harris Specifications Engineer Dallas, TX. Arc-Flash Hazard Mitigation & Selectivity

Ft Worth IEEE-PES. Presented by: Doug Harris Specifications Engineer Dallas, TX. Arc-Flash Hazard Mitigation & Selectivity Ft Worth IEEE-PES Presented by: Doug Harris Specifications Engineer Dallas, TX Arc-Flash Hazard Mitigation & Selectivity Electrical hazards Energized circuit/conductor Today s power system engineer must

More information

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Adam T. Powell, PE President Emerald Engineering, Inc. Jeffrey L. Small, Sr. Senior

More information

ADVANCES IN INDUSTRIAL SUBSTATION DESIGN USING THREE WINDING POWER TRANSFORMERS

ADVANCES IN INDUSTRIAL SUBSTATION DESIGN USING THREE WINDING POWER TRANSFORMERS ADVANCES IN INDUSTRIAL SUBSTATION DESIGN USING TREE WINDING POWER TRANSFORMERS Copyright Material IEEE Paper No. PCIC-2008-XX Doug Brooks P.Eng Don Morency P.Eng. Pascal Tang P.Eng Senior Member, IEEE

More information

SECTION POWER SYSTEMS STUDIES

SECTION POWER SYSTEMS STUDIES PART 1 - GENERAL 1.1 RELATED SECTIONS: Refer to Division 15 for Mechanical requirements. Refer to Division 16 for Electrical requirements. 1.2 OBJECTIVE: A. The short-circuit study is to calculate the

More information

Power System Study for the Pebble #2 Lift Station Las Vegas, Nevada

Power System Study for the Pebble #2 Lift Station Las Vegas, Nevada PQTSi Power System Study for the Pebble #2 Lift Station Las Vegas, Nevada Coordination Study and Arc Flash Analysis Power Quality Technical Services, Inc. 683 Scenic Tierra Ln. Henderson, NV 89015 Prepared

More information

1960 Research Drive, Suite 100, Troy, Michigan with. REVISION: December 10, 2007 (Supersedes previous versions) Prepared by:

1960 Research Drive, Suite 100, Troy, Michigan with. REVISION: December 10, 2007 (Supersedes previous versions) Prepared by: ENGINEERING SERVICES 1960 Research Drive, Suite 100, Troy, Michigan 48083 ARC FLASH REDUCTION with SEPAM RELAY ZONE SELECTIVE INTERLOCKING REVISION: December 10, 2007 (Supersedes previous versions) Prepared

More information

Thomas Wilkins Wilkins Consulting Henderson Nevada U.S.A.

Thomas Wilkins Wilkins Consulting Henderson Nevada U.S.A. Medium Voltage Vacuum Circuit Breaker with Mechanically Interlocked Grounding Switch (VDH/GSMI) Provides Better Safety and Reliability for Wind and Solar Power Plants and Their Personnel than Remote Transfer

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

ADVANCED CIRCUIT BREAKERS OPERATION AND MAINTENANCE SECTOR / ENGINEERING TECHNICAL & CERTIFICATE OF ATTENDANCE TRAINING COURSE

ADVANCED CIRCUIT BREAKERS OPERATION AND MAINTENANCE SECTOR / ENGINEERING TECHNICAL & CERTIFICATE OF ATTENDANCE TRAINING COURSE ADVANCED CIRCUIT BREAKERS OPERATION AND MAINTENANCE SECTOR / ENGINEERING TECHNICAL & CERTIFICATE OF ATTENDANCE TRAINING COURSE Circuit Breakers Play An Important Role In The Safe Distribution Of Electrical

More information

Key factors to maintaining arc flash safety

Key factors to maintaining arc flash safety APPLICATI TE Key factors to maintaining arc flash safety Arc flash and blast When an arc fault occurs, the result is a massive electrical explosion. The light and heat emitted by the explosion is known

More information

Electrical PIP ELEGL03 Guidelines for Power Systems Analysis

Electrical PIP ELEGL03 Guidelines for Power Systems Analysis July 2016 Electrical PIP ELEGL03 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements

More information

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

ECE 528 Understanding Power Quality

ECE 528 Understanding Power Quality ECE 528 Understanding Power Quality http://www.ece.uidaho.edu/ee/power/ece528/ Paul Ortmann portmann@uidaho.edu 208-733-7972 (voice) Lecture 43 1 Today HW7 and Final Questions? Safety Power quality instruments

More information

Lookout Brook Hydro Plant Refurbishment (Clustered), p. 4 of 96, $2,155,000

Lookout Brook Hydro Plant Refurbishment (Clustered), p. 4 of 96, $2,155,000 Requests for nformation PUB-NP-6 NP 2010 CBA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Lookout Brook Hydro Plant Refurbishment (Clustered), p. 4 of 96, $2,155,000 Q. n the report provided in Tab 1.2 Lookout

More information

Designing For a Critical Load using a Spot Network

Designing For a Critical Load using a Spot Network This is a photographic template your photograph should fit precisely within this rectangle. Designing For a Critical Load using a Spot Network Tony Oruga, P.E. Product and Sales Manager Network Protectors

More information

Copper Core & Coil Transformer

Copper Core & Coil Transformer Copper Core & Coil Transformer Transformer Stomach Pain Normal Operation: Transformer internal structures and windings are subjected to mechanical forces due to the magnetic forces. Through fault current

More information

Effective System Grounding

Effective System Grounding Effective System Grounding By Andrew Cochran of I-Gard and John DeDad of DeDad Consulting The costs associated with losses stemming from ground faults are staggering. For example, over a seven year period,

More information

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More 2017 ELECTRICAL SAFETY SERVICES Arc Flash Electrical Maintenance Lockout/Tagout And More ABOUT LEWELLYN TECHNOLOGY Improving workplace safety since 1993 Daryn Lewellyn founded Lewellyn Technology more

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

Experiences on using gapless waveform data & synchronized harmonic phasors

Experiences on using gapless waveform data & synchronized harmonic phasors 1 Panel Session: New Techniques for Power Quality Measurement and Field Experiences 15PESGM3040 Experiences on using gapless waveform data & synchronized harmonic phasors Wilsun Xu University of Alberta

More information

PRC Compliance Using Bitronics 70 Series Recorders

PRC Compliance Using Bitronics 70 Series Recorders PRC-002-2 Compliance Using Bitronics 70 Series Recorders Introduction The North American Electric Reliability Council (NERC) has defined standards for disturbance monitoring and reporting requirements

More information

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device ABB AG - EPDS The worldʼs fastest limiting and switching device Agenda The world s fastest limiting and switching device Customers Function: Insert-holder with insert Comparison: I S -limiter Circuit-breaker

More information

RMEL Safety Conference

RMEL Safety Conference Derek Bell, Kansas City Power & Light Jim Phillips, Brainfiller KCP&L s Senior Director Corporate Safety Derek Bell examines two recent arc flash events that resulted in life changing and potentially life

More information

Electrical Overcurrent Studies

Electrical Overcurrent Studies Electrical Overcurrent Studies 11-01-2011 Deliverables associated with electrical overcurrent studies are as follow : a. Draft Reports i. Construction Related Projects have the following draft reports

More information

Enclosed circuit breaker (ECB) with Arcflash Reduction Maintenance System

Enclosed circuit breaker (ECB) with Arcflash Reduction Maintenance System Technical Data TD008010EN Supersedes February 2016 Enclosed circuit breaker (ECB) with Arcflash Reduction Maintenance System The information below is taken directly from the National Electrical CodeT (NEC)

More information

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

Phase and neutral overcurrent protection

Phase and neutral overcurrent protection Phase and neutral overcurrent protection Page 1 ssued June 1999 Changed since July 1998 Data subject to change without notice (SE970165) Features Two-phase or three-phase time-overcurrent and earth fault

More information

Typical Limiting Values Of Substation Equipments

Typical Limiting Values Of Substation Equipments Typical Limiting Values Of Substation Equipments 1 / 6 2 / 6 3 / 6 Typical Limiting Values Of Substation One of the major challenges facing the electric industry is how to manage network fault levels,

More information

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems T. C. Dias, B. D. Bonatto, J. M. C. Filho Abstract-- Isolated industrial power systems or with high selfgeneration,

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, over-current protection relays, energy meters and transducers Primary injection testing capabilities

More information

CREATING A COMPARATIVE MAP OF RELATIVE POWER FOR DC ARC FLASH METHODOLOGIES. A Thesis. presented to

CREATING A COMPARATIVE MAP OF RELATIVE POWER FOR DC ARC FLASH METHODOLOGIES. A Thesis. presented to CREATING A COMPARATIVE MAP OF RELATIVE POWER FOR DC ARC FLASH METHODOLOGIES A Thesis presented to the Faculty of California Polytechnic State University, San Luis Obispo In Partial Fulfillment of the Requirements

More information

Use of Advanced Monitoring Technology to Detect Incipient Failure of Line Equipment

Use of Advanced Monitoring Technology to Detect Incipient Failure of Line Equipment Use of Advanced Monitoring Technology to Detect Incipient Failure of Line Equipment 71st Annual Conference for Protective Relay Engineers Texas A&M University College Station, Texas USA 26-29 March 2018

More information

Upgrading Your Electrical Distribution System To Resistance Grounding

Upgrading Your Electrical Distribution System To Resistance Grounding Upgrading Your Electrical Distribution System To Resistance Grounding The term grounding is commonly used in the electrical industry to mean both equipment grounding and system grounding. Equipment grounding

More information

Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits

Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits WREF 01 Paper # 048 Harmonics Issues that Limit Solar Photovoltaic Generation on Distribution Circuits Ketut Dartawan Ricardo Austria, Le Hui and Mark Suehiro* Pterra Consulting Maui Electric Company*

More information

Distribution System Development & Preliminary Studies

Distribution System Development & Preliminary Studies Distribution System Development & Preliminary Studies IEEE CED January 27, 2016 (second night) 2016 KBR, Inc. All Rights Reserved. Agenda Distribution System Development Modeling Data Studies Overview

More information

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

Multilin 350 Arc Flash Detection System Installation, Testing and Maintenance Application Note

Multilin 350 Arc Flash Detection System Installation, Testing and Maintenance Application Note GE Grid Solutions Multilin 3 Series Arc Flash Protection Multilin 350 Arc Flash Detection System Installation, Testing and Maintenance Application Note GE Publication Number: GET-20057A Copyright 2017

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

Relion 605 series Self-Powered Feeder Protection REJ603 Product Guide

Relion 605 series Self-Powered Feeder Protection REJ603 Product Guide Relion 605 series Relion 605 series Self-Powered Feeder Protection Product Guide Contents 1 Description...3 2 Protection functions...3 3 Application...4 4 Self-supervision...4 5 Inputs and outputs...4

More information

PPE: Why Fabric Matters

PPE: Why Fabric Matters PPE: Why Fabric Matters Chris Corner Vice President of International Business Development January 12, 2016 Agenda TenCate Overview Inherently Flame Resistant Fibers How Inherently Flame Resistant Fabrics

More information

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad

More information

How to maximize reliability using an alternative distribution system for critical loads

How to maximize reliability using an alternative distribution system for critical loads White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies

More information

Distribution Feeder Principles

Distribution Feeder Principles Distribution Feeder Principles Distribution Feeder Principles Introduction Electrical distribution is the final stage in the delivery of electricity to end users. The distribution system s network carries

More information

Notes 1: Introduction to Distribution Systems

Notes 1: Introduction to Distribution Systems Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission

More information

How does an Arc occur?

How does an Arc occur? How does an Arc occur? Arc Flash Suits are designed to provide protection from arc flash heat exposures. Arc flash suits are designed to protect the electrical technician from heat and to reduce or minimize

More information

Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially Parallel Proximity AC Transmission Circuits

Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially Parallel Proximity AC Transmission Circuits 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially

More information

Short-Circuit Apparent Power of System Survey Comments

Short-Circuit Apparent Power of System Survey Comments WG Item 87 Short-Circuit Apparent Power of System Survey Comments Again, the values given in Table 18 are totally unrealistic of system conditions. I do not know any systems for which the short-circuit

More information

The CABLETROLL 3600 FCI is capable of discriminating between PTP and PTG faults, and indicating the direction of the latter type.

The CABLETROLL 3600 FCI is capable of discriminating between PTP and PTG faults, and indicating the direction of the latter type. Directional fault current indicator for underground systems Presentation CABLETROLL 3600 directional Fault Current Indicators (FCI) are designed to help the operator locate faults on underground lines.

More information