Event-Based Data Collection for Generating Actuated Controller Performance Measures

Size: px
Start display at page:

Download "Event-Based Data Collection for Generating Actuated Controller Performance Measures"

Transcription

1 University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2007 Event-Based Data Collection for Generating Actuated Controller Performance Measures Edward J. Smaglik Purdue University Anuj Sharma University of Nebraska - Lincoln, anujs@iastate.edu Darcy M. Bullock Indiana University - Purdue University - Fort Wayne, darcy@purdue.edu James R. Sturdevant Indiana Depatment of Transportation Gary Duncan Econolite Control Products Follow this and additional works at: Part of the Civil Engineering Commons Smaglik, Edward J.; Sharma, Anuj; Bullock, Darcy M.; Sturdevant, James R.; and Duncan, Gary, "Event-Based Data Collection for Generating Actuated Controller Performance Measures" (2007). Civil Engineering Faculty Publications This Article is brought to you for free and open access by the Civil Engineering at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Civil Engineering Faculty Publications by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln.

2 Published in Transportation Research Record: Journal of the Transportation Research Board, No (2007): Copyright 2007, Transportation Research Board of the National Academies, Washington, D.C. DOI: / Used by permission. Event-Based Data Collection for Generating Actuated Controller Performance Measures Edward J. Smaglik 1, Anuj Sharma 1, Darcy M. Bullock 1,*, James R. Sturdevant 2 and Gary Duncan 3 1 School of Civil Engineering, Purdue University, 2 Division of Traffic Control Systems, Indiana Department of Transportation, 3 Econolite Control Products, * darcy@purdue.edu Cycle-by-cycle data have been shown to be effective in the analysis of a signalized intersection with measures of effectiveness such as volume-to-capacity ratios, arrival type, and average vehicular delay. Currently, actuated traffic controllers are unable to store vehicle counts and vehicle occupancy in cycle-by-cycle bins, requiring extra equipment and personnel to collect data in these bins. The objective of this research was to develop an integrated general purpose data collection module that time stamps detector and phase state changes within a National Electrical Manufacturers Association actuated traffic signal controller and uses those data to provide quantitative graphs to assess arterial progression, phase capacity utilization, movement delay, and served volumes on a cycle-by-cycle basis. Given that the United States recently received a grade of 61 of 100 on the National Traffic Signal Report Card, it is particularly important that procedures such as these be used to provide performance measures over extended periods so agencies have cost-effective mechanisms for assessing and priorityranking signal timing efforts. Data collection methods used by the Highway Capacity Manual (HCM) (1) are employed worldwide for quantifying the performance of signal systems. Those methods are oriented toward adjusting hourly volumes-to peak 15-minute flow rates for analysis and work very well with manually-collected data. However, it is not feasible for agencies to schedule manual data collection activities for extended periods or during unusual periods such as evening school events or weekend peaks at shopping malls. Consequently, it is desirable to have signal systems collect their own data for assessing their performance through an integrated general purpose data collection module within the controller. However, obtaining meaningful real-time performance data from signalized intersections has historically been challenging for two reasons: Typical stop-bar loop detectors provide good occupancy data but poor flow rate information (2). Data are typically recorded by controllers on an hourly or 15-minute basis. However, in the case of modern traffic controllers, phase splits and phase lengths vary cycle by cycle and the arbitrary binning in 5-, 15-, or 60-minute basis the controller does not permit tabulating data on a cycle-by-cycle basis. Consequently, it is impossible to evaluate theperformance of individual phases and splits on a cycle-by-cycle basis. For example, Figure 1 is a 24-hour plot of occupancy binned into 15-minute intervals, downloaded from an actuated controller. The occupancy of 12 separate detectors is plotted versus time. A similar plot can also be generated from count data. From this graph, it is clear that the intersection is reasonably busy from 5:00 a.m. to 10:00 p.m. Some detectors (for example, Detector 6) have pronounced morning and afternoon peaks. However, the following information is not at all clear from these graphs: How well progression is working in each direction, If there are any split failures that need attention, and The average delay experienced by motorists. LITERATURE REVIEW The North Carolina Department of Transportation found that one of the challenges of pulling useful data from loop detectors is producing it in a format that is useful to planners, designers, and other end users (3). To process data from its freeway sensors, the California Department of Transportation developed a system that collects loop detector data in real time and returns it in a format specified by the user (4). A system by the name of COMPASS was implemented in some areas of Toronto, Canada, for collecting information from SCOOT-controlled arterials and making it available to users. Data are collected in 20-second intervals and aggregated into time static intervals (5, 15, and 60 minutes; daily and monthly) and archived on a compact disc (3, 5). The Texas Transportation Institute recently completed research that developed a listof performance measures that could be collected within the limitations of existing detection systems and then developed a prototype system to automatically collect these data. Performance measures computed by this system include cycle time; time to service; queue service time; duration of the green, yellow, all-red, and red interval for each phase; number of vehicles entering the intersection during each interval; yellow and all-red violation rates; and phase failure rates. Collection of these data required the addition of a black box to the cabinet for data collection as well as count detectors placed in front of the stop bar (6). 97

3 98 S m a g l i k, Sh a r m a, Bu l l o c k, St u r d e v a n t a n d Du n c a n i n Tra n s p o r t a t i o n Re s e a r c h Re c o r d 2035 (2007) Even though data aggregation from some of these efforts is user specified, it has required additional hardware to obtain useful information from vehicle detector data. The research documented here describes an integrated general purpose data collection module that time-stamps detector and phase state changes within a National Electrical Manufacturers Association (NEMA) actuated traffic signal controller. The data collected are then used to provide quantitative graphs that assess progression and intersection delay. CONTROLLER ENHANCEMENT To make it possible to produce data easily for measures of effectiveness (MOEs), it is desirable to collect event-based data directly in the controller. In a cooperative effort involving Econolite Control Products, Inc., the Indiana Department of Transportation (INDOT), and Purdue University, the Econolite ASC/3 controller software was enhanced to include a data logger to collect time-stamped phase and detector state changes. Elements of the data logger include Time-stamped state changes of phases in use (1 to 16) and detectors in use (1 to 64) are stored in binary format on the ASC/3 controller in hourly data files. Data are retrieved from the controller by using a transmission control protocol/internet protocol network connection, with the controller serving as a file transfer protocol (FTP) server. Once downloaded from the controller, a Windows-based wizard is used to convert the binary data files into comma-separated-value (CSV) files for use in producing the appropriate reports. Figure 2 shows the FTP access of the controller log data with Microsoft Windows Internet Explorer. During busy periods, the compressed data logs for 1 hour are approximately 90 kb (around 5:00 p.m.), but the compressed logs are only about 7 kb (around 2:00 a.m.) during periods with lighter traffic and fewer cycles. These compressed files can be downloaded and converted into CSV files to produce performance measures such as arrival type, delay, volume-to-capacity (v/c) ratios, or served volumes. CYCLE-BY-CYCLE DATA COLLECTION Although there are a variety of ways that the data can be aggregated, cycle-by-cycle tabulation has been shown to be an effective method of categorizing data for adaptive control, offset tuning, and other signaltiming measures (7-11). It can also be used to produce MOEs such as arrival type, average vehicular delay, v/c ratios, and equivalent hourly volume. Figure 3 illustrates the cycle-by-cycle tabulation boundaries in relation to the percentage of vehicles arriving during the green interval, where each black circle represents an actuation of a setback detector. With cycle-by-cycle analysis, the performance during each cycle can be quantified. For example, if C1, C2, and C3 were placed into one large bin, the proportion arriving on the green would be 53%, and the individual values of 20%, 60%, and 80% would be overlooked. DESCRIPTION OF TEST BED INTERSECTION An ASC/3 controller with enhanced software was implemented at the INDOT intersection test bed in Noblesville, Indiana. This site is instrumented with 12 data collection units; the MOE plots shown in this paper use data collected by the ASC/3 controller. Figure 4 is an aerial view of the test bed intersection and surrounding area. Distance to the nearest signalized intersection in each direction is shown in Figure 4 as well as the location of the setback detectors on both the northbound and southbound approaches. The section of roadway immediately north of the intersection experiences an annual average daily traffic (AADT) of 24,080 vehicles, and the section immediately west experiences an AADT of 20,830 vehicles. The intersection is controlled by an

4 E v e n t -Ba s e d Da t a Co l l e c t i o n f o r Ge n e r a t i n g Ac t u a t e d Pe r f o r m a n c e Co n t r o l l e r Me a s u r e s 99

5 100 S m a g l i k, Sh a r m a, Bu l l o c k, St u r d e v a n t a n d Du n c a n i n Tra n s p o r t a t i o n Re s e a r c h Re c o r d 2035 (2007) approximately 40 hours of operation, data were retrieved from the controller, and performance plots were prepared showing equivalent hourly volume served, progression quality, vehicular delay, and v/c ratios. To verify the accuracy of the data logger in the ASC/3 controller, all data collected by the controller were compared with data collected independently by the data collection units. Data from the ASC/3 controller were benchmarked against data from the data collection units to validate the new ASC/3 controller data collection system. Equivalent Hourly Volume With cycle-by-cycle data, the equivalent hourly volume can be calculated as follows: (1) where EHV = equivalent hourly volume, C = cycle length, and v = served volume. This performance measure provides information regarding the volume on a movement at any point during the day, with a metric that can be easily compared from intersection to intersection and between movements at an intersection. Figure 6 shows the EHV calculated from cycle-by-cycle data collected by the ASC/3 controller The data collected during undersaturated conditions. During oversaturated periods, the EHV will effectively max out toward the capacity of the movement, since it is essentially served volume. The 20-cycle moving average presented in Figure 6 was calculated as follows: actuated controller and operates a typical eight-phase dualring structure, with coordination in the northbound and southbound directions during the a.m. peak and p.m. peak timing periods and in the eastbound and westbound directions during the midday and off-peak timing periods. The northbound and southbound approaches are high-speed approaches (88 kph, or 55 mph) with set-back detectors located 123 meters (405 feet) back from the stop bar. Figure 5 is an aerial view of the test bed with vehicle detectors indicated. All loops shown in Figure 5 are 6-foot-round preformed inductive loops. Stop bar loops shown in Figure 5 are tied together in various series configurations (series loops are separated by 9 feet), and each lane operates on an individual amplifier and lead-in cable. All loop amplifiers assigned to stop bar loops have both a presence and a count output. All setback loops also operate on a lane-by-lane basis. On the northbound approach, which has two sets of setback loops in each lane, the loops in each lane operate independently of each other and on a laneby-iane basis. Intersection operation is driven by the presence output of both stop bar and setback detectors. CONTROLLER IMPLEMENTATION On July 24, 2006, the ASC/3 controller with enhanced software was implemented at the test bed. During the study period, while data were collected in the controller, independent data collection units and video were also used at the intersection to allow verification of the data collected by the controller. After where veh is vehicles served in cycle i and C is the cycle length of cycle i. Arrival-Type Data The HCM uses the arrival-type (AT) parameter to describe the quality of progression. To calculate the AT of all approach vehicle arrival must be collected and binned into cycle-by-cycle intervals as shown in Figure 3, along with collection of green durations and cycle lengths. A vehicle arrival is defined as the time when the vehicle passes over the advance detectors shown in Figure 4. Vehicle arrivals for calculating AT data must come from setback detectors, since vehicle arrivals cannot be collected from stop bar detectors once the first vehicie arrives at the stop bar. Vehicle arrival data are then input into the HCM equation for platoon ratio and assigned an AT ranging from 1 (R p less than 0.50) to 6 (R p greater than 2.00) by using HCM Exhibit 15-4 (1, 12) where P is the percent of vehicles arriving on green and g is the length of the green indication. (2) (3)

6 E v e n t -Ba s e d Da t a Co l l e c t i o n f o r Ge n e r a t i n g Ac t u a t e d Pe r f o r m a n c e Co n t r o l l e r Me a s u r e s 101 In addition to classification of AT between 1 and 6, an estimated continuous AT can be calculated by using a piecewise continuous relationship between the platoon ratio and AT. For example, a platoon ratio of 0.5 is the threshold between AT 1 and AT 2, and a platoon ratio of 0.85 is the threshold between AT 2 and AT 3. Linear interpolation is used between these thresholds to provide a continuous estimate of AT based on the platoon ratio. Both the classified AT and estimated continuous AT are shown in Figure 7. Cycles in which arrivals were queued over the upstream detector (Figure 4) are shown as a triangle, diamond, or star in Figure 7. Calculated ATs were averaged over a 20-cycle moving average to remove noise from the data. The value of 20 cycles was chosen for smoothing purposes, removing enough noise to allow for easier examination of the data without removal of relevant fluctuations. The vertical lines shown in Figure 7 represent changes in time-of-day plans. This plot can be quickly examined to assess the progression performance of an intersection and investigate the impact of split and offset changes as these plans change throughout the day. The data presented in Figure 7 were collected during undersaturated conditions. As the study movement becomes oversaturated, this methodology will underestimate vehicle arrivals red, since the queue will likely pass well beyond the setback detection area. Delay Data The same event data used to assess vehicle progression can be used to estimate vehicular delay. With arrival and departure profiles, average vehicular delay per cycle can be calculated (13, 14). Figure 8a and b shows the queue profiles for C2 and C3 in Figure 3, representing poor progression and good progression, respectively. The queue profile represents the vehicle delay during each cycle and is calculated on the basis of both the arrival profile and the departure profile. The arrival profile is based on vehicle arrivals over setback detectors (Figures 4 and 5), whereas the departure profile is based on the saturation flow rate of vehicle departures over stop bar detectors (Figure 5). The area under the queue profile is the average vehicular delay during the cycle. Figure 8c is a 24-hour plot of average vehicular delay on a cycle-by-cycle basis, plotted by using a 20-cycle moving average. Obviously, if traffic queues.over the advance detector during oversaturated conditions, there can be significant errors in estimated delay because the arrival flows must be estimated, not observed.

7 102 S m a g l i k, Sh a r m a, Bu l l o c k, St u r d e v a n t a n d Du n c a n i n Tra n s p o r t a t i o n Re s e a r c h Re c o r d 2035 (2007)

8 E v e n t -Ba s e d Da t a Co l l e c t i o n f o r Ge n e r a t i n g Ac t u a t e d Pe r f o r m a n c e Co n t r o l l e r Me a s u r e s 103 Volume-to-Capacity Ratio With the vehicle departures from stop bar count detectors (Figure 5) binned on a cycle-by-cycle basis, phase indication length, and cycle length, an estimated vic ratio can be calculated for each individual green indication as follows (1): where V I = served flow rate for lane group l, C I = capacity of lane group l, q g = flow rate observed for green phase, S I = observed lane saturation flow rate, C = cycle length, and g l = length of green indication for movement l. (4) Figure 9 plots each v/c ratio over a 24-hour period for Phase 2 (northbound approach) at the Noblesville test bed. Not surprisingly, around 5:00 p.m. the flow rate (Figure 6) and delay (Figure 8) peak for the p.m. peak timing period. However, from examining Figure 7, which quantitatively documents progression quality, the quality of the progression is excellent in the subject direction. The few points above 1.0 in Figure 9 suggest that there are a couple of cycles in which there may be a split failure. If the v/c plots for competing phases were compared, these graphs could be used for reallocating split times (11). The data shown in Figure 9 were collected during undersaturated conditions. During oversaturated periods, the v/c will effectively hover around 1.0, since the volume component used for this calculation is served volume. DATA COLLECTION OVER TIME In addition to MOEs of current traffic data, trends in data can also be tracked over time. Figure 10 tracks EHV and AT between two dates approximately one year apart. On August 9, 2005, EHV and AT were calculated from cycle-by-cycle data collected by the data collection units at the Noblesville test bed. Those data are compared with those collected by the ASC/3 controller on July 25, 2006.

9 104 S m a g l i k, Sh a r m a, Bu l l o c k, St u r d e v a n t a n d Du n c a n i n Tra n s p o r t a t i o n Re s e a r c h Re c o r d 2035 (2007) Figure 10a shows EHV, and Figure 10b shows AT. One item to note is that in 2005, the p.m. peak timing plan went into effect at 1:00 p.m. and timed until 7:00 p.m. In 2006, the off-peak timing plan was in effect from 1:00 p.m. to 2:30 p.m., followed by the p.m. peak timing plan from 2:30 p.m. to 7:00 p.m. The impact of this change in plan time can be seen by observing the shift in the AT around this time in Figure 10b. DETECTION REQUIREMENTS FOR DATA COLLECTION The plots developed for this research require vehicle counts; however, desired detection placement and installation vary depending on the MOE. EHV and v/c Ratio Vehicle counts can be collected from either setback or stop bar detectors. Setback detectors can operate in either presence or count mode, provided that the detection zone is small (~6 feet). If operating in the presence mode,detectors can be operated on a movement basis; however, some data will be lost when traffic queues over the setback detection area. If counts are collected at the stop bar, each lane must be on a separate channel, equipped with a count amplifier. Arrival Type Vehicle counts must be collected from setback detectors, since stop bar detectors are unable to mark the arrival of vehicles after the first vehicle enters the detection zone. The same issues discussed for EHV for setback detectors apply for AT as well. Delay Estimation of delay is essentially more extensive processing of the advance detector information (used for measuring AT), so the queue delay polygons can be modeled as shown in Figure 5a. The data collection requirements for delay estimation are identical to those used for AT estimation. CONCLUSION An integrated general purpose data collection module is described that time-stamps detector and phase state changes within a NEMA actuated traffic signal controller and then uses those data to provide quantitative graphs that assess progression and intersection delay. With the detection requirements and procedures described here, performance measures can be collected over extended periods to provide agencies with costeffective mechanisms for assessing and priority-ranking signal timing efforts. Although the compilation of the plots in this paper used spreadsheets and other analysis tools, the ultimate goal is to integrate this functionality into vendor-supplied closed-loop system management software. Ultimately it would be desirable to have the industry standardize on the definitions of these MOEs as well as the methods by which they are calculated. ACKNOWLEDGMENTS This work was supported by the Joint Transportation Research Program administered by the Indiana Department of Transportation and Purdue University. The controller hardware used in this research was the ASC/3 controller manufactured by Econolite Control Products, Inc.

10 E v e n t -Ba s e d Da t a Co l l e c t i o n f o r Ge n e r a t i n g Ac t u a t e d Pe r f o r m a n c e Co n t r o l l e r Me a s u r e s 105

11 106 S m a g l i k, Sh a r m a, Bu l l o c k, St u r d e v a n t a n d Du n c a n i n Tra n s p o r t a t i o n Re s e a r c h Re c o r d 2035 (2007) REFERENCES 1. Highway Capacity Manual Transportation Research Board, National Research Council, Washington, D.C. 2. Smaglik, E. J. Enhanced Tactical and Strategic Control Methods for Traffic Signal Operation Doctoral dissertation. Purdue University, West Lafayette, Indiana. 3. Milazzo, J., R. S. Foyle, T. Rhoulac, K. Tanaka, C. Thompson, T. Delk, B. Forbis, S. Hill and S. McDonald. Overcoming Obstacles to the Use of Traffic Signal Detector Data for Traffic Forecasting North Carolina Department of Transportation, Raleigh. 4. Chen, C., K. Petty, A. Skabardonis, P. Varaiya and Z. Jia. Freeway Performance Measurement System: Mining Loop Detector Data Transportation Research Record: Journal of the Transportation Research Board, No. 1748: ITS Data Archiving: Case Study Analyses of San Antonio TransGuide Data Texas Transportation Institute, Texas A & M University System, College Station. 6. Balke, K. N., H. Charara and R. Parker. Development of a Traffic Signal Performance Measurement System. May TTI Report Texas Transportation Institute, College Station. 7. Abbas, M., D. Bullock and L. Head. Real-Time Offset Transitioning Algorithm for Coordinating Traffic Signals Transportation Research Record: Journal of the Transportation Research Board, No. 1748: Abbas, M., D. Bullock and A. Rhodes. Comparative Study of Theoretical, Simulation, and Field Platoon Data Traffic Engineering and Control, Vol. 42, No Luyanda, F., D. Gettman, S. Shelby, L. Head, D. Bullock and P. Mirchandani. ACS-Lite Algorithmic Architecture: Applying Adaptive Control System Technology to Closed-Loop Traffic Signal Control Systems Transportation Research Record: Journal of the Transportation Research Board, No. 1856: Smaglik, E. J., D. M. Bullock and T. Urbanik Evaluation of Laneby Lane Vehicle Detection for Actuated Controllers Serving Multilane Approaches Transportation Research Record: Journal ofthe Transportation Research Board, No. 1925: Smaglik, E. J., D. M. Bullock, and T. Urbanik II. Adaptive Split Control Using Enhanced Detector Data Proceedings, ITE International Annual Meeting and Exhibit, Paper AB05H-11, Melbourne, Australia. 12. Smaglik, E. J., D. M. Bullock and A. Sharma. A Pilot Study on Real- Time Calculation of Arrival Type for Assessment of Arterial Performance. July Journal of Transportation Engineering, Vol. 133, No Sharma, A., D. M. Bullock and J. A. Bonneson. Input-Output and Hybrid Techniques for Real-Time Prediction of Delay and Maximum Queue Length at Signalized Intersections Transportation Research Record: Journal of the Transportation Research Board, No. 2035: Bonneson J., D. Bullock, P. Koonce, D. Middleton, A. Sharma and M. Vandehay. Review of Techniques for Urban Street Performance Measurement NCHRP Project 3-79, Quarterly Progress Report. Texas Transportation Institute, Texas A & M University System, College Station. The contents of this paper reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented, and do not necessarily reflect the official views or policies of the Federal Highway Administration and the Indiana Department of Transportation, nor do the contents constitute a standard, specification, or regulation. The Traffic Signal Systems Committee sponsored publication of this paper.

Input-Output and Hybrid Techniques for Real- Time Prediction of Delay and Maximum Queue Length at Signalized Intersections

Input-Output and Hybrid Techniques for Real- Time Prediction of Delay and Maximum Queue Length at Signalized Intersections University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2007 Input-Output and Hybrid Techniques for Real- Time Prediction

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-05/0-4422-2 4. Title and Subtitle DEVELOPMENT OF A TRAFFIC SIGNAL PERFORMANCE MEASUREMENT SYSTEM (TSPMS) 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

Performance Evaluation of Coordinated-Actuated Traffic Signal Systems Gary E. Shoup and Darcy Bullock

Performance Evaluation of Coordinated-Actuated Traffic Signal Systems Gary E. Shoup and Darcy Bullock ABSTRACT Performance Evaluation of Coordinated-Actuated Traffic Signal Systems Gary E. Shoup and Darcy Bullock Arterial traffic signal systems are complex systems that are extremely difficult to analyze

More information

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details Georgia Department of Transportation Automated Traffic Signal Performance Measures Prepared for: Georgia Department of Transportation 600 West Peachtree Street, NW Atlanta, Georgia 30308 Prepared by: Atkins

More information

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS A Thesis Proposal By Marshall T. Cheek Submitted to the Office of Graduate Studies Texas A&M University

More information

Objective 1: Performance Measures for a Signalized Arterial System

Objective 1: Performance Measures for a Signalized Arterial System NCHRP Project 3-79a Working Paper No. O1-2 Objective 1: Performance Measures for a Signalized Arterial System Prepared for: National Cooperative Highway Research Program Transportation Research Board National

More information

PERFORMANCE MEASURES FOR TRAFFIC SIGNAL PEDESTRIAN BUTTON and DETECTOR MAINTENANCE

PERFORMANCE MEASURES FOR TRAFFIC SIGNAL PEDESTRIAN BUTTON and DETECTOR MAINTENANCE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 PERFORMANCE MEASURES FOR TRAFFIC SIGNAL PEDESTRIAN BUTTON and DETECTOR MAINTENANCE by Corresponding Author Jay

More information

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District 0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL

More information

Development and Evaluation of Lane-by-Lane Gap-out Based Actuated Traffic Signal Control

Development and Evaluation of Lane-by-Lane Gap-out Based Actuated Traffic Signal Control Development and Evaluation of Lane-by-Lane Gap-out Based Actuated Traffic Signal Control Pennsylvania State University University of Maryland University of Virginia Virginia Polytechnic Institute and State

More information

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,

More information

Configuration Methodology for Traffic-Responsive Plan Selection: A Global Perspective

Configuration Methodology for Traffic-Responsive Plan Selection: A Global Perspective University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2005 Configuration Methodology for Traffic-Responsive Plan Selection:

More information

Automatic Generation of Traffic Signal Timing Plan

Automatic Generation of Traffic Signal Timing Plan Automatic Generation of Traffic Signal Timing Plan Henry X. Liu, Principal Investigator Department of Civil, Environmental, and Geo- Engineering University of Minnesota September 2014 Research Project

More information

20. Security Classif.(of this page) Unclassified

20. Security Classif.(of this page) Unclassified 1. Report No. FHWA/TX-10/0-6029-1 4. Title and Subtitle IMPROVED INTERSECTION OPERATIONS DURING DETECTOR FAILURES Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

Sequence Optimization at Signalized Diamond Interchanges Using High-Resolution Event-Based Data

Sequence Optimization at Signalized Diamond Interchanges Using High-Resolution Event-Based Data Purdue University Purdue e-pubs Lyles School of Civil Engineering Faculty Publications Lyles School of Civil Engineering 215 Sequence Optimization at Signalized Diamond Interchanges Using High-Resolution

More information

Configuration of Traffic-Responsive Plan Selection System Parameters and Thresholds: Robust Bayesian Approach

Configuration of Traffic-Responsive Plan Selection System Parameters and Thresholds: Robust Bayesian Approach University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2004 Configuration of Traffic-Responsive Plan Selection System

More information

Signalized Corridor Assessment

Signalized Corridor Assessment Purdue University Purdue e-pubs Open Access Theses Theses and Dissertations Spring 2014 Signalized Corridor Assessment William Benjamin Smith Purdue University Follow this and additional works at: http://docs.lib.purdue.edu/open_access_theses

More information

Design Guidelines for Deploying Closed Loop Systems

Design Guidelines for Deploying Closed Loop Systems Final Report FHWA/IN/JTRP-2001/11 Design Guidelines for Deploying Closed Loop Systems By Andrew Nichols Graduate Research Assistant Darcy Bullock Associate Professor School of Civil Engineering Purdue

More information

Traffic Controller Timing Processes

Traffic Controller Timing Processes 4 Actuated Traffic Controller Timing Processes In Chapter 4, you will learn about the timing processes that run an actuated traffic controller. Many transportation engineers begin their study of signalized

More information

AN INTERSECTION TRAFFIC DATA COLLECTION DEVICE UTILIZING LOGGING CAPABILITIES OF TRAFFIC CONTROLLERS AND CURRENT TRAFFIC SENSORS.

AN INTERSECTION TRAFFIC DATA COLLECTION DEVICE UTILIZING LOGGING CAPABILITIES OF TRAFFIC CONTROLLERS AND CURRENT TRAFFIC SENSORS. AN INTERSECTION TRAFFIC DATA COLLECTION DEVICE UTILIZING LOGGING CAPABILITIES OF TRAFFIC CONTROLLERS AND CURRENT TRAFFIC SENSORS Final Report November 2008 UI Budget KLK134 NIATT Report Number N08-13 Prepared

More information

City of Surrey Adaptive Signal Control Pilot Project

City of Surrey Adaptive Signal Control Pilot Project City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors

More information

Adaptive signal Control. Tom Mathew

Adaptive signal Control. Tom Mathew Adaptive signal Control Tom Mathew Adaptive Control: Outline 1. Signal Control Taxonomy 2. Coordinated Signal System 3. Vehicle Actuated System 4. Area Traffic Control (Responsive) 5. Adaptive Traffic

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

Recent research on actuated signal timing and performance evaluation and its application in SIDRA 5

Recent research on actuated signal timing and performance evaluation and its application in SIDRA 5 Akcelik & Associates Pty Ltd REPRINT with MINOR REVISIONS Recent research on actuated signal timing and performance evaluation and its application in SIDRA 5 Reference: AKÇELIK, R., CHUNG, E. and BESLEY

More information

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 ACS-Lite The Next Generation of Traffic Signal Control Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 Outline Background on adaptive traffic signal Systems ACS-Lite Goals Development Functionality

More information

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES: Critical Infrastructure Elements for SPMs

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES: Critical Infrastructure Elements for SPMs AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES: Critical Infrastructure Elements for SPMs INSTITUTE OF TRANSPORTATION ENGINEERS WEBINAR PART 3 JUNE 11, 2014 ITE Webinar Series on Automated Traffic Signal

More information

Performance Measures for Local Agency Traffic Signals

Performance Measures for Local Agency Traffic Signals Purdue University Purdue e-pubs Indiana Local Technical Assistance Program (LTAP) Technical Reports Indiana Local Technical Assistance Program (LTAP) 3-2013 Performance Measures for Local Agency Traffic

More information

Area Traffic Control System (ATCS)

Area Traffic Control System (ATCS) Area Traffic Control System (ATCS) 1. Introduction: Area Traffic Control System is an indigenous solution for Indian Road Traffic, which optimizes traffic signal, covering a set of roads for an area in

More information

A Fuzzy Signal Controller for Isolated Intersections

A Fuzzy Signal Controller for Isolated Intersections 1741741741741749 Journal of Uncertain Systems Vol.3, No.3, pp.174-182, 2009 Online at: www.jus.org.uk A Fuzzy Signal Controller for Isolated Intersections Mohammad Hossein Fazel Zarandi, Shabnam Rezapour

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-06/0-4729-2 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle DISTRIBUTED ARCHITECTURE AND ALGORITHM FOR ROBUST REAL-TIME PROGRESSION EVALUATION AND IMPROVEMENT

More information

Transportation and Traffic Theory: Flow, Dynamics and Human Interaction

Transportation and Traffic Theory: Flow, Dynamics and Human Interaction Real-Time Estimation of Travel Times on Signalized Arterials 1 Transportation and Traffic Theory: Flow, Dynamics and Human Interaction Proceedings of the 16 th International Symposium on Transportation

More information

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450

More information

TCAG Annual Intersection Monitoring Program

TCAG Annual Intersection Monitoring Program TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT

More information

Next Generation of Adaptive Traffic Signal Control

Next Generation of Adaptive Traffic Signal Control Next Generation of Adaptive Traffic Signal Control Pitu Mirchandani ATLAS Research Laboratory Arizona State University NSF Workshop Rutgers, New Brunswick, NJ June 7, 2010 Acknowledgements: FHWA, ADOT,

More information

Improving method of real-time offset tuning for arterial signal coordination using probe trajectory data

Improving method of real-time offset tuning for arterial signal coordination using probe trajectory data Special Issue Article Improving method of real-time offset tuning for arterial signal coordination using probe trajectory data Advances in Mechanical Engineering 2017, Vol. 9(1) 1 7 Ó The Author(s) 2017

More information

Detector-Free Optimization of Traffic Signal Offsets with Connected Vehicle Data

Detector-Free Optimization of Traffic Signal Offsets with Connected Vehicle Data Detector-Free Optimization of Traffic Signal Offsets with Connected Vehicle Data Christopher M. Day, Howell Li, Lucy M. Richardson, James Howard, Tom Platte, James R. Sturdevant, and Darcy M. Bullock Signal

More information

Optimization of Time of Day Plan Scheduling Using a Multi-Objective Evolutionary Algorithm

Optimization of Time of Day Plan Scheduling Using a Multi-Objective Evolutionary Algorithm University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 1-2005 Optimization of Time of Day Plan Scheduling Using a Multi-Objective

More information

Adaptive Signal Control in Tyler Texas

Adaptive Signal Control in Tyler Texas Kirk Houser City of Tyler Kent Kacir - Siemens Adaptive Signal Control in Tyler Texas June 16, 2007 Amarillo, TX Agenda Transportation Planning and City Comprehensive Plan Description of the Corridor Operational

More information

Real-Time Identification and Tracking of Traffic Queues Based on Average Link Speed

Real-Time Identification and Tracking of Traffic Queues Based on Average Link Speed Paper No. 03-3351 Real-Time Identification and Tracking of Traffic Queues Based on Average Link Speed T. Nixon Chan M.A.Sc. Candidate Department of Civil Engineering, University of Waterloo 200 University

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS. A Thesis MARSHALL TYLER CHEEK

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS. A Thesis MARSHALL TYLER CHEEK IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS A Thesis by MARSHALL TYLER CHEEK Submitted to the Office of Graduate Studies of Texas A&M University

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection

Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection Clark Letter*, Lily Elefteriadou, Mahmoud Pourmehrab, Aschkan Omidvar Civil

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-01/1439-10 4. Title and Subtitle DEVELOPMENT OF AN ACTUATED TRAFFIC CONTROL PROCESS UTILIZING REAL-TIME ESTIMATED VOLUME FEEDBACK 7. Author(s) Michael J. Pacelli, Carroll J. Messer

More information

TCAG Annual Intersection Monitoring Program

TCAG Annual Intersection Monitoring Program TCAG Annual Intersection Monitoring Program 2015 Intersection Monitoring Report Prepared by: Transportation Modeling Department August, 2015 Work Element 605.01 TABLE OF CONTENTS INTRODUCTION...1 PROJECT

More information

Chapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles

Chapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles Chapter 39 Vehicle Actuated Signals 39.1 Introduction Now-a-days, controlling traffic congestion relies on having an efficient and well-managed traffic signal control policy. Traffic signals operate in

More information

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control Methodology to Assess Traffic Signal Transition Strategies Employed to Exit Preemption Control Jon T. Obenberger Dissertation submitted to the faculty of the Virginia Polytechnic Institute and State University

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

An Operational Test of Adaptive Signal Control. Campbell Road Corridor Richardson, Texas

An Operational Test of Adaptive Signal Control. Campbell Road Corridor Richardson, Texas An Operational Test of Adaptive Signal Control Campbell Road Corridor Richardson, Texas September 2011 Robert Saylor and John Black, City of Richardson Operational Test Objectives Install Rhythm adaptive

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

TRB Workshop on the Future of Road Vehicle Automation

TRB Workshop on the Future of Road Vehicle Automation TRB Workshop on the Future of Road Vehicle Automation Steven E. Shladover University of California PATH Program ITFVHA Meeting, Vienna October 21, 2012 1 Outline TRB background Workshop organization Automation

More information

SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS

SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS SYSTEMATIC IDENTIFICATION OF FREEWAY BOTTLENECKS Chao Chen* EECS Department University of California, Berkeley, 94720 Tel: (510)643-5894; Fax: (510)643-2356 chaos@eecs.berkeley.edu Alexander Skabardonis

More information

Signal Coordination for Arterials and Networks CIVL 4162/6162

Signal Coordination for Arterials and Networks CIVL 4162/6162 Signal Coordination for Arterials and Networks CIVL 4162/6162 Learning Objectives Define progression of signalized intersections Quantify offset, bandwidth, bandwidth capacity Compute progression of one-way

More information

A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS

A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS 0 0 A STOP BASED APPROACH FOR DETERMINING WHEN TO RUN SIGNAL COORDINATION PLANS Rasool Andalibian (Corresponding Author) PhD Candidate Department of Civil and Environmental Engineering University of Nevada,

More information

RHODES: a real-time traffic adaptive signal control system

RHODES: a real-time traffic adaptive signal control system RHODES: a real-time traffic adaptive signal control system 1 Contents Introduction of RHODES RHODES Architecture The prediction methods Control Algorithms Integrated Transit Priority and Rail/Emergency

More information

Canoga Traffic Sensing System

Canoga Traffic Sensing System Traffic Sensing System 942 and 944 Traffic Monitoring Cards Traffic Monitoring Card Configuration Software (TMC-CS) Matched Components of the Traffic Sensing System October 2007 942 and 944 Traffic Monitoring

More information

Next Generation Traffic Control with Connected and Automated Vehicles

Next Generation Traffic Control with Connected and Automated Vehicles Next Generation Traffic Control with Connected and Automated Vehicles Henry Liu Department of Civil and Environmental Engineering University of Michigan Transportation Research Institute University of

More information

Development of an Advanced Loop Event Data Analyzer (ALEDA) System for Dual-Loop Detector Malfunction Detection and Investigation

Development of an Advanced Loop Event Data Analyzer (ALEDA) System for Dual-Loop Detector Malfunction Detection and Investigation Development of an Advanced Loop Event Data Analyzer (ALEDA) System for Dual-Loop Detector Malfunction Detection and Investigation Patikhom Cheevarunothai 1*, Yinhai Wang 2, and Nancy L. Nihan 3 1* Graduate

More information

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES Yao Cheng*, Saed Rahwanji, Gang-Len Chang MDOT State Highway Administration University of Maryland,

More information

Detector-Health Classification for Quality Control of Traffic Counting Data (at MnDOT) NATMEC, 2018 Taek M.Kwon, Ph.D University of Minnesota Duluth

Detector-Health Classification for Quality Control of Traffic Counting Data (at MnDOT) NATMEC, 2018 Taek M.Kwon, Ph.D University of Minnesota Duluth Detector-Health Classification for Quality Control of Traffic Counting Data (at MnDOT) NATMEC, 2018 Taek M.Kwon, Ph.D University of Minnesota Duluth Outline Background Theoretical basis Implementation

More information

SIGNAL TIMING MANUAL. NCHRP Report 812. Second Edition

SIGNAL TIMING MANUAL. NCHRP Report 812. Second Edition SIGNAL TIMING MANUAL Second Edition Slides Courtesy of the Transportation Research Board, National Acknowledgments Team Members & Panel Members Tom Urbanik, Kittelson & Associates, Inc. Alison Tanaka,

More information

Battery saving communication modes for wireless freeway traffic sensors

Battery saving communication modes for wireless freeway traffic sensors Battery saving communication modes for wireless freeway traffic sensors Dr. Benjamin Coifman (corresponding author) Associate Professor The Ohio State University Joint appointment with the Department of

More information

Algorithm for Detector-Error Screening on Basis of Temporal and Spatial Information

Algorithm for Detector-Error Screening on Basis of Temporal and Spatial Information Algorithm for Detector-Error Screening on Basis of Temporal and Spatial Information Yang (Carl) Lu, Xianfeng Yang, and Gang-Len Chang Although average effective vehicle length (AEVL) has been recognized

More information

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY Joseph K. Lam, P.Eng., Managing Director Delcan Corporation 625 Cochrane Drive, Suite 500, Markham, Ontario, Canada, L3R 9R9 Tel: +1-905-943-0521,

More information

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES ITS California Technical Session 9 - Innovative Technology for Local Cities Thursday, October 16, 2014 Mark Taylor, P.E., PTOE Traffic Signal Operations Engineer

More information

I 20. Security Classif.(of this page) 21. No. of Pages 22. Price I Unclassified 72. October Form DOT F (8-72)

I 20. Security Classif.(of this page) 21. No. of Pages 22. Price I Unclassified 72. October Form DOT F (8-72) 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHW AffX-98/1477-S 4. Title and Subtitle 5. Report Date REAL-TIME APPLICATION OF PASSER IV: PROJECT SUMMARYANDGUIDELINES October 1997

More information

Freeway Performance Measurement System (PeMS)

Freeway Performance Measurement System (PeMS) CALIFORNIA PATH PROGRAM INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY Freeway Performance Measurement System (PeMS) Chao Chen California PATH Research Report UCB-ITS-PRR-2003-22

More information

Keywords- Fuzzy Logic, Fuzzy Variables, Traffic Control, Membership Functions and Fuzzy Rule Base.

Keywords- Fuzzy Logic, Fuzzy Variables, Traffic Control, Membership Functions and Fuzzy Rule Base. Volume 6, Issue 12, December 2016 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Fuzzy Logic

More information

State-Space Models with Kalman Filtering for Freeway Traffic Forecasting

State-Space Models with Kalman Filtering for Freeway Traffic Forecasting State-Space Models with Kalman Filtering for Freeway Traffic Forecasting Brian Portugais Boise State University brianportugais@u.boisestate.edu Mandar Khanal Boise State University mkhanal@boisestate.edu

More information

Frequently Asked Questions

Frequently Asked Questions The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions

More information

Multiobjective Plan Selection Optimization for Traffic Responsive Control

Multiobjective Plan Selection Optimization for Traffic Responsive Control University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 5-1-2006 Multiobjective Plan Selection Optimization for Traffic

More information

Flow-based Adaptive Split Signal Control

Flow-based Adaptive Split Signal Control University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Doctoral Dissertations Graduate School 5-2010 Flow-based Adaptive Split Signal Control Airton G. Kohls University of Tennessee

More information

DEVELOPMENT AND EVALUATION OF AN ARTERIAL ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM USING REINFORCEMENT LEARNING. A Dissertation YUANCHANG XIE

DEVELOPMENT AND EVALUATION OF AN ARTERIAL ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM USING REINFORCEMENT LEARNING. A Dissertation YUANCHANG XIE DEVELOPMENT AND EVALUATION OF AN ARTERIAL ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM USING REINFORCEMENT LEARNING A Dissertation by YUANCHANG XIE Submitted to the Office of Graduate Studies of Texas A&M University

More information

Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data

Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data Estimation of Freeway Density Based on the Combination of Point Traffic Detector Data and Automatic Vehicle Identification Data By Somaye Fakharian Qom Ph.D candidate and Research Assistant Department

More information

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority Morning Traffic Terminology TS2 Cabinet Components and Operation Traffic Signal Phasing Ring Structure Traffic Signal Timing Understanding a Signal Plan Maccarone Controller Programming Afternoon Basic

More information

SIGNAL TIMING ON A SHOESTRING

SIGNAL TIMING ON A SHOESTRING SIGNAL TIMING ON A SHOESTRING Publication Number: FHWA-HOP-07-006 TASK ORDER UNDER CONTRACT NUMBER: DTFH61-01-C-00183 MARCH 2005 Notice This document is disseminated under the sponsorship of the Department

More information

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS.

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS. Benjamin A. Coifman, Associate Professor Department of Civil and Environmental Engineering and Geodetic Science Department

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Impacts of Traveler Information on the Overall Network FINAL REPORT Prepared by September 2012 i 1. Report No. ENT-2012-2 2. Government Accession

More information

PROBE DATA FROM CONSUMER GPS NAVIGATION DEVICES FOR THE ANALYSIS OF CONTROLLED INTERSECTIONS

PROBE DATA FROM CONSUMER GPS NAVIGATION DEVICES FOR THE ANALYSIS OF CONTROLLED INTERSECTIONS PROBE DATA FROM CONSUMER GPS NAVIGATION DEVICES FOR THE ANALYSIS OF CONTROLLED INTERSECTIONS Arnold Meijer (corresponding author) Business Development Specialist, TomTom International P.O Box 16597, 1001

More information

Figures. Tables. Comparison of Interchange Control Methods...25

Figures. Tables. Comparison of Interchange Control Methods...25 Signal Timing Contents Signal Timing Introduction... 1 Controller Types... 1 Pretimed Signal Control... 2 Traffic Actuated Signal Control... 2 Controller Unit Elements... 3 Cycle Length... 3 Vehicle Green

More information

Traffic Signal Control with Connected Vehicles

Traffic Signal Control with Connected Vehicles Traffic Signal Control with Connected Vehicles Noah J. Goodall, Brian L. Smith, and Byungkyu (Brian) Park The operation of traffic signals is currently limited by the data available from traditional point

More information

TxDOT Project : Evaluation of Pavement Rutting and Distress Measurements

TxDOT Project : Evaluation of Pavement Rutting and Distress Measurements 0-6663-P2 RECOMMENDATIONS FOR SELECTION OF AUTOMATED DISTRESS MEASURING EQUIPMENT Pedro Serigos Maria Burton Andre Smit Jorge Prozzi MooYeon Kim Mike Murphy TxDOT Project 0-6663: Evaluation of Pavement

More information

FHWA/IN/JTRP-2006/40. Final Report IMPLEMENTATION OF HEALTH MONITORING PROCEDURES FOR ITS SENSORS. Volume 1: Research Report

FHWA/IN/JTRP-2006/40. Final Report IMPLEMENTATION OF HEALTH MONITORING PROCEDURES FOR ITS SENSORS. Volume 1: Research Report FHWA/IN/JTRP-2006/40 Final Report IMPLEMENTATION OF HEALTH MONITORING PROCEDURES FOR ITS SENSORS Volume 1: Research Report Timothy J. Wells Edward J. Smaglik Darcy M. Bullock June 2008 INDOT Research TECHNICAL

More information

Using Time Series Forecasting for Adaptive Traffic Signal Control

Using Time Series Forecasting for Adaptive Traffic Signal Control 34 Int'l Conf. Data Mining DMIN'17 Using Series Forecasting for Adaptive Traffic Signal Control S. Kim 1, M. Keffeler 1, T. Atkison 1, A. Hainen 2 1 Computer Science Department, University of Alabama,

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-03/0-4020-P2 Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle GUIDELINES FOR SELECTING SIGNAL TIMING SOFTWARE 5. Report

More information

Self-Organizing Traffic Signals for Arterial Control

Self-Organizing Traffic Signals for Arterial Control Self-Organizing Traffic Signals for Arterial Control A Dissertation Presented by Burak Cesme to The Department of Civil and Environmental Engineering in partial fulfillment of the requirements for the

More information

DEVELOPMENT AND PRELIMINARY TESTING OF AN AUTOMATIC TURNING MOVEMENTS IDENTIFICATION SYSTEM

DEVELOPMENT AND PRELIMINARY TESTING OF AN AUTOMATIC TURNING MOVEMENTS IDENTIFICATION SYSTEM DEVELOPMENT AND PRELIMINARY TESTING OF AN AUTOMATIC TURNING MOVEMENTS IDENTIFICATION SYSTEM Final Report Submitted to Ohio Transportation Consortium By Ping Yi, Ph.D Chun Shao, Ph.D Jialei Mao Department

More information

Development and Application of On-Line Strategi for Optimal Intersection Control (Phase Ill) 1II II! IIi1111 III. I k I I I

Development and Application of On-Line Strategi for Optimal Intersection Control (Phase Ill) 1II II! IIi1111 III. I k I I I iii DEPi T OF TRANSPORTATIONi j - "L IIIIIIIIIIIIIII l ll IIIIIIIIIIN lll111111111 II 1II II!11111 11IIi1111 III 3 0314 00023 6447 Report Number C/UU'. I -.: ; ',, I k I I S1 I 0 I I a, Cu 60 C P1-5 /I

More information

1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4.

1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4. 1. Travel time measurement using Bluetooth detectors 2. Travel times on arterials (characteristics & challenges) 3. Dealing with outliers 4. Travel time prediction Travel time = 2 40 9:16:00 9:15:50 Travel

More information

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY Introduction In 2010, the North Central Texas Council of Governments (NCTCOG) launched the Regional Traffic Signal Retiming Program (RTSRP), the

More information

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Jamie Mackey, P.E., PTOE Utah Department of Transportation Statewide Signal Engineer jamiemackey@utah.gov NOCoE Webinar Are Your Traffic Signals Ready

More information

Applicability of Adaptive Traffic Control Systems in Nevada s Urban Areas

Applicability of Adaptive Traffic Control Systems in Nevada s Urban Areas NDOT Research Report Report No. 92-9-83 Applicability of Adaptive Traffic Control Systems in Nevada s Urban Areas March 211 Nevada Department of Transportation 1263 South Stewart Street Carson City, NV

More information

1 of REV:0

1 of REV:0 1 of 5 683-10573-0418 This specification sets forth the minimum requirements for purchase and installation of an aboveground Radar Advance Detection Device (RADD) system for a real-time, advance vehicle-detection

More information

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 1 Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 Presentation to the 18 th World Congress on Intelligent Transport Systems Technical

More information

USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION. A Thesis TAO ZHANG

USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION. A Thesis TAO ZHANG USING SYSTEM PARTITION METHOD TO IMPROVE ARTERIAL SIGNAL COORDINATION A Thesis by TAO ZHANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements

More information

Traffic Measurement and Vehicle Classification with a Single Magnetic Sensor

Traffic Measurement and Vehicle Classification with a Single Magnetic Sensor Traffic Measurement and Vehicle Classification with a Single Magnetic Sensor Sing Yiu Cheung, Sinem Coleri, Baris Dundar, Sumitra Ganesh, Chin-Woo Tan and Pravin Varaiya * University of California, Berkeley,

More information

Reduce the Wait Time For Customers at Checkout

Reduce the Wait Time For Customers at Checkout BADM PROJECT REPORT Reduce the Wait Time For Customers at Checkout Pankaj Sharma - 61310346 Bhaskar Kandukuri 61310697 Varun Unnikrishnan 61310181 Santosh Gowda 61310163 Anuj Bajpai - 61310663 1. Business

More information

Arterial Traffic Signal Optimization: A Person-based Approach

Arterial Traffic Signal Optimization: A Person-based Approach Paper No. 13-3395 Arterial Traffic Signal Optimization: A Person-based Approach Eleni Christofa, Ph.D. corresponding author Department of Civil and Environmental Engineering University of Massachusetts

More information