The SKA LOW correlator design challenges
|
|
- Kerry Stevens
- 6 years ago
- Views:
Transcription
1 The SKA LOW correlator design challenges John Bunton CSP System Engineer C4SKA, Auckland, 9-10 February, 2017 CSIRO ASTRONOMY AND SPACE SCIENCE
2 SKA1 Low antenna station (Australia)
3 Station beamforming part of Receptor Sub-Element (LFAA)
4 Low Stations Low Frequency Aperture Array - LFAA LFAA has 512 station, maximum baseline less than 65km Distributed between 1-16 subarrays Each station 256 dual polarisation log periodic antenna. Frequency band MHz Signal is sent using RF-over-Fibre to Digitiser/beamformer. Output to CSP_Low 384 coarse channels per station (781 khz each, 300 MHz total) Channels can have any of 8 different look directions. Stations can be in any of 16 subarrays Up to 128 look directions! 5.8Tbps of data
5 Central Signal Processing Central Signal Processing (CSP) tasked to take the data from LFAA and produce visibilitiy data and Pulsar products. CSP divided into 4 sub-elements Correlator and beamform Pulsar timing Pulsar search and Local Monitor and control Correlator and beamformer (CBF) work package is done by CSIRO (Australia), ASTRON (Netherlands) and AUT (New Zealand)
6 Correlator standard mode Low correlator full Stokes (all polarisation parameters) Low 524,800 correlations per frequency channel Upt to 65k channels across the band Low 34G correlation per dump, 0.25s dumps, 11.0Tbps output Note originally 0.9s Compute load in the correlator (one correlation acc equiv 8 Flop) Low 524,800 correlation at 0.3GHz = 1.26 Petaflops Other processing within CSP similar in compute load MWA LOFAR JVLA ASKAP ALMA SKA1_LOW SKA1_MID Correlator TFLOPS Inpt data rate Tbits/sec Output data rate Gbit/sec
7 Frequency reolution Frequency Resolution standard observing 4.6 khz across 300 MHz 52k frequency channels Or Zoom Mode - 4 bands Zoom band bandwidth each 4, 8, 16, 32, 64, 128 or 256 MHz Note orginally just 4, 8, 16, 32 MHz Zoom band centre frequency anywhere in observing band. Band overlap allowed An LFAA frequency channels can be in any zoom band 16k output frequency channels per zoom bnad resolutions 0.23 to 14.5 khz
8 Requirement churn Recent Engineering Change Proposal has allows an exchange of bandwidth for number of inputs. Each of 512 LFFA stations can be configured to sum subsets of the 256 Example over 150 MHz sum two separate sets of 128 antennas Looks like two smaller stations (substations) each with 150MHz bandwidth. Input to correlator now 1024 station, to maintain total numbe of correlations constant bandwidth is reduced to 75MHz. Must design so it is possibel to accomodate 1204 or 2048 substation Other major recent changes Added zoom modes MHz. Required a major design change. Decrease in integation time major increase in output data rate Design must be capable of adapting to requirement change.
9 Station based processing FX correlator implemented channelise data to final resolution before correlations 8 diiferent frequency resolutions (226 to 14.5kHz) - 8 filterbanks??? Finest zoom mode 4096 channel filterbank AH HA! Implement finest zoom and integrate in frequency for rest Integration of 1,2,4,8,16,24,32, or 64 channels for all resolution Relative delay of astronomical signal to stations varies with time Must be remove Implemented as sample delay correction (coarse) and phase slope across filterbank channels. RFI flagging input data has flags and internal flagging needed
10 Corner turning Filterbanks and correlation engine cannot process all frequency channels simultaneously Must process part of the bandwidth at time Filterbanks and correlator to process a few of the 384 LFAA channels at a time Store all frequency channels for short term integration time and read out to filterbanks all time data for limited channels at time Input data All frequencies for limited time (0.2ms) Output data All time data for limited bandwidth (0.9, 0.25s)
11 Gemini board Proof of Concept (POC) Single FPGA Xilinx Virtex Ultrascale+, water cooled, 4xHybrid Memory Cubes (2 link, 4G), 4x12 fibre optical at 25G, 4x Four to be mounted in a 1U chassis BUT 2 link, 4G HMC is now end-of-life Redesign underway for Prototype HMC high bandwidth memory replaced by integrated HBM (smaller but faster) Add DDR4 for bulk memory
12 Design Evolution - POC design Separate Subsysems With Gemini POC originally had a separate Correlator, Beamfromer and Station Based processing and 0.9s integration time Major corner turn for correlator in the Station based processing (144Gbps per FPGA). But insufficient HMC or 0.9s (1.3TB double buffer but had 43 FPGAs with 16 G each) Must store accumulate full time integration in correlation 0.34TB But uses most of available HMC bandwidth
13 Prototype (Unified) Design Change to HBM reduced the available memory by half. Major problems fitting the design in Go to unified design - Station based processing and correlation in the same FPGA. Number FPGAs that accept inputs from LFAA increased from 43 to 288 Six times reduction in input bandwidth per FPGA Can now use DDR4 for corner turn AND no buffer size limitation 0.9s possible Correlator can output data SDP for a frequency channel as soon as it is computed. Very little memory need for correlator buffer What looked like a disaster with loss of a key component has lead a better an more robust design
14 Connecting the FPGA The Unified design has 288 FPGAs All FPGAs must be able to communicate with all others Switch?? But the heart of switch is usually and FPGA Number the FPGAs (X,Y,Z) (X 1:8) (Y,Z 1:6) Arrange as a cube with these coordinates Cross connect within rows and colums Inculding self connection each FPGA has 6 in X, 6 in Y and 8 in Z connections 20 connection in total - 500Gbps Y, 1 to 6 Z, 1 to 8 FPGA Cube (3,4,3) (3,4,1) (1,1,1) (3,1,1) X, 1 to 6
15 Data Flow Input FPGA have at most one LFAA input (2 stations full bandwidth) ZXY connections to uniformly distribute data for processing Allows uniform distribution of compute and output in Zoom mode Beamformers must bring all frequency data together use same XYZ LFAA inputs Ingest Doppler Correction Station Processing Z Buffer In Filterbank Delay RFI XY Buffers Correlator Output Buffer PSS Beamformer PST Beamformer Array Processing XY Z XYZ PST Buffer Z Corr Emit PSS Emit PST Emit SDP Outputs PSS Outputs PST Outputs VLBI Reformat VLBI Outputs
16 0.9 to 0.25 sec integration With 0.9s integration output uses 72 (50% full) One in 4 FPGAs have output. Aggregate using Z connect All 8 interconnected FPGA send data to two output FPGA half to each At 0.25s (changed requirement) is 144 at 100%. Use 180 at 80% Simply change to 5 out of 8 FPGAs have outputs. Each FPGA sends 1/5 of its data to an output FPGA. Design can accommodate 22Tbps of ouput data to SDP without modifications. Small change to hardware (duplicate the 8 Z connection on each FPA) and can do 44Tbps
17 Substations Unified design ease usage of fast memory Without substations 4 LFAA channels are processed in parallel Need for uniform distribution of load from 4 zoom bands. With 2048 substations process 1LFAA station at a time - 4X stations Same data rate to correlator, Same size for input buffer to correlator for 2048 substations Correlator process 2048 stations in 16 passes Buffer for correlation products increases form 55MB to 0.88GB Progressive readout during processing could reduce this but more complex
18 Conclusion CSIRO/ASTRON/AUT have design a flexible FPGA based system for the LOW Correlator It has sufficient spare resources, I/O and memory to accommodate recent requirement changes and still have spare capacity 20 of 48 internal optical connection per FPGA are currently used. Further expanasion possible not I/O limited Zoom mode changes required major redesign of data ordering but no chance to the hardware Changes to integration time and addition of substation were changes only to some subsystems
19 Revised Low Correlator and Beamformers All processing modules identical. Cross connects deliver part band to each correlator and beamformer. Interconnects in reverse aggregate the data e.g. 2 complete PSS beams per Filtebank/Correlator Now 4 LFAA station per GEMINI Previous was 12 separate filterbank From LFAA From LFAA From LFAA From LFAA From LFAA From LFAA Filterbanks 1/8 BW per link Cross connects 1st group of Gemini 8th group of 16 Correlator To SDP, PSS, PST 16 groups of 8 also an option PSS and PST Beamformers Gemini 6 Gemini per group All internal links bi-directional Gemini
20 Gemini version II On board to rule them all (functions that is) One HMC retained for High Bandwidth External memory Two DDR4 to be added for High Memory depth system Up to 4 12-fibre 25G optics + QSPF,SFP Change to card rack system, Each card a single Gemini II with all I/O Water cooling, up to 200W per card One FPGA per LRU - Reduced (1/4) I/O per line replaceable unit (LRU Pluggable Optics, Power and Water at rear easy replacement All data connections optical
21 SKA1 Overview SKA1-low stations include Station Beamformer Central Signal Processing includes Correlator and Pulsar systems
22
23 Thank you CASS John Bunton SKA1 CSP System Engineer t e john.bunton@csiro.au w PO BOX 76 EPPING, 1710, AUSTRALIA
24
25 Central Signal Processing For Mid and Low Central Signal Processing (CSP) consists of Correlator between all pairs of elements (dish or station) Tied Array Beamforming coherent sum of signals from all elements Tied Array beams are processed by Pulsar Search engine (limited bandwith) Pulsar Timing engine and are used for VLBI LMC - Monitor of performance and control of all functions (NRC Canada, )
26 SKA1 MID antennas (South Africa)
27 Mid Dishes m offset Gregorian Dishes + 64 MeerKAT dishes Total of 197 dishes (Distributed between 1-16 subarrays) maximum baseline, less than 150 km Receivers for 5 bands 0.35 to GHz full bandwidth 0.70 GHz at 8 bit resolution 0.95 to 1.76 GHz full bandwidth 0.81 GHz at 8 bit resolution 1.65 to 3.05 GHz not installed during construction 2.80 to 5.18 GHz not installed during construction 4.6 to 13.8 GHz 2 x 2.5GHz! at 4 bits resolution 16 subarrays
28 CSP Organisation at PDR 2014 (Correlator) In December 2014 the Preliminary Design Review (PDR) held At that time three telescopes Low, Mid and Survey. Physical Implementation Proposal (PIP) submitted for each Low lead by Oxford University with three designs in a single PIP Uniboard (ASTRON), PowerMX (NRC Canada), Redback (CSIRO) Survey lead by AUT (NZ) considered many options in a single PIP Redback (CSIRO), PowerMX (NRC Canada), Multicore processor, GPUs and ASIC MID lead by NRC Canada had thee separate PIPs PowerMX (Canada), Redback (CSIRO Australia) & SKARAB (S.A.) Project management MDA Canada, Local Monitor Control NRC
29 Pulsars The Pulsar teams are Pulsar Timing lead by Swinburne University CPU/GPU based Pulsar Search lead by Manchester University CPU/GPU based with FPGA acceleration/power saving Pulsar search on limited bandwidth (120 MHz Low, 300 MHz Mid) They process array beams (coherent, polarisation corrected sums of data from ~400 stations) generated by CBF
30 A shake up for CSP Correlator/Beamformer One outcome of the review was the SKA Office wanted just one design to proceed for each Telescope THEN as total cost too high Rebaselining occurred. Decisions Stop the Survey Telescope Delay work PAFs (led by CSIRO) (Critical to Survey) The politicians stepped and decided which designs would proceed NRC Canada continue to lead Mid (PowerMX) CSIRO to lead Low with ASTRON, (Redback/Uniboard)+AUT This resulted in the South African and UK teams to leaving (taking most of the Systems Engineering with them)
31 Pulsar Timing Beamforming Mid and Low form 16 tied array beams Delay aligned, coherent summation of dual polarisation data Must apply polarisation correction for each value summed ~ 3M Jones Matrices for low Time resolution of data 200ns Mid, 2us Low Basically no significant time ripples allowed, narrow impulse response For Mid approach taken was fractional time delay filter on wideband signal to do delay correction and achieve narrow impulse response For Low summation done on narrow band channels, phase only which is cheaper than fractional time delay followed by synthesis. New approach to avoid synthesis filterbank being investigated.
32 Pulsar Timing Pulsar signal is smeared due to dispersion (delay α wavelength 2 ) Must remove dispersion. Pulsar time implement overlap-save convolution on the beamformed time series and the correction filter. Time series ~1 minute, bandwidth 10 MHz, multi-million point FFTs in GPUs. Very stringent timing requirements on data supplied less than 10ns error over a 10 year period.
33 Pulsar Search (PSS) Mid to form 1500 power beams at a bandwidth of 300MHz Low to form 500 power beams at a bandwidth of 120MHz dishes/stations in compact area used, PSS beams to fill dish/station beam Coherent summation of dish/station data, phase on narrow channels ~20kHz Polarisation correction to dish/station data (beam centre) and for Low after beamforming. (~800,000 Jones Matrices for MID) Search each beam for Pulsars in PSS engine (GPU/CPU 16 racks, Low) 500 dispersion measures in each dispersion measure acceleration search to 300ms -1
34 Other Functions Both Mid and Low require a transient buffer. in Low allocated to LFFA, 256GB per Station, 150MHz of data, 2-bit precision in Mid allocated to CSP 32GB per dish, 300MHz of data, 2-bit precision Mid produces four VLBI beams. VLBI possible Europe, America, Australia, Asia. not sufficient Low frequency telescope for VLBI with Low.
35 Hardware Pulsar Search (PSS) and Pulsar Timing (PST) use common hardware for Mid and Low. CPU/GPU based (FPGA acceleration for PSS). PST two racks at each site PSS 16 rack at Low, dissipating ~160 kw, Mid 59 ~470 kw wider bandwidth, more beams but lower total delay to search Each compute node process 2 beams (TBC) Correlator and Beamformers are FPGA based Mid based on PowerMX Low based on Perentie (development from Redback+Uniboard)
36 Perentie (CSIRO/ASTRON) for Low July 2015 Final confirmation the CSIRO would lead CSP for Low Condition of leadership was to collaborate with ASTON on design. At that time ASTRON were completing their Uniboard II CSIRO platform was Redback-3. Both multi-fpga boards. For SKA CSIRO had proposed, Redback-5 a board with a single FPGA After a lengthy downselect process it was decided in November to proceed with GEMINI board Four of these to be mounted in a 1U chassis
NRC Herzberg Astronomy & Astrophysics
NRC Herzberg Astronomy & Astrophysics SKA Pre-Construction Update Séverin Gaudet, Canadian Astronomy Data Centre David Loop, Director Astronomy Technology June 2016 update SKA Pre-Construction NRC Involvement
More informationThe Australian SKA Pathfinder Project. ASKAP Digital Signal Processing Systems System Description & Overview of Industry Opportunities
The Australian SKA Pathfinder Project ASKAP Digital Signal Processing Systems System Description & Overview of Industry Opportunities This paper describes the delivery of the digital signal processing
More informationStatus of Design Planning for Construction
Status of Design Planning for Construction Alistair McPherson 18 May 2016 International Design Teams Project Management and System Engineering based at Jodrell Bank, Manchester, UK ~500 scientists & engineers
More informationNovember SKA Low Frequency Aperture Array. Andrew Faulkner
SKA Phase 1 Implementation Southern Africa Australia SKA 1 -mid 250 15m dia. Dishes 0.4-3GHz SKA 1 -low 256,000 antennas Aperture Array Stations 50 350/650MHz SKA 1 -survey 90 15m dia. Dishes 0.7-1.7GHz
More informationASKAP Phased Array Feed Digital Beamformer Design Overview and Performance Characteristics
ASKAP Phased Array Feed Digital Beamformer Design Overview and Performance Characteristics John Tuthill, Tim Bateman, Grant Hampson, John Bunton, Andrew Brown, Daniel George, Mia Baquiran August 2016 CASS
More informationSmart Antennas in Radio Astronomy
Smart Antennas in Radio Astronomy Wim van Cappellen cappellen@astron.nl Netherlands Institute for Radio Astronomy Our mission is to make radio-astronomical discoveries happen ASTRON is an institute for
More informationMarch Phased Array Technology. Andrew Faulkner
Aperture Arrays Michael Kramer Sparse Type of AA selection 1000 Sparse AA-low Sky Brightness Temperature (K) 100 10 T sky A eff Fully sampled AA-mid Becoming sparse Aeff / T sys (m 2 / K) Dense A eff /T
More informationPhased Array Feeds for the SKA. WP2.2.3 PAFSKA Consortium CSIRO ASTRON DRAO NRAO BYU OdP Nancay Cornell U Manchester
Phased Array Feeds for the SKA WP2.2.3 PAFSKA Consortium CSIRO ASTRON DRAO NRAO BYU OdP Nancay Cornell U Manchester Dish Array Hierarchy Dish Array L5 Elements PAF Dish Single Pixel Feeds L4 Sub systems
More informationMISCELLANEOUS CORRECTIONS TO THE BASELINE DESIGN
MISCELLANEOUS CORRECTIONS TO THE BASELINE DESIGN Document number... SKA-TEL.SKO-DD-003 Revision... 1 Author...R.McCool, T. Cornwell Date... 2013-10-27 Status... Released Name Designation Affiliation Date
More informationSKA technology: RF systems & signal processing. Mike Jones University of Oxford
SKA technology: RF systems & signal processing Mike Jones University of Oxford SKA RF processing Dish receivers Cryogenics RF electronics Fast sampling Antenna processing AA receivers RF gain chain Sampling/antenna
More informationAn FPGA-Based Back End for Real Time, Multi-Beam Transient Searches Over a Wide Dispersion Measure Range
An FPGA-Based Back End for Real Time, Multi-Beam Transient Searches Over a Wide Dispersion Measure Range Larry D'Addario 1, Nathan Clarke 2, Robert Navarro 1, and Joseph Trinh 1 1 Jet Propulsion Laboratory,
More informationMemo 65 SKA Signal processing costs
Memo 65 SKA Signal processing costs John Bunton, CSIRO ICT Centre 12/08/05 www.skatelescope.org/pages/page_memos.htm Introduction The delay in the building of the SKA has a significant impact on the signal
More informationA report on KAT7 and MeerKAT status and plans
A report on KAT7 and MeerKAT status and plans SKA SA, Cape Town Office 3rd Floor, The Park, Park Road, Pinelands, Cape Town, South Africa E mail: tony@hartrao.ac.za This is a short memo on the current
More informationCorrelator Development at Haystack. Roger Cappallo Haystack-NRAO Technical Mtg
Correlator Development at Haystack Roger Cappallo Haystack-NRAO Technical Mtg. 2006.10.26 History of Correlator Development at Haystack ~1973 Mk I 360 Kb/s x 2 stns. 1981 Mk III 112 Mb/s x 4 stns. 1986
More informationFocal Plane Array Beamformer for the Expanded GMRT: Initial
Focal Plane Array Beamformer for the Expanded GMRT: Initial Implementation on ROACH Kaushal D. Buch Digital Backend Group, Giant Metrewave Radio Telescope, NCRA-TIFR, Pune, India kdbuch@gmrt.ncra.tifr.res.in
More informationTowards SKA Multi-beam concepts and technology
Towards SKA Multi-beam concepts and technology SKA meeting Meudon Observatory, 16 June 2009 Philippe Picard Station de Radioastronomie de Nançay philippe.picard@obs-nancay.fr 1 Square Kilometre Array:
More informationPhased Array Feeds & Primary Beams
Phased Array Feeds & Primary Beams Aidan Hotan ASKAP Deputy Project Scientist 3 rd October 2014 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Review of parabolic (dish) antennas. Focal plane response to a
More informationPhased Array Feeds A new technology for multi-beam radio astronomy
Phased Array Feeds A new technology for multi-beam radio astronomy Aidan Hotan ASKAP Deputy Project Scientist 2 nd October 2015 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Review of radio astronomy concepts.
More informationSKA-LOW: Status Update. André van Es SKA-LOW Project Manager
SKA-LOW: Status Update André van Es SKA-LOW Project Manager SKA global community Australia (DoI&S) Canada (NRC-HIA) China (MOST) India (NCRA/DAE) Italy (INAF) Netherlands (NWO) New Zealand (MED) South
More informationSKA-low and the Aperture Array Verification System
SKA-low and the Aperture Array Verification System Randall Wayth AADCC Project Scientist On behalf of the Aperture Array Design & Construction Consortium (AADCC) AADCC partners ASTRON (Netherlands) ICRAR/Curtin
More informationMulti-octave radio frequency systems: Developments of antenna technology in radio astronomy and imaging systems
Multi-octave radio frequency systems: Developments of antenna technology in radio astronomy and imaging systems Professor Tony Brown School of Electrical and Electronic Engineering University of Manchester
More informationIntegrated receivers for mid-band SKA. Suzy Jackson Engineer, Australia Telescope National Facility
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility ASKAP/SKA Special Technical Brief 23 rd October, 2009 Talk overview Mid band SKA receiver challenges ASKAP
More informationOverview of the SKA. P. Dewdney International SKA Project Engineer Nov 9, 2009
Overview of the SKA P. Dewdney International SKA Project Engineer Nov 9, 2009 Outline* 1. SKA Science Drivers. 2. The SKA System. 3. SKA technologies. 4. Trade-off space. 5. Scaling. 6. Data Rates & Data
More informationTechnologies for Radio Astronomy
Technologies for Radio Astronomy CSIRO Astronomy and Space Science Alex Dunning in lieu of Tasso Tzioumis Facilities Program Director Technologies June 2017 Directions for ATNF Engineering (Update since
More informationMay AA Communications. Portugal
SKA Top-level description A large radio telescope for transformational science Up to 1 million m 2 collecting area Operating from 70 MHz to 10 GHz (4m-3cm) Two or more detector technologies Connected to
More informationPhased Array Feeds A new technology for wide-field radio astronomy
Phased Array Feeds A new technology for wide-field radio astronomy Aidan Hotan ASKAP Project Scientist 29 th September 2017 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Review of radio astronomy concepts
More information2-PAD: An Introduction. The 2-PAD Team
2-PAD: An Introduction The 2-PAD Team Workshop, Jodrell Bank, 10 Presented th November 2009 by 2-PAD: Dr An Georgina Introduction Harris Georgina Harris for the 2-PAD Team 1 2-PAD Objectives Demonstrate
More informationEvolution of the Capabilities of the ALMA Array
Evolution of the Capabilities of the ALMA Array This note provides an outline of how we plan to build up the scientific capabilities of the array from the start of Early Science through to Full Operations.
More informationMWA Antenna Description as Supplied by Reeve
MWA Antenna Description as Supplied by Reeve Basic characteristics: Antennas are shipped broken down and require a few minutes to assemble in the field Each antenna is a dual assembly shaped like a bat
More informationRadio Interferometers Around the World. Amy J. Mioduszewski (NRAO)
Radio Interferometers Around the World Amy J. Mioduszewski (NRAO) A somewhat biased view of current interferometers Limited to telescopes that exist or are in the process of being built (i.e., I am not
More informationThe CASPER Hardware Platform. Richard Armstrong
The CASPER Hardware Platform Richard Armstrong Outline Radio Telescopes and processing Backends: How they have always been done How they should be done CASPER System: a pretty good stab at how things should
More informationSKA Phase 1: Costs of Computation. Duncan Hall CALIM 2010
SKA Phase 1: Costs of Computation Duncan Hall CALIM 2010 2010 August 24, 27 Outline Motivation Phase 1 in a nutshell Benchmark from 2001 [EVLA Memo 24] Some questions Amdahl s law overrides Moore s law!
More informationSoftware Spectrometer for an ASTE Multi-beam Receiver. Jongsoo Kim Korea Astronomy and Space Science Institute
Software Spectrometer for an ASTE Multi-beam Receiver Jongsoo Kim Korea Astronomy and Space Science Institute Design Consideration software spectrometer for a near future ASTE multi-beam receiver spectrometer
More informationIntegrated receivers for mid-band SKA. Suzy Jackson Engineer, Australia Telescope National Facility
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting Chateau de Limelette 4-6 November, 2009 Talk overview Mid band SKA receiver challenges
More informationCasper Instrumentation at Green Bank
Casper Instrumentation at Green Bank John Ford September 28, 2009 The NRAO is operated for the National Science Foundation (NSF) by Associated Universities, Inc. (AUI), under a cooperative agreement. GBT
More informationATA memo 73. The ATA Correlator. W.L. Urry, M. Wright, M. Dexter, D. MacMahon. 16 Feb Abstract
ATA memo 73 The ATA Correlator W.L. Urry, M. Wright, M. Dexter, D. MacMahon 16 Feb. 2007 Abstract This memo describes the current status of the ATA correlator. The correlator is designed for 352 antennas,
More informationTechnologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE
Technologies for Radio Astronomy Mark Bowen Acting Theme Leader Technologies for Radio Astronomy October 2012 CSIRO ASTRONOMY AND SPACE SCIENCE Outline Current Projects CABB ATCA C/X Upgrade FAST Parkes
More informationLBA Operations. Cormac Reynolds, Chris Phillips, Phil Edwards + LBA Team 19 November 2015 CSIRO ASTRONOMY & SPACE SCIENCE
LBA Operations Cormac Reynolds, Chris Phillips, Phil Edwards + LBA Team 19 November 2015 CSIRO ASTRONOMY & SPACE SCIENCE Hartebeesthoek 8000 km Real-time e-vlbi LBA 6 ant 1700km 40 ujy/beam (Ceduna) +Auscope
More informationA Scalable Computer Architecture for
A Scalable Computer Architecture for On-line Pulsar Search on the SKA - Draft Version - G. Knittel, A. Horneffer MPI for Radio Astronomy Bonn with help from: M. Kramer, B. Klein, R. Eatough GPU-Based Pulsar
More informationSignal Processing on GPUs for Radio Telescopes
Signal Processing on GPUs for Radio Telescopes John W. Romein Netherlands Institute for Radio Astronomy (ASTRON) Dwingeloo, the Netherlands 1 Overview radio telescopes motivation processing pipelines signal-processing
More informationGreen Bank Instrumentation circa 2030
Green Bank Instrumentation circa 2030 Dan Werthimer and 800 CASPER Collaborators http://casper.berkeley.edu Upcoming Nobel Prizes with Radio Instrumentation Gravitational Wave Detection (pulsar timing)
More informationImage-Domain Gridding on Accelerators
Netherlands Institute for Radio Astronomy Image-Domain Gridding on Accelerators Bram Veenboer Monday 26th March, 2018, GPU Technology Conference 2018, San Jose, USA ASTRON is part of the Netherlands Organisation
More informationSKA-low DSP and computing overview : W. Turner SPDO. 8 th September 2011
SKA-low DSP and computing overview : W. Turner SPDO 8 th September 2011 Agenda An overview of the DSP and Computing within the Signal Processing Domain (mainly SKA1) Channelisation Correlation Central
More informationDense Aperture Array for SKA
Dense Aperture Array for SKA Steve Torchinsky EMBRACE Why a Square Kilometre? Detection of HI in emission at cosmological distances R. Ekers, SKA Memo #4, 2001 P. Wilkinson, 1991 J. Heidmann, 1966! SKA
More informationSKA station cost comparison
SKA station cost comparison John D. Bunton, CSIRO Telecommunications and Industrial Physics 4 August 2003 Introduction Current SKA white papers and updates present cost in a variety of ways which makes
More informationVLBI Developments in Australia Cormac Reynolds, Chris Phillips + LBA & Parkes Teams 14 November 2018 CSIRO ASTRONOMY & SPACE SCIENCE
VLBI Developments in Australia Cormac Reynolds, Chris Phillips + LBA & Parkes Teams 14 November 2018 CSIRO ASTRONOMY & SPACE SCIENCE LBA LBA VLBI array operated by CSIRO UTAS, AUT and SARAO (Hart) Parkes
More informationThe SKA New Instrumentation: Aperture Arrays
The SKA New Instrumentation: Aperture Arrays A. van Ardenne, A.J. Faulkner, and J.G. bij de Vaate Abstract The radio frequency window of the Square Kilometre Array is planned to cover the wavelength regime
More informationASKAP Industry technical briefing. Tim Cornwell, ASKAP Computing Project Lead Australian Square Kilometre Array Pathfinder
! ASKAP Industry technical briefing Tim Cornwell, ASKAP Computing Project Lead Australian Square Kilometre Array Pathfinder The Square Kilometre Array 2020 era radio telescope Very large collecting area
More informationSpecifications for the GBT spectrometer
GBT memo No. 292 Specifications for the GBT spectrometer Authors: D. Anish Roshi 1, Green Bank Scientific Staff, J. Richard Fisher 2, John Ford 1 Affiliation: 1 NRAO, Green Bank, WV 24944. 2 NRAO, Charlottesville,
More informationSOFTWARE CORRELATOR CONCEPT DESCRIPTION
SOFTWARE CORRELATOR CONCEPT DESCRIPTION Document number... WP2 040.040.010 TD 002 Revision... 1 Author... Dominic Ford Date... 2011 03 29 Status... Approved for release Name Designation Affiliation Date
More informationTechnology Drivers, SKA Pathfinders P. Dewdney
Technology Drivers, SKA Pathfinders P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada National Research Council Canada Conseil national
More informationJoeri van Leeuwen The dynamic radio sky: Pulsars
Joeri van Leeuwen The dynamic radio sky: Pulsars Joeri van Leeuwen The dynamic radio sky: Pulsars Coenen, van Leeuwen et al. 2015 Joeri van Leeuwen The dynamic radio sky: Pulsars Joeri van Leeuwen The
More informationA Multi-Fielding SKA Covering the Range 100 MHz 22 GHz. Peter Hall and Aaron Chippendale, CSIRO ATNF 24 November 2003
A Multi-Fielding SKA Covering the Range 100 MHz 22 GHz Peter Hall and Aaron Chippendale, CSIRO ATNF 24 November 2003 1. Background Various analyses, including the recent IEMT report [1], have noted that
More informationPhased Array Feeds for Parkes. Robert Braun Science with 50 Years Young
Phased Array Feeds for Parkes Robert Braun Science with Parkes @ 50 Years Young Outline PAFs in the SKA context PAFSKA activities Apertif, BYU, NRAO, NAIC, DRAO, ASKAP ASKAP PAF MkI ASKAP PAF MkII Parkes:
More informationPhased Array Feed Design. Stuart Hay 23 October 2009
Phased Array Feed Design Stuart Hay 23 October 29 Outline Why phased array feeds (PAFs) for radioastronomy? General features and issues of PAF approach Connected-array PAF approach in ASKAP Why PAFs? High
More informationSKA DISH ELEMENT TECHNICAL SOLUTION
SKA DISH ELEMENT TECHNICAL SOLUTION Document number... SKA TEL.DSH.MGT CSIRO TS 004 Revision... 1 Author....SKADC Consortium Date... 06 June 2013 Status... Released Name Designation Affiliation Date Signature
More informationPreliminary Design for the Digital Processing Subsystem of a Long Wavelength Array Station I. Introduction and Summary II.
LWA Memo No. 154 Preliminary Design for the Digital Processing of a Long Wavelength Array Station L. D'Addario and R. Navarro Jet Propulsion Laboratory, California Institute of Technology 1 11 February
More informationIndian participation in the SKA
Indian participation in the SKA A summary of activity during 2009-2014 Yogesh Wadadekar March 2014 ASI Annual Meeting Outline The past: upto 2012 The present - 2013 2016 The future - 2017 SKA timeline
More informationHigh Speed E-Band Backhaul: Applications and Challenges
High Speed E-Band Backhaul: Applications and Challenges Xiaojing Huang Principal Research Scientist and Communications Team Leader CSIRO, Australia ICC2014 Sydney Australia Page 2 Backhaul Challenge High
More informationASIC BASED PROCESSING FOR MINIMUM POWER CONSUMPTION CONCEPT DESCRIPTION FOR PHASE 1
ASIC BASED PROCESSING FOR MINIMUM POWER CONSUMPTION CONCEPT DESCRIPTION FOR PHASE 1 Document number... WP2 040.090.010 TD 001 Revision... 1 Author... L D Addario Date... 2011 03 29 Status... Approved for
More informationData processing with the RTS A GPU-accelerated calibration & imaging stream processor
Data processing with the RTS A GPU-accelerated calibration & imaging stream processor Daniel Mitchell 2018 ICRAR/CASS Radio School CSIRO ASTRONOMY AND SPACE SCIENCE The RTS (Real-Time System) A GPU-accelerated
More informationMemo 136. SKA PAF Beamformer. J.D. Bunton (CSIRO) August
Memo 136 SKA PAF J.D. Bunton (CSIRO) August 2011 www.skatelescope.org/publications SKA PAF 23 August 2011 Project: ASKAP Prepared by: CSIRO Approved by: Iain Collings John Bunton CSIRO, ICT Centre Enquiries
More informationLOFAR: Special Issues
Netherlands Institute for Radio Astronomy LOFAR: Special Issues John McKean (ASTRON) ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) 1 Preamble http://www.astron.nl/~mckean/eris-2011-2.pdf
More informationThe AAMID consortium: Mid Frequency Aperture Array
The consortium: Mid Frequency Aperture Array Wim van Cappellen, Consortium Lead Livingstone curves Brought to our attention by Ron Ekers Technological capability leads to discovery in astronomy A single
More informationPractical Aspects of Focal Plane Array Testing
Practical Aspects of Focal Plane Array Testing Lessons from an FPA Test-bed at CSIRO, Marsfield Douglas B. Hayman1-3, Trevor S. Bird2,3, Karu P. Esselle3 and Peter J. Hall4 1 2 3 CSIRO Astronomy and Space
More informationNew Zealand evlbi. Tim Natusch,Sergei Gulyaev, Stuart Weston, Hiroshi Takiguchi
New Zealand evlbi Tim Natusch,Sergei Gulyaev, Stuart Weston, Hiroshi Takiguchi Institute for Radio Astronomy and Space Research, AUT University Auckland New Zealand November 2011 Johannesburg 1/80 Radio
More informationActive Impedance Matched Dual-Polarization Phased Array Feed for the GBT
Active Impedance Matched Dual-Polarization Phased Array Feed for the GBT Karl F. Warnick, David Carter, Taylor Webb, Brian D. Jeffs Department of Electrical and Computer Engineering Brigham Young University,
More informationData Digitization & Transmission Session Moderator: Chris Langley
Data Digitization & Transmission Session Moderator: Chris Langley Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array
More informationTHE KAROO ARRAY TELESCOPE (KAT) & FPA EFFORT IN SOUTH AFRICA
THE KAROO ARRAY TELESCOPE (KAT) & FPA EFFORT IN SOUTH AFRICA Dr. Dirk Baker (KAT FPA Sub-system Manager) Prof. Justin Jonas (SKA SA Project Scientist) Ms. Anita Loots (KAT Project Manager) Mr. David de
More informationExascale computer system design : the square kilometre array Jongerius, R.
Exascale computer system design : the square kilometre array Jongerius, R. Published: 20/09/2016 Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume
More informationDetection of Radio Pulses from Air Showers with LOPES
Detection of Radio Pulses from Air Showers with LOPES Andreas Horneffer for the LOPES Collaboration Radboud University Nijmegen Radio Emission from Air Showers air showers are known since 1965 to emit
More informationSome Notes on Beamforming.
The Medicina IRA-SKA Engineering Group Some Notes on Beamforming. S. Montebugnoli, G. Bianchi, A. Cattani, F. Ghelfi, A. Maccaferri, F. Perini. IRA N. 353/04 1) Introduction: consideration on beamforming
More informationFocal Plane Array Related Activities at CSIRO
ICT Centre /antennas Focal Plane Array Related Activities at CSIRO Trevor S. Bird (1), Douglas Hayman (1), Suzy Jackson (2) & Dick Ferris (2) (1) CSIRO ICT Centre (2) CSIRO Australia Telescope National
More informationCross Correlators. Jayce Dowell/Greg Taylor. University of New Mexico Spring Astronomy 423 at UNM Radio Astronomy
Cross Correlators Jayce Dowell/Greg Taylor University of New Mexico Spring 2017 Astronomy 423 at UNM Radio Astronomy Outline 2 Re-cap of interferometry What is a correlator? The correlation function Simple
More informationDetector Systems. Graeme Carrad
Detector Systems Graeme Carrad November 2011 The Basic Structure of a typical Radio Telescope Antenna Receiver Conversion Digitiser Signal Processing / Correlator They are much the same CSIRO. Radiotelescope
More informationTHE purpose of beamforming is to precisely align the
1 Beamforming Techniques for Large-N Aperture Arrays K. Zarb-Adami, A. Faulkner, J.G. Bij de Vaate, G.W. Kant and P.Picard arxiv:1008.4047v1 [astro-ph.im] 24 Aug 2010 Abstract Beamforming is central to
More informationGPU based imager for radio astronomy
GPU based imager for radio astronomy GTC2014, San Jose, March 27th 2014 S. Bhatnagar, P. K. Gupta, M. Clark, National Radio Astronomy Observatory, NM, USA NVIDIA-India, Pune NVIDIA-US, CA Introduction
More informationArray noise temperature measurements at the Parkes PAF Test-bed Facility
Array noise temperature measurements at the Parkes PAF Test-bed Facility Douglas B. Hayman, Aaron P. Chippendale, Robert D. Shaw and Stuart G. Hay MIDPREP 1 April 2014 COMPUTATIONAL INFORMATICS ASTRONOMY
More informationLOFAR: Lessons Learnt
LOFAR: Lessons Learnt Michiel van Haarlem van Weeren, Bonafede, Ferrari, Orrù, Pizzo, Shulevski, van der Tol, Macario Jason Hessels & Pulsar Team LOFAR 40 stations in NL and 8 stations throughout Europe
More informationCosmic Rays with LOFAR
Cosmic Rays with LOFAR Andreas Horneffer for the LOFAR-CR Team Cosmic Rays High energy particles Dominated by hadrons (atomic nuclei) Similar in composition to solar system Broad range in flux and energy
More informationHolography Transmitter Design Bill Shillue 2000-Oct-03
Holography Transmitter Design Bill Shillue 2000-Oct-03 Planned Photonic Reference Distribution for Test Interferometer The transmitter for the holography receiver is made up mostly of parts that are already
More informationAll-Digital Wideband Space-Frequency Beamforming for the SKA Aperture Array
All-Digital Wideband Space-Frequency Beamforming for the SKA Aperture Array Vasily A. Khlebnikov, 44-0865-273302, w.khlebnikov@ieee.org, Kristian Zarb-Adami, 44-0865-273302, kza@astro.ox.ac.uk, Richard
More informationREQUIREMENTS DOCUMENT FOR SKA SIGNAL PROCESSING
REQUIREMENTS DOCUMENT FOR SKA SIGNAL PROCESSING Document number... WP2 040.030.011 TD 001 Revision... 1 Author... W.Turner Date... 2011 03 30 Status... Approved for release Name Designation Affiliation
More informationASTRON/LOFAR Reproduction in whole or in part is prohibited without written consent of the 1au
The Data Explosion in Radio-Astronomy Virtual Instruments and E-LOFAR Marco de Vos ASTRON Director of R&D (devos@astron.nl) Drenthe-light Early history and near future Start of radio-astronomy: Grote Reber,
More informationTROPOSPHERIC CHARACTERISATION OF SKA SITES
TROPOSPHERIC CHARACTERISATION OF SKA SITES Document number... WP3 040.020.000 R 001 Revision... 2 Author... R.P. Millenaar Date... 2011 02 09 Status... Approved for release Name Designation Affiliation
More informationCross-correlators for Radio Astronomy
ATP-NSI Cross-correlators for Radio Astronomy Brent Carlson, NRAO Synthesis Imaging Summer School 29 May 2012 Brent Carlson, 2012 NRAO Synthesis Imaging Summer School Outline What is the purpose p of the
More informationEffelsberg Status. James M Anderson On behalf of MPIfR and the LOFAR collaboration
Effelsberg Status anderson@mpifr-bonn.mpg.de On behalf of MPIfR and the LOFAR collaboration 1/16 Overview of EF Anderson/MPIfR 2/16 Recent/Current Issues 3/16 HBA Field Repair 2012 Apr 03 A Horneffer 3
More informationBeamforming for IPS and Pulsar Observations
Beamforming for IPS and Pulsar Observations Divya Oberoi MIT Haystack Observatory Sunrise at Mileura P. Walsh Function, Inputs and Outputs Function - combine the voltage signal from each of the 512 tiles
More informationProcessing Real-Time LOFAR Telescope Data on a Blue Gene/P
Processing Real-Time LOFAR Telescope Data on a Blue Gene/P John W. Romein Stichting ASTRON (Netherlands Institute for Radio Astronomy) Dwingeloo, the Netherlands 1 LOw Frequency ARray radio telescope 10
More informationarxiv: v1 [astro-ph.im] 7 Dec 2010
arxiv:1012.1583v1 [astro-ph.im] 7 Dec 2010 University of Amsterdam (UvA), Amsterdam, The Netherlands E-mail: a.alexov@uva.nl Jason W. T. Hessels Netherlands Institute for Radio Astronomy (ASTRON), Dwingeloo,
More informationFocal Plane Arrays & SKA
Focal Plane Arrays & SKA Peter Hall SKA International Project Engineer www.skatelescope.org Dwingeloo, June 20 2005 Outline Today: SKA and antennas Phased arrays and SKA Hybrid SKA possibilities» A hybrid
More informationSKA1 low Baseline Design: Lowest Frequency Aspects & EoR Science
SKA1 low Baseline Design: Lowest Frequency Aspects & EoR Science 1 st science Assessment WS, Jodrell Bank P. Dewdney Mar 27, 2013 Intent of the Baseline Design Basic architecture: 3-telescope, 2-system
More informationName Designation Affiliation Signature. Authored by: Peter Dewdney SKAO. Date: Owned by: Peter Dewdney SKAO. Date: Approved by: Peter Dewdney SKAO
RFI CHARACTERISATION AND SKA1 SIGNAL CHAIN DESIGN CONSIDERATIONS Document Number... Document Type... DRE Revision... Author...P.E. Dewdney, G. H. Tan, M. Waterson Date... Document Classification... Status...
More information5GCHAMPION. mmw Hotspot Trial, Results and Lesson Learned. Dr. Giuseppe Destino, University of Oulu - CWC Dr. Gosan Noh, ETRI
5GCHAMPION mmw Hotspot Trial, Results and Lesson Learned Dr. Giuseppe Destino, University of Oulu - CWC Dr. Gosan Noh, ETRI EU-KR Symposium on 5G From the 5G challenge to 5GCHAMPION Trials at Winter Olympic
More informationRadio Astronomy Transformed
Radio Astronomy Transformed - Aperture Arrays: Past, Present & Future Prof. Michael Garrett ASTRON, the Netherlands Institute for Radio Astronomy Leiden University. Mike Garrett / NAC 1 Early Antenna Arrays
More informationRecent progress in EVLA-specific algorithms. EVLA Advisory Committee Meeting, March 19-20, S. Bhatnagar and U. Rau
Recent progress in EVLA-specific algorithms EVLA Advisory Committee Meeting, March 19-20, 2009 S. Bhatnagar and U. Rau Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic
More informationDiFX Correlator at Bonn
DiFX Correlator at Bonn 1 Alessandra Bertarini, IGG University of Bonn & MPIfR Bonn Walter Alef, MPIfR Bonn Arno Müskens, IGG University of Bonn Helge Rottmann, MPIfR Bonn Jan Wagner, MPIfR Bonn DiFX DiFX
More informationPoS(MeerKAT2016)001. The MeerKAT Radio Telescope. Justin L. Jonas ab and the MeerKAT Team b a Rhodes University b SKA South Africa
The MeerKAT Radio Telescope ab and the MeerKAT Team b a Rhodes University b SKA South Africa E-mail: J.Jonas@ru.ac.za This paper is a high-level description of the development, implementation and initial
More informationLOFAR: From raw visibilities to calibrated data
Netherlands Institute for Radio Astronomy LOFAR: From raw visibilities to calibrated data John McKean (ASTRON) [subbing in for Manu] ASTRON is part of the Netherlands Organisation for Scientific Research
More informationWhite Rabbit in Radio Astronomy
White Rabbit in Radio Astronomy Paul Boven boven@jive.eu ICALEPCS 2017, Barcelona, 2017-10-10 White Rabbit in a Nutshell WR: 1ns accuracy for distances up to 10 km Standardized on 1000base-BX10 SFPs (10km
More information